HIGH ATTENUATION SLEEPER SYSTEM Vibration Mitigation System for Monoblock Sleepers Thanks to its booted sleeper dimension tolerance and well-known replacement process, the HAS system can be replaced overnight. HAS is an integrated system dedicated to mitigating ground vibrations generated from rolling stock. Not only does HAS have mitigation properties similar to floating slab tracks (FSTs), it enables tracks to be laid ten times as fast. The HAS System was co-developed and co- patented by ALSTOM Transport and SATEBA, the CONSOLIS Group’s French subsidiary. SATEBA brought its expertise in designing and manufacturing concrete sleepers to the table, while Alstom Transport contributed its expertise in designing and laying railway tracks. SATEBA already successfully developed in the late 1990s the SAT S312 twin block sleeper. One evolution of this sleeper has been used for vibration mitigation in UK tunnels (e.g. the high- speed Channel Tunnel Rail Link-CTRL 2) A COST-EFFECTIVE ALTERNATIVE TO FLOATING SLAB TRACKS A Cost-efficient Solution The HAS Design THE HAS SYSTEM – THE SOLUTION FOR URBAN TRANSPORT “Before HAS there simply weren’t any sleeper-based solutions that could mitigate vibration like this.” HAS was developed as an innovative alternative to float- ing slab tracks (FSTs). As a high-performance anti-vibration track system, FSTs are mainly used in urban environments, particularly underground, where the highest level of vibration mitigation is required due to high population density and the presence of landmarks. HAS provides attenuation performance equivalent to most FSTs at a fraction of the cost. Building floating slab tracks inside a tunnel is costly and time consuming. HAS is much easier to implement and is compliant with all rapid transit requirements (design, implementation, mainte- nance specs, etc.). Though the system provides mitigation performance similar to FSTs, HAS tracks can be laid inside a tunnel ten times as fast. The time saved on both laying tracks and designing tunnel dimensions leads to significant cost savings. The HAS System consists of a heavy prestressed monoblock concrete sleeper set on two resilient pads in a rigid plastic hull. The hull is cast in the concrete slab. Lateral pads fixed inside the hull allow HAS to withstand longitudinal and trans- verse loads (static and dynamic). The concrete sleeper is mobile inside the rigid hull. To a certain extent, its weight can be adapted to fit the level of mitigation needed: the heavier the sleeper, the higher the level of mitigation. The HAS System’s Mean Time Between Failures (MTBF) is 40 years. HAS CONSOLIS 31 Place Ronde - Quartier Valmy La Défense 92800 Puteaux France Tel: +33 (0)1 46 53 24 00 www.consolis.com BELGIUM CONSOLIS Services Co Chaussée de la Hulpe, 120 BE - 1 000 Brussels Tel: +32 2 290 3600 www.consolis.com ESTONIA AS SWETRAK Tammi tee 51 - Harku EE - 76 902 Harju Maakond Tel: +372 6 71 2500 Email: [email protected] www.swetrak.lt FINLAND PARMA RAIL PL 76 - Hiidenmäentie 20 FI - 03 101 Nummela Tel: +358 20 577 5500 Email: info@parma.fi www.parma.fi FRANCE SATEBA Quartier Valmy - 31, place Ronde FR - 92800 Paris La Défense Tel: +33 (0)1 46 53 29 00 www.sateba.com GERMANY DW SCHWELLEN GmbH Heerdterbuschstrasse 8 D - 41 460 Neuss Tel: +49 (0)2131 / 186-0 Email: [email protected] www.dw-schwellen.de LITHUANIA UAB SWETRAK Gamyklų str. 1 - LT-68108 Marijampole Tel: +370 343 98712 / +370 5 2133479 Email: [email protected] www.swetrak.lt MOROCCO SATEBA MAROC Immeuble 1 - Zénith 1 - 1 er étage Sidi Maarouf - 20 000 Casablanca Tel: +212 522 78 78 68 NORWAY SPENNCON RAIL AS Hensmoveien 98 -3516 Hønefoss POLAND WPS Wytwórnia Podkładów Strunobetonowych S.A. Mirosław Ujski 51 - 64 850 Ujście Tel: +48 67 28 40 340 www.wps-sa.com.pl PORTUGAL SATEPOR Edificio Coopali - Rua José Afonso 4-C, 1° PT-1600-130 LISBON - (São Domingos de Benfica) Tel: +351 217 200 670 SERBIA RAJ SCHWELLEN DOO 28, Octobra 66 - 13 320 Velika Plana Tel: +381 (0)26 515 140 Email: offi[email protected] www.rajholding.rs SWEDEN STRÄNGBETONG RAIL AB Gjörwellsgatan 30 - 112 60 Stockholm Tel: +46 (0)8 615 82 00 Email: [email protected] www.strangbetong.se THE NETHERLANDS SPANBETON B.V. Hoogewaard 207 / 209 NL - 2 396 AS Koudekerk a/d Rijn Tel: +31 (0)71 342 02 00 Email: [email protected] www.spanbeton.nl UK SBC RAIL Littlewell Lane - Stanton-by-Dale Ilkeston - Derbyshire - UK - DE74QW Tel: +44 (0)115 944 1448 Email: [email protected] www.stanton-bonna.co.uk WORLDWIDE RUBBER GASKET SEALING CONCRETE SLEEPER LATERAL PADS RESILIENT PAD RIGID HULL Photos: © Consolis / Design: Malika Benamara for le8au22 / Copywriting: Victoria Marshall, Benjamin Eskinazi, Richard Venturi / September 2014

