66

Hetero Infra SEZ TOR Covering Letter - Welcome to …heterodrugs.com; [email protected] Telephone Number Direct: +91 – 40 – 23704923/24/25 Hetero Infrastructure SEZ

Embed Size (px)

Citation preview

HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE,  NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT,  

ANDHRA PRADESH     

   

ADDITIONAL INFORMATION         

            

     

 

Project No. 1115‐04‐01 November 2015 

 

Hetero Corporate Office 7‐2‐A2, Industrial Estate, Sanath Nagar,  Hyderabad – 500 018 Phone: 040‐23704923/24/25 Fax: 040‐23704926 Mobile: +91 9395102624 E‐mail: [email protected]                

STUDIES AND DOCUMENTATION BYTEAM Labs and Consultants B‐115‐117 & 509, Annapurna Block,  Aditya Enclave, Ameerpet,  Hyderabad‐500 038. Phone: 040‐23748 555/23748616, Telefax: 040‐23748666      

 

SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, 

ANDHRA PRADESH, GOVERNMENT OF INDIA

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES:‐  

S.No  Information required  Information to be furnished by the proponents 1. Name of the   project or activity  Hetero Infrastructure SEZ Ltd  

6.1 MW ‐ Co‐generation Plant  2. Name of the organization/owner.   Hetero Infrastrucutre SEZ Ltd.  

3. Address for communication   Hetero Corporate Office 7‐2‐A2, Industrial Estate, Sanath Nagar, Hyderabad, Telangana. 

4. Telephone numbers   Direct: +91 – 40 – 23704923/24/25 Mobile: +91‐9395102624 

5. Email ID of the organization or contact person 

Email: [email protected] ; [email protected];  [email protected] 

6. Location  of  the  Proposed  project  or activity 

Hetero Infrastructure SEZ Ltd.  Sy. No. 125, 138 & 150,   N. Narasapuram Village, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. 

7. Appraisal Category (B2 or B1)  B1 

8. Nearest  habitation  and  distance  from the project or activity 

Janakayyapeta  Village is at a distance of 1. 2 Km ‐ NE 

9. Installed  capacity  /  Production Capacities 

Description  MW Installation of Turbine  6.1 

10. Specify  the  Fuel  (Coal  /  CNG  / biomass/Others) and quantity required 

 

11. Details of  Land use/Land Cover  Existing Plant area of Hetero Infrastructure SEZ Ltd.,  

12. Occupancy,  ownership  of  the  land  in which the activity is proposed: (Government  land  /  Private  land  / Forest  land  /Revenue  land  /Temple land  /leased  land/  land  belongs  to other  Department) 

Hetero Infrastructure SEZ Ltd.  Sy. No. 125, 138 & 150,   N. Narasapuram Village, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. 

13. If  it  is  a  Forest  land,    the  following details shall be furnished: (Whether  it  is  a  Reserved  forest  / Protected  forest/Demarcated  forest/ National Parks/Sanctuaries/any  land  in possession of Forest Department.) (The village map with Sy. No. indicating nearest forest boundary line from the site shall be enclosed) 

Not applicable 

14. Total  investment  of  the project/activity. 

Rs: 11.45 Crores 

15. a. Funds allocated for EMP (capital cost and recurring cost per    annum) 

 

16. Brief  description  of  the  project  with special  reference  to  specific  pollution and its control measures. 

Proposal  is  for  Installation  of  turbine  to  generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler.

17. Compliance report on the following :    

i. Status  of  compliance  of  the conditions  and  environmental safeguards stipulated  in the earlier clearance letters.  

Enclosed at Annexure of FORM I Application 

ii. Details  of  the  court  cases,  if  any, pending in any Court of Law against the  project  as  well  as  any directions  passed  by  the  Court relating  to  the  project  directly  or indirectly. 

NA 

iii. Details of the notices,  if any, given to  the  project  under  Section  5  of the Environmental (Protection) Act, 1986  and  Section  18  of  the  Air (Prevention & Control of Pollution) Act, 1981. 

