15
HEALTH SITUATION UPDATES: “Typhoon Milenya” Department of Health May 4, 2009 As of 9:00 am

HEALTH SITUATION UPDATES: “Typhoon Milenya”

  • Upload
    ting

  • View
    57

  • Download
    0

Embed Size (px)

DESCRIPTION

Department of Health May 4, 2009 As of 9:00 am. HEALTH SITUATION UPDATES: “Typhoon Milenya”. SITUATIONER. REPORTED CASUALTIES. DAMAGED DOH HOSPITALS. DAMAGED LGU HOSPITALS. TOP 5 MORBIDITY CASES AT EC. WATER AND SANITATION STATUS IN EC. ACTIONS TAKEN. - PowerPoint PPT Presentation

Citation preview

Page 1: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

HEALTH SITUATION UPDATES: “Typhoon Milenya”

Department of Health

May 4, 2009As of 9:00 am

Page 2: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

2

SITUATIONER

Total Affected Areas & Population

Affected Areas

Regions 5

Provinces 15

Cities 12

Municipalities 282

Barangays 5,741

Affected PopulationFamilies 1,004,590

Persons 5,024,368

No. of E.C.s (Evacuation Centers) 373

Number of Displaced Population

Inside E.C.sFamilies 145,150

Persons 762,948

Outside E.C. sFamilies 317,394

Persons 1,586,970

TotalFamilies 462,544

Persons 2,349,918

Page 3: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

3

REPORTED CASUALTIES

REGIONSCASUALTIES

DEAD INJURED MISSING TOTAL

I 200 305 400 905

3 2,586 16,025 1,692 20,303

NCR 76 253 97 426

4A 150 150 118 418

CAR 80 100 50 230

TOTAL 3,092 16,833 2,357 22,282

Page 4: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

4

DAMAGED DOH HOSPITALS

REGIONS NUMBER OF INFRASTRUCTURE EQUIPMENT TOTAL

  HOSPITALS Estimated Cost Estimated Cost EST. COST

NCR 9 67,500,000.00 40,500,000.00 108,000,000.00

I 2 15,000,000.00 9,000,000.00 24,000,000.00

III 5 37,500,000.00 22,500,000.00 60,000,000.00

IV-A 0      

CAR 1 7,500,000.00 4,500,000.00 12,000,000.00

TOTAL 17 127,500,000.00 76,500,000.00 204,000,000.00

Page 5: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

5

DAMAGED LGU HOSPITALS

REGIONS NUMBER OF INFRASTRUCTURE EQUIPMENT TOTAL

  HOSPITALS Estimated Cost Estimated Cost EST. COST

NCR 8 36,000,000.00 18,000,000.00 54,000,000.00

I 13 58,500,000.00 29,250,000.00 87,750,000.00

III 31 210,500,000.00 69,750,000.00 280,250,000.00

IV-A 15 67,500,000.00 33,750,000.00 101,250,000.00

CAR 7 31,500,000.00 15,750,000.00 47,250,000.00

TOTAL 82 404,000,000.00 166,500,000.00 570,500,000.00

Page 6: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

6

TOP 5 MORBIDITY CASES AT ECREGIONS DISEASES

NCR Cough (101)

  Viral Influenza (66)

  Cough and Fever (45)

  UTI ( 30)

  Fever (29)

I Fever ( 99)

  Cough ( 88)

  Cough and Fever ( 75)

  UTI (74)

  Acute Bronchitis (50)

III Fever and Cough ( 195)

  Acute Bronchitis ( 181)

  Diarrhea (179)

  Fever ( 159)

  UTI ( 30)

  Fever ( 123)

IV-A Viral Influenza (99)

  Cough and Fever (88)

  UTI (75)

  Acute Bronchitis (74)

  Fever ( 114)

CAR Viral Influenza (98)

  Cough and Fever (81)

  UTI (70)

  Acute Bronchitis (66)

