Name of Hon'ble MLA: Shri Ved Narang Total population : 203524 Area (Sq km): 491.85 HSAMB Road Network Status HSAMB Roads Chronology: Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Barwala Constituency information (2001) PWD Roads Network: NH 0.00 SH 0.00 MDR 3.00 ODR 127.19 Transferred from HSAMB 22.25 Total 152.44 (Information of PWD road network in the Constituency may not be very accurate) Completed Roads under Maintenance 36 118.29 No SR envisaged roads km 2 5.61 SR Awarded roads km 38 123.90 Sub Total: roads km New Construction going on 1 0.91 New Construction - Awarded roads km 1 0.91 Sub Total: roads km Transferred 1 5.00 Transferred to PWD (938 roads) roads km 3 11.64 Transferred to PWD (Individual) roads km 4 16.64 Sub Total: roads km 43 141.45 Group Total: roads km 12 39.85 a) Roads Completed before 1-7-1999 roads km 9 29.58 b) Roads Completed between 1-7-1999 and 4-3-2005 roads km 4 17.62 c) Roads Completed between 5-3-2005 and 25-9-2009 roads km 13 41.80 d) Roads Completed between 26-9-2009 and 25-10-2014 roads km 4 11.69 e) Roads Completed after 26-10-2014 roads km 42 140.54 Total: roads km Friday, February 05, 2016 Page 1 of 18 Barwala B

Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Embed Size (px)

Citation preview

Page 1: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Name of Hon'ble MLA: Shri Ved Narang

Total population : 203524

Area (Sq km): 491.85

HSAMB Road Network Status

HSAMB Roads Chronology:

Haryana State Agricultural Marketing Board

Summary of Road Network

Name of Constituency: Barwala

Constituency information

(2001)

PWD Roads Network:

NH

0.00

SH

0.00

MDR

3.00

ODR

127.19

Transferred from HSAMB

22.25

Total

152.44

(Information of PWD road network in the

Constituency may not be very accurate)

Completed Roads under Maintenance

36 118.29No SR envisaged roads km

2 5.61SR Awarded roads km

38 123.90Sub Total: roads km

New Construction going on

1 0.91New Construction - Awarded roads km

1 0.91Sub Total: roads km

Transferred

1 5.00Transferred to PWD (938 roads) roads km

3 11.64Transferred to PWD (Individual) roads km

4 16.64Sub Total: roads km

43 141.45Group Total: roads km

12 39.85 a) Roads Completed before 1-7-1999 roads km

9 29.58 b) Roads Completed between 1-7-1999 and 4-3-2005 roads km

4 17.62 c) Roads Completed between 5-3-2005 and 25-9-2009 roads km

13 41.80 d) Roads Completed between 26-9-2009 and 25-10-2014 roads km

4 11.69 e) Roads Completed after 26-10-2014 roads km

42 140.54Total: roads km

Friday, February 05, 2016 Page 1 of 18Barwala B

Page 2: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Completed Roads under Maintenance

No SR envisaged

H - 1389 Dhani Garan To Dhani Khan Bahadur 1.931) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110336 18-Sep-15

Good condition.95635 09-Mar-15

Constructed- 1994 ,Path 5 Karam, Crust 150 mm, 6 Nos, 450 mm H.P. Culvert, SR 2008, 20 mm PC from RD 0 to 1350, 1545 to 1645 & CC from RD 1350 to 1545 & 1645 to 1750 & 1750 to 1930 Work Plan:- Good Condition

6436 27-Sep-11

H - 1391 Kharar Alipur To Dhani Raipur 5.792) km.

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110338 18-Sep-15

Good condition.95636 09-Mar-15

EE reported: Road taken over from PWD to HSAMB on 03.07.2013.51968 23-Jul-13

Constructed 1994, Path 6 karam,Crust 150mm, Upgradation (PMGSY Scheme) in 2009.

12298 21-Oct-11

H - 1392 Kharar Alipur To Dhani Qutubpur 2.823) km.

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110339 18-Sep-15

Good condition.95637 09-Mar-15

Constructed 1994, Path 6 karam, Crust 150mm, Upgradation 150mm (PMGSY Scheme) in 2009

12299 21-Oct-11

H - 1394 Niyana To Kharar Alipur 4.544) km.

Work Completed on 15.10.2015.Road is in good condition.111262 29-Oct-15

Constructed- 1994. Path 5 Karam. Crust 150 mm. 286m CC (Niyana) and rest PC done in 2005. 'Work alloted under Work Plan 2015-16 to 'M/s Rajender Singh Contractor, Sector-13, Hisar. (No. 4237-41). On dated 12.08.15 with the A/A Rs. 23.87 lacs & schedule date for completion of work is 11.11.15.

110275 18-Sep-15

A/A accorded for Rs. 23.87 lac on 03.08.2015 (Under work plan 2015-16). Tender approved on dated 04.08.2015 (Sh. Rajender Singh Contractor).

106905 04-Aug-15

Work plan 2015-16: WBM patches 10% with PC in RD 800m to 4270m with earth work, EC 29.07 lacs

102446 12-May-15

Work plan: 750 (Niyana) pavers and rest patches, DOC 12.08.12, Exp. 28.52 lacs

101772 20-Aug-12

Constructed- 1994. Path 5 Karam. Crust 150 mm. 286m CC (Niyana) and rest PC done in 2005.

6441 27-Sep-11

H - 1395 Bugana To Sulkhani 2.925) km.

Friday, February 05, 2016 Page 2 of 18Barwala B

Page 3: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110341 18-Sep-15

Work completed on 30.03.2015.99706 16-Apr-15

PIP Blocks laid in 350 m length in Bugana Phirni and in 100 m in Sulkhani village & in rest patch work completed in A/R 2014-15

97414 10-Mar-15

Tender approved on dated 28.07.2014 (Sh. Mahipal Singh Contractor). A/A accorded for Rs. 25.22 lac on 28.07.2014.

