2017 DALLAS ECONOMIC DEVELOPMENT GUIDE 189 AROUND THE REGION | MAJOR TRANSPORTATION CONSTRUCTION PROJECTS 9 10 2 7 3 2 4 6 5 1 8 33 20 21 25 15 14 13 22 12 11 17 18 26 27 19 28 29 31 30 24 23 16 32 46 37 38 44 45 36 48 40 34 35 41 42 47 39 49 1 I-35E MANAGED LANES Phase 2: Widen 6 to 8 gen. purpose lns and 2 to 4 concurrent toll managed lanes; Scheduled construction: 2019-2024 2 SL 12/I-35E Reconstruct & widen hwy. / add toll managed lanes; Scheduled construction: 2025-2028 3 I-35E Reconstruct and widen from 6 to 8 lanes; Scheduled construction: 2025-2028 4 I-35E PEGASUS/PART OF LOWER STEMMONS Reconstruct highway and add toll managed lanes; Scheduled construction: 2025 5 I-30 PEGASUS/ THE CANYON Reconstruct highway and add toll managed lanes; Scheduled construction: 2025 6 I-35E (LOWEST STEMMONS) Construct 5 collector- distributor roads and reconstruct frontage roads; Scheduled construction: 2025 7 I-35E/US 67 (THE SOUTHERN GATEWAY) Widen highway and add reversible non-tolled managed express lanes; Scheduled competion: 2025 8 I-35 (NORTH) Reconstruct and widen highway; Scheduled construction: 2028 9 I-35E (WAXAHACHIE) PHASE I Reconstruct and widen highway from 4 to 6 lanes; Scheduled competion: 2017 10 I-35E (WAXAHACHIE) PHASE II Add interchanges and improve ramps; Scheduled construction: 2025 11 SH 183/SH114 Build remaining portions of ultimate to include 6/8 hwy. lanes & 4/6 toll managed lanes; Scheduled construction: 2035 12 I-35W Reconstruct/widen hwy. & add toll managed lanes; Scheduled construction: 2028 13 US 175/SM WRIGHT (II-A) Reconstruct highway to six-lane arterial; Scheduled construction: 2020 14 US 175/SM WRIGHT (II-B) Reconstruct interchange & extend frontage roads; Scheduled construction: 2020 15 I-345 REHAB. (PHASE II) Rehabilitation of existing overhead highway; Scheduled completion: 2017 16 JEFFERSON MEM. VIADUCT Reconstruct existing viaduct in new location; Scheduled construction: 2023 17 I-635 LBJ FREEWAY EAST Reconstruct & widen hwy. / add toll managed lanes; Scheduled completion: 2025 18 US 75 Reconstruct & widen hwy.; corridor study started ‘12; Scheduled completion: 2025 19 US 75 Reconstruct and widen highway; Scheduled construction: 2028 20 LOOP 9 Construct 6 lane toll road with 4/6 lane frontage roads; Scheduled construction: 2021 21 SH 190 (THE EAST BRANCH) Construct new location toll road; Scheduled construction: 2022 22 TRINITY PKWY. (NTTA PROJ.) Construct new location toll road; Scheduled completion: 2019 23 SH 161 Add toll managed lanes. Reconstr. NB hwy. lanes; Scheduled completion: 2019 24 SH 121 Reconstruct & widen 2 to 4 lanes w/ interchanges; Scheduled completion 2018 25 I-30/US 80 (EAST CORRIDOR) Reconstruct & widen hwy. / add toll managed lanes; Scheduled construction: 2028 26 I-30 (ROCKWALL CO.) Reconstruct and widen 4 to 6 lanes; Scheduled construction: 2028 27 SH 205 Widen 2 lane rural to 4 lane divided (Ultimate 6); Scheduled construction: 2025 28 US 380/US 377 Widen 4 to 6 lane div. urban w/ IC improvements; Scheduled completion: 2020 29 US 380 Conduct Feasibility Study; Scheduled completion: 2016 30 SH 5 Widen 2 lane rural highway to 4 lane urban (Ultimate 6); Scheduled construction: 2020-2023 31 SH 5 Widen 4 lane undivided to 4/6 lane divided; Scheduled completion: 2023 32 I-20 CORRIDOR EAST Add continuous frontage roads 33 US 67 WIDENING Widen highway from 4 to 6 lanes; Scheduled completion: 2019 34 NTE SEGMENT 3A PHASE 2 Widen highway/add toll managed lane connections at downtown 35 NTE SEGMENT 2E Build ultimate configuration of phased toll managed lane project; Scheduled completion: 2025 36 DFW CONNECTOR Construct configuration 3/ ultimate project 37 I-30 Reconstruct and add 2 additional lanes 38 I-30 Expand to 6/8 lane highway and add interchange 39 I-35W SEGMENT 3C ULTIMATE Reconstruct and widen highway and add toll managed lanes 40 I-35W Add 4 additional lanes 41 I-20/I-820/US 287 INTERCHANGE Reconstruct and widen existing interchange 42 I-20 Add 4 lane toll connection between SH 360 and SH 161 43 I-20 Add 1 additional highway lane 44 SH 170 Build 6-lane highway in new location 45 