HARRIS COUNTY WATERSHEDS WITHIN LOOP 610 SOURCE: HARRIS COUNTY FLOOD CONTROL DISTRICT

HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

  • Upload
    phiala

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

HARRIS COUNTY WATERSHEDS WITHIN LOOP 610. SOURCE: HARRIS COUNTY FLOOD CONTROL DISTRICT. White Oak Bayou Watershed Population = 416,067 Drainage Area = 111 sq. miles Open Stream Miles = 151 - PowerPoint PPT Presentation

Citation preview

Page 1: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

SOURCE: HARRIS COUNTY FLOOD CONTROL DISTRICT

Page 2: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

White Oak Bayou Watershed• Population = 416,067• Drainage Area = 111 sq. miles• Open Stream Miles = 151• Primary Streams = White Oak Bayou, Little White Oak Bayou, Brickhouse Gully, Cole Creek, Vogel Creek

SOURCE: HARRIS COUNTY FLOOD CONTROL DISTRICT

Page 3: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

Buffalo Bayou Watershed• Population = 410,658• Drainage Area = 103 sq. miles• Open Stream Miles = 116• Primary Streams = Buffalo Bayou, Rummel Creek, Soldiers Creek, Spring Branch, Turkey Creek

SOURCE: HARRIS COUNTY FLOOD CONTROL DISTRICT

Page 4: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

Brays Bayou Watershed• Population = 722,716• Drainage Area = 127 sq. miles• Open Stream Miles = 121• Primary Streams = Brays Bayou, Keegans Bayou, Willow Waterhole Bayou** SEVERE FLOODING, ON AVGERAGE, ONCE EVERY DECADE

SOURCE: HARRIS COUNTY FLOOD CONTROL DISTRICT

Page 5: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

CURRENT LAND USE IN RELATION TO FLOODPLAINS

SOURCE: H-GAC

Page 6: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

SOURCE: H-GAC

Page 7: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

SOURCE: H-GAC

Page 8: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

• Today, the 52-mile stretch of Buffalo Bayou is the nation’s number one port in foreign cargo and one of the largest ports in the world. •The Buffalo Bayou Master Plananticipates $5.6 billion of privateinvestment in the Buffalo BayouDistrict over the next 20 years.Public investment is estimated at$800 million (hard costs only) overthis period.• Flood capacity improvements integrated with waterfront growth protect Downtown: 100-year flood levels can be reduced by an estimated eight feet.

BUFFALO BAYOU AND BEYOND

SOURCE: WWW.BUFFALOBAYOU.ORG/VISIONARY

Page 9: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

• The new North Canal invites design of multilevel structured edges to provide flood protection, as well as areas for outdoor seats, tables, and kiosks.

• Richardson Park is envisioned with an office center, homes, apartments, retail services and an environmental science campus.

SOURCE: WWW.BUFFALOBAYOU.ORG/VISIONARY

Page 10: HARRIS COUNTY WATERSHEDS WITHIN LOOP 610

PROJECT BRAYS• 70 individual projects• The three major techniques being used are channel modifications, bridge modifications and the construction of regional storm-water detention basins.• The total cost of Project Brays will be approximately $450 million.

SOURCE: WWW.PROJECTBRAYS.ORG