646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Pine Tree Cottage Renovation
▪ Complete HVAC, Plumbing and Fire Protection design for conversion of 19th century
cottage into office space.
▪ Restoration of existing garage into office area.
Palamountain Hall / Anthropology Department Renovations
▪ Renovation of existing classroom spaces into new state
of the art Anthropology Lab with the latest in MEP
technology. Solid state LED lighting throughout.
Hall / Anthropology Department Renovations
▪ Renovation of existing classroom spaces into new state of
the art Anthropology Lab with the latest in MEP technology. Solid state LED lighting
throughout.
President’s Office Suite Reconstruction
▪ Renovation of existing office space into new President’s Office suite. Design highlights
included DDC temperature controls and solid state LED lighting.
Waring House Renovation
▪ Renovation of existing 19th century mansion into mixed use office. Complete mechanical,
electrical, plumbing and fire protection systems design.
Foreign Language Department Renovation
▪ Renovation of existing classroom/office spaces in Palamountain Hall. Upgrades to existing
MEP infrastructure to improve comfort and efficiency.
Exercise Physiology Lab Renovation
▪ Renovation of existing racquetball courts into new state of the art laboratory space.
Design included LED lighting and specialized ventilation systems.
Lucy Scribner Library
▪ Design of the Mechanical and Electrical system
for The Lucy Scribner Library. This project
involved expansion and total renovation with
new 20,000 sq. ft. additions at each end of the
existing structure, and renovation of some
67,000 square feet of library space. Library new additions (4-story), extensive building
reconstruction work included construction of new campus chiller plant building.
Winner of a 1996 GBC Build New York Award.
Skidmore College Saratoga Springs, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Carbon Monoxide Detection - Campus Wide
▪ Upgrade of existing campus buildings to new CO
detection standards.
Centennial Hall
▪ Renovation of existing café area.
▪ Upgrade to existing water source heat pump HVAC
system.
Wellness Center
▪ Complete mechanical, electrical and plumbing design
of renovation of existing residential property to
College Wellness Center.
Picotte Digital Photo Lab
▪ Renovation of existing photography studio into digital
photo lab.
▪ Upgrade of building wide smoke damper systems.
Security Office Renovation
▪ Addition and renovation to existing security building.
2 South Main Renovation
▪ Conversion of existing two-family house into student
housing.
▪ Upgrade of all mechanical, electrical and life safety
systems.
President’s House
▪ Provided new high-efficiency air conditioning system to
President's residence.
College of Saint Rose ALBANY, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Renovation of Olin Science Center
▪ Complete HVAC renovation of Science Center including ventilation upgrades.
▪ Conversion to LED lighting systems.
Visual Arts Renovation
▪ Upgrade of all mechanical and electrical systems to current standards.
▪ Coordination with campus facilities department to optimize new cogeneration sys-
tem.
▪ State of the art ventilation and lighting systems.
Rathskeller Renovations
▪ MEP design of renovated dining area following flood damage.
Karp Hall Renovations
▪ Complete MEP design of renovated classroom building.
▪ Design highlights include heat recovery ventilation and dehumidification system, and
energy efficient lighting.
Student Housing Fire Protection Upgrades - Campus Wide
▪ Design of complete fire protection systems for (15) campus buildings.
▪ Coordination with college and city of Schenectady to upgrade student housing to cur-
rent life safety standards.
Wicker Wellness Center
▪ Design of electrical and plumbing systems for new state of the air healthcare facility.
▪ Coordination with mechanical design-build
contractor.
Webster Hall Boiler Replacement
▪ Replacement of original heating system with new
high-efficiency boiler design.
Union College Schenectady, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Renovation of Hines Hall ITS Department / Security Suite
▪ MEP design for technology rich IT department renovation beneath existing chapel.
▪ Design of new standby generator system.
▪ New chilled water system design for entire facility.
Renovation of Siena Hall
▪ Renovation of classroom and office space. MEP design includes 4-pipe fan coil
system , DDC controls and energy efficient lighting.
New Rosetti Hall - LEED Certification
▪ New three-story academic building for the Education, Social Work & Sociology de-
partments, including geothermal HVAC design, photovoltaic solar panels and full sol-
id state LED lighting. The building features classrooms complete with the latest in
teaching technology, offices, seminar rooms, meeting rooms and collaborative learn-
ing spaces throughout. It will also have computer labs, a video editing suite and the
Center for Urban Education.
Pool Filter Room Renovation
▪ Mechanical design of new pool filtration system including; high efficiency filter, pool
pump, variable frequency drive, automatic chemical feed system, pool heat exchang-
er, main drain diverter valve, water level control pool piping, stainless steel gutter
grating and filter room ventilation system, power and lighting. New pool filter sys-
tem is estimated to save 104,650 gallons of heated and chemically treated pool water
a year. The new pumping system will also provide power savings allowing the owner
to ramp down the pool pump motor speed during long periods of non use.
J. Spencer & Patricia Standish Library
▪ New three floor library building with plumbing, sprinkler fire protection, HVAC, elec-
trical systems and technology infrastructure. The building is equipped with flextube
boilers and chilled water system with external cooling tower.
Serra Dining Hall Boiler/Domestic HW
▪ Feasibility Study; Reviewed multiple options for boiler replacement in Serra Dining
Hall.
Foy Hall Reconstruction
▪ Designed new HVAC, Electrical and Plumbing systems for the renovation of the art
teaching space in the lower level of Foy Hall.
Siena College Loudonville, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Phase I - Energy Upgrades
▪ Engineered Solutions performed design services for
HVAC renovation work at the Knight Campus, Provi-
dence Campus and the Newport Campus.
▪ The design included reconstruction of the geo-
thermal system at the Warwick Mega Structure.