HIGH ATTENUATION SLEEPER SySTEm - Strängbetong Rail€¦ · HAS’ design is customized to vibration mitigation needs. • Directly applicable to ballastless tracks. • Alternative

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

  • HIGH ATTENUATION SLEEPER SySTEmVibration Mitigation System for Monoblock Sleepers

    Thanks to its booted sleeper dimension tolerance and well-known replacement process, the HAS system can be replaced overnight.

    HAS is an integrated system dedicated to mitigating ground vibrations generated from rolling stock.

    Not only does HAS have mitigation properties similar to floating slab tracks (FSTs), it enables tracks to be laid ten times as fast.

    The HAS System was co-developed and co- patented by ALSTOm Transport and SATEBA, the CONSOLIS Group’s French subsidiary. SATEBA brought its expertise in designing and manufacturing concrete sleepers to the table, while Alstom Transport contributed its expertise in designing and laying railway tracks.

    SATEBA already successfully developed in the late 1990s the SAT S312 twin block sleeper. One evolution of this sleeper has been used for vibration mitigation in UK tunnels (e.g. the high-speed Channel Tunnel Rail Link-CTRL 2)

    A cost-effective AlternAtive to floAting slAb trAcks

    A Cost-efficient Solution

    The HAS Design

    tHe HAs system – tHe solution for urbAn trAnsport

    “Before HAS there simply weren’t any sleeper-based solutions

    that could mitigate vibration like this.”

    HAS was developed as an innovative alternative to float-ing slab tracks (FSTs). As a high-performance anti-vibration track system, FSTs are mainly used in urban environments, particularly underground, where the highest level of vibration mitigation is required due to high population density and the presence of landmarks.HAS provides attenuation performance equivalent to most FSTs at a fraction of the cost.

    Building floating slab tracks inside a tunnel is costly and time consuming.HAS is much easier to implement and is compliant with all rapid transit requirements (design, implementation, mainte-nance specs, etc.).Though the system provides mitigation performance similar to FSTs, HAS tracks can be laid inside a tunnel ten times as fast.The time saved on both laying tracks and designing tunnel dimensions leads to significant cost savings.

    The HAS System consists of a heavy prestressed monoblock concrete sleeper set on two resilient pads in a rigid plastic hull. The hull is cast in the concrete slab. Lateral pads fixedinside the hull allow HAS to withstand longitudinal and trans-verse loads (static and dynamic).The concrete sleeper is mobile inside the rigid hull. To a certain extent, its weight can be adapted to fit the level of mitigation needed: the heavier the sleeper, the higher the level of mitigation.The HAS System’s mean Time Between Failures (mTBF) is 40 years.

    HASCONSOLIS 31 Place Ronde - Quartier ValmyLa Défense 92800 PuteauxFranceTel: +33 (0)1 46 53 24 00www.consolis.com

    BeLgIumCONSOLIS Services Co Chaussée de la Hulpe, 120 BE - 1 000 Brussels Tel: +32 2 290 3600www.consolis.com

    eStONIaaS SWetRaKTammi tee 51 - Harku EE - 76 902 Harju Maakond Tel: +372 6 71 2500 Email: [email protected]

    FINLaNdPaRma RaILPL 76 - Hiidenmäentie 20 FI - 03 101 Nummela Tel: +358 20 577 5500 Email: [email protected] www.parma.fi

    FRaNCeSateBaQuartier Valmy - 31, place Ronde FR - 92800 Paris La Défense Tel: +33 (0)1 46 53 29 00 www.sateba.com

    geRmaNydW SChWeLLeN gmbhHeerdterbuschstrasse 8 D - 41 460 Neuss Tel: +49 (0)2131 / 186-0 Email: [email protected]

    LIthuaNIauaB SWetRaKGamyklų str. 1 - LT-68108 Marijampole Tel: +370 343 98712 / +370 5 2133479 Email: [email protected] www.swetrak.lt

    mOROCCOSateBa maROCImmeuble 1 - Zénith 1 - 1er étageSidi Maarouf - 20 000 Casablanca Tel: +212 522 78 78 68

    NORWaySPeNNCON RaIL aSHensmoveien 98 -3516 Hønefoss

    POLaNdWPSWytwórnia Podkładów Strunobetonowych S.A. Mirosław Ujski 51 - 64 850 Ujście Tel: +48 67 28 40 340www.wps-sa.com.pl

