HFE Program fo
Responses to the JuResponses to the Ju
Audit Reco
on M
eeti
ng
on M
eeti
ng August
re-a
pp
lica
tio
Pre
-ap
pli
cati
o
Korea Hydro and Nu
7thP
r11
thP Korea Hydro and Nu
r the APR1400
une 3 through 7 HFE une 3 through 7 HFE
ommendations
13, 2013
uclear Power Co., Ltd.
APR1400-E-I-EC-13005-NP
uclear Power Co., Ltd.
Meeting ObjectiveMeeting Objective
To discuss revisions, based on the Ju
HFE program and its documentation
the HFE Implementation Plansthe HFE Implementation Plans
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
1
Human Factors Engineering
une 3 through 7 NRC Audit, of the KHNP
as contained in the DCD Chapter 18 and
1 APR1400-E-I-EC-13005-NP
Presentation OutlinPresentation Outlin
1. Proposed List of HFE Docum
2. Major Pre-audit Observation
3. Response Example – V&V IP
Mee
tin
g
4. Detail Audit Observations an
5. Questions
pp
lica
tion
M11
thP
re-a
p
2
Human Factors Engineering
nene
ments for DC
P
nd Response
2 APR1400-E-I-EC-13005-NP
HFE Documents fo
DCD Tier 1 for HFE and Tier 2 C
HFE Implementation Plans1) HFE Program Plan
2) OER3) FRA/FA4) TA
Mee
tin
g
)5) S&Q6) TIHA7) HSI Design
pp
lica
tion
M 7) HSI Design8) HFE V&V9) Design Implementation
11th
Pre
-ap
10) HPM
3
Human Factors Engineering
or DC
Chapter 18
Technical Reports1) Basic HSI Platform2) Style Guide3) V&V Scenarios
Result Summary Reports1) OER Report (*)2) FRA/FA Report (*)2) FRA/FA Report (*)* DC scope only, 15 months after
Docketing
3 APR1400-E-I-EC-13005-NP
Major NRC Audit O
There is a substantial amount of tecExamples include:
KHNP R
Examples include:
KHNP Response;
All IPs are reviewed against NU
All IP d T h i l R t
Mee
tin
g
All IPs and Technical Reports ar
June NRC Audit
pp
lica
tion
M11
thP
re-a
p
4
Human Factors Engineering
Observation
chnical information missing.
REG-0711 Rev. 3 for completeness
i d t d th fi di i thre revised to remedy the findings in the
4 APR1400-E-I-EC-13005-NP
Generic Revisions toGeneric Revisions toand the HFE Implem Ch18 and all Implementation Pla Ch18 and all Implementation Pla
June NRC Audit
Consistency between Ch 18 and Consistency between Ch 18 and
Alignment of IPs to NUREG-0711
Mee
tin
g
Expanded level of detail and add
Special emphasis placed on the
pp
lica
tion
M − Verification and Validation
− Task Analysis
11th
Pre
-ap
− Functional Requirements An
Editorial/English reviews
5
Human Factors Engineering
o the DCD Chapter 18o the DCD Chapter 18 mentation Plans
ans (IPs) are revised based on theans (IPs) are revised, based on the
the IPs and between IPs the IPs, and between IPs
1 Rev 3 structure and content
ded acceptance criteria
most challenging and complex IPs;
nalysis / Function Allocation
5 APR1400-E-I-EC-13005-NP
Response ExampleSampling of Operational Con
Sampling Dimension;
A multidimensional sampling st
O ti l C ditiOperational Conditions
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
6
Human Factors Engineering
e - V&V IP (1/10)nditions for ISV
trategy is applied for the Sampling of
Proprietary
6 APR1400-E-I-EC-13005-NP
Response Example
Plant Conditions Mapping Tables
Sampling of Operational Con
Plant Conditions Mapping Tables
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
7
Human Factors Engineering
e - V&V IP (2/10)nditions for ISV
ProprietaryProprietary
7 APR1400-E-I-EC-13005-NP
Response Example
Plant Conditions Mapping Tables (c
Sampling of Operational Con
Plant Conditions Mapping Tables (c
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
8
Human Factors Engineering
e - V&V IP (3/10)
continued)
nditions for ISV
Proprietarycontinued) Proprietary
8 APR1400-E-I-EC-13005-NP
Response Example
Current Status of SOC;
Sampling of Operational Con
Current Status of SOC;
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
9
Human Factors Engineering
e - V&V IP (4/10)nditions for ISV
ProprietaryProprietary
9 APR1400-E-I-EC-13005-NP