80784 28-Jul-14

Work plan 2014-15: RD (0-336) = 336 (m) PIP Block over GSB 250mm in widening portion & GSB 150mm on existing surface in 18' width (Bugana Phirni). RD 2820-2920=100(m) GSB+ PIP block & Nala both side in 336(m) (Phirni Sulkhani Side). Estimated cost 44 lacs.

75135 24-Jun-14

EE reported: Road taken over from PWD to HSAMB on 03.07.2013.51963 23-Jul-13

Transferred to PWD. PWD RoadID: __________.21176 16-Mar-12

Constructed 1994, Path 6 karam, Crust 150mm, Patches + PC in 2010

12301 21-Oct-11

H - 1396 Ladwa To Bhagana 5.066) km.

Work Completed on 20.10.2015.Road is in good condition.111242 29-Oct-15

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110342 18-Sep-15

Construction 1995, Path 5 Karam, Crust 150 mm. Last S/R in 2010, 20mm PC. Now under S/R Work plan 2014-15: RD (4100-4530) & RD 4730-5060= 760 (m), PIP Block over GSB 250mm in widening portion & GSB 150mm on existing surface in 18' width & Nala both side in 760(m) in village Bhagana phirni. Lean concrete done in Nalla in 250 m. Nala complete. GSB complete in 700 m, Further work is in progres. Expenditure incurred upto date is Rs. 6.96 lacs & completed on 31.08.2015.

110255 18-Sep-15

Now under S/R Work plan 2014-15: RD (4100-4530) & RD 4730-5060= 760 (m), PIP Block over GSB 250mm in widening portion & GSB 150mm on existing surface in 18' width & Nala both side in 760(m) in village Bhagana phirni. Lean concrete done in Nalla in 250 m. Nala complete. GSB complete in 700 m, Further work is in progres. Expenditure incurred upto date is Rs. 6.96 lacs & expected completion date of work is 30.09.2015

109987 16-Sep-15

RD (4100-4530) & RD 4730-5060= 760 (m), PIP Block over GSB 250mm in widening portion & GSB 150mm on existing surface in 18' width & Nala both side in 760(m) in village Bhagana phirni. Estimated cost 76 lacs.

90313 05-Dec-14

Work not started by the agency, earnest Money forfeited vide this office memo No. 11367 dated 29.09.2014. And tender re-invited on 25.11.14.

89036 24-Nov-14

S/R work allotted on 14.08.14 to Sh. Baljeet Kaswan cont. GSB is in progress

86142 01-Oct-14

T/S granted for Rs. 50.20 lac on 31.07.2014.82285 08-Aug-14

Tender approved on dated 28.07.2014 (Sh. Baljeet Kaswan Contractor). A/A accorded for Rs. 50.20 lac on 28.07.2014.

80790 28-Jul-14

Work plan 2014-15: RD (4100-4530) & RD 4730-5060= 760 (m), PIP Block over GSB 250mm in widening portion & GSB 150mm on existing surface in 18' width & Nala both side in 760(m) in village Bhagana phirni. Estimated cost 76 lacs.

75136 24-Jun-14

Constructed- 1995 ,Path 5 Karam, Crust 150 mm, 10 Nos, 450 mm 6443 27-Sep-11

Friday, February 05, 2016 Page 3 of 18Barwala B

Page 4: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

H.P. Culvert, SR 2010, 20mm PC Work Plan:- A/R @ 16000 & PIP Tiles/CC in 960 m in phirni of vilage Bhagana from RD 4100 to 5060 Est. Cost:- 39.81 Lacs.

H - 1398 Nh 10 Bye Pass To Satrod Pump House 0.837) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110344 18-Sep-15

Patch work required.95639 09-Mar-15

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45657 18-Apr-13

Constructed 3/1997, Path 6 karam, Crust 150mm, Patches + PC in 2002

12355 21-Oct-11

Transferred to PWD. PWD RoadID : 91347471 03-Oct-11

H - 1399 Satrod Khurd To Mela Kothi Road 3.068) km.

Work completed on 10.11.2014.Road is in good condition.111243 29-Oct-15

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110345 18-Sep-15

Construction 1999, Path 6 Karam, Crust 150 mm, Patches + PC in 2007. Work plan 2014-15: RD (385 to 535) = 150 (m), PIP Block over GSB 250mm in widening portion & GSB 150mm on existing surface in 18' width & both side Nala in 150m (Satrod Khurd Phirni). . Work completed on 10.11.2014.

110256 18-Sep-15

Road is in good condition.109989 16-Sep-15

Construction 3/ 1999, Path 6 Karam, Crust 150 mm, Patches + PC in 2007. S/R - 10.11.2014- with PIP from RD (385 to 535) = 150 (m), in widening portion & . Rest unthouched . Work completed on 10.11.2014.

109988 16-Sep-15

Work completed on 10-Nov-14.108795 07-Sep-15

S/R work allotted on 11.08.14. GSB is in progress.86140 01-Oct-14

Tender approved on dated 28.07.2014 (Sh. Mahipal Singh Contractor). A/A accorded for Rs. 11.00 lac on 28.07.2014.

80767 28-Jul-14

H - 1401 Pwd Road To Shiv Mandir At Village Niyana 0.469) km.

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110346 18-Sep-15

Good condition.95641 09-Mar-15

Constructed- 2000 ,Path 5 Karam, Crust 325 mm.6448 27-Sep-11

H - 1403 Behbalpur To Jewra 5.4010) km.