NA 

18. Name of the Consultant:  M/s TEAM Labs and Consultants 

 

HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE,  NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT,  

ANDHRA PRADESH     

   

1. FORM I 2. PRE‐FEASIBILITY REPORT                          

Project No. 1115‐04‐01 November 2015 

Hetero Corporate Office 7‐2‐A2, Industrial Estate, Sanath Nagar, Hyderabad – 500 018 Phone: 040‐23704923/24/25 Fax: 040‐23704926 Mobile: +91 9395102624 E‐mail: [email protected] 

STUDIES AND DOCUMENTATION BYTEAM Labs and Consultants B‐115‐117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad‐500 038. Phone: 040‐23748 555/23748616, Telefax: 040‐23748666 

 

SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, 

ANDHRA PRADESH, GOVERNMENT OF INDIA

HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE,  NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT,  

ANDHRA PRADESH     

   

FORM I                             

Project No. 1115‐04‐01 November 2015 

Hetero Corporate Office 7‐2‐A2, Industrial Estate, Sanath Nagar, Hyderabad – 500 018 Phone: 040‐23704923/24/25 Fax: 040‐23704926 Mobile: +91 9395102624 E‐mail: [email protected] 

STUDIES AND DOCUMENTATION BYTEAM Labs and Consultants B‐115‐117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad‐500 038. Phone: 040‐23748 555/23748616, Telefax: 040‐23748666 

 

SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, 

ANDHRA PRADESH, GOVERNMENT OF INDIA

Hetero Infrastructure SEZ Ltd. 

Form I        Page 1 

APPENDIX – I (See Paragraph – 6) 

FORM I I)  Basic Information S.No.  Item  Details 1  Name of the Project/s  Hetero Infrastructure SEZ Ltd 2  S. No in the Schedule   1(d) – B category – Thermal Power Plants 3  Proposed capacity/area/length/tonnage to be 

handled/command area/lease area/number of wells to be drilled 

6.1 MW ‐ Co‐generation Plant  No additional land is required. 

4  New/Expansion/Modernization  Installation  of  turbine  to  generate  6.1  MW  power utilizing steam from existing 45 TPH coal fired boiler 

5  Existing Capacity/Area etc.  Not Applicable 6  Category of Project i.e 'A' or 'B'  “B” 7  Does it attract the general condition? If yes, 

please specify No 

8  Does it attract the Specific condition? If yes, please specify. 

No 

9  Location      Plot/Survey/Khasra No.  Sy. No. 125, 138 & 150   Village  N. Narasapuram Village   Tehsil  Nakkapally Mandal   District  Visakhapatnam  State  Andhra Pradesh 

10  Nearest railway station/airport along with distance in km. 

Railway Station: Narsipatnam – 9 Km  Airport : Visakhapatnam Airport – 63 Km  

11  Nearest Town, City, District Headquarters along with distance in kms. 

Town – Tuni – 20 Km   

12  Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 

Nakapally Panchayat   

13  Name of the Applicant  Hetero Infrastructure SEZ Ltd.  14  Registered Address  Hetero Infrastructure SEZ Ltd.  

Sy. No. 125, 138 & 150,   N. Narasapuram Village, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. 

15  Address for Correspondence:     Name  K.V. Bhaskar Reddy   Designation(Owner/Partner/CEO)  Director   Address  Hetero Corporate Office 

7‐2‐A2, Industrial Estate, Sanath Nagar,  Hyderabad, Telangana. 

  Pin Code  500 018   E‐mail  Email: [email protected] ; 

[email protected];  [email protected] 

  Telephone Number  Direct: +91 – 40 – 23704923/24/25 

Hetero Infrastructure SEZ Ltd. 

Form I        Page 2 

Mobile: +91‐9395102624   Fax No.  +91 – 40 – 23704926 

16  Details of alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 

Not Applicable. 

17  Interlinked Projects  Not applicable 18  Whether separate application of interlinked 

project has been submitted? Not applicable 

19  If yes, date of submission  Not applicable 20  If no, reason  Not applicable 21  Whether the proposal involves 

approval/clearance under: if yes, details of the same and their status to be given.                             (a) The Forest (Conservation) Act, 1980?               (b) The Wildlife (Protection) Act, 1972?                (c) The C.R.Z Notification, 1991? 

No 

22  Whether there is any Government Order/Policy relevant/relating to the site? 

 No 

23  Forest land involved (hectares)   No 24  Whether there is any location pending against 

the project and /or land in which the project is propose to be set up?                                                  (a) Name of the Court                                                  (b) Case No                                                         (c) Orders/directions of the Court, if any and its relevance with the proposed project. 

No  

Hetero Infrastructure SEZ Ltd. 

Form I        Page 3 

(II)  Activity  1.  Construction,  operation  or  decommissioning  of  the  Project  involving  actions,  which  will  cause  physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate quantities 

/rates, wherever possible) with source of information data 

1.1  Permanent or temporary change in land use, land cover or topography including increase in    intensity of land use (with respect to local     land use plan) 

NO  The  proposal  is  for  Installation  of  turbine  to generate  6.1  MW  power  utilizing  steam  from existing 45 TPH coal fired boiler.  

