12
HERA-Experim.-Coord.03/28 /06 1 HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY Luminosity • Polarization • Operations • Developments • Plans

HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY

  • Upload
    guang

  • View
    48

  • Download
    2

Embed Size (px)

DESCRIPTION

HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY. Luminosity Polarization Operations Developments Plans. Beam Currents. RF conditioning during injection seems to be successful so far  get to 39mA positron current quickly. Efficiency. - PowerPoint PPT Presentation

Citation preview

Page 1: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 1

HERA Status March 2006HERA-Experiments-Coordination March 28, 2006

F. Willeke, DESY

• Luminosity

• Polarization

• Operations

• Developments

• Plans

Page 2: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 2

Beam Currents

RF conditioning during injection seems to be successful so far

get to 39mA positron current quickly

Page 3: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 3

Efficiency

Page 4: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 4

Specific Luminosities

Page 5: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 5

Luminosity Production

Page 6: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 6

Polarisation

No change w.r.t. last year

30-40 % for the colliding, good polarization for non-

colliding bunches

Machine interested in flipping rotators one-by-one starting at next maintenance day

Page 7: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 7

H1 Backgrounds: Quick recovery of IR vacuum and gas induced p-

backgrounds

Page 8: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 8

ZEUS p Backgrounds:improved by using complementary collimator set

Page 9: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 9

HERMES Target Cell

new target cell is heating up due to HOML‘s during 12GeV positron injection limits e beam intensity at present (~39mA)

Synchrotron Radiation heating at 27.5GeV?

Page 10: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 10

Successful commissioning of longitudinal broad band damper system short bunches

(1ns) at 920GeV

FWHM=1.1nsFWHM=1.1ns

Enhanced emittance growth (IBS, RF noise)

Need more RF voltage

Factor of 2 reserve available needs more work

Beam energyBeam energy

Bunchlength FWHMBunchlength FWHM

FWHM=2.8nsFWHM=2.8ns

Page 11: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 11

HERA Week #12 2006

Intergrated Luminosity: 7.9 pb-1 (Z), Peak : Lp 4.68 1031cm-2s-1

Efficiency: 73%

ZEUS Backgrouind problems reduced

Only minor technical problems

Page 12: HERA Status March 2006 HERA-Experiments-Coordination  March 28, 2006 F. Willeke, DESY

HERA-Experim.-Coord.03/28/06 12

Further Plans• Consolidate operations with high beam currents (>40mA

positrons, 100mA protons) and high specific luminosity• Prepare luminosity optics with

xp:2.30, yp=16cm (& matched e-beam)• Use long feedback in routine operation• Increase RF Voltage by a factor of 2• Increase the number of bunches to 180 to raise the

intensity limitation by the HERMES target cell• Explore injection with frequency offset.• Maintenance day April 5 with IR warm-up North (and South?)