Page 1 of 2 Memorandum HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard Suite 200 La Mesa, CA 91942 [email protected] 619.462.1515 tel 619.462.0552 fax www.helixepi.com Date: March 29, 2016 To: Catherine Rom, City of San Diego Cc: Shelby Howard, HELIX Environmental Planning, Inc. From: Summer Schlageter, Biologist HELIX Environmental Planning, Inc. Bruce McIntyre, Principal Planner HELIX Environmental Planning, Inc. Subject: Post-maintenance Report for the Nestor Creek Channel Emergency Maintenance Project – Map 134 HELIX Proj. No.: SDD-24.25 Message: This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located at 1760 Palm Avenue, San Diego (See Figures 1 and 2). The information on the biological resources affected by the emergency maintenance area is based on a pre-maintenance survey conducted by Dudek on November 13, 2015, and a post-maintenance inspection conducted by HELIX Environmental Planning (HELIX), immediately following completion of the maintenance on February 6, 2016. The information is also based on the results of monitoring conducted by HELIX during the maintenance activities. PRE-MAINTENANCE CONDITIONS The vegetation communities which existed prior to maintenance are depicted in Figure 3. Photographs contained in Attachment A illustrate the pre-maintenance area. The channel was unvegetated, and had accumulated trash, debris, sediment, and loose vegetation. Vegetation communities adjacent to and along the channel were disturbed lands, disturbed Arundo-dominated wetland, and disturbed freshwater marsh. No sensitive plant or animal species were observed or detected during the pre-maintenance survey. MAINTENANCE DESCRIPTION The maintenance occurred on February 5 and 6, 2016. The maintenance involved excavation of sediment, debris, and vegetation from an earthen riprap channel segment. The maintenance took place along approximately 65 linear feet of channel with a bottom width of 15 to 22 feet and a top width of 28 feet.

HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

Page 1 of 2

Memorandum HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard Suite 200 La Mesa, CA 91942 [email protected] 619.462.1515 tel 619.462.0552 fax www.helixepi.com

Date: March 29, 2016

To: Catherine Rom, City of San Diego

Cc: Shelby Howard, HELIX Environmental Planning, Inc.

From: Summer Schlageter, Biologist HELIX Environmental Planning, Inc. Bruce McIntyre, Principal Planner HELIX Environmental Planning, Inc.

Subject: Post-maintenance Report for the Nestor Creek Channel Emergency Maintenance Project – Map 134

HELIX Proj. No.: SDD-24.25

Message:

This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located at 1760 Palm Avenue, San Diego (See Figures 1 and 2). The information on the biological resources affected by the emergency maintenance area is based on a pre-maintenance survey conducted by Dudek on November 13, 2015, and a post-maintenance inspection conducted by HELIX Environmental Planning (HELIX), immediately following completion of the maintenance on February 6, 2016. The information is also based on the results of monitoring conducted by HELIX during the maintenance activities.

PRE-MAINTENANCE CONDITIONS

The vegetation communities which existed prior to maintenance are depicted in Figure 3. Photographs contained in Attachment A illustrate the pre-maintenance area. The channel was unvegetated, and had accumulated trash, debris, sediment, and loose vegetation.

Vegetation communities adjacent to and along the channel were disturbed lands, disturbed Arundo-dominated wetland, and disturbed freshwater marsh.

No sensitive plant or animal species were observed or detected during the pre-maintenance survey.

MAINTENANCE DESCRIPTION

The maintenance occurred on February 5 and 6, 2016. The maintenance involved excavation of sediment, debris, and vegetation from an earthen riprap channel segment. The maintenance took place along approximately 65 linear feet of channel with a bottom width of 15 to 22 feet and a top width of 28 feet.