Response ExampleScenario Outline
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
10
Human Factors Engineering
e - V&V IP (5/10)
ProprietaryProprietary
0 APR1400-E-I-EC-13005-NP
Response ExampleScenario #1: SBLOCA with C
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
11
Human Factors Engineering
e - V&V IP (6/10)CBP/Displays Failures
ProprietaryProprietary
1 APR1400-E-I-EC-13005-NP
Response ExamplePreparation of Evaluation
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
12
Human Factors Engineering
e - V&V IP (7/10)
Proprietary
2 APR1400-E-I-EC-13005-NP
Response ExampleMajor Steps of Scenario
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
13
Human Factors Engineering
e - V&V IP (8/10)
Proprietary
3 APR1400-E-I-EC-13005-NP
Response ExamplePrimary Task Performance M
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
14
Human Factors Engineering
e - V&V IP (9/10)Measures
P i tProprietary
4 APR1400-E-I-EC-13005-NP
Response ExampleSubjective Questionnaire
Mee
tin
gp
pli
cati
on M
11th
Pre
-ap
15
Human Factors Engineering
e - V&V IP (10/10)
Proprietary
5 APR1400-E-I-EC-13005-NP
p y
Audit Observation
The process used for determining thconditions to be tested during the ve
KHNP R V&V
the HFE program.
KHNP Response; V&V
A detailed process for the samp
added to the V&V IP (section 3
Mee
tin
g
added to the V&V IP (section 3.
The application of this SOC proc
further defined in the Technical R
pp
lica
tion
M further defined in the Technical R
(section 3.1, page 3-1)
11th
Pre
-ap
16
Human Factors Engineering
1
he sample of operational erification and validation phase of
ling of operational conditions has been
1 page 3 1)1, page 3-1)
cess to the definition of scenarios is
Report containing the scenariosReport containing the scenarios
6 APR1400-E-I-EC-13005-NP
Audit Observation
The methodology for conducting Tasdescribed.
KHNP R TAKHNP Response; TA
The Task Analysis application of
use of workload analysis time a
Mee
tin
g
use of workload analysis, time a
needs and crew qualification req
and 3 3 6 page 3-8 )
pp
lica
tion
M
and 3.3.6, page 3-8 )
A detailed approach to the meth
example will be submitted
11th
Pre
-ap example will be submitted
17
Human Factors Engineering
2
sk Analysis was not completely
f the Hierarchical Task Analysis and its
available time required crew staffingavailable, time required, crew staffing
quirements has been added (section 3.3
hodology description with an illustrative
7 APR1400-E-I-EC-13005-NP
Audit Observation
Scenarios to test operator performasystem interfaces were not providedValidation (ISV)
KHNP Response; V&V scenarios
Validation (ISV).
Using the SOC a set of seven coand are included in a separate T
Scenarios include:
Mee
tin
g
― Small Break Loss of Coolant A― Anticipated Transient Without T― Excessive Steam Demand w/A
pp
lica
tion
M ― Loss of all Feed Water ― Station Blackout ― Steam Generator Tube Ruptur
11th
Pre
-ap
― Main Control Room Fire Application matrix demonstrating
scenario set
18
Scenario summary has been ad
Human Factors Engineering
3
nce and the adequacy of human d as part of the Integrated System
s omplete scenarios have been defined Technical Report
Accident w/CBP/Displays FailuresTrip w/DCS FailureAlarm Failures
re
g all SOC have been applied in the
8 APR1400-E-I-EC-13005-NP
ded to the report
Audit Observation
Performance measures used duringpersonnel performance were not propersonnel performance were not pro
KHNP Response; V&V performan
Explicit pass/fail and diagnostic
Mee
tin
g
described (section 5.5, page 5-4
Performance measures are map
pp
lica
tion
M (section 5.5.1, page 5-5)
11th
Pre
-ap
19
Human Factors Engineering
4
g ISV testing to measure plant and ovidedovided.
nce measures
performance measures have been
4)
pped into each scenario
9 APR1400-E-I-EC-13005-NP
Audit Observation
An explanation for the basis for the t id dnot provided.