    PORtugaLSatePOREdificio Coopali - Rua José Afonso 4-C, 1° PT-1600-130 LISBON - (São Domingos de Benfica) Tel: +351 217 200 670

    SeRBIaRaj SChWeLLeN dOO28, Octobra 66 - 13 320 Velika Plana Tel: +381 (0)26 515 140 Email: [email protected]

    SWedeNStRäNgBetONg RaIL aBGjörwellsgatan 30 - 112 60 Stockholm Tel: +46 (0)8 615 82 00 Email: [email protected]

    the NetheRLaNdSSPaNBetON B.v.Hoogewaard 207 / 209 NL - 2 396 AS Koudekerk a/d Rijn Tel: +31 (0)71 342 02 00 Email: [email protected] www.spanbeton.nl

    uKSBC RaILLittlewell Lane - Stanton-by-Dale Ilkeston - Derbyshire - UK - DE74QW Tel: +44 (0)115 944 1448 Email: [email protected] www.stanton-bonna.co.uk

    WorldWide

    RubbeR gASkeT SeAling

    ConCReTe SleepeR

    lATeRAl pAdS

    ReSilienT pAd

    Rigid Hull

    Phot

    os: ©

    Con

    solis

    / De

    sign:

    Mali

    ka B

    enam

    ara f

    or le

    8au2

    2 / C

    opyw

    ritin

    g: V

    ictor

    ia M

    arsh

    all, B

    enjam

    in E

    skin

    azi,

    Rich

    ard

    Vent

    uri /

    Sep

    tembe

    r 201

    4

  • -50

    -40

    -30

    -20

    -10

    0

    10

    20

    Inse

    rtion

    Loss

    (dB)

    Frequency (Hz)

    HAS measuredHAS predicted

    FST Taipei

    Requirement

    6.3 10 16 25 40 63 100 160 250

    HAS helps reduce maintenance costs.

    efficient vibration mitigation system up to -20db at 63Hz. HAS’s resonance frequency is 20Hz.

    Construction Advantages

    Ideal for Underground Tunnels

    Easy and Cost-efficient Maintenance

    tHe HAs system’s key AdvAntAges

    lAb simulAtions And live triAls on test trAcks

    tHe HAs system: designed for efficiency And durAbility

    HAS Lab Test Results

    HAS System Compliances

    • The filling concrete around the sleeper doesn’t need to be reinforced.•No disruption in the construction method.•HAS can be laid in 18m-long panels using standard installation

    equipment.•Thanks to the cushion mats under HAS, construction trains can run

    on the track before concreting.

    HAS is designed for the following:•Light Rail train applications (axle load up to 12 tonnes)•metro applications (axle load up to 16 tonnes)•Standard tracks (axle load up to 25 tonnes)

    HAS System can be laid as follows: •On open-air tracks as well as in tunnels•In straight lines or canted curves

    HAS’ design is customized to vibration mitigation needs.

    • Directly applicable to ballastless tracks.•Alternative solution to floating slab tracks.•HAS is more compact than a standard floating slab track, reducing

    tunnel diameter by as much as 20 to 30cm.

    maintaining HAS is a quick and simple process. If need be, the sleeper can easily be removed from its rigid plastic hull and replaced by a new one. All the system’s resilient components – lateral pads, resilient pads, etc. – can be accessed without difficulty.Thanks to this smooth and fast maintenance process, track down-time can be greatly reduced.

    Using feedback from the CTRL 2 project and measurements taken during train operations, a computer simulation was developed. Trials were performed using a monoblock version with inertia, leading to higher vibration mitigation (20db at 63Hz). This was HAS’s proof of concept.Thanks to this simulation, we were able to compare the vibration mitigation of different systems – including floating slab tracks – and to work out the suitable rigidity of HAS’s resilient pads.A prototype was then cast in a concrete slab and subjected to mechanical tests in SATEBA’s Chalon-sur-Saône (France) lab. Vibration mitigation measurements were recorded.

    Final validation was made in live trial on a testing track of HAS at the Centre d’Essais Ferroviaire de Valenciennes in France.The track’s mechanical behaviour and its vibration mitigation were consistent with the predicted performances.

    Sleepers are embedded in second-stage concrete.

    More compact than a standard floating slab track, HAS allows tunnel diameter reduction by 20 to 30cm.

    HAS has successfully passed lab tests.

    RUBBER GASKET SEALANT Its shape and hardness allow the sleeper to move in the hull.

    CONCRETE SLEEPER HAS is a massive monoblock sleeper. Its weight is one of the key factors in its good vibration mitigation performances (20Hz frequency resonance).

    LATERAL PADS These are designed with grooves to reduce friction and provide good lateral track elasticity.

    RESILIENT PAD made of polyurethane foam, its thickness varies according to the expected level of performance.

    RIGID HULL made of ABS, it’s designed to resist shocks and loads from both track laying and everyday use. The external face has several fins to ensure the hull is firmly anchored in concrete. Its rigidity makes maintenance easier.