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110348 18-Sep-15

Good condition.95643 09-Mar-15

E.E. reported that minor patches required ( Area 300sqm, Estimated cost 0.60 lacs)

78041 09-Jul-14

877 Sqm patches done on 22.11.2013 (Exp._______)59624 10-Dec-13

EE reported: Road taken over from PWD to HSAMB on 03.07.2013.51965 23-Jul-13

Friday, February 05, 2016 Page 4 of 18Barwala B

Page 5: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Constructed 2002, Path 6 karam,Crust 150mm, Patches + PC in 201012303 21-Oct-11

H - 1405 Bus Stand To Panchayat Ghar At Kheri Barki 0.2311) km.

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110350 18-Sep-15

Good condition.95645 09-Mar-15

Constructed- 2000 ,Path 5 Karam, Crust 325 mm, Work Plan:- Good Condition

6452 27-Sep-11

H - 1406 Behbalpur To Dhigtana 1.6912) km.

Road is in good condition.111280 29-Oct-15

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110351 18-Sep-15

Work completed on 25.02.2015 as per work plan, in rest patch work compoleted under A/R 2014-15.

97417 10-Mar-15

RD (1260-1690) = 430 (m) PIP block over GSB 250mm in widening portion & GSB 150mm on existing surface in 18' width & both side Nala in 430m (Dhigtana Phirni). Estimated cost 43 lacs.

90315 05-Dec-14

GSB in progress. Earnest money forfeited of the agency vide this office memo No. 11009 dt 10.09.14.

89038 24-Nov-14

Work allotted on 14.08.2014.83224 21-Aug-14

Work plan 2014-15: RD (1260-1690) = 430 (m) PIP block over GSB 250mm in widening portion & GSB 150mm on existing surface in 18' width & both side Nala in 430m (Dhigtana Phirni). Estimated cost 43 lacs.

75138 24-Jun-14

EE reported: Road taken over from PWD to HSAMB on 03.07.2013.51964 23-Jul-13

Constructed 2002, Path 6 karam, Crust 150mm, Patches + PC in 2010

12304 21-Oct-11

H - 1407 Mirjapur To Sulkhani 5.2113) km.

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110352 18-Sep-15

Good condition.95646 09-Mar-15

WBM 11.67 cum, PC 104 sqm done by 21.10.2013 (Exp.170k)58169 18-Nov-13

EE reported: Road taken over from PWD to HSAMB on 03.07.2013.51966 23-Jul-13

Transferred to PWD. PWD RoadID: __________.21179 16-Mar-12

Constructed 2002, Path 6 karam,Crust 150mm, Patches + PC in 201012305 21-Oct-11

H - 1408 Juglan To Behbalpur 4.6214) km.

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110353 18-Sep-15

Good condition.95647 09-Mar-15

Wbm 11.74 cum,PC patches 1420.56 sqm done by 31.08.2013 (EXp292k). Now road is in good condition.

59626 10-Dec-13

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45473 18-Apr-13

Friday, February 05, 2016 Page 5 of 18Barwala B

Page 6: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Constructed 12/2004Path 6 karam, Crust 150 & 225 mm CC(Vill.Juglan) 325m & (Behbalpur) 650m

12358 21-Oct-11

Transferred to PWD. PWD RoadID : 91207473 03-Oct-11

H - 1411 Kharar Alipur Mayar Road To Dhani Late Sh. Parlahad Singh 2.5015) km.

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110355 18-Sep-15

Good condition.95649 09-Mar-15

(50.19sqm) patches during 2012-2013. Expenditure: 0.13 lacs.45189 12-Apr-13

(64 sqm) patches done 01.11.2011 to 03.01.2011 (18 K).17139 05-Jan-12

Constructed- 2008 ,Path 5 Karam, Crust 150 mm, 4 Nos, 450 mm H.P. Culvert, Work Plan:- A/R @ 16000 Est. Cost:- 0.4

6458 27-Sep-11

H - 1412 Dhiktana To Dhansu 5.4416) km.

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110356 18-Sep-15

Good condition.95650 09-Mar-15

56.43 sqm pathces done on 20/12/2012. Exp. 0.15 K.42534 14-Mar-13

( 111 sqm) patches done 02.11.2011 to 04.11.2011 ( 34 K).17140 05-Jan-12

Constructed- 2009 ,Path 6 Karam, Crust 225 mm, 17 Nos, 450 mm H.P. Culvert.

6459 27-Sep-11

H - 1413 Sulkhani To Kharkari 5.3317) km.

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110357 18-Sep-15

Good condition.95651 09-Mar-15

WBM 36.32 cum, PC 1297 sqm patches done on 23.10.2013 (Exp. 299k).

59628 10-Dec-13

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45661 18-Apr-13

Constructed 3/2009, Path 6 karam, Crust 225 mm12359 21-Oct-11

Transferred to PWD. PWD RoadID : 91387469 03-Oct-11

H - 1414 Barwala To Badawar 6.7818) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110358 18-Sep-15

Good condition.95652 09-Mar-15

E.E. reported that minor patch work required ( area 500 sqm, Estimated cost 1.00 lacs)

78050 09-Jul-14

WBM 12.51 cum, PC 1233 sqm patches done on 09.11.2013(Exp. 258k).

59629 10-Dec-13

Constructed- 2009 ,Path 5 Karam, Crust 225 mm, 13 Nos, 450 mm H.P. Culvert.

6461 27-Sep-11

H - 1415 Mirjapur To Satrod 5.9419) km.

