REDUCE MONTHLY NATURAL GAS CONSUMPTION – HVAC

Department of Mechanical Engineering, IUPUIME 414 Thermal-Fluid Systems DesignFall 2010, Professor John Toksoy

Mohammad Shams, Seyed Alireza Tabatabaei, Roozbeh Hojatpanah, Siavash Farahmand, Shahriar Ahmadi Ghoohaki

Page 2: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Y Statement Reduce monthly natural gas

consumption by 20% for the months of Dec thru Mar Set back temperature Insulation improvements

Page 3: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

The Funneling Effect

Critical Input Variables

30+ Inputs

8 - 10

4 - 8

3 - 6

Found Critical X’s

Controlling Critical X’s

10 - 15

All X’s

1st “Hit List”

Screened List

MEASURE

ANALYZE

IMPROVE

CONTROL

• Process Maps

• Failure Modes and Effects Analysis

• Multi-Vari Studies

• Design of Experiments (DOE)

• Control Plans

• C&E Matrix

Page 4: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Does the Setup Measure Energy Consumption Accurately

For each of the 24 hr data set Calculate the heater on time Calculate heating degree days Plot HDD vs. heater on time

Does it show a linear behavior

Page 5: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Analysis Heater on Time vs HDD

DateTotal Heater On Time

(hrs)

Total Heater On

Time (days)

Calculated

HDD

Theoretical

HDD

Error percent

22-Jan 0.284 0.011833333 30.05351743 30 0.17839144328-Jan 1.325 0.055208333 49.58732704 48 3.30693134229-Jan 1.328 0.055333333 50.30495225 50 0.6099044973-Feb 0.828 0.0345 36.87681015 37 0.3329455534-Feb 1.0465 0.043604167 33.9020865 35 3.1368957025-Feb 1.185 0.049375 32.6507873 32 2.0337103226-Feb 1.057 0.044041667 42.25509352 41 3.061203695

Page 6: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Analysis Heater on Time vs HDD

Calculated HDD vs. Total Heatre On Time

y = 382.75x + 23.306R2 = 0.5049

0

10

20

30

40

50

60

0 0.01 0.02 0.03 0.04 0.05 0.06

Total Heater on Time (days)

Calc

ulat

ed H

DD

Calculated HDD

Linear (Calculated HDD)

Page 7: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Analysis Heater on Time vs HDD

Caculated HDD vs. Actual HDD

y = 1.0555x - 1.788R2 = 0.9906

0

10

20

30

40

50

60

0 10 20 30 40 50 60

Calculated HDD

Linear (Calculated HDD)

Page 8: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Analysis Error Percent of Heater on Time vs HDD

Error percent

0

0.5

1

1.5

2

2.5

3

3.5

22-Jan 28-Jan 29-Jan 3-Feb 4-Feb 5-Feb 6-Feb

Error percent

Page 9: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Therms Analysis

DateTotal Heater On

Time (hrs)

Total Heater On

Time (days)

Calculated

HDD

Theoretical HDD Error

percent

Energy Consumption (BTU) Energy Consumption

(Therms)22-Jan 0.284 0.011833333 30.05351743 30 0.178391 18744 0.1874428-Jan 1.325 0.055208333 49.58732704 48 3.306931 87450 0.874529-Jan 1.328 0.055333333 50.30495225 50 0.609904 87648 0.876483-Feb 0.828 0.0345 36.87681015 37 0.332946 54648 0.546484-Feb 1.0465 0.043604167 33.9020865 35 3.136896 69069 0.690695-Feb 1.185 0.049375 32.6507873 32 2.03371 78210 0.78216-Feb 1.057 0.044041667 42.25509352 41 3.061204 69762 0.69762

BTU/hr BTU Therm-8934.34 -58704867.84 -587.0486784

Total Heat loss for heating season (9 months) : (from the excel file)

BTU/hr BTU Therm-992.7044444 -6522763.093 -65.22763093

Total Heat loss for January : (from the excel file)

