7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
1/16
Ride through systems Diesel UPS systems
www.hitec-ups.com
Injazat Data CentreAbu Dhabi
Ride through systems Diesel UPS systems
www.hitec-ups.com
Injazat Data Centre
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
2/16
Injazat Data Centre
Injazat Data Centre Co-hosting Data Centre
Provision of a managed, secure and environmentally controlled 2000m
Data Hall for hosting mission critical servers and related IT equipment
Timescales
Commenced May 2007
Construction Completion May 2008
Operational December 2008
Operating Environment Arid Desert, Remote Location 46 Degree Ambient
Controlled Temperature
Controlled Humidity
Clean Room Conditions
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
3/16
Injazat Data Centre
Construction
Two storey construction
Plant rooms at ground floor level
Data Centre at first floor level
Physical separation of power and cooling systems
Power Technology 6.6 MVA Building Load (5.4 MVA of Critical Load)
Utility power from 2no dedicated primary supplies
Fully redundant power distribution systems
Simultaneous power from systems A & B
System isolation until point of delivery
DRUPS providing clean un-interrupted power supply Critical power requirements fully backed by DRUPS
Stand alone capability for 72 hours
Injazat Data Centre
Tier IV Infrastructure
Provision of secure, and redundant critical
services to maintain 99.995% Data Hall uptime
regardless of utility service failure or maintenance
activities.
Highest level of Data Centre Reliability
First facility of its type in the Middle East
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
4/16
May 2007
March 2008
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
5/16
Network Schematic SingleHV DRUPS System
Network Schematic Downstream Load Distribution
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
6/16
Normal Operation(Mains Available)
MVDRUPS
System B
MVDRUPS
System A
Non-CriticalLoad
Critical Cooling& Mech Load
Critical IT &Server Load
Low-Voltage
O/P Bus O/P Bus
ADWEASUPPLY
A
ADWEASUPPLY
B
Tier IV - 2 (N+1)Architecture
(Medium Voltage)
Emergency Operation(Supply A Fails)
MVDRUPS
System B
MVDRUPS
System A
Non-CriticalLoad
Critical Cooling& Mech Load
Critical IT &Server Load
Low-Voltage
O/P Bus O/P Bus
ADWEASUPPLY
A
ADWEASUPPLY
B
Tier IV - 2 (N+1)Architecture
(Medium Voltage)
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
7/16
MVDRUPS
System B
MVDRUPS
System A
Non-CriticalLoad
Critical Cooling& Mech Load
Critical IT &Server Load
Low-Voltage
O/P Bus O/P Bus
ADWEASUPPLY
A
ADWEASUPPLY
B
Tier IV - 2 (N+1)Architecture
(Medium Voltage)
Emergency Operation(Supply B Fails)
Emergency Operation(Supply A and B Fail)
MVDRUPS
System B
MVDRUPS
System A
Non-CriticalLoad
Critical Cooling& Mech Load
Critical IT &Server Load
Low-Voltage
O/P Bus O/P Bus
ADWEASUPPLY
A
ADWEASUPPLY
B
Tier IV - 2 (N+1)Architecture
(Medium Voltage)
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
8/16
Injazat Data Centre
Plan View - DRUPS PlantRoom Layout
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
9/16
Elevation Radiator Layout
Deliveries and Offloading
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
10/16
Specialist Plant Handling
150 Ton Mobile Crane
8 No. 28,000 kg lifts
Zero Shock requirement
Levelled Rails
Hydraulic Rams
Injazat Data Centre
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
11/16
Remote Radiators
Remote Radiators System A
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
12/16
Two of Four Modules System A
UTP LV to HV Step-upTransformers
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
13/16
Service Fuel Tank andHeat Exchangers
DRUPS Control Room System A
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
14/16
BCP Panel and UCP Panel
February 2009
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
15/16
Injazat Data CentreFebruary 2009
Injazat Data CentreFebruary 2009
7/28/2019 Hitec Power Protection - Injazat Data Center - Tier IV Solution
16/16
Injazat Data CentreFebruary 2009