CRITICAL Marina One REF. NO. HDGS-SIONE-RFI-C&S-150 DATE 31 October 2014 SUBCON / REF.NO. YONGNAM / MO_GLT_RFI-030 DIVISION Design Division A SPEC. SECTION NA I DRAWING NO. I REPLY REQUIRED BY 07 November 2014 I DATE COPY TO BECA C&S REMARKS SUBJECT: Parcel A1-A4 Request for Additional Beam at High Rise Tower Glass Lift A : Action / I : Information Architects 61 BECA M&E MPM INFORMATION REQUESTED Please review/confirm the additional beams. 1) Proposed new beam: RHS 500x300xt @ 4th storey (new beam TOS 130.05) REQUEST FOR INFORMATION (RFI) TO ATTENTION FROM Hyundai-GS Joint Venture Mr Ong Teck Huat BECA C&S COPY TO MPM SB A61 IA BECA C&S BECA M&E SKM AAC AL ICN AXIS LS AFE FROM COMMENTS To be notified after response. SCHEDULE IMPACT COST IMPACT To be notified after response. Reference drawings enclosed (5 Sheets). Regarding Glass Lift & Main Building Interface Connection, additional steel beam at glass lift side is required to receive/connect with the main building (floor) steel beam due to the TOS difference between the two structure's interface. 2) Proposed new beam: RHS 500x300xt @ lower roof level (new beam TOS 299.42) Jason (Jongsun) Kim Marina One

HDGS-SIONE-RFI-C&S-150_Parcel A1-A4 Request for Additional Beam at High ....pdf

  • Upload
    apdec3

  • View
    32

  • Download
    1

Embed Size (px)

Citation preview

Page 1: HDGS-SIONE-RFI-C&S-150_Parcel A1-A4 Request for Additional Beam at High ....pdf

■ CRITICAL

Marina One

REF. NO. HDGS-SIONE-RFI-C&S-150

DATE 31 October 2014

SUBCON / REF.NO. YONGNAM / MO_GLT_RFI-030

DIVISION Design Division

■ A SPEC. SECTION NA

■ I DRAWING NO.

■ I REPLY REQUIRED BY 07 November 2014

■ I

DATE

COPY TO

BECA C&S

REMARKS

SUBJECT: Parcel A1-A4 Request for Additional Beam at High Rise Tower Glass Lift

A : Action / I : Information

Architects 61

BECA M&E

MPM

INFORMATION REQUESTED

Please review/confirm the additional beams.

1) Proposed new beam: RHS 500x300xt @ 4th storey (new beam TOS 130.05)

REQUEST FOR INFORMATION (RFI)

TO

ATTENTION

FROM Hyundai-GS Joint Venture

Mr Ong Teck Huat

BECA C&S

COPY TO □ MPM □ SB □ A61 □ IA □ BECA C&S □ BECA M&E □ SKM □ AAC

□ AL □ ICN □ AXIS □ LS □ AFE

FROM

COMMENTS

To be notified after response. SCHEDULE IMPACT

COST IMPACT To be notified after response.

Reference drawings enclosed (5 Sheets).

Regarding Glass Lift & Main Building Interface Connection, additional steel beam at glass lift side is required to receive/connect with the main building (floor) steel beam due to the TOS difference between the two structure's interface.

2) Proposed new beam: RHS 500x300xt @ lower roof level (new beam TOS 299.42)

Jason (Jongsun) Kim

Marina One

PTT1
Typewriter
We have no comment. Please seek Arch comment for the interfacing with the glass lift design and configuration.
PTT1
Typewriter
OTH
PTT1
Typewriter
03/11/2014
oth
Pencil
Page 2: HDGS-SIONE-RFI-C&S-150_Parcel A1-A4 Request for Additional Beam at High ....pdf

$(++ *'++ *'++ *'++ !%%++ %)++ *'++ *'++

2?,;; ?819 ;9C5.95C0DC010C 9> /72 A>F;)#'+

0E90CA,? ;9,8C.,;0;7! C010C 9> /72A>F &)#%'%)";"+&(+1>C /09,8?;

GA>.G >59 <,A0? 1CB28; /0;82A0/ 9> 3,H0;?,- ,A/ 8A90C8>C 1CB2C0B>H0/ ,9 >7A0CI;><9F ;00 J9@< 1?C ;?,-GA>.G">59 <,A0?J/09,8?

GA>.G >59 <,A0? 1CB2 8; /0;82A0/9> 3,H0 ;?,- ,A/ 8A90C8>C 1CB2C0B>H0/ ,9 >7A0CI; ><9F ;00 J9@<1?C ;?,- GA>.G">59 <,A0?J /09,8?

!$)

!'+

$&% #'&

#&+

(&+ %*'&*%

##+ !*!

!(+ !%+

##+

$++

##+

!$$

!$$

!$$

!$$

!$$

!#&

'#+

#++

!&& ##+

!%& !))

