Highway 1/169 Improvements Six Mile Lake Road to Bradach Road “Eagles Nest” October 10, 2014 Project Update Meeting Eagles Nest Town Hall

Highway 1/169 Improvements Six Mile Lake Road to Bradach Road “Eagles Nest”

Embed Size (px)

DESCRIPTION

Highway 1/169 Improvements Six Mile Lake Road to Bradach Road “Eagles Nest”. October 10, 2014 Project Update Meeting Eagles Nest Town Hall. Why are we here TODAY?. Project Update Report on Progress since July 2014 Build Alternatives – Minor Revisions/Layout Refinements - PowerPoint PPT Presentation

Citation preview

Page 1: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

Highway 1/169 ImprovementsSix Mile Lake Road to Bradach Road

“Eagles Nest”

October 10, 2014Project Update MeetingEagles Nest Town Hall

Page 2: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

• Project Update• Report on Progress since July 2014

• Build Alternatives – Minor Revisions/Layout Refinements• Estimated Detour Days & User Costs• Wetland Impacts Revised

• Environmental Review Process• Discuss Project Schedule

Why are we here TODAY?

Page 3: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

• Short Presentation ~ 15 min• Questions/Comments• 3 Minute Limit per person

Today’s Meeting Guidelines

Page 4: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

• Project Meetings (Since July 2014)• EPA

• MnDOT and FHWA traveled to Chicago• Discuss Project Alternatives - Update• Mix and Match East and West Segments• Sulfide Rock-Related Issues

• Corp of Engineers • Public Notice Period for Wetland Permit Timing

Project Update

Page 5: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

• Middle Route (Constructed Under Traffic)-PINK• Existing Route (Constructed Under Detour)-BLUE• South Route - ORANGE• Hybrid Alternatives

Build Alternatives

Page 6: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

Alternatives Impacts No Build Existing Route

w/DetourMiddle Route

w/ Traffic South Route

Project Funds (HPP) $15.3M (Fed.) + $3.9M (State) = $19.2M

Construction/ROW Cost (1) Estimate $0 $18.5 Million $17.3 Million $21.6 Million

Wetland Impacts 0 Acres 6.6 Acres 13.3 Acres 17.3 Acres

Rock Exc. (Vol.) None 126,000 CY 69,000 CY 266,000 CY

Detour Impacts (2) -User Costs

0 Days$0M

84-140 Days$2.8M - $4.7M

0-21 Days$0M - $0.7M

0 Days$0M

Shoulder Widths 3’ paved / 1’ grvl 6’ paved/2’ grvl 6’ paved/2’ grvl 6’ paved/2’ grvl

(1) 2016 Dollars(2) Estimated Duration – To be modified with Final Design

Page 7: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

West Segment

Impacts Existing Routew/Detour

Middle Route w/ Traffic South Route

Passing Opportunities (total both directions) 1.04 Miles 1.2 Miles 3.2 Miles

Wetland Impacts 3.8 Acres 6.1 Acres 3.8 Acres

Rock Exc. (Vol.) 11,000 CY 38,000 CY 132,000 CY

Detour Impacts Yes No No

Page 8: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

East Segment

Impacts Existing Routew/Detour

Middle Route w/ Traffic South Route

Passing Opportunities (total both directions) 1.02 Miles 1.2 Miles 1.7 Miles

Wetland Impacts 2.8 Acres 7.2 Acres 13.5 Acres

Rock Exc. (Vol.) 116,000 CY 31,000 CY 135,000 CY

Detour Impacts Yes No No

Page 9: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

Hybrid Alternatives2A Hybrid 3A Hybrid

Impacts West East West East

Project Funds (HPP) $15.3M (Fed.) + $3.9M (State) = $19.2MConstruction/ROW Cost (1) Estimate $20.0 Million $19.5 Million

Wetland Impacts 6.6 Acres 11.0 AcresRock Exc. (Vol.) 248,000 CY 163,000 CYDetour Impacts (2) - User Costs

50-70 Days$1.6M - $2.3M 0-15 Days

$0 - $0.5M

Shoulder Widths 6’ paved/2’ grvl 6’ paved/2’ grvl

(1) 2016 Dollars(2) Estimated Duration – To be modified with Final Design

Page 10: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

• Purpose and Need – EPA and COE Concurrence• Alternative Analysis - EPA and COE Concurrence• Cooperating Agency Review Draft EA – (now in progress)• EA Publication/Public Comment Period/Public Hearing –

Opportunity for public comments on EA content, including social, economic, and environmental impacts and minimization/mitigation measures. EA will identify a preferred alternative.

• MnDOT and FHWA review of comments, and make decision if there is potential for significant impacts.

Environmental Review Process

Page 11: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

• Complete Environmental Documentation• Review Draft Environmental Assessment to FHWA and

Cooperating Agencies- October 2014• EA Public Comment Period/Hearing – Dec/Jan 2014-5• Alignment Selection – February 2015

• Final Plans – Fall 2016• ROW Acquisition Complete – December 2016• Permitting - December 2016• Construction – Goal is Begin in Winter of 2016/2017

Project Schedule - Steps For Completion

Page 12: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

QUESTIONS / COMMENTS?

•3 Minute Limit per person

Page 13: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”
Page 14: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”
Page 15: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

• Design Build Method of Construction• Corp of Engineers Permit

• Innovative ways to streamline ROW Acquisition process• Access for Tree Clearing

Opportunities to Expedite Construction

Page 16: Highway 1/169 Improvements Six Mile Lake Road to  Bradach  Road “Eagles Nest”

Overland Flow Question