I-820 SEG. 4 Reconstruct and widen highway and add toll managed lanes 46 SH 360 Add one mainlane each direction, ramp improvements 47 SH 360 SOUTH Build ultimate configuration, 6 to 8 lane divided toll road 48 SH 199 Expand to 6/8 lane highway and 3 interchanges 49 I-20 Reverse ramps and other operational improvements 2017-2021 PLANNED HIGHWAY CONSTRUCTION PROJECTS SOURCE: Texas Department of Transportation (TxDOT) DALLAS ECONOMIC DEVELOPMENT GUIDE 2017 188 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS Transportation is essential to Texas’ future. The movement of goods and people in an efficient manner ensures that the economy remains competitive and economically prosperous. North Texas continues to experience tremendous population growth, and this places increased demand on the region’s transportation infrastructure. Billions of dollars are being invested to maintain existing infrastructure, prevent congestion, and ensure mobility and safety by relieving chokepoints and expanding critical corridors. Dozens of projects currently are under underway with many more planned for the future. 19 20 22 23 21 1 3 2 4 9 10 10 11 7 8 1 12 13 5 6 15 14 16 HIGHWAY CONSTRUCTION PROJECTS SOURCE: Texas Department of Transportation 1 I-35E MANAGED LANES North of I-635 to US 380; Phase 1: Add additional lane each direction in Denton Co, add rev toll managed lanes IH 635 to Turbeville, add bridge over Lake Lewisville; Scheduled completion: 2017 2 NTE SEG. 3A I-30 to north of I-820; Reconstruct highway and add toll managed lanes; reconstruct remainder of I-35W/I-820 interchange; Scheduled completion: 2018 3 NTE SEG. 3B North of I-820 to U.S. 81/287; Reconstruct and widen highway and add toll mgd and expand lanes; Scheduled completion: 2016 4 HORSESHOE I-35E (8th St. to Commerce St.) I-30 (Sylvan Avenue to east of I-35E); Reconstruct I-35E and I-30 bridges over Trinity River; rebuild/widen existing highway; Scheduled completion: 2017 5 US 75 North of Melissa Road to FM 455; Reconstruct and widen highway; Scheduled completion: 2019 6 I-345 REHABILITATION (PHASE I) I-345 from I-30 to SP 366; Rehabilitation of existing overhead highway; Scheduled completion: 2018 7 SH 121 SEG. 13 (DAL) South of FM 2499 to Business 121 H; Reconstruct and widen highway; Scheduled completion: 2017 8 I-30 West of Fielder Rd. to Sylvan Ave.; Construct toll managed lanes with wishbone ramps; Scheduled completion: 2017/2020 9 US 67 CLEBURNE EAST LOOP SH 174 to Spur 102; Widen to 4 lane facility; Scheduled completion: 2017 10 MIDTOWN EXPRESS SH 183; SH 114; Loop 12; Rebuild/widen portions of the highway and add toll managed lanes; Scheduled completion: 2018 11 SH 360 (NTTA/TXDOT) US 287 to south of I-20; Phased 2 to 4 lane new toll road; Scheduled completion: 2018 12 I-35E (WAXAHACHIE) PHASE I US 77 south of Waxahachie to US 77 north of Waxahachie; Reconstruct and widen highway from 4 to 6 lanes; Scheduled completion: 2019 15 US 175 (SM WRIGHT FREEWAY) US 175; I-45; Extend US 175 to I-45; Scheduled completion: 2019 16 SH 360/I-30 INTERCHANGE At interchange; Reconstruct and widen existing interchange; Scheduled completion: 2020 17 SH 199 Nine Mile Bridge Rd. to Western Center Blvd.; Construct mainlanes, bridges and ramps; Scheduled completion: 2019 18 DFW CONNECTOR SH 121/360 Interchange; Construct interchange; Scheduled completion: 2018 19 I-35E/US 67 (SOUTHERN GATEWAY) I-35E and US 67; Widen highway and add reversible express lanes; Scheduled completion: 2021 20 I-35W SEG. 3C US 81/287 to north of Eagle Parkway; Reconstruct and widen highway and add toll managed lanes; Scheduled completion: 2019 21 I-35E Dallas North Tollway to Woodall Rodgers; Construct collector/distributor lanes; Scheduled completion: 2019 22 I-635 LBJ FREEWAY EAST I-30 to east of US 75; Reconstruct and widen highway and add toll managed lanes/express lanes; Scheduled completion: 025 23 I-820 SEG. 4 I-820/SH 183/SH 121 to Randol Mill Rd.; Reconstruct and widen highway; Scheduled completion: 2021 Key Projects Awarded or Under Construction Key Projects (Procurement) DAL/FTW Key Projects (Development)

