What was covered in the 2014 PEAG Meeting?

1. What is North-REP?2. Modality /structures3. Interventions4. Impacts5. Partnerships6. Achievements, challenges & targets7. Post North-REP

Page 3: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

What we will cover in the 2015 PEAG meeting?

Highlights 2011 to 2015•What would we do again?•What would we do differently?•What was not planned?•Achievements

Page 4: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

What would we do again?

Page 5: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Multi-country Programme• Funds from the EU (EDF-10) National Indicative Programme• 3 Financing Agreements between the EU and the Countries

(RMI, FSM & Palau)• 1 Contribution Agreement between EU and SPC• Implementing partner is SPC• Partnership between the EU, RMI-FSM-Palau and SPC

Page 6: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Hardware – RE

Solar PV micro-grids

Page 7: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Hardware – RE

Solar PV Stand-alone Systems at public facilities

Page 8: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Hardware – RE

Solar PV Home Systems

Page 9: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Hardware – RE

Grid connected systems – solar PV

Page 10: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Hardware – RE

Grid connected systems - hydropower

Page 11: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Hardware – EE

Retrofitting of buildings through the Development Bank

Page 12: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Hardware – EE

Retrofitting of government buildings

Page 13: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Workshops, sharing experience …….

Page 14: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Hands-on training

Page 15: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Awareness and education

Page 16: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Institutional Arrangements

• Financial accounts• Revenue collection• Energy Act• O&M approaches• MOAs – host of

equipment vs utility ownership

• Tariff setting• Maintenance schedule

Page 17: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Multi-stakeholder involvement

• Governments (e.g. in the FSM, 5 governments)• Government entities• Power utilities• Local educational institutions (e.g. Palau

Community College)• NGOs (WUTMI – women united towards Marshall

Islands)• Other projects (e.g. ADMIRE & SEDREA)• Other regional organizations (e.g. PPA)• Financial institutions (e.g. National Development

Bank of Palau)

Page 18: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Procurement modalities

• Turn-key (supply & install)• Supply of equipment only • Supply of equipment and training on installation• Installation by local power utilities• Installation outsourced but separate from

supplier of equipment

Page 19: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Forward Looking

• Palau Energy Act• Policy Review• Wind resource monitoring• Coconut resource

assessment• Satowan (Chuuk, FSM)

engineering design for a solar-diesel hybrid system

• ACSE – project development document on net metering for small scale grid connected RE systems

Page 20: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

What would we do differently?

Page 21: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Better integration of energy with livelihood activities

Page 22: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015
Page 23: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Better rewarding community assistance

Page 24: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

• Transportation arrangements• Sustainability approaches• Meeting demands (small

community projects – e.g. up to US$50k – linking to proposal /project development training)

• Bridging into next funding cycle(s)

• Fostering of more partners (co-funding) and synchronizing implementing timeframes

Page 25: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

What was not planned?

Page 26: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Typhoon /Hurricane

Page 27: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

• North-REP = EUR15.49m• 3 PICTs = total population of approx. 300,000• Affects 12% of the total population of the 3 PICTs• 1.8MW of renewable energy (RE) – new installations• 17,000 people access to basic electricity for the first time• 20,000 people improved access• Public facilities: 5 health Centres & 15 Schools – first time

access• Contribution to meeting the National Energy Policy targets• Institutionalization of RE course on grid connected PV• Access to finance: EE retrofitting loans programme for

residential & commercial buildings

In Summary – achievements

Page 28: Highlights (2011-2015) PEAG Meeting, Suva, Fiji 16-19 November, 2015

Thank You