Friday, February 05, 2016 Page 6 of 18Barwala B

Page 7: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110359 18-Sep-15

Good condition.95653 09-Mar-15

WBM 40.46 cum, PC 1445 sqm Patches done on 23.10.2013 (Exp. 333K)

59630 10-Dec-13

EE reported: Road taken over from PWD to HSAMB on 03.07.2013.51967 23-Jul-13

Transferred to PWD. PWD RoadID: __________.21180 16-Mar-12

Constructed 2009, Path 6 karam,Crust 225mm12306 21-Oct-11

H - 1416 Sarsod To Rajli 4.9120) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110360 18-Sep-15

Good condition.95654 09-Mar-15

Constructed- 2009 ,Path 5 Karam, Crust 225 mm, 14 Nos, 450 mm H.P. Culvert, Work Plan:- A/R @ 16000/- Est. Cost:- 0.79

6463 27-Sep-11

H - 1417 Approach Road Sport Stadium At Juglan 0.4821) km.

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110361 18-Sep-15

Good condition.95655 09-Mar-15

Constructed- 2010 ,Path 5 Karam, Crust 150 mm29640 20-Aug-12

H - 1434 Pwd Road To Phirni At Rajli 3.4722) km.

Inspection: On dated 27.08.2014,S.E. Hisar inspect the road. S.E. Karnal be asked to re-collect thee samples of paver blocks and be sent to H.O for testing from Lab. at Panchkula

100369 17-Apr-15

Good condition.95816 09-Mar-15

Work completed on 31.10.2014.91817 06-Jan-15

Work completed, but additional work demanded by the villagers. Case sent to Head Office, Panchkula.

89020 24-Nov-14

Work alloted to Sh. Ashutosh Contractor, on 16.12.13. Time limit 6 months.

66203 12-Mar-14

A/A/D/E of Rs.9617100/- accorded and rates also approved on 09.12.2013

59489 09-Dec-13

S/R (2013-14) sanctioned in principle to Rs. 92.80 lacs54994 18-Sep-13

PIP Blocks RD 2630 to 3188, RD 3288 to 3320. AR with laying WBM and GSB with 3 layer. PC with one layer WBM RD 0 to 1020, 1362 to 2615, Nallah. Both side from RD 2615 to 3320, slab culvert 7 nos.

49674 20-Jun-13

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45659 18-Apr-13

250mm GSB, Pavers, drains both sides in 833m (RD 1234 to 1362, 2615 to 3320) and 9.15m width PC with 75mm WBM in RD 0 -1020, 1362-2615 and 7 no. HP culverts. Estimated Cost: Rs 105 lacs.

91330 01-Apr-13

Constructed 5/2002, Path 6 karam,Crust 150mm12360 21-Oct-11

H - 1533 Dhani Prem Nagar To Naya Gaon 3.5023) km.

Friday, February 05, 2016 Page 7 of 18Barwala B

Page 8: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110436 18-Sep-15

Good condition.95735 09-Mar-15

Constructed- 2001 ,Path 3 Karam, Crust 150 mm, 11 Nos, 450 mm H.P. Culvert, SR 2010,20mm PC

29631 20-Aug-12

Patches done 31.08.2011. Only repair of culverts done (31 K).17150 05-Jan-12

H - 4909 Dhani Khan Bahadur Road To Barwala 3.2024) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110489 18-Sep-15

Good condition.95788 09-Mar-15

WBM=0.60cum, PC patches=150sqm. AR patches done in 2013-1449796 21-Jun-13

A/A granted on 5/07/11 for 96.51 lacs. Path 5k. Crust-400mm. Tender allotted on 30/01/12(Sh.Vinod Saharan)

18002 14-Feb-12

H - 4910 Rajli To Ghirai 5.0425) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110490 18-Sep-15

Good condition.95789 09-Mar-15

A/A granted on 05.07.11 for 152.27 lacs. Path-5 & 6k . Crust-400 mm. Tender on 12.09.11, Tender approved on 28/11/2011 for Rs. 167 lacs (Sh. Jai Pal Singh, Contractor). Work completed on 31/3/2013.

29598 20-Aug-12

H - 4911 Panghal To Dhani Garan 2.3426) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110491 18-Sep-15

Good condition.95790 09-Mar-15

Patch work done now road is in good condition.86130 01-Oct-14

A/A granted on 5/07/11 for 67.57 lacs. Path 5 karam. Crust 400mm, 7 no. 600mm HP culvert, Tender approved on 18.7.2012 (Sh. Vinod Saharan, Contractor).

29606 20-Aug-12

H - 4912 Satrod Khurd To Satrod Kalan Via Janak Factory 2.2627) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110492 18-Sep-15

Inspection report is satisfactory.102586 15-May-15

Inspection: On dated 29.07.2013,Sh. Deepak Verma (SDO-QC-I) inspect the road. Satisfactory

100377 17-Apr-15

Tender approved on 16.03.2012 for Rs. 80.24 Lacs ( Sh. Raghu Nath Rai Contractor), work completed on 31.01.13. E.E. reported that road is in good condition

78189 09-Jul-14

A/A granted on 05.07.11 for 73.32 lacs. Path-5k . Crust-225 mm.CC in RD (0 to 30 and 2230 to 2740m) Existing CC in 480 m. Existing manned R'ly phatak.Tender on 12.09.11

4304 07-Sep-11

H - 4913 Ladwa To Mirkan 2.6528) km.

Friday, February 05, 2016 Page 8 of 18Barwala B

Page 9: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110493 18-Sep-15

Inspection: On dated 19.03.2015 E.I.C has ordered that GMD consultant to check the work and report.

100100 17-Apr-15

On the complaint made by Sh. Dharambir S/o Ram Kumar, Worthy CA Board ordered to checking by M/s GDM Consultant.

99004 19-Mar-15

M/s GMD Consultant to check the road and report.99003 19-Mar-15

A/A granted on 05.07.11 for 80.09 lacs. Path-5k . Crust-225 mm CC in (RD 2371 to 2634m & PC 0 to 2371m). Tender allotted on 06.09.11 (R.S Const), completed on 15.07.12

29600 20-Aug-12

H - 5564 Bugana to Dhansu 2.3029) km.

