18
HIGHWAY 401 EXPANSION PROJECT PUBLIC INFORMATION CENTRE October 17, 2019

HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

HIGHWAY 401 EXPANSION PROJECT

PUBLIC INFORMATION CENTREOctober 17, 2019

Page 2: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Purpose of this Public Information Centre (PIC)

• Provide information on the Highway 401 Expansion Project

• Describe the Environmental Assessment process

• Summarize how traffic and environmental impacts are being mitigated

• Identify Next Steps

• Outline how you can stay informed and involved

PIC Content available on the Project website includes:

1. Video presentation

2. PDF / Downloadable copy of the presentation slides

3. PDF Map of the entire Highway 401 Expansion corridor

4. Summary of the Question and Answer Sessions

5. PIC Comment form

2

Page 3: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Project Limits

3

Page 4: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Benefits of the Project

The Highway 401 Expansion Project will have both local and regional benefits:

Improved Travel

Provides Carpooling

Options

Economic Benefits

• Reduced traffic congestion

• Reduced travel times

• New and expanded Commuter Carpool Lots

• High Occupancy Vehicle (HOV) Lanes

• More efficient movement of people and goods, within the Highway 401 corridor

• Generation of employment opportunities

4

Page 5: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Project Background and Environmental Assessment

This Project is following the approved planning process for a Group ‘B’ project under

the MTO Class Environmental Assessment (EA) for Provincial Transportation

Facilities (2000)

Preliminary Design (2013) Detail Design and Construction of three bridges (2015 – 2018)

WCC selected to design and build the Highway 401 Expansion (Spring 2019)

5

Page 6: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

EA and Design Build Process PRELIMINARY DESIGN (2013)

DETAIL DESIGN (Commenced Spring 2019)

Review Secondary Source InformationConduct Field Investigations

Commence Detail Design

Notice of Study Commencement and Design and Construction Report No. 1

Design and Construction Report No. 1 (30-day Stakeholder Review)

Environmental Clearance

CONSTRUCTION

Construction can commence on DCR No. 1 Works

Hold Public Information Centre We are here

Design and Construction Report No. 2(30-day Stakeholder Review)

Environmental Clearance

Construction can commence on DCR No. 2 Works

Design and Construction Report No. 3 (30-day Stakeholder Review)

Environmental Clearance

Construction can commence on DCR No. 3 Works

Construction Completion

Stak

eh

old

er

Co

nsu

ltat

ion

Th

rou

gho

ut

Co

nstru

ction

and

Enviro

nm

en

tal M

on

itorin

g Thro

ugh

ou

t

DCR No. 1

• Clearing and Grubbing

• Structure Replacements:

• CN Rail Bridge

• Trafalgar Road Bridge

• CP Rail Bridge

• Environmental Clearance issued and construction of DCR No. 1 works has commenced

6

Page 7: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Highway 401 Widening

Typical 10 Lane Cross Section

Westbound Lanes Eastbound Lanes

Median widths will vary throughout the corridor

Typical 12 Lane Cross Section

Median widths will vary throughout the corridor

Westbound Lanes Eastbound Lanes

7

Page 8: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Interchanges and Road Realignment

• Interchange reconfiguration:

• Regional Road 25

• James Snow Parkway

• Trafalgar Road

• Winston Churchill Boulevard

• Mississauga Road

• Highway 401 and Highway 407 ETR

• Local road realignments:

• Sixth Line north and south of Highway 401

• Trafalgar Road north and south of Highway 401

• Creditview Road north and south of Highway 401

Mississauga Road, southwest quadrant

8

Page 9: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

StructuresStructure Description of work

New and Replacement Bridges

Highway 401 and Highway 407 ETR Interchange Ramp

• Existing Highway 407 ETR westbound to Highway 401 westbound ramp relocated

Sixth Line Bridge • Bridge Replacement • Number of lanes on Sixth Line will remain the same • Existing structure will be maintained during

construction

Creditview Road Bridge • Bridge Replacement • Final bridge will provide two lanes in each direction

Watercourse Bridge Replacements

Oakville Creek East Bridges • Bridge Replacement and Widening • Will accommodate wildlife passage under the

structure

Credit River Bridges • Bridge Replacement and Widening • Will accommodate wildlife passage under the

structure Credit River Bridge

Hwy 401 / Hwy 407ETR Interchange

9

Page 10: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

StructuresStructure Details

Bridge Rehabilitations and Widening

Ninth Line Bridge • Bridge Rehabilitation• Lane closures during construction, as necessary

Winston Churchill Boulevard Bridges • Bridge Rehabilitation• Lane closures during construction, as necessary

Derry Road Bridges • Bridge Rehabilitation & Widening of Highway 401 bridge over Derry Road to six lanes in each direction

• Lane closures during construction, as necessary

Other Structures:• Culverts• Retaining Walls and Toe Walls

Derry Road, looking south Winston Churchill Blvd, looking south

10

Page 11: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Bridge Aesthetics• Architectural detail on the parapet wall and embossments on the wingwalls will be

included on the following bridges:

• Trafalgar Road Bridge

• Sixth Line Bridge

• Creditview Road Bridge

Architectural detail for parapets

Embossment Concepts

11

Page 12: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Drainage and Stormwater Management• Stormwater quantity and quality control

• Sewers, culverts, roadside and flat-bottom grassed ditches, and existing and new stormwater management ponds.