KHNP Response; Basic HSI Platf
The Basic HSI Platform design d
Mee
tin
g
concept of operations, and desig
(section 1.2, page 1)
pp
lica
tion
M The basis for the Basic HSI in th
design is described in the Basic
11th
Pre
-ap
(section 2.0, page 2)
20
Human Factors Engineering
5
Basic HSI Design platform was
form
describes the HSI design inputs,
gn description of HSI.
he CE System 80+ and the SKN 3&4
c HSI Platform Technical Report.
0 APR1400-E-I-EC-13005-NP
Audit ObservationNUREG-0711 Task Analysis acceptaof personnel needed to do the task) knowledge and abilities required toknowledge and abilities required to addressed.
KHNP Response; TA
The TA methodology and IP hav
Mee
tin
g
assessment of the number of pe
knowledge and their abilities (se
pp
lica
tion
M The IP revision also includes an
(scope), 4 (relationships among
11th
Pre
-ap
(page 1-2, page 3-10, page 4-1)
All task considerations from NU
21
included (section 3.2, page 2-3)
Human Factors Engineering
6ance criterion 6 (related to number and criterion 7 (related to
perform the task) were notperform the task) were not
ve been revised to include the
ersonnel required to do the task, their
ection 3.1, page 3-1, page 3-11)
n expanded discussion of criteria 1
tasks), and 9 (IHA)
)
REG-0711 Rev 3 Table 5-1 have been
1 APR1400-E-I-EC-13005-NP
Audit Observation
NUREG-0711 OER acceptance criteto identify operating experience) andidentif ing important h man actionsidentifying important human actions not addressed.
KHNP Response; OER
Operator interviews have been a
Mee
tin
g
sub criteria of criteria 4 of NURE
process has been expanded (se
pp
lica
tion
M Identification of HAs from prede
of their relevance to the APR140
11th
Pre
-ap
(section 3.1, page 3-1)
22
Human Factors Engineering
7
erion 4 (related to using interviews d criterion 5 for (related to from predecessor designs) erefrom predecessor designs) were
and are used to identify OE for the 6
EG-0711 Rev 3. The description of this
ection 4.1, page 4-1)
cessor designs and the determination
00 design descriptions are added
2 APR1400-E-I-EC-13005-NP
Audit Observation
HFE process elements mentioned incorresponding Verification and Validsampling of operational conditions, o
KHNP Response; V&V, TA
SOC has been added to the V&
Mee
tin
g
definition (section 3.0, page 2-3)
Methodology for the TA has bee
pp
lica
tion
M OSD is deleted from the TA met
11th
Pre
-ap
23
Human Factors Engineering
8
n the DCD are not included in the dation Implementation Plan (e.g., operational sequence diagrams).
&V IP and applied in the scenario
)
en unified between the IP and Ch 18,
thod
3 APR1400-E-I-EC-13005-NP
Audit Observation
Numerous grammatical and sentencmaking the meaning of the materialmaking the meaning of the material
KHNP Response;
An editorial review has been ma
Mee
tin
g
18 for;
― Korean to English translatio
pp
lica
tion
M ― Grammar, sentence structu
― Use of ambiguous terminolo
11th
Pre
-ap
24
Human Factors Engineering
9
ce structure issues contribute to unclearunclear.
ade of all the IPs and the DCD chapter
on clarity and meaning
ure, and understandability
ogy in commitments
4 APR1400-E-I-EC-13005-NP
Audit Observation
The task analysis IP defines HierarcDecomposition but does not describimplemented (i.e. who is responsible
KHNP Response; TA
A detailed level of description to
Mee
tin
g
been added, including an illustra
The IP contains a description of
pp
lica
tion
M qualifications and how they app
(section 3.1.8)
11th
Pre
-ap
Integration of the TA results in th
(section 3.4, page 3-10)
25
Human Factors Engineering
10
chal Task Analysis and Task be how the methods will be e, how these will be integrated).
o the application of the TA method has
ative example (section 3.0, page 3-1)
f the TA team, their minimum
ly subject matter experience
he HFE program is now described
5 APR1400-E-I-EC-13005-NP
Audit ObservationThe description for the APR1400 HFauthority lacks sufficient detail to detthe overall engineering organizationthe overall engineering organizationauthority.