Good condition.95860 09-Mar-15

Work completed on 31.07.14 & final bill awaited from SDO.86178 01-Oct-14

Work alloted to M/s Sheoran Const. company on 05.02.2014. Time limit 6 months.

66191 12-Mar-14

Path RD 0 to 1700m= 30'1", 1700 to 1767m= 36'-9", 1767 to 2200m=30'-1" wide st, no distance shortened, H.P. culvert 5 no.

57591 08-Nov-13

A/A on 31.10.2013 for Rs. 68.14 lac. 57590 08-Nov-13

CM has approved the road on 18/2/2013.41724 06-Mar-13

H - 5568 Dhani Khan Bahadur to Dhani Mirdad 2.9030) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110508 18-Sep-15

Good condition.95805 09-Mar-15

Work allotted to Sh. Vinod Saharan contractor on 21.11.2012. Work completed on 2/4/2013.

37856 04-Apr-13

A/A Rs. 60.91 lacs on 16.08.12, crust 400m, path 5 karam(Straight), HP culvert 7 no., Length=2800-676 existing paver pavement Rs. 308 to 676m and phirni portion from RD 0 to 308m)=2.124km.

29530 17-Aug-12

H - 5597 Kharar Alipur to Lalpur 3.3231) km.

Work completed on 15.12.2015. Crust 400mm , Path 5k, Upto date exp. is Rs. 26.00 lacs.

114435 29-Dec-15

Work alloted on 21.11.2013. PC pending. Expenditure incurred upto date is Rs. 67.28 lacs & likely completion date of work is 30.09.2015.

110247 18-Sep-15

Work alloted to M/s Payal Const. company on 21.11.13. Time limit 12 months.

66195 12-Mar-14

CM has approved the road on 18/2/2013. A/A on 20.09.2013 for Rs. 1.27 crore.

55472 26-Sep-13

Because with the const. of this road no distance will be shortened. Recommended by Hon’ble MLA, Barwala & Hansi. Road not fall in the policy as no distance will be shortened. Path is 40’ to 150’ belongs to Irrigation Deptt. NOC given by Irrigation Deptt.

7381 01-Oct-11

H - 5696 NH 65 Bus Stand Dhani Garan to NGM Barwala. 1.0232) km.

Friday, February 05, 2016 Page 9 of 18Barwala B

Page 10: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110512 18-Sep-15

Good condition.95809 09-Mar-15

A/A on 12.03.2013 for Rs. 31.40 lacs.42632 15-Mar-13

Hon'ble CM approved on 13.12.12. Path RD 0 to 1050m = 27'-6"39776 04-Jan-13

H - 6448 Raipur To Shikarpur 1.9833) km.

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110513 18-Sep-15

Good condition.95811 09-Mar-15

Work completed on 30.04.14 & final bill rceived and under check in division office.

86176 01-Oct-14

Work allotted to M/s Sheoran Const. Company on 18.09.2013. Time limit 6 months. T/S for Rs. 48.76 lacs on 18.09.2013. E.E. reported that road is in good condition. Final bill paid by 10.05.2014.

70153 29-Apr-14

Length 2km, Path RD 0to 2000m=43'11" st., crust 400mm, HP culvert 7 no., lump-sump Rs. 30000/-for shifting of transformer.

51248 10-Jul-13

Hon'ble CM has approved the Const. of road on 18.02.2013.A/A on 28.06.2013 for Rs. 55.36 lacs.

41967 11-Mar-13

Recommended by MLA Barwala on 08.02.2012.Path 8k, no distance shortened

22982 09-May-12

H - 6896 Kharar to Dhani Mai Ram 2.1034) km.

Work Completed on 15.10.2015. Road is in good condition.111232 29-Oct-15

Work alloted on 10.09.2014. GSB & WBM complete. PC pending. Expenditure incurred upto date is Rs. 30.64 lacs & likely completion date of work is 30.09.2015.

110249 18-Sep-15

On dated 27.06.2014, Presented to Hon'ble CM and Hon'ble CM forwarded for necessary action. Road demanded by Vinod Bhayana CPS Power/ MLA, Hansi and Sh. Ramniwas Ghorela, MLA Barwala.

84338 15-Sep-14

Tender approved on 09.09.2014 (M/s Sheoran Const. Co., Agroha) and T/S D/E approved for Rs. 56,21,900/-.

84238 11-Sep-14

A/A accorded for Rs. 58.02 lac on 05.08.2014.82184 06-Aug-14

Hon'ble Chief Minister has approved the construction of subject cited road on Dated: 30-07-2014

81802 06-Aug-14

Demanded by Sh. Ram Niwas Ghorela, MLA Barwala. On 5.12.2013, Hon'ble CM has desired that matter to be examined and put up.

60115 19-Dec-13

H - 7051 Dhiktana to Juglan 4.4135) km.

Work Completed on 15.07.2015. Road is in good condition.111231 29-Oct-15

Work alloted on 04.09.2014. Crust thickness : 350 mm. Work Completed on 15.07.15.

110248 18-Sep-15

Worthy CA Board Ordered that the concerned JE & SDO are charge sheeted under rule 8.

109037 10-Sep-15

Tender approved on 27.08.2014 (Sh. Suresh Kumar Chug) and D/E sanctioned for Rs. 1,09,27,200/-.

83828 28-Aug-14

A/A accorded for Rs. 1.115 crore on 14.08.201482582 14-Aug-14

Friday, February 05, 2016 Page 10 of 18Barwala B

Page 11: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

On 04.08.2014, Hon'ble CM has approved the construction of the road except phirni portion if any.