Page 2: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

Page 2 of 2

Memorandum (cont.) HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard Suite 200 La Mesa, CA 91942 619.462.1515 tel 619.462.0552 fax www.helixepi.com

Maintenance on February 4 involved preparing the site including installing a pump and hose upstream behind a sand bag berm approximately 3 feet high and 2.5 feet deep placed across the bottom of the channel upstream of the work area. Water from the concrete channel upstream was diverted downstream of the work limits. An excavator was the primary piece of equipment used in the maintenance. Crews used the excavator to remove vegetation and silt build up from within the channel and deposit it into a haul truck for removal from the site. The Urban Corps of San Diego County were also on site raking trash and removing vegetation from the channel with hand-held tools. Maintenance activities on February 5 involved continual removal of vegetation and debris adjacent to the channel using an excavator. The debris was then loaded into a haul truck for removal from the site. The Urban Corps of San Diego County were on site removing trash and raking vegetation from within the channel using hand-held tools. The project impacted 0.02 acre (65 linear feet) of wetland waters of the U.S. (disturbed freshwater marsh) within the earthen-lined section of Nestor Creek through the removal of accumulated sediment and vegetation. The project also temporarily impacted 0.002 acre of non-wetland waters of the U.S. of Nestor Creek by the sandbag berm. An estimated 62 cubic yards of sediment and vegetation were removed during the maintenance. All equipment and material were removed upon completion of the work. MAINTENANCE MONITORING

HELIX biologists were present throughout the maintenance activity. Monitoring was conducted by HELIX biologist Talaya Rachels, on February 5, and by HELIX biologist, Laura Moreton, on February 6, 2016. Total impacts to jurisdictional areas were 0.02 acre of wetlands waters of the U.S. (disturbed freshwater marsh). Throughout the maintenance, the biological monitors confirmed that the maintenance was confined to the pre-determined area, and that appropriate Best Management Practices were implemented to protect against excessive erosion and impact to adjacent areas.

POST-MAINTENANCE CONDITIONS

Upon completion of the maintenance, the maintained area was devoid of vegetation, as illustrated in the photographs contained in Attachment B.

If you have any questions or comments on this memo, please contact me or Shelby Howard.

Page 3: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

CampoImperialBeach

ChulaVista

NationalCity Bonita

Coronado

LemonGrove

LaMesa

Poway

Encinitas

San Diego

Carlsbad

SanMarcos Escondido

VistaValleyCenter

Camp PendletonSouth Hidden

MeadowsOceanside

Bonsall

CampPendleton

North

Fallbrook

Rainbow

Jamul

Rancho SanDiego

SpringValley

AlpineHarbisonCanyon

Lakeside PineValley

El Cajon

Santee

Ramona San DiegoCountryEstates

Julian

BorregoSprings

SanClemente

DanaPoint

San JuanCapistrano

g

Temecula

Jacumba

Boulevard

Santa Ysabel

Imperial County

Orange

County

San Diego

CountySan Diego County

San Diego County

Riverside CountyS a l t o n

S e a

P a c i f i c

O c e a n

905

195

274

209

1

163

98

56

75

371111

52

86

67

7679

94

78

15

8

15

8

5

805

5

M E X I C OM E X I C OCopyright:' 2014 Esri

FIGURE 1

Regional MapNestor Creek Channel (MMP Map 134) - Emergency Channel Maintenance

0 155 10Miles

Project Site

Page 4: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

905

75 5

Vicinity MapNestor Creek Channel (MMP Map 134) - Emergency Channel Maintenance

SOURCE: USGS 7.5-Minute Series - Imperial Beach Quadrangle.

Date:

12/31

/2015

- L

ast s

aved

by: h

pann

o -

Path

: Z:\P

rojec

ts\Ci

tyofS

DAsN

eede

d\j93

5701

\MAP

DOC\

DOCU

MEN

T\Re

portF

igure

s\Nes

torCr

eekC

hann

el 13

4\Figu

re2_

Vicin

ity.m

xd

0 1,900950Feet

Channel Survey AreaFigure 3 (MMP Map 134)

FIGURE 2

Figure 3 (MMP Map 134)

Page 5: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

OW_CC

FWM_CC

DEV

DEV

DEV

FWM_CC

FWM_CC

FWM_CC

FWM_CC

DEV

DW_ARU

DL

DL

dFWM

CYPRESS ST

UN

NA

MED

ST

PALM (SB) AV

18TH

ST

DORIS ST

THER

MA

L AV

CALLA ST

CEDAR (SB) ST

BET

TY (S

B) S

T

ALI

CE

(SB

) ST

Biological Resources and ImpactsNestor Creek Channel (MMP Map 134) - Emergency Channel Maintenance

SOURCE: SANDAG Imagery 2015; Helix 2015; City of San Diego 2015; California Coastal Commission, 2012.