HIGHWAY CONSTRUCTION PROJECTS PLANNED … hwy. lanes; Scheduled completion: 2019 ... HIGHWAY CONSTRUCTION PROJECTS SOURCE: ... 2 NTE SEG. 3A I-30 to north of I-820;

  • Upload
    vandan

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

2 0 1 7 D A L L A S ECONOMIC DEVELOPMENT G U I D E 1 8 9

AROUND THE REGION | 

MAJOR TRANSPORTATION CONSTRUCTION PROJECTS9

10

2 7

32

4 65

1

8

33

20

21

2515

14

1322

12

1117

18

26

27

19

28 2931

3024

23

16

32

46

3738

44

45

36

48

40

34 35

41 42

47

39

49

1 I-35E MANAGED LANESPhase 2: Widen 6 to 8 gen. purpose lns and 2 to 4 concurrent toll managed lanes; Scheduled construction: 2019-2024

2 SL 12/I-35EReconstruct & widen hwy. / add toll managed lanes; Scheduled construction: 2025-2028

3 I-35EReconstruct and widen from 6 to 8 lanes; Scheduled construction: 2025-2028

4 I-35E PEGASUS/PART OF LOWER STEMMONSReconstruct highway and add toll managed lanes; Scheduled construction: 2025

5 I-30 PEGASUS/THE CANYONReconstruct highway and add toll managed lanes; Scheduled construction: 2025

6 I-35E (LOWEST STEMMONS)Construct 5 collector-distributor roads and reconstruct frontage roads; Scheduled construction: 2025

7 I-35E/US 67 (THE SOUTHERN GATEWAY)Widen highway and add reversible non-tolled managed express lanes; Scheduled competion: 2025

8 I-35 (NORTH)Reconstruct and widen highway; Scheduled construction: 2028

9 I-35E (WAXAHACHIE)PHASE IReconstruct and widen highway from 4 to 6 lanes; Scheduled competion: 2017

10 I-35E (WAXAHACHIE) PHASE IIAdd interchanges and improve ramps; Scheduled construction: 2025

11 SH 183/SH114Build remaining portions of ultimate to include 6/8 hwy. lanes & 4/6 toll managed lanes; Scheduled construction: 2035