1.2  Clearance of existing land, vegetation and buildings? 

NO   

1.3  Creation of new land uses?  NO  Existing land use – Industrial 1.4  Pre‐construction investigations e.g. 

bore houses, soil testing? YES  Soil test done  

1.5  Construction works?      YES  Construction  activity  involves M/C  Foundation  and other structures for installation of turbine. 

1.6  Demolition works?  NO   1.7  Temporary sites used for construction 

works or housing of construction workers? 

NO  Construction  labor  from  local  villages  shall  be employed. 

1.8  Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 

YES  Structural work for installation of turbine.  

1.9  Underground works including mining or   tunneling? 

NO  No underground works like mining and tunneling.  

1.10  Reclamation works?  NO   1.11  Dredging?   NO   1.12  Offshore structures?  NO   1.13  Production and manufacturing 

processes? YES  Enclosed in Annexure – II 

1.14  Facilities for storage of goods or materials? 

NO  The  proposal  is  for  Installation  of  turbine  to generate  6.1  MW  power  utilizing  steam  from existing 45 TPH coal fired boiler 

1.15  Facilities for treatment or disposal of solid waste or liquid effluents? 

YES  The  proposal  is  for  Installation  of  turbine  to generate  6.1  MW  power  utilizing  steam  from existing 45 TPH coal fired boiler 

1.16  Facilities for long term housing of operational workers? 

NO  No housing proposed 

1.17   New road, rail or sea traffic during construction or operation? 

NO   

1.18   New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 

NO   

1.19   Closure or diversion of existing transport routes or infrastructure 

NO   

Hetero Infrastructure SEZ Ltd. 

Form I        Page 4 

leading to changes in traffic movements? 

1.20  New or diverted transmission lines or pipelines? 

NO   

1.21  Impoundment, damming, culverting, realignment or other changes to the hydrology   of watercourses or aquifers? 

NO   

1.22  Stream crossings?  NO   1.23  Abstraction or transfers of water form 

ground or surface waters? NO  The  proposal  is  for  Installation  of  turbine  to 

generate  6.1  MW  power  utilizing  steam  from existing 45 TPH coal fired boiler. Existing water  balance  is  presented  in Annexure  – III. 

1.24  Changes in water bodies or the land surface affecting drainage or run‐off? 

NO   

1.25  Transport of personnel or materials for construction, operation or decommissioning? 

YES  The construction material shall be drawn from  local sources within 10 – 15 km.  There is no transport of personnel,  as  the  construction  workers  shall  be drawn from local villages. 

1.26  Long‐term dismantling or decommissioning or restoration works? 

NO   

1.27  Ongoing activity during decommissioning which could have an impact on the environment? 

NO   

1.28  Influx of people to an area in either temporarily or permanently? 

NO   

1.29  Introduction of alien species?  NO   1.30  Loss of native species or genetic 

diversity? NO   

1.31  Any other actions?  NO   

Hetero Infrastructure SEZ Ltd. 

Form I        Page 5 

2.   Use  of Natural  resources  for  construction  or  operation  of  the  Project  (such  as  land, water, materials  or energy, especially any resources which are non‐renewable or in short supply): S.No.  Information/checklist confirmation  Yes/No  Details thereof (with approximate quantities /rates, 

wherever possible) with source of information data 2.1  Land especially undeveloped or 

agricultural land (ha) NO  The proposal is for Installation of turbine to generate 

6.1 MW power utilizing steam from existing 45 TPH coal fired boiler 

2.2   Water (expected source & competing users) unit: KLD 

NO  The proposal  is  for  Installation of turbine to generate 6.1 MW  power  utilizing  steam  from  existing  45  TPH coal fired boiler.  Existing water balance is presented in Annexure – III. 

2.3  Minerals (MT)  NA   2.4  Construction material – stone, 

aggregates, sand / soil (expected source – MT) 

YES  Will be sourced from the local villages. 

2.5  Forests and timber (source – MT)  NO   2.6  Energy including electricity and fuels 

(source, competing users) Unit: fuel (MT), energy (MW) 

YES  The required steam (high pressure) for turbine shall be met  from  existing  45  TPH  coal  fired  boiler.  The stepping    down  pressure  in  turbine  is  reused  for process and effluent treatment system. 

2.7  Any other natural resources (use appropriate standard units) 

NA   

Hetero Infrastructure SEZ Ltd. 

Form I        Page 6 

3.   Use,  storage,  transport, handling or production of  substances       or materials, which  could be harmful  to human health or the environment or raise concerns about   actual or perceived risks to human health. S.No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 3.1  Use of substances or materials, which 

are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and  water supplies) 

NO   

3.2  Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases). 