!$) !()

!#& !'(

!!! !(#

!&! #'&

#'+

!)#

#*'

!#&

!'&

!'&

')

!+)

!$$

(+ !!&

!&)

!%+

!$+

**

##+

##%

(&

!+&

!%+

!%+!(

+

!++

!#! #$+#++

))

&)

3@&+

+6#+

+6*6

!'K$

)L

5-%&

(6!*

!6'(

K#%L

3@&+

+6#+

+6*6

!#K&

!LMN

#+

3@!+++6%++6!*6$' K!+(L MN$+

3@(++6#&+6!#6## K!#+L MN%&

3@'&+6#++6*6!# K%&L MN%+

-5!$++6$$+6$+! K!%'L MN!&

-5!$++6$$+6$+! K*'L MN!&

-5!$++6$$+6$+! K*'L MN!&

3@'++6#++6*6!' K$(L

3@'&+6#++6*6!# K%!L

3@'++6#++6*6!# K&&L

3@&&+6#++6*6!# K&*L MN#+

5-%&(6!&#6'+ K$#L

3@'++6#++6!#6!' K$)L

5-%&(6!&#6'+ K$$L

5-%&(6!&#6'+ K$$L

5-%&(6!&#6'+ K$#L

3@'++6#++6!#6!' K$)L

5-%&(6!&#6'+ K$#L

5-%&(6!&#6&# K$$L

-5!$++6$$+6$+! K!%'L MN!&

3@'++6#++6*6!' K$%L

3@!+++6$&+6!*6#& K!&*L

3@*++6#&+6!%6!* K!+)L MN#+

3@&&

+6#&

+6*6

!'K$

*L

3@&+

+6#+

+6*6

!'K$

*L

3@&+

+6#+

+6*6

!'K$

*L

5-$&

'6!#

(6$$

K#%L

5-$+

&6!+

#6#)

K#%L

5-$+

&6!+

#6$$

K##L

3@)++6$++6!#6#& K)'L

3@'++6#++6*6!* K%#L

3@'++6#++6*6!* K%$L

3@'++6#&+6!#6!' K%&L

3@&&+6#++6*6!* K%!L

3@&&+6#++6*6!# K%$L

3@!+++6$++6!'6$# K%!L MN#+

3@&+

+6#+

+6*6

!#K#

!L

5-$&

'6!#

(6$*

K#%L

3@(++6#++6*6!' K#)L

3@'++6$++6!#6!'3@'++6#++6*6!# K$%L

5-%+'6!%+6%'

3@&&+6#++6*6!# K%#L MN#+

5-%&(6!&#6'+O9

5-%&(6!&#6'+O9

B

5-&$$6#!+6)# K$+L

B

5-#&

%6!+

#6#)

K!+L

B

B

5-$+

&6!+

#6$$

5-%+

'6!%

+6%'

MN!+

#$( 3@'++6#++6*6!# K&&L MN%+

#!# 3@&&+6#++6*6!# K%!L MN$&

(! 5-$+&6!+#6#& K!&L

)& 5-$+&6!+#6#) K#&L

*) 5-$&'6!#(6$$ K#&L

!!' 5-%+'6!%+6%' K%$L

!+( 5-%+'6!%+6$* K#!L

!$$ 5-%&(6!&#6'+ K$#L !$$ 5-%&(6!&#6'+ K$#L

B B B B B

#&&#

B

&!'& $!&+

&+&+

!+&+

!&+ %$&+

$%(&

)(&

$*#&

!!+

5-%&(6!&#6'+ K#)L

#(&

BB B

0

!%&+

(&+6!%++0

!+%+

$+#+

(&+6!%++

-

!+%+

$+#+

(&+6!%++

%

-%&+6!#++

' !#++

'!++

-#++"

%%++

&#+++

3@&++6#++6*6!#3@&++6#++6*6!#

B

B

!%* 3@&&+6#++6*6!# K%)L MN!+

.#%,

!+

;)'$+

#(& ##+

!"#$%

&$;8B

&(!

&&

!%#

!$$

!"#$%

&"

!"#$%

&"><<

#$++ #%++

BBB

B

!!+

!!+

!'

;)(+!

!,

#-

#,

0&++6'++

)#&

/

-

!*++

!)$+

&++6'++

%++6&++

!!

&++

!! !! !!

&++

&++

&++

-%++6&++

!)$+

/&++6!+++

#)%+

-

-

!&++

#%&+

#++"

!&+"

,#++"

!&++

,#++"

!&++

-%++6&++

!)$+

,%++6&++

!)$+

,!&+"

,!&+"

(++

#*++

!*++

/

-#++"

&++6!+++

!&++

#(++

#+&+

#(&

(#&

B

B

B!+&+

B B BBBB

($&

'$!&

'&+

&$++

#*++

$!&+ !+++

BB!$#&

(&

5-$+

&6!+

#6#)

&#&

!+(+

!+(&

'#&

!%(& !'++

!+(&

B B

B

B

B

BB

B

(++

B B B

5-$+

&6!+

#6$$

!&++

<? !!++6!&K&L!*R!++ S $++

B

B

B

B

B

B

!-

EI EI KHINE
Line
EI EI KHINE
Line
EI EI KHINE
Line
EI EI KHINE
Line
EI EI KHINE
Line
EI EI KHINE
Text Box
A
EI EI KHINE
Text Box
A
elena
Text Box
4TH STOREY PLAN
Page 3: HDGS-SIONE-RFI-C&S-150_Parcel A1-A4 Request for Additional Beam at High ....pdf

