Standing Committee on Concrete Technology Annual Concrete Seminar 2007
High Workability Concrete for Bored Pile Construction
CC Wai, Alan Wan Gammon Construction Limited
iRl lA . det
mi
iL n oictur
stnoC n o
mma
G 6 002©
2
ghts
Res
erve
d.
Week 2
Week 3
Week 1
Sequence of Work in Bored Pile Construction
Sun Mon Tue Wed Thu Fri Sat
Excavation
Excavation Rock Drilling
Rock Drilling Airlifting Concrete Cage
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
3
. dver
seeR s thgi
R l lA . detimiL n oi
cturstno
Cn o
mma
G 6 002©
4
Presentation Scope
• Method of Concreting Bored Pile
• Problems and Defects
• Deficiencies in Current Practice
• Proactive Approach
• The Way Forward
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
5
Concreting of Bored Pile
. dver
seeR
s thgiRl lA
. detimiL
n oictur
stnoC
n om
maG
6 002©
6
General Setup ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
Ramp
Skip
Tremie Pipe
Concreting Platform
Concrete Truck
Concrete
7
m
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
Stages in Bored Pile Concreting
(1) (2) (3) (4)
Extract Tremie Pipe Extract Temporary Casing
Concrete Overbreak
Drop in Concrete
Head
Tremie Pipe
Temporary Casing
©20
06 G
am
8
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
9
Cement Grout
Concrete
QA / QC
• Slump tests / Flow table
• Check temperature ( 32o)
• Cube samples to determine concrete strength
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
10
©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
11
Concreting Takes Many Hours
12:00 14:00
18:00 21:00
30
25
ours
)
20
(h 15
10
Tim
e
5
0 0 20 40 60 80 100
Pile Length (m)
Concreting Time Varies With Pile Length ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
12
©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
13
Slump Varies With Time
Time
Slu
mp
Common Problems Encountered
• Temporary casing cannot be withdrawn
• Tremie pipe cannot be withdrawn
• Blocked tremie pipe
• Reinforcement cage rides up with temporary casing
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
14
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
15
Defects
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
16
Honeycomb
• Reduced workability affects self compaction
©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
17
Air Voids
Entrapped Air Inside Concrete During Pouring ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
Air Voids
(1) (2) (3) 18
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
19
Segregated Concrete
• Additive quantity needs fine-tuning
Remedial Actions
• Grouting
• High pressure water jet to remove “weak” concrete, followed by pressure grouting
• Stitched pile
• Additional pile
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
20
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
21
Deficiencies in Current Practice
First In …. Last Out ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
16
17
1 *
2
3
18
First few truckloads need to remain workable throughout concreting
* Indicate order of truckload
22
Deficiencies in Current Practice ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
• Large piles / deep piles mean large concrete volume
• Specification / Contract Document – Single slump value specified on drawing – Workability vs time not considered – Lack of flexibility in interpretation
• Quality control – Need to control consistency in material
properties
23
The Proactive Approach ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
• Need to Consider …..
– Specification
– Concrete volume (related to pile size
and depth)
– Site constraints (physical or
environmental restrictions)
– Site location (travel time to site from
batching plant)
24
Pile Acceptance
Time
Concrete Performance
Material Consistency
Concrete Site Construction Volume Constraints Procedure
Route to Pile Acceptance ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
25
Delivery ~ 3 hours
Grade 45/20 •Designed slump 200mm
•Workability 5 hours
SUCCESS STORY ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
Hong Kong – Shenzhen Western Corridor
26
SUCCESS STORY Hong Kong – Shenzhen Western Corridor
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
• Supplier formulated a special concrete mix with enhanced workability
• Engineer relaxed concreting time to 5 hours
• Contractor checked workability prior to pouring
• Side-effect : minor segregation, need to pour additional concrete to avoid undercasting
27
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
28
Way Forward
Concrete Triangle ©
2006
Gam
mon
Con
stru
ctio
n Li
mite
d. A
ll R
ight
s R
eser
ved.
Designer
Contractor Concrete Supplier
Concrete Quality / Performance
Constructability
Slump Retention Consistency
29
©20
06 G
amm
on C
onst
ruct
ion
Lim
ited.
All
Rig
hts
Res
erve
d.
30