NO   

3.3  Affect the welfare of people e.g. by changing living conditions? 

NO   

3.4  Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 

NO  No sensitive receptors are present  in the  immediate vicinity of the site.  

3.5  Any other causes  NO    

4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data4.1  Spoil, overburden or mine wastes  NO4.2  Municipal waste (domestic and or 

commercial        wastes) NO   

4.3  Hazardous wastes (as per Hazardous Waste  Management Rules) 

YES  Hazardous  waste  generation  during  construction shall be  limited to waste oils, which shall be sent to authorized recyclers.  

4.4  Other industrial process wastes  NO   4.5  Surplus product  NO4.6  Sewage  sludge  or  other  sludge  from 

effluent  treatment NO   

4.7  Construction or demolition wastes  NO  Construction  activity  involves M/C  Foundation  and other structures for installation of turbine. 

4.8  Redundant machinery or equipment  NO   4.9  Contaminated soils or other materials NO4.10  Agricultural wastes  NO   4.11  Other solid wastes  YES  Waste oil from turbine. 

 

Hetero Infrastructure SEZ Ltd. 

Form I        Page 7 

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No.  Information/Checklist confirmation  Yes/No Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 5.1  Emissions from combustion of fossil 

fuels from stationary or mobile sourcesNO  Emissions from existing 45 TPH coal fired boiler will be 

let  out  into  atmosphere  after  passing  through  Bag filters.  Details  of  stack  emission  presented  in Annexure IV.  

5.2  Emissions from production processes  NO  No process emission will generated as the proposal is for  installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler. 

5.3  Emissions from materials handling including storage or transport 

NO   

5.4  Emissions from construction activities including plant and equipment 

YES  Dust  may  rise  during  transport  of  material  and construction  activity.    The  dust  emissions  shall  be mitigated by closed construction.    

5.5  Dust or odors from handling of materials including construction materials, sewage and  waste 

NO   

5.6  Emissions from incineration of waste  NO   5.7  Emissions from burning of waste in 

open air (e.g. slash materials, construction debris) 

NO   

5.8  Emissions from any other sources  NO   

Hetero Infrastructure SEZ Ltd. 

Form I        Page 8 

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No.  Information/Checklist confirmation Yes/No  Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data with source of information data 

6.1  From operation of equipment e.g. engines, ventilation plant, crushers 

YES  Material transport and construction equipment shall be source  of  noise, while  transfer  pumps,  Turbine  is  the source of noise during operation.   

6.2  From industrial or similar processes  NO   6.3  From construction or demolition  YES  Noise during construction shall be due to construction 

equipment and emergency DG sets.    6.4  From blasting or piling  NO   6.5  From construction or operational 

traffic NO  The  increased  traffic  shall  not  have  any  significant 

impact.  6.6  From lighting or cooling systems  NO   6.7  From any other sources  NO   

  7.Risks of contamination of land or water from releases of    pollutants into the ground or into sewers,   surface     waters, groundwater, coastal waters or the sea: S.No.  Information/Checklist confirmation  Yes/No Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 7.1  From handling, storage, use or spillage 

of hazardous materials NO   

7.2  From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 

NO   

7.3  By deposition of pollutants emitted to air into the land or into water 

NO  

7.4  From any other sources  NO   7.5  Is there a risk of long term build up of 

pollutants in environment from these     sources? 

NO  

 

Hetero Infrastructure SEZ Ltd. 

Form I        Page 9 

8.Risk of  accidents during  construction or operation of  the Project, which  could  affect human health or  the environment 

S.No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate quantities/rates, wherever possible) with source of information data 

8.1  From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 

YES  All  Inbuilt  Safety  precautions  will  be adopted  and  there  will  not  be  any damage  to  environment  or  human health. 

8.2  From any other causes  NA   8.3  Could the project be affected by natural disasters 

causing environmental damage (e.g.     Floods, earthquakes, landslides, cloudburst etc)? 

NO   

  9.Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts  with  other existing or planned activities in the locality S. No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate 

quantities/rates, wherever possible) with source of information data 

9.1  Lead to development of supporting.   facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) •      housing development •      extractive industries •      supply industries •      other 

YES  The  project  shall  enhance  the  socio economic status of the area, improving the  employment.  There  are  no major support  industries  required  for  this plant. 

9.2  Lead to after‐use of the site, which could haven impact on the environment 

NO   

9.3  Set a precedent for later developments  NO   

9.4  Have cumulative effects due to proximity to other existing or planned projects with similar    effects 

NO  The  baseline  environmental  status  of the  surrounding  areas  is  within  the prescribed  limits as observed  from the Secondary data. 

