Gas
Feedwater Bypass
Circ Water Supply
Circ Water Return
Steam Byproduct
EDI Module
Waste Water Collection
City Sanitary Sewer
CCCW Supply
CCCW
Booster Pump
Potable Water Supply
Effluent Water Chamber x2
Oil Water Separator Chamber x 2
Plant Drains & Trenches
Waste Water Pumps X 2
Pump
Service Water Supply
Compressed / Instrument Air Supply
Air Dryers X 2
Rotary Screw Air Compressor x 2
Emergency Showers / Eye Wash Stations
Temporary Compressor Connection
Water Treatment /Demin Water Supply
CTG 11 Evap Cooler
CTG 10 Evap Cooler
Demin Feed Pumps Carbon Filters
Mixer
1st & 2nd Pass RO Skid
1st & 2nd Pass RO Skid
RO Permeate Tank
EDI Module
EDI Feed Pumps
Evap Cooler Pump
Evap Cooler Pump
Demin Water Pump
Demin Water Pump
�� Compressor Washing�� Glycol / Water Mix�� CCCW Water Head Tank�� Condensate System Fill�� Emergency Makeup to Condenser�� Makeup to Condenser�� Aux Boiler Chem Skid�� Makeup to Aux Boiler Dearator�� EDI Modules�� Cycle Water Chem Feed Skid
DemineralizedWater Tank
CCCW Head Tank
CCCW Heat Exchanger
CCCW Heat Exchanger
Pump
PumpCCCW Return
Demin
Aux Cooling Water
Potable Water
Jockey Pump
Building Fire Water Supply
Diesel Pump
Electric Pump
ButtonSTG & Water Treatment
ButtonBoiler / Maint. / Admin
ButtonStandpipe / Hose Supply
ButtonDeluge Lube Oil Skid
ButtonGTA & CTG Area
ButtonPreaction STG Bearing & Reduction Gear
Fuel Gas Supply
Drain Tank
Fuel Gas Vane Separator
HBPW Fuel Receiving Station
Dewpoint Heater
Emergency Generator
Heat Pump Loop Boiler
Final Filters X 2
Aux Boiler (Aux Steam)
Windbox / Furnace
Ignition Air
Combustion Air
Aux Steam
Main Steam System Tie-In
Electric Superheat
Condenser Hotwell Sparging
Feedwater
Steam Drum
Mud Drum
Demin
Blowdown Tank
Blowdown
Aux Steam
Auxiliary BoilerDeaerator
Vent
Common Skid Drain Header
CTG Inlet Air Heating
HRSG Sparging
STG Gland Seal
Condensate Pumps X 3
Combustion Turbine X 2
Condenser
Hotwell
Aux Steam Desuperheater Booster Pump
Aux Steam Desuperheater
SprayGland Steam Condenser
Iron Filter
HRSG 10 LT Econ
HRSG 11 LT Econ
HRSG 10 S.H. Drain
Tank
HRSG 11 S.H. Drain
Tank
Turbine Exhaust
Hood Spray
Sample
HRSG 10 LP Steam B.P.
Desup Spray
Emergency Hotwell Dump
Feedwater Fill
LTE B.P. Feedwater Supply X 2
HRSG 11 L.P. Steam B.P. Desup
Spray
HRSG 10 HP Steam B.P. Desup
Spray
HRSG 11 HP Steam B.P. Desup
Spray
HRSG X2
HP S
uper
heat
er 1
HP E
cono
mize
r 1
LP E
vapo
rato
r
Feed
wat
er H
eate
r 1
LP S
uper
heat
er
Rehe
ater
2
HP S
uper
heat
er 2
CO C
atal
yst
SCR
Cata
lyst
HP E
cono
mize
r 3
HPSteamDrum
HP S
uper
heat
er 3
HP E
cono
mize
r 4
LPSteamDrum
HP E
vapo
rato
r 1HP
Eva
pora
tor 2
HP E
cono
mize
r 2
Feed
wat
er H
eate
r 2
ChemicalFeed
ChemicalFeed
Sample
VentHead
er
Amm
onia
Inje
ction
G
rid
Steam Turbine
HP Steam
LP Steam
HP Feedwater Pump
LP Feedwater Pump
Feedwater Pump
Feedwater
STG Seal Steam Supply
Start 1
2
3
HBPW Potable Water Supply
HBPW Natural Gas Supply
Circ Water Pump
Circ Water Pump
Aux Cooling Water Pump
Cooling Tower Basin
Circ Water Return
Condensate Supply
Snowmelt Pumps X 2
CCCW Heat Exchanger
Circ Water Supply From Condenser
Aux Steam Supply
City Snowmelt
Supply
Facility Snowmelt
Supply
Filter House
CEMS
Continuous Emissions Monitoring
Nitrogen Supply
Various Nitrogen Injection
Points
Required Fire Water System Components Prepared Prior
to Introduction of Gas to Facility
Various Building Hose Connections /
Dist. Points
For initial Compressed Air needs a temporary compressor / dryer system will need to be utilized
until such time that the Closed Cycle Cooling Water system is permanently available to the
compressors.
Substantial Completion
Inlet Air Heating
Upon the completion of steam blows the HRSG will
be loaded with catalyst blocks used as a function of filtering exhaust gases prior to entering the atmosphere. Ammonia
Storage / Supply
CCCW Available for plant use. This form of cooling ultimately provides a mechanism for the plants equipment to cool while in operation.
Seal Steam available to STG for steam blows dumping to
Condenser
The Combustion Turbines will be fired for the fist time and work and
the various pieces of plant equipment will enter a period of
performance testing to ensure that equipment performs to the intent
of the design.
STG On Turning Gear & Ready for Steam Blows
Demin Water Making Capabilities Available
Condensate & Feedwater available for HRSG flush &
plant supply
Commissioning has proven that all process plant components have met performance criteria and that plant is prepared to enter a 30 day reliability
test run.
Prior to the introduction of plant process chemicals such as those utilized in the process of making Demineralized
Water, proper safety precautions must be taken. These precautions involve the operability of Emergency Showers
& Eyewash Stations should an accident occur.
Aux Boiler Boil Out
Cooling Tower & Condenser available for operation
After the combustion turbines have been first fired and completed initial testing, the turbines will be
used to generate steam pushed through a series of piping systems in order to remove dirt and debris
from piping.
Gas
Potable Water serves as a vital component to the operation of the plant supplying critical services
to fire water, safety water, and service water permitting the functions of the plant to
progressively come online.
Wet Air Receiver Dry Air
Receiver
Air Supply to CCCW Pumps
To various system control
valves in the order they are
required.
Air
Air
Inlet Air Heating
Demin
Snowmelt Return
City Snowmelt
Return
Glycol Water Mix Skid
Chemicals
Gas Steam
Steam
Chemicals
The Waste Water system serves as an early vital component to collect all water captured in the plant drain system. This includes storm water
drains.Manual
Oil Extract Point
The CEMS system consistently monitors the emissions introduced to
the atmosphere in order to ensure that proper levels are met and maintained.
&Holland Energy Park
2 x 1 Combined Cycle Commissioning Philosophy