82201 07-Aug-14

Path= RD 0 to 1660m=35'8", 1660 to 1710m=Existing PWD B&R road NH-65, 1710 to 3900m=32'11", 3900 to 4200m=33', 4200 to 4410m=29'4"(Phirni portion) wide st. No distance shortened.

53240 01-Aug-13

Demanded by Sh. Ram Niwas Ghorela, MLA Barwala.50271 24-Jun-13

H - 7358 Satrod kalan to PWD Ladwa road upto Petwar Distributory Bridge 1.8636) km.

Work Completed on 31.10.2015. Crust 400mm , Path 5k, 114436 29-Dec-15

Work alloted on 28.08.2014. PC pending only. Expenditure incurred upto date is Rs. 26.04 lacs & likely completion date of work is 30.09.2015.

110250 18-Sep-15

Work allotted to Sh. Surender Kumar on 28.08.14.86159 01-Oct-14

A/A for Rs. 55.48 lac on 23.07.2014.80044 23-Jul-14

Path : RD 0 to 130m=27'6", 130 to 1400m=27'-4.5", 1400 to 1855m=29'-1.5" wide st, Distance shortened 1045m.

58862 29-Nov-13

Recommended by MLA Barwala .Path is 5 and 6 Karam58666 22-Nov-13

118.29 km. Sub Total:

SR Awarded

H - 1388 Barwala To Harijan Settlement Devi Garh Punia 1.261) km.

PIP Block laid RD 0 to 345 m WBM completed PC Left. Exp. Upto date is Rs. 0.09 lacs. Likely date of competion is 31.03.2016.

114447 29-Dec-15

Constructed- 1990 ,Path 5 Karam, Crust 150 mm, SR S/R Done:- 2010, 20 mm PC & CC in 192 m in phirni portion at village Devigarh Punia. Work alloted under Work Plan 2015-16 to Sh. Satish Kumar Contractor, Village Dhani Khan Bahadur, Distt Hisar. with A/A amounting to Rs. 32.04 lacs, schedule date for completion of work is 10.11.15.

110274 18-Sep-15

A/A for Rs. 32.04 on 4/8/2015. Tender approved on dated 04.08.2015 (Sh. Satish Kumar Contractor) & D/E Tech. Sanction for Rs. 32.04 lacs.

106917 04-Aug-15

Work plan 2015-16: 2.20m Widening 400m with PC and 345m with PIP. On existing road PIP 185m (RD 48 - 233m), EC 29.88 lacs

102447 12-May-15

Work plan 2015-16: 2.20m Widening 400m with PC and 345m with PIP. On existing road PIP 185m (RD 48 - 233m), EC 29.88 lacs

101775 07-May-15

Constructed 1990, Path 5 karam, crust 150mm, SR 2010: 20mm PC 91m (RD 0 - 47 & 232 - 276m) and CC in 185m (RD 47 - 232m), Exp. 2.88 lacs

101774 27-Sep-11

H - 1410 Satrod Kalan To Bugana 4.352) km.

WBM completed PC pending only. Exp upto date is Rs. 4.35 lacs. Likely date of completion is 31.03.2016.

114441 29-Dec-15

Work of Annual Repair alloted to M/s Jassu Construction Company vill. Kanwari Distt. Hisar on dt: 23.06.15.

110354 18-Sep-15

Construction 2007, Path 5 Karam, Crust 150 mm WBM done in 1400 m. Now under Work plan 2014-15: RD (150-1800)= 1650 (m),

110257 18-Sep-15

Friday, February 05, 2016 Page 11 of 18Barwala B

Page 12: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

One layer WBM + PC. RD (1800-2100)=300 (m), Earth work Cutting + 2 Layer WBM + PC, Now PC pending.

RD (150-1800)= 1650 (m), One layer WBM + PC. RD (1800-2100)=300 (m), Earth work Cutting + 2 Layer WBM + PC. Estimated cost 27.30 lacs.

90316 05-Dec-14

S/R work allotted on 11.08.14. WBM in 1400m completed.86141 01-Oct-14

A/A accorded for Rs. 23.08 lac and tender approved on 26.07.2014 (M/s Balaji Const. Co.)

81218 05-Aug-14

Work plan 2014-15: RD (150-1800)= 1650 (m), One layer WBM + PC. RD (1800-2100)=300 (m), Earth work Cutting + 2 Layer WBM + PC. Estimated cost 27.30 lacs.

75139 24-Jun-14

Work completed on 28/8/2012.32108 03-Sep-12

Pavers in 180m started. Tech.approved on 27/02/12(7.14 lacs). Tender allotted on 29/5/2012. AA for Rs. 6.65 lacs.

21531 08-Jun-12

Constructed- 2007. Path 5 Karam. Crust 150 mm.6457 27-Sep-11

5.61 km. Sub Total:

Friday, February 05, 2016 Page 12 of 18Barwala B

Page 13: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

New Construction going on

New Construction - Awarded

H - 7521 Kharar Alipur by Pass link Road 0.911) km.

Earth work complete in 800 m length. Exp. upto date is Rs. 0.31 lacs. Likely date of completion is 31.03.2016.

114437 29-Dec-15

Earth work complete in 800 m length. Likely date of completion is 31.03.2016.

112653 24-Nov-15

Work alloted on 11.12.2014. Earth work complete in 800 m length & expected completion date of work is 30.09.2015.

110251 18-Sep-15

Work allotted on 11.12.2014 to Sh. Jaideep Kumar Contractor for amounting to Rs. 41.82 lacs . E/w complete in 450 m length. Further work is in progress.