Date:

12/29

/2015

- L

ast s

aved

by: h

pann

o -

Path

: Z:\P

rojec

ts\Ci

tyofS

DAsN

eede

d\j93

5701

\MAP

DOC\

DOCU

MEN

T\Re

portF

igure

s\Nes

torCr

eekC

hann

el 13

4\Figu

re3_

Biolo

gicalR

esou

rces_

Impa

cts_N

estor

Cree

kCha

nnel.

mxd

Channel Survey Area

Coastal ZonesCoastal Commission Appealable AreaCoastal Commission Permit JurisdictionCoastal Zone BoundaryDefferred Certification AreaNon Appealable Area 1Non Appealable Area 2

ImpactsChannel Maintenance Impact AreaAccess/Staging Area

Jurisdictional DelineationACOE/RWQCB/CDFWCDFW OnlyVegetation CommunitiesDEV, DevelopedDL, Disturbed LandsDW_ARU, Disturbed Wetland (Arundo-dominated)

FWM_CC, Fresh Water Marsh (Concrete-Lined)

OW_CC, Open Water (Concrete-Lined)dFWM, Disturbed Fresh Water Marsh

MMP Map 134; Figure 3

0 6030Feet

Channel Survey Area

Page 6: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

ATTACHMENT A

Nestor Creek Channel Emergency Channel Maintenance, MMP Map 134

Photograph Log

Photograph 1: Looking downstream (west) from the center of the concrete lined section of the channel toward the west end of MMP Map 134; Figure 3.

(November 13, 2015; 10:14am)

Photograph 2: Looking south within the north end of the Access/Staging area in MMP Map 134; Figure 3 .

(November 13, 2015; 10:29am)

Page 7: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

Photograph 3: Looking south towards the earthen channel impact area and adjacent properties from the staging area in the northwest end of MMP Map 134; Figure 3.

(November 13, 2015)

Photograph 3: Looking northeast at the properties adjacent to the proposed emergency impact area (see Arundo on right side of photo) at the northwest end of MMP Map 134; Figure 3.

(November 13, 2015)

Page 8: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

Photograph 4: Looking upstream from the northern end of the Access/Staging area towards disturbed freshwater marsh and adjacent properties in MMP Map 134; Figure 3.

(November 13, 2015; 10:21am)

Page 9: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

G\PROJECTS\S\SDD-ALL\SDD-24_Stormwater\25_As-needed O&M_Emergency Support\Nestor Map 134\Photos During and Post-construction Photograph Log

NESTOR CREEK CHANNEL EMERGENCY MAINTENANCE, MMP MAP 134

Attachment B

Excavator clearing channel (facing north).February 5, 2016

Excavator clearing channel (facing south).February 5, 2016

Page 10: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

G\PROJECTS\S\SDD-ALL\SDD-24_Stormwater\25_As-needed O&M_Emergency Support\Nestor Map 134\Photos During and Post-construction Photograph Log

NESTOR CREEK CHANNEL EMERGENCY MAINTENANCE, MMP MAP 134

Attachment B

Bypass pump hung above channel.February 5, 2016

Cleared channel (facing north).February 5, 2016

Page 11: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

G\PROJECTS\S\SDD-ALL\SDD-24_Stormwater\25_As-needed O&M_Emergency Support\Nestor Map 134\Photos During and Post-construction Photograph Log

NESTOR CREEK CHANNEL EMERGENCY MAINTENANCE, MMP MAP 134

Attachment B

Removal of trash and vegetation from within the channel using hand-held tools.February 6, 2016

Debris loading into dump truck for removal from site.February 6, 2016

Page 12: HEP Memo Template - San Diego...This memo documents the pre- and post-maintenance conditions associated with emergency maintenance in an earthen bottom, riprap-lined channel located

G\PROJECTS\S\SDD-ALL\SDD-24_Stormwater\25_As-needed O&M_Emergency Support\Nestor Map 134\Photos During and Post-construction Photograph Log

NESTOR CREEK CHANNEL EMERGENCY MAINTENANCE, MMP MAP 134

Attachment B

Cleared downstream portion of channel.February 6, 2016

Cleared channel (facing south).February 6, 2016