BTU/hr BTU Therm-32.02272401 -210411.7127 -2.104117127

Average Daily Heat Loss for January: (form the excel file)

BTU/hr BTU Therm-8934.34 -58704867.84 -587.0486784

Total Heat loss for heating season (9 months) : (from the excel file)

BTU/hr BTU Therm-992.7044444 -6522763.093 -65.22763093

Total Heat loss for February : (from the excel file)

BTU/hr BTU Therm-35.45373016 -232955.8248 -2.329558248

Average Daily Heat Loss for February: (form the excel file)

Page 10: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Measurement Error Error due to long signal wires Filter design

Impact on mean value

Page 11: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Initial Capability Initial capability

What is the current energy usage as baseline where savings will be calculated from Degree day comparison Past 5 to 10 years gas and electric bills (kWhr used not $$$)

Calculate heat loss from the house using the excel analysis tool Make the tool more general to include individual rooms

Run transient heat transfer analysis using the Matlab tool and compare to measured data

Page 12: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Energy Cost Estimation

Date Total Heater On Time (hrs) Total Heater On Time (days) Calculated HDD Theoretical HDD Error percent Energy Consumption (BTU) Energy Consumption (Therms) Energy Cost $

22-Jan 0.284 0.011833333 30.05351743 30 0.178391443 18744 0.18744 5745.03628-Jan 1.325 0.055208333 49.58732704 48 3.306931342 87450 0.8745 26803.42529-Jan 1.328 0.055333333 50.30495225 50 0.609904497 87648 0.87648 26864.1123-Feb 0.828 0.0345 36.87681015 37 0.332945553 54648 0.54648 16749.6124-Feb 1.0465 0.043604167 33.9020865 35 3.136895702 69069 0.69069 21169.64855-Feb 1.185 0.049375 32.6507873 32 2.033710322 78210 0.7821 23971.3656-Feb 1.057 0.044041667 42.25509352 41 3.061203695 69762 0.69762 21382.053

Page 13: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Results The cost for one day at

these temperatures is: $0.33

The optimal day time temperature is: 51 Degrees F

The total running time per day is: 97 Minutes

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Number of peaks =29

T_Out

T_Reg

T_Room

Humidity

Jan 22nd

Page 14: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Results The cost for one day at

these temperatures is: $0.13

The optimal day time temperature is: 59 Degrees F

The total running time per day is: 38 Minutes

Jan 28th

Number of peaks =51

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

T_Out

T_Reg

T_Room

Humidity

Page 15: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Results

The cost for one day at these temperatures is: $0.18

The optimal day time temperature is: 47 Degrees F

The total running time per day is: 53 Minutes

Jan 29th

Number of peaks =59

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

T_Out

T_Reg

T_Room

Humidity

Page 16: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

ResultsNumber of peaks =33

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

T_Out

T_Reg

T_Room

Humidity

•The cost for one day at these temperatures is: $0.24•The optimal day time temperature is: 48 Degrees F•The total running time per day is: 71 Minutes

Feb 3rd

Page 17: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Results

The cost for one day at these temperatures is: $0.28

The optimal day time temperature is: 50 Degrees F

The total running time per day is: 83 Minutes

Number of peaks =48

0

10

20

30

40

50

60

70

80

90

100

0 5 10 15 20 25

T_Out

T_Reg

T_Room

Humidity

Feb 4th

Page 18: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Results

The cost for one day at these temperatures is: $0.27

The optimal day time temperature is: 50 Degrees F

The total running time per day is: 79 Minutes

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Number of peaks=57

T_Out

T_Reg

T_Room

Humidity

Feb 5th

Page 19: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Results

The cost for one day at these temperatures is: $0.22

The optimal day time temperature is: 49 Degrees F

The total running time per day is: 64 Minutes

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Number of peaks=50

T_Out

T_Reg

T_Room

Humidity

Feb 6th

Page 20: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

HEAT EXCHANGER DESIGN

Department of Mechanical Engineering, IUPUIME 414 Thermal-Fluid Systems DesignFall 2010, Professor John Toksoy