97410 10-Mar-15

Work Not started.91811 06-Jan-15

Work not awarded and not started.88888 20-Nov-14

On dated 27.06.2014, Presented to Hon'ble CM and Hon'ble CM forwarded for necessary action. Road demanded by Vinod Bhayana CPS Power/ MLA, Hansi and Sh. Ramniwas Ghorela, MLA Barwala.

84337 13-Nov-14

A/A accorded for Rs. 41.82 lac on 29.08.2014.83851 29-Aug-14

On dated 19.08.2014, Hon'ble Chief Minister has approved the construction of subject cited road.

82906 20-Aug-14

Hon'ble CM Haryana has desired & with recommendation of Sh. Ram Niwas Ghorela MLA, Barwala & Sh. Vinod Bhayana CPS, Haryana.

73403 02-Jun-14

0.91 km. Sub Total:

Friday, February 05, 2016 Page 13 of 18Barwala B

Page 14: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Planned - New Construction

Planned

H - 6176 Barwala to Bhaini Badashahpur 4.831) km.

On dated 14.07.2014, presented to Hon'ble CM and forwarded for necessary action. Road demanded by Naresh Selwal, MLA Uklana.

84359 16-Sep-14

On 1/7/2014, Hon'ble AM rejected the construction of road.77382 04-Jul-14

Case sent to PSA vide CA memo no. 645 dated 31.10.2013. Case sent to Hon'ble A.M. vide PSA Memo No. 2890 dated 06.11.2013.

59104 03-Dec-13

Path= RD 0 to 1015m=24'-11", 1015 to 4075m=22'-6", 4075 to 4210m=27'-6", 4210 to 4840m=31' wide st, disstance shortened 3.23km

53692 29-Aug-13

Agriculture Minister (Sh. Paramvir Singh) asked on 30.11.2012 that due to paucity of funds, the proposed road may be put up for consideration in the next financial year.

38309 13-Dec-12

Path 5 karam(Straight), 4 km distance shortened falls in the policy. P/R sent to Govt. vide no. 222 dated 26.03.12 for approval.

26041 26-Jun-12

4.83 km. Sub Total:

Friday, February 05, 2016 Page 14 of 18Barwala B

Page 15: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Transferred

Transferred to PWD (938 roads)

H - 1400 Kharar Alipur To Khokha 5.001) km.

S.D.O. reported that road is in good condition.64372 18-Feb-14

PWD has allotted works worth 50 lacs.43428 20-Mar-13

Constructed 5/2003, Path 6 karam, Crust 150mm12357 21-Oct-11

Transferred to PWD. PWD RoadID : 91327470 03-Oct-11

5.00 km. Sub Total:

Transferred to PWD (Individual)

H - 1390 Dabra To Satrod 4.401) km.

Work of Annual Repair alloted to Sh. Satish Kumar Contractor Dhani Khan Bahadur Distt. Hisar on dt: 23.06.15.

110337 18-Sep-15

Transferred to PWD. PWD RoadID: __________.21175 16-Mar-12

Constructed 1993, Path 6 karam,Crust 150mm, Patches + 75 mm WBM layer + PC in 2007

12297 21-Oct-11

H - 1393 Niyana To Shikarpur 2.212) km.

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110340 18-Sep-15

Constructed 1994, Path 6 karam,Crust 150mm, CC 7" thick over 75 mm WBM layer (Chikarpur) 100m, Patches + PC in balance portion in 2010

12300 21-Oct-11

H - 1397 Niyana To Khokha 5.033) km.

Work of Annual Repair alloted to M/s Dabba Contractor, VPO Kumbha Distt. Hisar on dt: 23.06.15.

110343 18-Sep-15

Road handed over to B&R on 03.10.201122912 03-May-12

Constructed 1995, Path 6 karam, Crust 150mm,CC exists RD (400 to 550m)=250m in balance portion Patches + PC in 2010

12302 21-Oct-11

11.64 km. Sub Total:

Friday, February 05, 2016 Page 15 of 18Barwala B

Page 16: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Other

Dropped

H - 5575 Dhani Khan Bahadur to Panghal 1.881) km.

Due to General Assembly Elections a Code of Conduct is imposed.Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85243 19-Sep-14

H - 6064 Dhansu road to Mirzapur 3.302) km.

Resubmit after the Haryana Vidhan Sabha General Elections Model Code of Conduct is over.

85982 30-Sep-14

Path is 3 karam in entire length. Hence not feasible due to less path. EE assured to submit PR by 15.05.2014.

72364 13-May-14

CM has approved the road subject to the land should be provided by the villagers but Land owners are not ready to provide land free of cost.

39624 27-Dec-12

H - 7052 Kharar Alipur to NH-9 near Power Grid 3.213) km.

Road does not fall in the policy of the board due to not distance shorten. Case is filed.

93327 05-Mar-15

On 01.08.2014, Hon'ble CM has not approved the construction of the road due to non availability of consolidation path.

82207 07-Aug-14

PR sent to AM vide ACS (A) memo no. 2840 dated 06.11.13.66652 19-Mar-14

On 4.12.2013, Hon'ble CM has desired the present status of the road.

60130 19-Dec-13

Path= RD0 to 2280m=27'6", RD 2280 to 2330m= 16'2", 2330 to 2400m 23'4", 2400 to 3020m=27'6", 3020 to 3210m=26'2" wide st., no distance shortened.

53241 01-Aug-13

Demanded by Sh. Ram Niwas Ghorela, MLA Barwala.50272 24-Jun-13

H - 7162 Bhagana to Sultanpur 4.604) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85686 24-Sep-14

PR sent to PSA vide CA memo no. 716 dated 31/10/2013. Case sent to Hon'ble A.M. vide PSA Memo No. 2769 dated 06.11.2013.

58995 03-Dec-13

Path= RD 0 to 240m=22', 240 to 1995m=24'11", 1995 to 2403m=29'10", 2403 to 2663m=30', 2663 to 3950m=33', 3950 to 4600m=27'6" wide st. ,34m distance shortened.