12 I-35WReconstruct/widen hwy. & add toll managed lanes; Scheduled construction: 2028

13 US 175/SM WRIGHT (II-A)Reconstruct highway to six-lane arterial; Scheduled construction: 2020

14 US 175/SM WRIGHT (II-B)Reconstruct interchange & extend frontage roads; Scheduled construction: 2020

15 I-345 REHAB. (PHASE II)Rehabilitation of existing overhead highway; Scheduled completion: 2017

16 JEFFERSON MEM. VIADUCTReconstruct existing viaduct in new location; Scheduled construction: 2023

17 I-635 LBJ FREEWAY EASTReconstruct & widen hwy. / add toll managed lanes; Scheduled completion: 2025

18 US 75 Reconstruct & widen hwy.; corridor study started ‘12; Scheduled completion: 2025

19 US 75Reconstruct and widen highway; Scheduled construction: 2028

20 LOOP 9Construct 6 lane toll road with 4/6 lane frontage roads; Scheduled construction: 2021

21 SH 190 (THE EAST BRANCH)Construct new location toll road; Scheduled construction: 2022

22 TRINITY PKWY. (NTTA PROJ.)Construct new location toll road; Scheduled completion: 2019

23 SH 161Add toll managed lanes. Reconstr. NB hwy. lanes; Scheduled completion: 2019

24 SH 121Reconstruct & widen 2 to 4 lanes w/ interchanges; Scheduled completion 2018

25 I-30/US 80 (EAST CORRIDOR)Reconstruct & widen hwy. / add toll managed lanes; Scheduled construction: 2028

26 I-30 (ROCKWALL CO.)Reconstruct and widen 4 to 6 lanes; Scheduled construction: 2028

27 SH 205Widen 2 lane rural to 4 lane divided (Ultimate 6); Scheduled construction: 2025

28 US 380/US 377Widen 4 to 6 lane div. urban w/IC improvements; Scheduled completion: 2020

29 US 380Conduct Feasibility Study; Scheduled completion: 2016

30 SH 5Widen 2 lane rural highway to 4 lane urban (Ultimate 6); Scheduled construction: 2020-2023

31 SH 5Widen 4 lane undivided to 4/6 lane divided; Scheduled completion: 2023

32 I-20 CORRIDOR EASTAdd continuous frontage roads

33 US 67 WIDENINGWiden highway from 4 to 6 lanes; Scheduled completion: 2019

34 NTE SEGMENT 3A PHASE 2Widen highway/add toll managed lane connections at downtown

35 NTE SEGMENT 2EBuild ultimate confi guration of phased toll managed lane project; Scheduled completion: 2025

36 DFW CONNECTORConstruct confi guration 3/ultimate project

37 I-30Reconstruct and add 2 additional lanes

38 I-30Expand to 6/8 lane highway and add interchange

39 I-35W SEGMENT 3C ULTIMATEReconstruct and widen highway and add toll managed lanes

40 I-35WAdd 4 additional lanes

41 I-20/I-820/US 287 INTERCHANGEReconstruct and widen existing interchange

42 I-20Add 4 lane toll connection between SH 360 and SH 161

43 I-20Add 1 additional highway lane

44 SH 170Build 6-lane highway in new location

45 I-820 SEG. 4Reconstruct and widen highway and add toll managed lanes

46 SH 360Add one mainlane each direction, ramp improvements

47 SH 360 SOUTHBuild ultimate confi guration, 6 to 8 lane divided toll road

48 SH 199Expand to 6/8 lane highway and 3 interchanges

49 I-20Reverse ramps and other operational improvements 2017-2021

PLANNED HIGHWAY CONSTRUCTION PROJECTS

SOURCE: Texas Departmentof Transportation (TxDOT)

D A L L A S ECONOMIC DEVELOPMENT G U I D E 2 0 1 71 8 8

MAJORTRANSPORTATION CONSTRUCTIONPROJECTSTransportation is essential to Texas’ future. The movement of goods and people in an effi cient manner ensures that the economy remains competitive and economically prosperous. North Texas continues to experience tremendous population growth, and this places increased demand on the region’s transportation infrastructure. Billions of dollars are being invested to maintain existing infrastructure, prevent congestion, and ensure mobility and safety by relieving chokepoints and expanding critical corridors. Dozens of projects currently are under underway with many more planned for the future.