▪ The project also included complete HVAC up-
grade of the Field House including all HVAC and
ventilation systems.
▪ Lincoln campus energy upgrades including a high
efficiency condensing boiler system, domestic
hot water conversion and control upgrades.
▪ Newport and Providence Campus Energy and
Control upgrades.
Phase II - Energy Upgrades
▪ Lincoln Campus
▪ High efficiency domestic water heating systems
for Field House and Main Building.
Community College of Rhode Island Warwick, RI
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Energy and Water Upgrades
▪ Implementation of campus wide geothermal heat pump system, conversion
of existing water source heat pump to geothermal use.
▪ Lab area ventilation upgrade to current standards.
▪ Conversion of heating, ventilation and air conditioning systems in campus
buildings to current efficiency standards.
▪ Upgrade of domestic hot water heating systems throughout campus.
Roxbury Community College Roxbury Crossing, MA
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Energy Performance Contract
▪ Design and modernization of existing central steam heating plant.
▪ Design of steam/flue gas heat recovery and economizer system for central
plant.
▪ Kitchen ventilation upgrade.
▪ Rooftop heating, ventilation and air conditioning units replacement.
▪ Campus wide digital controls upgrade.
Rhode Island College Providence, RI
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Hudson Valley Community College Troy, NY
New Science Center:
Engineered Solutions was the communications engineer for the $47.4 Million,
100,000 square foot new Science Center, completed 2013.
This new building consisted of (25) laboratories, (11) student classrooms, (45)
faculty and staff offices, conference and computer lab spaces, a science study
center and a greenhouse.
The communications design included:
▪ A New Data Network
▪ Wireless Ethernet Network
▪ IP security System including Door Access
▪ Electronic Presentation System
Marvin Library:
Basement Emergency Lighting System Upgrades [2016]
Higbee Hall:
Complete MEP renovations to the Data Center in Higbee Hall [2014]
Fitzgibbons Hall:
First Floor Renovation Project [2015]
Reconstruction and Alterations of Second & Third Floors [2014]
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
▪ Structured Cable Design for six (6) buildings on the University’s main campus.
The project included Lab Buildings, Lecture Halls, the Student Union and
Computer Center. The Computer Center work included upgrades to the
campus data center
Cornell University Ithaca, NY
Energy Upgrades
▪ Engineering for $2 million of electrical power distribution and energy up-
grades. Design support for installation of new high efficiency boilers and
cooling towers.
Suffolk County Community College Long Island, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Eric Sheffer of was the Principal-in-Charge
of electric engineering for major mechani-
cal, electrical and plumbing renovations
to (3) dormitories on the SUNY Geneseo
Campus. The buildings each consisted of
(3), three-story pods. The renovations
included power distribution and branch
circuit replacements and additions,
heating plant upgrades and toilet room
renovations.
State University at Geneseo Geneseo, NY
Academic Building Addition
▪ Programming phase for communications, technology and A/V systems for a
new 70,000 square foot Academic Building to be located in downtown
Binghamton.
Dining Hall
▪ Electrical design for expansion of main din-
ing hall on SUNY Binghamton campus.
State University at Binghamton Binghamton, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
▪ Electrical design for new four (4)
story dormitory building, 2012
construction
Adirondack Community College Gansevoort, NY
Electrical design for site lighting and power distribution for
new sports fields and courts
Genesee Community College Genesee, NY
Electrical design for site lighting and power distribution for
new sports fields and courts.
NCAA/USTA Farmingdale State College Farmingdale, NY
Electrical design for site lighting and power distribution for
new sports fields and courts.
Purchase College Purchase, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Engineered Solutions has worked on multiple projects at the University of Roch-
ester campus.
ResNet and ResLife
▪ ResNet and ResLife, which were structured cable plant for the University’s
Student Housing Division (19 Residence Halls). Cable plant and PBX design
for multiple off-site medical office locations.
Hutchinson Hall
▪ Designed modifications to the NMR and Mass Spectrometer Research Space,
the Laminar Flow Hood Laboratory, the Monolayer Laboratory, the Confocal
Microscope Room, the Plasma Mass Spectrometer Laboratory and the Laser
Lab Room #220. Master plan for Electric and Plumbing upgrades
Laboratory for Laser Energetics
▪ A 100,000-square-foot addition to the existing Laser Laboratory on the South
Campus of the University of Rochester.
University of Rochester Rochester, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
▪ Engineered Solutions performed electrical consulting for a comprehensive
study with detailed options to build a new Data Center for the State University
of New York at Albany. Design criteria was to utilize existing warehouse
space for the data center conversion. The Study
was completed in October 2008.
▪ Eric Sheffer was Principal-in Charge for the
renovation to the
University Theater.
State University at Albany Albany, NY
State University Construction Fund
▪ Engineered Solutions performed design services for
State University Construction Fund project included new
network infrastructure for the campus. The project in-
cluded work in (18) buildings and was completed in 2011.
Payson Hall Renovations
▪ MEP design for renovation of existing office and class-
room areas, completed 2006.
State University at Canton Canton, NY
▪ Electrical design for power to site lighting.
State University at Brockport Brockport, NY
646 Plank Road #104 ▪ Clifton Park, NY 12065 ▪ 518.280.2410
www.engineered-solutions.net
Higher Education Experience
Kearney Hall Renovations
▪ Project included campus-wide voice,
data and video underground cabling
and manhole system audit for the
entire campus and satellite buildings
(total 20).
Data Center Relocation
▪ Data center relocation project included
full M/E/P design, comprehensive back-
bone fiber system modifications for
500+ strands of fiber supporting LAN/WAN, DCC and fire alarm systems.
St. John Fisher College Rochester, NY