 

         

Hetero Infrastructure SEZ Ltd. 

Form I        Page 10 

(III)  Environmental Sensitivity S.No.  Areas  Name/ 

Identity Aerial distance  (within 15 km.) Proposed project location boundary 

1   Areas protected under international conventions,  national  or  local  legislation  for  their  ecological,  landscape, cultural or other related value 

NA   

2  Areas  which  are  important  or  sensitive  for ecological  reasons  ‐  Wetlands,  watercourses  or other  water  bodies,  coastal  zone,  biospheres, mountains, forests 

YES  Rajayyapeta RF – 4.5 Km – S Donevani Lakshmipuram RF–5.7 Km‐SW Vempadu RF – 8.6 Km ‐ SW  Payakaraopeta RF – 9 Km – NW Bay of Bengal – 4 Km ‐ SE 

3  Areas  used  by  protected,  important  or  sensitive  species  of  flora  or  fauna  for  breeding,  nesting, foraging, resting, over wintering, migration 

NA     

4   Inland, coastal, marine or underground waters  NO   5   State, National boundaries  NO   6   Routes or  facilities used by  the public  for access 

to recreation or other tourist, pilgrim areas NO   

7   Defense installations  NO   8   Densely populated or built‐up area  YES  Nakkapalli  – 4 Km ‐ N 

9   Areas occupied by sensitive man‐made land uses  (hospitals, schools, places of worship, community facilities) 

NA  4 Km from the site 

10  Areas containing important, high quality or scarce resources  (ground  water  resources,  surface resources, forestry, agriculture, fisheries, tourism, minerals) 

NO   

11  Areas  already  subjected  to  pollution  or  environmental damage. (those where existing legal environmental standards     are exceeded) 

NO   

12   Areas  susceptible  to natural hazard which  could  cause  the  project  to  present  environmental problems  (earthquakes,  subsidence,  landslides, erosion,  flooding  or  extreme  or  adverse  climatic conditions) 

NO       

 (IV) Proposed Terms of Reference for EIA studies      Scope of Work of EIA 

The standard terms of reference (page 65‐71)  issued by the Ministry of Environment Forest and Climate change shall  be  followed  for  preparation  of  EIA  report.    Any  additional  study  proposed  by  the  SEAC  shall  also  be completed. 

Ref:  Standard  Terms  of  Reference  (TOR)  for  EIA/EMPO  report  for  projects/activities  requiring  environmental clearance under EIA notification, 2006, MoEFCC, GOI, April 2015. 

HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE,  NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT,  

ANDHRA PRADESH     

   

ANNEXURES         

            

     

 

Project No. 1115‐04‐01 November 2015 

 

Hetero Corporate Office 7‐2‐A2, Industrial Estate, Sanath Nagar,  Hyderabad – 500 018 Phone: 040‐23704923/24/25 Fax: 040‐23704926 Mobile: +91 9395102624 E‐mail: [email protected]                

STUDIES AND DOCUMENTATION BYTEAM Labs and Consultants B‐115‐117 & 509, Annapurna Block,  Aditya Enclave, Ameerpet,  Hyderabad‐500 038. Phone: 040‐23748 555/23748616, Telefax: 040‐23748666      

 

SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, 

ANDHRA PRADESH, GOVERNMENT OF INDIA

Hetero Infrastructure SEZ Ltd. Form I Annexures

            Page 1

Loca

tion

Map

of

Het

ero

Infr

astr

uctu

re S

EZ L

td.

Hetero Infrastructure SEZ Ltd. Form I Annexures

            Page 2

Plan

t Lay

out o

f H

eter

o In

fras

truc

ture

SEZ

Ltd

.

Hetero Infrastructure SEZ Ltd. Form I Annexures

            Page 3

ANNEXURE - II

M/s. Hetero Infrastructure SEZ Ltd., proposed to Install turbine to generate 6.1 MW power

utilizing steam from existing 45 TPH coal fired boiler in Hetero Infrastructure SEZ Ltd., at ,

N. Narasapuram, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. The

proposal is for inclusion of Turbine only, and does not entail any increase in permitted

pollution loads of Environment Clearance obtained, vide letter no. 21-641/2007-IA.III dated

25.10.2010.