• Proposed Stormwater Management Ponds:

• Two (2) new wet ponds south of Highway 401 (one west of Fifth Line and one west of Sixth Line).

• Modifications to two (2) existing wet ponds near the Highway 407 ETR and Highway 401 Interchange

Pond 2 – West of Fifth Line Pond 1 – West of 6th Line 407ETR Pond 1 and Pond 5

12

Page 13: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Supplementary Works• Commuter Carpool Lots:

• New Trafalgar Road Commuter Carpool Lot

(Northwest Quadrant)

• New Winston Churchill Boulevard Commuter

Carpool Lot (Northwest Quadrant)

• Expansion of existing Mississauga Road

Commuter Carpool Lot (Northwest Quadrant)Mississauga Road Commuter Carpool Lot

• Active Transportation:

• Accommodate future bike lanes on Regional Road 25

• Accommodate future bike lanes on Trafalgar Road Underpass Structure

• Multi-use path along the west side of Creditview Road

• Illumination: Continuous high mast lighting corridor wide

13

Page 14: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Traffic Impacts

• During peak traffic hours six lanes will be maintained on mainline Highway 401, as per existing conditions

• During off peak traffic hours there will be short term closures and lane reductions

• Lane closures anticipated:

• Some off-ramps will be reduced to a single lane throughout construction

• Ninth Line will be reduced from 2 Lanes to 1 Lane

• Derry Road will be reduced from 6 Lanes to 4 Lanes

• Winston Churchill Boulevard will be reduced from 6 Lanes to 4 Lanes

• Creditview Road Bridge lane closures to be confirmed

Information about traffic disruptions will be posted on the website and traffic updates will be sent to those subscribed by email to the Project contact list

14

Page 15: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Landscaping and Restoration• Landscaping and restoration will occur corridor wide, including around the

stormwater ponds, within interchanges, and in valley corridors

• Ecological Restoration will include habitat enhancement for species at risk and wildlife passage features

Typical Interchange LandscapingStormwater Management Pond Naturalization

15

Page 16: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Environmental MitigationFactor Existing Conditions and / or Impacts Mitigation Measures

Terrestrial

• Isolated Natural areas• Existing highway is a barrier to wildlife movement

• Minimize vegetation removals and install tree protection barriers• Invasive species management• Landscaping and restoration • Wildlife fence and wildlife passage features

Aquatic• Fish bearing watercourses – Direct and Indirect• Watercourse realignments • Risk of erosion and sedimentation

• Permits and approvals• In-water work timing windows• Install and maintain ESC measures until the site is stabilized

Species at Risk • Four Species at Risk (SAR) • Consultation with regulatory agencies is ongoing

• Permits and approvals• Adhere to timing windows

Water / Erosion and Sediment • Groundwater dewatering

• Construction impacts to surface water • Risk of erosion and sedimentation

• Environmental Activity and Sector Registry (EASR) / Permit To Take Water (PTTW)• Properly installed and monitored ESC measures• Spills Prevention and Management Plan, Groundwater Monitoring Program,

Surface Water Monitoring Program

Land Use • Mix of urban, agricultural and some natural areas• Property has already been acquired by the

province; no additional property is needed

• Construction works will be limited to the Project Lands• Permission to Enter will be obtained if required

16

Page 17: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Environmental Mitigation

Factor Existing Conditions and / or Impacts Mitigation Measures

Noise and Vibration • No permanent noise mitigation • Construction noise mitigation• Potential for vibration impacts

• Noise bylaw exemption for work within municipal right-of-way• Limit noisy construction activities to daytime, equipment in good operating

condition, noise complaints will be investigated• Vibration monitoring at select locations

Air Quality• No significant impacts to regional air quality • Limited construction air quality impacts

• Keep construction machinery and equipment in good condition• Dust suppressant measures

Excess Earth, Waste and Contamination

• Excess earth generation • Contaminated areas requiring remediation • Demolition of structures/buildings with

designated substances

• Excess materials management• Remediation of soil • Designated substances management

Archaeology • The areas to be impacted have been cleared of

archaeological value• If undocumented archaeological resources are discovered, construction will

stop and findings investigated

Built Heritage• Two Provincial Heritage Properties

• Documentation produced• Mitigation measures including landscaping

17

Page 18: HIGHWAY 401 EXPANSION PROJECT€¦ · 1. Video presentation 2. PDF / Downloadable copy of the presentation slides 3. PDF Map of the entire Highway 401 Expansion corridor 4. Summary

Next Steps and How to Stay Informed

• Ongoing construction

• Review and response to comments

• DCR No. 2 review period anticipated for January 2020

• DCR No. 3 review period anticipated for Winter/Spring 2020

• Travelers can expect to have full use of the expanded facility by late 2022

There is a PIC Comment Form available on the website. Please provide comments on the PIC by October 31, 2019.

For more information on the Project or to contact the WCC Project Team:

Email : [email protected]

Phone: 1-888-619-1668 (24 hour)

Project Website: www.401expansion-mississauga-milton.ca

18