53248 01-Aug-13

CM announcement code 6018 dated 10.07.2013.52281 26-Jul-13

H - 7234 Panghal to Khanpur upto Hansi Road 3.035) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85735 24-Sep-14

Friday, February 05, 2016 Page 16 of 18Barwala B

Page 17: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

Case sent to PSA vide CA memo no. 685 dated 31.10.2013. Case sent to Hon'ble A.M. vide PSA Memo No. 2801 dated 06.11.2013.

59026 03-Dec-13

Path RD 0 to 3025m= 33'-8.5", wide st, No distance shortened.55493 27-Sep-13

Recommended by MLA, Barwala, Path is 6 karam55270 18-Sep-13

H - 7393 Javera to Bahbal pur- Bado upto NH-52 2.006) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85694 24-Sep-14

P/R sent to PSA vide CA memo no. 882 dated 31.12.13. PR sent to AM vide ACS (A) memo no. 4016 dated 03.02.14

66708 19-Mar-14

Path RD 0-467m =36' 10", RD 467-2000m = 34' 3.5", no distance shortened.

60384 31-Dec-13

On the request of MLA Barwala, Hon'ble CM desire that the request be examined and put up on 22.05.2013 pat is 7 karam

59308 05-Dec-13

H - 7410 Village Khokha to Chanot 5.007) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85673 24-Sep-14

P/R sent to PSA vide CA memo no. 27 dated 17.01.14. PR sent to AM vide ACS (A) memo no. 97 on 03.02.14.

66786 19-Mar-14

H - 7712 House of Ashok S/o Sh. Lilu Ram to House of Risal Singh S/o Sh. Karm Singh

0.128) km.

On dated 21.08.2014, Hon'ble CM has seen and desired to take necessary action. Road demanded by Sube Singh S/o Sh. Risal Singh.

84074 05-Sep-14

H - 7717 Shamsukh to Kirori 2.009) km.

On dated 14.07.2014, presented to Hon'ble CM and forwarded for necessary action. Road demanded by Naresh Selwal, MLA Uklana.

84358 16-Sep-14

25.14 km. Sub Total:

RecycleBin

H - 4921 Approach Road Leading To Govt. College Barwala 0.441) km.

A/A awaited.49728 21-Jun-13

Compliance made on E-mail on 16.07.12, now at HQ for A/A.29625 20-Aug-12

0.44 km. Sub Total:

Rejected by Government

H - 5342 Rajli to khanpur Bus stand upto Hansi road 3.551) km.

Friday, February 05, 2016 Page 17 of 18Barwala B

Page 18: Haryana State Agricultural Marketing Board - … wise reports/Barwala - Shri Ved...Haryana State Agricultural Marketing Board ... H - 1391 Kharar Alipur To Dhani Raipur 5.79 km

On 01.08.2014, Hon'ble CM has not approved the construction of the road due to non availability of consolidation path.

82225 07-Aug-14

Case sent to PSA vide CA memo no. 594 dated 31/10/2013. Case sent to Hon'ble A.M. vide PSA Memo No. 2816 dated 06.11.2013.

59041 03-Dec-13

Path =RD 0 to 660m=25'3", 660 to 1200m=33', 1200 to 1360m=28'7", 1360 to 3515m=33', 3515 to 3550m=33' wide st., 411m distance shortened.

53249 01-Aug-13

Path 0 to 660m = 27' 6", 660 to 1240 = 33', 1240 to 1360m = 27' 6" and 1360 to 3540m = 33'.

37517 15-Nov-12

H - 5573 Satroad Kalan to Dabra 4.102) km.

Demanded by Sh. Ram Niwas Ghorela, MLA Barwala.50267 24-Jun-13

Hon'ble CM has not apporved the construction of the road on 26.03.2013, due to no distance shortened.

44281 08-Apr-13

Case is with APSCM CM Sectt. No. 2892 dated 16.04.2012.25107 14-Jun-12

Approved Prinicipaly on 15.07.2011 by Hon'ble C.M. Path is 5 Karam in entire length.

5348 19-Sep-11

H - 6063 Bhagana to Ramayana. 2.953) km.

Hon'ble C.M. not approved the proposal on 19.12.2011 as the available consolidation path is less than prescribed norms.

17317 10-Jan-12

H - 6621 Raipur road to Kutubpur road Kharar Alipur 0.384) km.

Hon'ble AM on 24.12.12 has returned the P/R , due to two bridges are required & one retaining wall to be built , may not be taken up the const. at the moment

39764 04-Jan-13

Path 60'6" in entrie 3800m length. Only 300m distance shortened. Two heavy bridge RS. 40 lacs and 280m retaining wall also involved. Upward of EIC on 17.10.2012.

34596 17-Oct-12

Villagers request received through CM Haryana/ DC Hisar. Path is 13 karam

29426 14-Aug-12

H - 6806 Panghal to Sarsod 4.605) km.

On 4.12.2013, Hon'ble CM has desired the present status of the road.

60128 19-Dec-13

Hon'ble CM has not approved the construction of road on 25.11.2013 due to less path.

59407 09-Dec-13

Hon'ble CM has not approved the construction of this road due to non-availability of consolidation path on dated 25.11.2013.

59238 05-Dec-13

Path 66'. 4.1 km distance shortened to reach PC sarsod. Umanned Rly crossing & does not fall in the Polcy. PR upward of EIC on 12/02/2013.

40763 12-Feb-13

Recommended by MLA Barwala, Path is 12 karam unmanned railway crossing in RD 2380

40220 04-Feb-13

15.58 km. Sub Total:

Friday, February 05, 2016 Page 18 of 18Barwala B