16 March 2005
THE CAROLINA DEPOTTHE CAROLINA DEPOT
Helicopter Dynamics ComponentsHelicopter Dynamics ComponentsProjectProject
Robert KestlerMaterials Engineer (AIR-4.9.7.)
Naval Air Depot Cherry Point, NC
Report Documentation Page Form ApprovedOMB No. 0704-0188
Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.
1. REPORT DATE 16 MAR 2005 2. REPORT TYPE
3. DATES COVERED 00-00-2005 to 00-00-2005
4. TITLE AND SUBTITLE Helicopter Dynamics Components Project
5a. CONTRACT NUMBER
5b. GRANT NUMBER
5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S) 5d. PROJECT NUMBER
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Air Depot Cherry Point,AIR 4.9.7,Cherry Point,NC,28533
8. PERFORMING ORGANIZATIONREPORT NUMBER
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)
11. SPONSOR/MONITOR’S REPORT NUMBER(S)
12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited
13. SUPPLEMENTARY NOTES 25th Replacement of Hard Chrome and Cadmium Plating Program Review Meeting, March 15-17, 2005,Greensboro, NC. Sponsored by SERDP/ESTCP.
14. ABSTRACT
15. SUBJECT TERMS
16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as
Report (SAR)
18. NUMBEROF PAGES
7
19a. NAME OFRESPONSIBLE PERSON
a. REPORT unclassified
b. ABSTRACT unclassified
c. THIS PAGE unclassified
Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18
16 March 2005
THE CAROLINA DEPOTTHE CAROLINA DEPOT
Current StatusCurrent StatusCHCH--4646
CH-46 Generator Drive Gears Flight ClearanceWaiting to be installed900 hour testEvaluated every 100 hours
16 March 2005
THE CAROLINA DEPOTTHE CAROLINA DEPOT
Current StatusCurrent StatusCHCH--5353
CH-53 DCC-88 approvedImplementation being discussedPiston coated with WC-Co (83/17)Housings coated with Tribaloy 400One land on cylinder housing to receive plasma WC-Co
16 March 2005
THE CAROLINA DEPOTTHE CAROLINA DEPOT
Positioner Positioner HousingHousing
MS28774-022RETAINER (REF)(SEE NOTE 1)
REMOVE / INSTALL:M83461 / 1-022PACKING - 1 REQ'D
65126-11222-101PISTON (REF)
AN960PD1616LWASHER (REF)
NAS 1493-6LOCKNUT (REF)
NAS1443S6PLOCKWASHER (REF)
REWORK 65126-11305-044HOUSING ASSY TO -046PER DETAIL INSTRUCTIONS
REMOVE:S44283 SEAL (1)MS28775-330 PACKING (1)INSTALL:S37804-330BAE-5 PLUS SEAL AQ - 1 REQ'DS33861-330-10 BACKUP RING - 1 REQ'D
INSTALL:S30855-221BAE99 SEAL - 1 REQ'DS33861-221-29 BACKUP RING - 1 REQ'D
REMOVE:C12E1B-221N-01 SEAL (1)
MS27595-237
INSTALL:S33157-339-29C BACKUP
S30852339BAE-5N SEAL
REMOVE:S30662-3003 SEAL (1)MS28775-339 PACKING (1)
REWORK65126-11202-041
REMOVE / INSTALL:M83461 / 1-237
M83461 / 1-234 PACKING - 1 REQ'D
SS5088-05 NUT (REF)MS20002-6 WASHER (REF)
HEAD ASSYTO -042 PERFIGURE 2
RING - 2 REQ'D
PLUS II - 1 REQ'D
PACKING - 1 REQ'D
RETAINER (REF)
INSTALL:
16 March 2005
THE CAROLINA DEPOTTHE CAROLINA DEPOT
Cylinder AssemblyCylinder Assembly
SECTION A-AA
(SEE NOTE 3)
UR-168S RETAININGRING (REF)
REMOVE:65126-11206-101BUSHING (1)INSTALL:S34550-3006BEARING - 1 REQD
MACHINE TO1.4491.448
VA
16 March 2005
THE CAROLINA DEPOTTHE CAROLINA DEPOT
Potential Candidates forPotential Candidates forComponent TestingComponent Testing
Fwd Carrier shaft and Aft Vertical shaft testing cancelledDiscussions underway concerning testing at NAVAIR Pax RiverConsidering sun gear, pinion gear, planetary carrier
16 March 2005
THE CAROLINA DEPOTTHE CAROLINA DEPOT
Questions?Questions?