KHNP Response; HFE PP
The placement of the HFE desig
Mee
tin
g
process has been clarified (sect
The HFE design teams decision
pp
lica
tion
M coordination have been clarified
The organization chart containe
11th
Pre
-ap
expanded to one additional leve
discussions during the June Aud
26
Human Factors Engineering
11FE design team placement and termine where the team fits into
its reporting relationship and, its reporting relationship, and
gn team and its authority in the design
tion 2.2, page 2)
n making process and its lines of
d (section 3.4, Figure 3, page 9)
ed in the HFE Program Plan has been
el up in the organization, as per
dit (section 2.2, Figure 1, page 2)
6 APR1400-E-I-EC-13005-NP
Audit Observation
Although the FRA/FA mentions “sucfunctions, the concept of success paexplained or illustrated.
KHNP Response; FRA/FA
A more detailed discussion of su
Mee
tin
g
4.1.2, page 9)
The relationship between the AP
pp
lica
tion
M the CE System 80+ is described
11th
Pre
-ap
27
Human Factors Engineering
12
ccess paths” for accomplishing aths is merely mentioned but not
uccess paths has been added (section
PR1400’s success paths and those of
d in a new table (Table 2)
7 APR1400-E-I-EC-13005-NP
Audit Observation
The current ITAAC format is not suffcompletion. The acceptance criteria Summary Report must be providedSummary Report must be provided product and evaluation results mustthe HFE design process was implem
KHNP Response; ITAAC
The ITAAC format and content i
Mee
tin
g
The ITAAC format and content i
format and content provided by
pp
lica
tion
M11
thP
re-a
p
28
Human Factors Engineering
13
ficient to determine element do not reflect that a Results to document the final designto document the final design t be presented that demonstrate mented as described in the DCD.
s being revised to match the samples being revised to match the sample
the NRC Staff during the June Audit
8 APR1400-E-I-EC-13005-NP
Summary
KHNP h f ll i d th KHNP has carefully reviewed thincluding the Audit Report and tthe AuditOb ti t d i th A Observations reported in the Auissues, resulting in the revision Implementation PlansT h i l i f ti d i
Mee
tin
g
Technical information and reviewRev 3 has been added to the do
Translation, grammatical and set d lti i d
pp
lica
tion
M corrected resulting in more unde The HFE ITAAC format, IP acce
Report content will demonstratei l d d ib d i h
11th
Pre
-ap implemented as described in th
29
Human Factors Engineering
h lt f th J 3 th h 7 A dithe results of the June 3 through 7 Audit, the discussion that took place during
dit R t t t d iudit Report were treated as generic of the DCD Chapter 18 and all
it i t i d i NUREG 0711w criteria contained in NUREG-0711 ocumentsentence structure issues have been
t d bl terstandable reports eptance criteria and Results Summary e that the HFE design process was
DCDe DCD
9 APR1400-E-I-EC-13005-NP
QuestionsM
eeti
ng
pp
lica
tion
M11
thP
re-a
p
30
Human Factors Engineering
Proprietary
0 APR1400-E-I-EC-13005-NP
Abbreviation List AOP abnormal operating procedu APR1400 Advanced Power Reactor 14 CBP computer-based procedure DCS distributed control systemy DA diagnostic action EOP emergency operating proced FRA/FA functional requirements ana HAs human actions HAs human actions HFE human factors engineering HPM human performance monito HSI human-system interface IHA i t t h ti
Mee
tin
g
IHA important human actions TIHA treatment of important huma IP implementation plans ISV integrated system validation
pp
lica
tion
M KHNP Korea Hydro and Nuclear P OE operating experience OSD operational sequence diagra SKN 3&4 Shin Kori Unit 3 and 4
11th
Pre
-ap
S&Q staffing and qualifications SOC sampling of operational con SOP system operating procedure SPTA standard post trip action
31
p p TA task analysis V&V verification and validation
Human Factors Engineering
ure400
durealysis / function allocation
ring
an action
nower Co., Ltd
ams
ditionse
1 APR1400-E-I-EC-13005-NP