Page 7: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

7

WATER AND SANITATION STATUS IN EC

Regions

No of Provinces

No. of E.C

Displaced Population Water Supply Toilet Facilities

Inside E.C.s Water Points Needed No. of Needed

    Available   Functional  

Families Persons        

NCR   14

1,687

8,435 39 0 170 251

I 3 63

7,591

37,954 150 39 759 1,138

III 7 191 123,220 653,300 573 2694 13,066 19599

IV-A 3 42

5,061

25,305 100 26 466 799

CAR 3 63

7,591

37,954 150 40 759 1,138

Grand Total 373

145,150

762,948 1,012

2,799 15,220 22,925

Page 8: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

8

ACTIONS TAKEN

Page 9: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

9

Health and WASH Services Provided to 5 Affected Regions:

1. Conduct Rapid Health Assessment

2. Augmented assorted drugs and medicines.

3. Medical Consultations and Referrals

4. Provision of water disinfectants and water container

5. Provisions of water testing reagents for water quality surveillance

6. Established Disease Surveillance in Evacuation Sites

7. Prepared health advisories on communicable diseases

Page 10: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

10

Additional Health and WASH Services Provided to Region III (The Worst Affected Region):

1. Deployed Medical Teams consisting of doctors and nurses to J.B. Lingad Hospital and LGU Hospitals in Zambales including Ramon Magsaysay Memorial (Iba) Medical Center and James L. Gordon Memorial Hospital (Olongapo)

2. Deployment of Mobile Water Treatment Facility and MWCI (Active WASH Cluster Member) Staff

3. Provision of Cadaver Bags

Page 11: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

11

1. Deployed representatives from HEMS to render duty at NDCC Emergency Operation Center.

2. Conducted cluster mtg. for the deployment of Surveillance and Medical Team

3. Code Red Declared in CHD and DOH hospitals in affected regions

Other DOH & Health Sector Activities

Page 12: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

12

SUMMARY OF ASSISTANCE/ LOGISTICS PROVIDED

RECIPIENT ITEMS AMOUNT

     

CHD NCR Drugs, Medicine, Vaccines 206,000.00

  Water Disinfectants, Containers 131,405.00

  Sub-Total 337,405.00

CHD 1 Drugs, Medicine, Vaccines 880,000.00

  Water Disinfectants, Containers 645,255.00

  Water Testing Reagents 110,000.00

  Sub-Total 1,635,255.00

CHD III Drugs, Medicine, Vaccines, Cadaver Bags 506,000.00

  Water Disinfectants, Containers 531,405.00

  Sub-Total 1,037,405.00

CHD IV-A Drugs, Medicine, Vaccines 1,100,000.00

  Water Disinfectants, Containers 750,000.00

  Water Testing Reagents 120,000.00

  Sub-Total 1,970,000.00

CHD CAR Drugs, Medicine, Vaccines 880,000.00

  Water Disinfectants, Containers 645,255.00

  Water Testing Reagents 110,000.00

  Sub-Total 1,635,255.00

  TOTAL 6,615,320.00

Page 13: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

13

WASH ASSISTANCE NEEDED FOR REGION 3(Worst Affected Region)

IMPACTS/ CONCERNS ASSISTANCE NEEDED QUANTITY COST

       

Water Supply      

and Sanitation Facilities      

123,220 Families HH Water Disinfectant 370440 bottles 16,669,800.00

in 191 EC Water Container 123480 pcs. 2,226,400.00

in 94 Municipalities Water Tanks 1000 pcs 20,000,000.00

  Mobile Water Tanks 100 units 9,000,000.00

  Additional Portable Water    

  Testing Equipment 7 sets 28,000,000.00

  Chlorine Granules 200 jars 80,000.00

  Toilet Facilities LS 87,100.000.00

  Handwashing and Bathing    

  Facilities LS 9,550,000.00

       

       

89,204 Damaged Repair of Damage Water LS 4,460,200,000.00

Level 1 Water Supply Facilities    

Supply Facilities      

in the community      

    Sub-Total 4,545,726,200.00

Page 14: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

14

Needs1. Restoration of basic health services (DOH

and LGU hospitals)2. Repair/Rehabilitation of damaged hospitals3. Repair and construction of damage water

facilities4. Safe water supply in evacuation centers5. Construction/Installation of toilet ,

handwashing and bathing facilities in evacuation Centers

6. Procurement of additional generator sets for hospitals

Page 15: HEALTH SITUATION UPDATES:   “Typhoon Milenya”

15

Thank You!