Process Description

The medium pressure and medium temperature steam generated in boiler will enter a multi-

stage turbine and will cause the turbine shaft to rotate. In this process, the steam will loose its

temperature and pressure. As the pressure is coming down volume will increase, thereby

increasing velocity of flow in the turbine. This thermal energy getting converted to mechanical

energy will rotate the turbine shaft which is rigidly coupled to generator. An electrical

generator coupled to the steam turbine shaft will rotate in a magnetic field and generate

electrical power of 6.1 MW at voltage of 11 KV. A small percentage of electrical power thus

produced will be used in the power plant itself to energies the rotating equipment like the FD

fan and ID fan of boiler, the feed water pumps, lighting etc

Technical Specifications of Turbine Parameter Specification No. of Turbines 1 (one) Type Multi stage, horizontal split casing, high speed

with gear box, impulse type, extraction cum Condensing with air cooled condenser

Rated Output 6.1 MW @ 26 TPH process steam @ 9 bar Speed of Turbine Shaft 7556 RPM Speed of Generator Shaft 1500 RPM Gear box Provided with SF 1.4, ratio = 5,03:1 Rotation (Viewed from turbine front) Clock Wise Main steam conditions at stop valve Inlet steam pressure

64 ATA, 485 C, 45 TPH

Type of Governing Electronic

Hetero Infrastructure SEZ Ltd. Form I Annexures

            Page 4

Technical Specifications of Generator Parameter Specification No. Of generators 1(One) Type Three phase synchronous generator, totally enclosed air cooled

with air to water heat exchanger, horizontal and indoor. Output 6.1 MW Voltage 11 KV Frequency 50 Hz Speed 1500 RPM Power Factor 0.8 No. of Poles 4 Inlet cooling water temp 32°C Excitation Brushless Excitation system

ANNEXURE – III: Water requirement and Wastewater Generation

There shall be no addition water required for proposed installation of turbine for

generation of 6.1 MW power utilizing permitted 45 TPH coal fired boiler.

Water requirement and Wastewater Generation Description As per EC Utilized Balance Water Consumption (KLD) 1674 546.15 1127.85 Wastewater Generated (KLD) 1132 264.15 867.85

Wastewater Treatment Facilities

The effluents are segregated into three streams. High TDS effluents treated in Stripper,

MEE and ATFD followed by biological treatment plant at common effluent treatment plant

(CETP) of Hetero Infrastructure SEZ Ltd. The total effluent after biological treatment will

be stored in Guard ponds and conduct the test for Bioassay before Marine Disposal.

Wastewater from domestic usage sent to sewage treatment plant and treated wastewater

reused for green belt development.

Hetero Infrastructure SEZ Ltd. Form I Annexures

            Page 5

ANNEXURE – IV: Existing Stack Emissions Details

No additional utilities are proposed for generation of 6.1 MW power. The required steam

will be met from existing 45 TPH coal fired boiler. Emission details of existing stacks are

presented in following Table.

Stack Emission Details S.

No Stack Attached to Stack

Ht (m) Dia (m) Velocity

(m/s) Temp (OC)

Pollutant Emission Rate (g/s) PM SO2 NOX

1 1X10 TPH Boiler 40 0.6 24.28 160 0.34 0.92 1.02 2 2X6 TPH Boiler 35 0.3 16.97 150 0.24 0.36 0.97 3 1X20 TPH Boiler 40 1 18 170 0.61 1.25 1.25 4 1X45 TPH Boiler* 50 1.2 20 190 0.75 1.57 1.65

* Steam from boiler shall be used in turbine for generation of 6.1 MW power

Air Pollution Control Equipment: Description Control Equipment 10 TPH Coal Fired Boiler Bag Filters 6 TPH Coal Fired Boiler Multi-Cone Cyclone Separators 20 TPH Coal Fired Boiler Bag Filters 45 TPH Coal Fired Boiler Electro Static Precipitators

HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE,  NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT,  

ANDHRA PRADESH   

  

    

 

       

 

  

 

  

 

 

STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants   QCI: MoE&F OM, List A‐1, S.No.25.   (An ISO 9001:2008, ISO 14001:2004 &  OHSAS 18001:2007 Certified Organization) B‐115, Annapurna Block, Aditya Enclave Ameerpet, Hyderabad‐500 038. Phone: 040‐23748 555/616, Telefax: 040‐23748666 Email: [email protected] 

HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE,  NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT,  

ANDHRA PRADESH   

       

PRE‐FEASIBILITY REPORT 

  

   

 

  

 

 

 

Hetero Corporate Office 7‐2‐A2, Industrial Estate, Sanath Nagar,  Hyderabad – 500 018 Phone: 040‐23704923/24/25 Fax: 040‐23704926 Mobile: +91 9395102624 E‐mail: [email protected]  

     

SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, 

ANDHRA PRADESH, GOVERNMENT OF INDIA

Hetero Infrastructure SEZ Ltd.,     

1 | P a g e  

Hetero Infrastructure SEZ Ltd Sy.No.125, 138 & 150, N.Narasapuram Village, Nakkapally Mandal, Visakhapatanam District, Andhra Pradesh. DISCLAIMER

