BRINGING POWER INTO THE NATION ANDTHE WORLD
The Role of Private Sector
in Fulfilling the Demand of Electricity for Industry
By N. Hasto Kristiyono
President Director & CEO – PT Sumberdaya Sewatama
The 69th National Electricity Day Event Series : “Electricity for Prosperity”
October 1st – 3rd, 2014 – Jakarta Convention Center
BRINGING POWER INTO THE NATION ANDTHE WORLD
Strong National Resilience to Compete Globally
16th1st 2nd 3rd 4th 5th 6th
27th1st 2nd 3rd 4th 5th 6th
2000
2013
Need to Generate
More Power
BRINGING POWER INTO THE NATION ANDTHE WORLD
Industrial Electricity Supply / Demand Situation
Taxonomy of Electricity Sector Provision
UUD 1945Pasal 33 Ayat 2 &3
UUD 1945Pasal 33 Ayat 2 &3
Definitive
Regulation
Definitive
Regulation
� UU No. 15/1985 replaced with;
� UU No. 9/2009 on Electricity
Provision
ELECTRICITY
SUPPLY
Generation
Transmission & System Operation
Distribution
IPPs Self-Generation Co-operatives
PPA
Growth 3%-5%
� UU No. 30/2007 on Energy
� UU No. 30/2007 on Nuclear
� UU No. 30/2007 on Oil & Gas
� UU No. 30/2007 on Geothermal
� UU No. 30/2007 on Hydro Resources
� SU No. 30/2007 on Coal & Mineral
Regulation on
Energy Upstream
Regulation on
Energy Upstream
Private Sector
Strong Electricity Demand on Industry
+
Global / RegionalEconomics Drivers
Global / RegionalEconomics Drivers
ELECTRICITY
DEMAND
CUSTOMERS Industrial - Continuous
Business / Commercial - Base load
Captive Power - Backup
SAIDI / SAIFI Cost of Electricity
Growth 9%-10%
Performance
Source: RUPTL & PLN Statistic
+
BRINGING POWER INTO THE NATION ANDTHE WORLDBRINGING POWER INTO THE NATION AND THE WORLD
Lack of Electricity Infrastructure Development
� Land acquisition
� Source of financing and/or Government Guarantee
� Tariff acceptance – reliance on subsidy
� Primary Energy location gap, vis-a-vis archipelago nature of the
country
� Low reliability of product & technology selected based on initial cost
� Local Government Autonomy vs Capacity
� Bureaucracy pitfall - “Form Over Substance”
KEY EXISTING CHALLENGES
T&D Development RealizationFTP Project Progress
+
MW %
Initial target 2009
(100%)
Source: PLN presentation Source: PLN statistic
Needs balancer and/or complement to Public Utility player
BRINGING POWER INTO THE NATION ANDTHE WORLDBRINGING POWER INTO THE NATION AND THE WORLD
Private Sector/Player Characteristics and Differentiators
� Regulatory Compliance
� Project Development approach
� Environmental and Social Responsibility
� Form of accountability and degree of closeness
to shareholders
� Speed of decision making
� Flexibility of solution approach – Substance over
Form
� Risk appetite – business oriented investment
process
� Speed of project execution
� Adoption of Proven Technology
General Characteristics Differentiators from Public player
BRINGING POWER INTO THE NATION ANDTHE WORLD
Longer term Sustainable Solution Medium term Power Solution
Meeting Indonesia’s Electricity Needs …
Role of Private Sector in Fulfilling the Demand
Being a credible complement to Public Utility in covering the entire country geographical regions with
Imbalances in regional development & substandard electricity support
As a bridging process to close the supply and
demand gap ���� Temporary Power Solution
� Relevant
� Rapid
� Proven
� Reliable
Fill-Gap Short term Power Solution
Some relevant solutions for Industrial Customers:
� Optimizing existing assets
� Operations & Maintenance
� Supply and Demand Side Management
– Energy Efficiency & Optimization –
� Thermal Power Solution
� Renewable Power Solution
Key Success Factor /Supports needed by Private Sector in Accelerating
Electricity Development
� A clear division of authority in the governance and provision of electricity in Indonesia
� Licensing / permit issues (central vs. central government)
� Robust but Nimble cooperation framework and Speedy bureaucracy culture in the
implementation of process
� Support/Endorsement towards the creation of integrated sustainable power solutions
� A change in mindset towards Proven Technology (procurement process)
� Acceleration in Power Wheeling rule to encourage the smoothness of “alih wilayah usaha”
BRINGING POWER INTO THE NATION ANDTHE WORLD