Mohammad Shams, Seyed Alireza Tabatabaei, Roozbeh Hojatpanah, Siavash Farahmand, Shahriar Ahmadi Ghoohaki

Page 21: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Design Parameters Process Fluid

Water Inlet 45ºC Outlet 25ºC

City Water Inlet 20ºC

Optimal Length Less Than 7 meters

Page 22: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Effective VariablesEffective Variables

Tube ThicknessShell ThicknessShell Material

M-dot Tube M-dot TubeShell I/D Shell I/D

Tube Length Tube LengthCounter / Parallel

Tube O/D Tube O/DTube Material

•Due to previous iterations these nine were the variables that had the greatest effect on Weight, Length, Q, and ∆P’s

Page 23: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Generated Matlab File

Page 24: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Initial Inputs Generating

Page 25: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Plots of Main Effect

Page 26: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Pareto Charts for Optimization• Shell side pressure drop- Shell I/D had the greatest effect• Heat Exchanger overall weight- Shell I/D and Tube Length• Tube pressure drop- Mass flow rate through the tubes, Shell I/D

and Tube Length

• Shell side pressure drop- Shell I/D had the greatest effect• Heat Exchanger overall weight- Shell I/D and Tube Length• Tube pressure drop- Mass flow rate through the tubes, Shell I/D

and Tube Length

Page 27: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Pareto Charts for Optimization

Page 28: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Optimization Plot

Page 29: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Optimization Results

Tube Side Heat Transfer ParametersNumber of Tubes, N 4169Number of Passes 1

Tubes OD 0.0063 mTubes ID 0.0054 m

Tube Length, L 4.4000 mTube Pitch, PT 0.0079 m

Heat Transfer Coefficient, h 4158.44 W/m2.C

Shell Side Heat Transfer ParametersShell ID 0.5398 m

Shell Cross Sectional Area 0.2289 m2Shell Flow Area 0.1059 m2

Shell Equivalent Diameter 0.0046 mMass Velocity, G 1028.84 kg/m2.s

Heat Transfer Coefficient, h 4419.42 W/m2.C

Overall Heat Transfer CoefficientU (Tube outside Area) 1739.11 W/m2.C

Heat Transfer RateDesired Heat Transfer Rate 5106273.07 W

Calculated Heat Transfer Rate 5133356.91 WDifference -27083.84 W

Desired - To - Calculated Ratio 0.99

HE Pressure DropShell Side ∆P 85606.84 Pa Tube Side ∆P 8115.88 Pa

Heat Exchanger WeightTotal Weight 1362.78 kg

Page 30: Heat Exchanger Design - Engineering and …engr.iupui.edu/departments/me/research/_documents/_u... · PPT file · Web view2016-10-06 · Heat Exchanger Design. Department of Mechanical

Adjusted Optimized Results

Tube Side Heat Transfer ParametersNumber of Tubes, N 3881Number of Passes 1

Tubes OD 0.0062 mTubes ID 0.0053 m

Tube Length, L 4.2759 mTube Pitch, PT 0.0077 m

Heat Transfer Coefficient, h 4087.62 W/m2*C

Shell Side Heat Transfer ParametersShell ID 0.5462 m

Shell Cross Sectional Area 0.2343 m2

Shell Flow Area 0.1084 m2

Shell Equivalent Diameter 0.0045 mMass Velocity, G 1006.65 kg/m2*s

Heat Transfer Coefficient, h 4383.64 W/m2*C

Overall Heat Transfer CoefficientU (Tube outside Area) 1715.16 W/m2*C

Heat Transfer RateDesired Heat Transfer Rate 5106273.07 W

Calculated Heat Transfer Rate 5163877.58 WDifference -57604.51 W

Desired - To - Calculated Ratio 0.99

HE Pressure Drop

Shell Side ∆P 85674.36 Pa

Tube Side ∆P 7956.80 Pa

Heat Exchanger Weight

Total Weight 1360.46 kg