The purpose and scope of this information memorandum is to introduce the subject matter and provide a general idea and information on the said area. All the material included in this document is based on data/information gathered from various sources and is based on certain assumptions. Although, due care and diligence has been taken to compile this document, the contained information may vary due to any change in any of the concerned factors, and the actual results may differ substantially from the presented information. M/s. Hetero Infrastructure SEZ Ltd., does not assume any liability for any financial or other loss resulting from this memorandum in consequence of undertaking this activity. Therefore, the content of this memorandum should not be relied upon for making any decision, investment or otherwise. The prospective user of this memorandum is encouraged to carry out his/her own due diligence and gather any information he/she considers necessary for making an informed decision. 1. Executive Summary M/s. Hetero Infrastructure SEZ Ltd., proposed to Install turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler in Hetero Infrastructure SEZ Ltd., at , N. Narasapuram, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. The proposal is for inclusion of Turbine only, and does not entail any increase in permitted pollution loads of Environment Clearance obtained, vide letter no. 21-641/2007-IA.III dated 25.10.2010. The site is having a longitude 83039’25”(E) and latitude 18008’21’’(N). The site surrounded by open lands in north and east directions, Hetero Complex (Hetero Group (Labs & Drugs) and road connecting Nakkappali to Rajaiahpeta in west direction. The NH 5 is in the North direction at a distance of 4 Km. the nearest Railway station is located at Narsipatnam at a distance of 9 km in the North direction. The nearest airport is located at a distance of 70 Km in the North East direction at Visakhapatnam. The Bay of Bengal is on the South Eastern direction of the site at a distance of 1.2 km. The nearest habitation from the site is Janakayyapeta in NE direction. There are no ecologically sensitive areas like national parks, sanctuaries within 10 km radius of the site.

Hetero Infrastructure SEZ Ltd.,     

2 | P a g e  

2. Introduction of the Project / Background Information: 2.1 Identification of Project and Project Proponent:

M/s. Hetero Infrastructure SEZ Ltd., proposed to Install turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler in Hetero Infrastructure SEZ Ltd., at , N. Narasapuram, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. The proposal is for inclusion of Turbine only, and does not entail any increase in permitted pollution loads of Environment Clearance obtained, vide letter no. 21-641/2007-IA.III dated 25.10.2010. Capital cost of the project is Rs. 11.45 crores towards installation of Turbine. 2.2 Brief Description of Nature of the Project: Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler.

2.3 Need for the project and its importance to the country and or region: World population is growing at an alarming rate. In the Indian sub continent population growth is more than that of developed countries. To meet the needs and comforts of ever-growing population industrialization became inevitable. Growing population resulting in more load on power requirement. Hence the industry is proposing to installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler to meet the demand.

2.4 Demands-Supply Gap: The generated power will be utilized for plants located in Hetero Infrastructure SEZ limited.

2.5 Imports Vs. Indigenous Production: The generated power will be utilized for plants located in Hetero Infrastructure SEZ limited.

2.6 Domestic/export Markets: The generated power will be utilized for plants located in Hetero Infrastructure SEZ limited.

2.7 Employment Generation (Direct and Indirect) due to the project: No additional employment required, as the proposal is for installation of turbine. Turbine will be operated by auto machine.

Hetero Infrastructure SEZ Ltd.,     

3 | P a g e  

3. Project Description 3.1 Type of Project including interlinked and interdependent projects, if any:

M/s. Hetero Infrastructure SEZ Ltd., proposed to Install turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler in Hetero Infrastructure SEZ Ltd., at , N. Narasapuram, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. The proposal is for inclusion of Turbine only, and does not entail any increase in permitted pollution loads of Environment Clearance obtained, vide letter no. 21-641/2007-IA.III dated 25.10.2010. 3.2 Size or magnitude of operation: Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler.

3.2 Process Description with process details (a schematic diagram/flow chart)

The medium pressure and medium temperature steam generated in boiler will enter a multi-stage turbine and will cause the turbine shaft to rotate. In this process, the steam will loose its temperature and pressure. As the pressure is coming down volume will increase, thereby increasing velocity of flow in the turbine. This thermal energy getting converted to mechanical energy will rotate the turbine shaft which is rigidly coupled to generator. An electrical generator coupled to the steam turbine shaft will rotate in a magnetic field and generate electrical power of 6.1 MW at voltage of 11 KV. A small percentage of electrical power thus produced will be used in the power plant itself to energies the rotating equipment like the FD fan and ID fan of boiler, the feed water pumps, lighting etc