19

20

222321

1

3

2

4

9

10

10

11

7

8

1

12

13

14

13

5

615 14

16

19

20

HIGHWAY CONSTRUCTION PROJECTS

SOURCE: Texas Department of Transportation

1 I-35E MANAGED LANESNorth of I-635 to US 380; Phase 1: Add additional lane each direction in Denton Co, add rev toll managed lanes IH 635 to Turbeville, add bridge over Lake Lewisville; Scheduled completion: 2017

2 NTE SEG. 3AI-30 to north of I-820; Reconstruct highway and add toll managed lanes; reconstruct remainder of I-35W/I-820 interchange; Scheduled completion: 2018

3 NTE SEG. 3BNorth of I-820 to U.S. 81/287; Reconstruct and widen highway and add toll mgd and expand lanes; Scheduled completion: 2016

4 HORSESHOEI-35E (8th St. to Commerce St.) I-30 (Sylvan Avenue to east of I-35E); Reconstruct I-35E and I-30 bridges over Trinity River; rebuild/widen existing highway; Scheduled completion: 2017

5 US 75North of Melissa Road to FM 455; Reconstruct and widen highway; Scheduled completion: 2019

6 I-345 REHABILITATION (PHASE I)I-345 from I-30 to SP 366; Rehabilitation of existing overhead highway; Scheduled completion: 2018

7 SH 121 SEG. 13 (DAL)South of FM 2499 to Business 121 H; Reconstruct and widen highway; Scheduled completion: 2017

8 I-30West of Fielder Rd. to Sylvan Ave.; Construct toll managed lanes with wishbone ramps; Scheduled completion: 2017/2020

9 US 67 CLEBURNE EAST LOOPSH 174 to Spur 102; Widen to 4 lane facility; Scheduled completion: 2017

10 MIDTOWN EXPRESSSH 183; SH 114; Loop 12; Rebuild/widen portions of the highway and add toll managed lanes; Scheduled completion: 2018

11 SH 360 (NTTA/TXDOT)US 287 to south of I-20; Phased 2 to 4 lane new toll road; Scheduled completion: 2018

12 I-35E (WAXAHACHIE) PHASE IUS 77 south of Waxahachie to US 77 north of Waxahachie; Reconstruct and widen highway from 4 to 6 lanes; Scheduled completion: 2019

15 US 175 (SM WRIGHT FREEWAY)US 175; I-45; Extend US 175 to I-45; Scheduled completion: 2019

16 SH 360/I-30 INTERCHANGEAt interchange; Reconstruct and widen existing interchange; Scheduled completion: 2020

17 SH 199Nine Mile Bridge Rd. to Western Center Blvd.; Construct mainlanes, bridges and ramps; Scheduled completion: 2019

18 DFW CONNECTORSH 121/360 Interchange; Construct interchange; Scheduled completion: 2018

19 I-35E/US 67 (SOUTHERN GATEWAY)I-35E and US 67; Widen highway and add reversible express lanes; Scheduled completion: 2021

20 I-35W SEG. 3CUS 81/287 to north of Eagle Parkway; Reconstruct and widen highway and add toll managed lanes; Scheduled completion: 2019

21 I-35EDallas North Tollway to Woodall Rodgers; Construct collector/distributor lanes; Scheduled completion: 2019

22 I-635 LBJ FREEWAY EASTI-30 to east of US 75; Reconstruct and widen highway and add toll managed lanes/express lanes; Scheduled completion: 025

23 I-820 SEG. 4I-820/SH 183/SH 121 to Randol Mill Rd.; Reconstruct and widen highway; Scheduled completion: 2021

Key Projects Awarded or Under Construction

Key Projects (Procurement)

DAL/FTW Key Projects (Development)