1-1

2

3

3-1

4

A-1 B C D E

BU1100x300x241 (64)[-400]

BU1100x300x241 ([-400]

BU1100x300x241 (85)[-400]

HY1000x250x16x22 (178)[-400]

UB457x152x67 (71)[-400]

HY

HY600x200x9x12 (42) HY600x200

HY600x200x9x12 (42) HY600x200x9x

HY550x200x9x12 (42) HY550x200x9

HY750x250x14x19 (65)[-400]

HY750x250x14[-400]

UB457x152x52 (28)[-400]

UB457x152x5[-400]

BUS2400x665 (163) S460

BU

S22

00x5

65(1

53)S

460

HY

1000

x250

x16x

22(1

09)

HY

700x

200x

9x12

(55)

c=15

HY

700x

200x

9x12

(47)

c=15

HY

700x

200x

9x12

(44)

c=15

BU

1800

x300

x458

(135

)

BU2000x450x659 (187) S460

HY

700x

200x

9x16

(53)

UB

305x

102x

25(3

0)[-

400]

HY450x250x9x16 (47)[-400]

UB457x152x52

[-400]M

[-40

0]M

[-40

0]

UB

457x

152x

52(6

6)[-

400]

M

[-400]

M

[-400]H

Y60

0x20

0x9x

12(6

5)[-

400]

UB

457x

152x

52(7

8)

M M M M M

BU2000x30

M

[-40

0]

M

[-40

0]

HY700x2

50x9x1

9 (68) c=

20

UB457x1

52x67 (37

)

M

UB356x127x33

[-400]

[-40

0]

[-400]

[-400]

[-40

0]

[-400] [-400] [-400]

[-400]

[-40

0]

[-40

0]

[-40

0]

[-400]

GLASS LIFT STRUCTURE,REFER TO DWG NO. S8260

2

245

53

2433275

436

129

320

180

3461

1722

361

365

360

343

360

80

832

948

89

303

151

1459

365

360

360

80

596

756

738

2358

2183

1173

529

569

734

236

921 716

4257

3185

347

2064

3613

195

286

70

UB457x152x52

[-400]

182

M

[-40

0]

M

[-40

0]

UB

457x

152x

52

[-40

0]

UC254x254x73COL ABOVE

UC254x254x73

UC254x254x73COL ABOVE

UC254x254x73COL ABOVE

M

C25

MAIN ROOF PLAN

elena
Polygon
elena
Text Box
B
elena
Text Box
B
Page 4: HDGS-SIONE-RFI-C&S-150_Parcel A1-A4 Request for Additional Beam at High ....pdf

SECTION B-B(MAIN BUILDING ROOF LEVEL)

B13:RHS 500x300x10

UB 553x210x92

4th Storey: FL 131.50

GL TOC/TOS: 131.45

Main Building TOS: 130.05

Main Building TOC: 130.25

1100

1433

4th storeyBuilt-Up Slab

130 15

0

150

500

533

No Support Here.New beam (Bn) reqd to support

main building steel beam.[ proposed section size (Bn) : RHS 500x300xt ]

1450

SECTION A-A(4TH STOREY)

Bn:RHS 500x300xt

B13:RHS 500x300x10

UB 457x152x60

GL TOS: 302.425

3005

454

No Access Lobby to Glass Lift here.

Main Building TOS: 299.42

SL 299.67

Glass Lift Stiffener Level

B13:RHS 500x300x10

GL TOS: 298.30

No Access Lobby to Glass Lift here.

Glass Lift Stiffener Level

1120

No Support Here.New beam (Bn) reqd to support

main building steel beam.[ proposed section size (Bn) : RHS 500x300xt ]

Bn:RHS 500x300xt

SL 299.85

250

180

Page 5: HDGS-SIONE-RFI-C&S-150_Parcel A1-A4 Request for Additional Beam at High ....pdf
EI EI KHINE
Line
EI EI KHINE
Text Box
1450 mm
EI EI KHINE
Text Box
beam "Bn"
EI EI KHINE
Line
EI EI KHINE
Line
EI EI KHINE
Text Box
new beam reqd to support main building steel beam.
EI EI KHINE
Rectangle
Page 6: HDGS-SIONE-RFI-C&S-150_Parcel A1-A4 Request for Additional Beam at High ....pdf
EI EI KHINE
Line
EI EI KHINE
Text Box
3005 mm
EI EI KHINE
Text Box
TOS 299.42
EI EI KHINE
Line
EI EI KHINE
Text Box
beam "Bn"
EI EI KHINE
Line
EI EI KHINE
Text Box
new beam reqd to support main building steel beam.
EI EI KHINE
Text Box
1120 mm
EI EI KHINE
Line
EI EI KHINE
Rectangle
elena
Text Box