Technical Specifications of Turbine Parameter Specification No. of Turbines 1 (one) Type Multi stage, horizontal split casing, high speed

with gear box, impulse type, extraction cum Condensing with air cooled condenser

Rated Output 6.1 MW @ 26 TPH process steam @ 9 bar Speed of Turbine Shaft 7556 RPM Speed of Generator Shaft 1500 RPM Gear box Provided with SF 1.4, ratio = 5,03:1 Rotation (Viewed from turbine front) Clock Wise Main steam conditions at stop valve Inlet steam pressure

64 ATA, 485 C, 45 TPH

Type of Governing Electronic

Hetero Infrastructure SEZ Ltd.,     

4 | P a g e  

Technical Specifications of Generator Parameter Specification No. Of generators 1(One) Type Three phase synchronous generator, totally enclosed air

cooled with air to water heat exchanger, horizontal and indoor.

Output 6.1 MW Voltage 11 KV Frequency 50 Hz Speed 1500 RPM Power Factor 0.8 No. of Poles 4 Inlet cooling water temp 32°C Excitation Brushless Excitation system

3.4 Raw material required along with estimated quantity likely source, marketing area of final product/s, mode of transport of raw material and finished product. Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler.

3.5 Availability of water its source, energy/power requirement and source should be given There shall be no addition water required for proposed installation of turbine for generation of 6.1 MW power utilizing permitted 45 TPH coal fired boiler.

Water requirement and Wastewater Generation Description As per EC Utilized Balance Water Consumption (KLD) 1674 546.15 1127.85 Wastewater Generated (KLD) 1132 264.15 867.85

3.5.1 Electricity: Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler.

3.6 Quantity of wastes to be generated (liquid and solid) and Scheme for their Management/disposal The effluents are segregated into three streams. High TDS effluents treated in Stripper, MEE and ATFD followed by biological treatment plant at common effluent treatment plant (CETP) of Hetero Infrastructure SEZ Ltd. The total effluent after biological treatment will be stored in Guard ponds and conduct the test for Bioassay before Marine Disposal. Wastewater from domestic usage sent to sewage treatment plant and treated wastewater reused for green belt development.

Hetero Infrastructure SEZ Ltd.,     

5 | P a g e  

4. Site Analysis 4.1 Plant Location The site is having a longitude 83039’25”(E) and latitude 18008’21’’(N). The site surrounded by open lands in north and east directions, Hetero Complex (Hetero Group (Labs & Drugs) and road connecting Nakkappali to Rajaiahpeta in west direction. The NH 5 is in the North direction at a distance of 4 Km. the nearest Railway station is located at Narsipatnam at a distance of 9 km in the North direction. The nearest airport is located at a distance of 70 Km in the North East direction at Visakhapatnam. The Bay of Bengal is on the South Eastern direction of the site at a distance of 1.2 km. The nearest habitation from the site is Janakayyapeta in NE SW direction. There are no ecologically sensitive areas like national parks, sanctuaries within 10 km radius of the site 5. Planning Brief: The project is envisages to be completed the project in January 2016.

6. Proposed Infrastructure:

6.1 Power Requirement and Supply/Source

The proposed is for installation of turbine for 6.1 MW power generation.

6.2 Utilities No additional utilities are proposed for generation of 6.1 MW power. The required steam will be met from existing 45 TPH coal fired boiler. 6.3 Waste management

Liquid Effluents The effluents are segregated into three streams. High TDS effluents treated in Stripper, MEE and ATFD followed by biological treatment plant at common effluent treatment plant (CETP) of Hetero Infrastructure SEZ Ltd. The total effluent after biological treatment will be stored in Guard ponds and conduct the test for Bioassay before Marine Disposal. Wastewater from domestic usage sent to sewage treatment plant and treated wastewater reused for green belt development. 7. Rehabilitation and Resettlement (R&R) Plan Not applicable.

Hetero Infrastructure SEZ Ltd.,     

6 | P a g e  

8. Project Schedule & Cost Estimates 8.1 Likely date of start of construction and likely date of completion (Time

schedule for the project to be given) Within two months after getting clearance of Consent for establish as it involves installation of turbine. 8.2 Estimated project cost along with analysis in terms of economic viability of the project The estimated cost of the project is approximately Rs. 1145 Lakhs

Project Cost Rs. lakhs Plant& machinery 427 Civil buildings & Structures 300

Total 727 Pipe lines & insulation 20% on plant & machinery 145.4 Electricals & instrumentation 13% on plant & machinery 95 Erection & commissioning & painting 8% on plant & machinery and structures 58 Others 119 Project Cost (Rs. Lakhs) 1145