19
Home Upgrade: Weekly Home Upgrade: Weekly Comparison Progress Comparison Progress Report Report 2112 Walnut Ct. Walnut Hills ST 12345 Weekly Progress 10/02/ Weekly Progress 10/02/ 2015 2015 Weekly Progress 10/08/ Weekly Progress 10/08/ 2015 2015 INSPECTED BY: [email protected] COMPANY: C6 Construction PREPARED FOR: Owner DATE OF INSPECTION: 10/02/2015 INSPECTED BY: [email protected] COMPANY: C6 Construction PREPARED FOR: Owner DATE OF INSPECTION: 10/08/2015

Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Home Upgrade: WeeklyHome Upgrade: WeeklyComparison ProgressComparison ProgressReportReport2112 Walnut Ct.Walnut Hills ST12345

Weekly Progress 10/02/Weekly Progress 10/02/20152015

Weekly Progress 10/08/Weekly Progress 10/08/20152015

INSPECTED BY: [email protected]: C6 ConstructionPREPARED FOR: Owner

DATE OF INSPECTION: 10/02/2015

INSPECTED BY: [email protected]: C6 ConstructionPREPARED FOR: Owner

DATE OF INSPECTION: 10/08/2015

Page 2: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

INSPECTION INFORMATIONINSPECTION INFORMATION INSPECTION INFORMATIONINSPECTION INFORMATION

Inspected By MSAModel 3-bed/2-bathStatus Vacant

SCHEDULE OF CONDITIONSCHEDULE OF CONDITION SCHEDULE OF CONDITIONSCHEDULE OF CONDITION

Upgrade ProjectsUpgrade Projects Upgrade ProjectsUpgrade Projects

During current tenant change improve curb appeal toincrease rent, Replace old single pane windows with dualpane windows. Repaint entire house exterior. Upgrademaster bathroom. Add recessed can lighting in 3 rooms.

Dual pane windows, exterior house repaint, and lightingprojects complete. Master bathroom 60% complete.

10/02/2015 14:36 (UTC) 10/08/2015 15:03 (UTC)

SPACESSPACES SPACESSPACES

PaintingPainting PaintingPainting

Upgrade exterior painting for improved curb appeal andrental increase.

Painting completed. Dramatically improved curb appealand rental increase potential.

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Page 1 of 18

Page 3: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Painting - FrontPainting - FrontPainterPainter

Painting - FrontPainting - FrontPainterPainter

10/02/2015 18:16(UTC)

The front elevationmaster bedroom sectionhas been painted bodycolor.10/02/2015 14:40(UTC)

10/08/2015 14:26(UTC)

10/08/2015 14:26(UTC)

The front elevationgarage has been bodycolor painted.10/02/2015 14:40(UTC)

New support postsinstalled.10/02/2015 14:40(UTC)

10/08/2015 14:27(UTC)

10/08/2015 14:27(UTC)

The front entry eaveshas been body colorpainted.10/02/2015 14:41(UTC)

The front door needs tobe prepped and painted.10/02/2015 14:41(UTC)

10/08/2015 14:28(UTC)

Door was painted toowner selected purple.Did not work so doorrepainted to classicblack.10/08/2015 14:28(UTC)

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 2 of 18

Page 4: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Painting - LeftPainting - LeftPainterPainter

Painting - LeftPainting - LeftPainterPainter

In the 3 locations, at theleft patio section, thereare 3 drops of caulkingmaterial that need to becleaned10/02/2015 15:11(UTC)

The home is beingsprayed and than alsorolled to ensure propercoverage.10/02/2015 15:35(UTC)

The dining and kitchenside wall, painting wasstarted around theedges to then be filledin the middle10/02/2015 15:03(UTC)

The left elevationgarage section has beenbody color painted.10/02/2015 15:03(UTC)

10/08/2015 14:31(UTC)

10/08/2015 14:32(UTC)

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 3 of 18

Page 5: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Painting - BackPainting - BackPainterPainter

Painting - BackPainting - BackPainterPainter

The back down spouthole has been repaired.Additional material willneed to be applied.10/02/2015 15:05(UTC)

Hairline cracks acrossback wall have all beenpatched.10/02/2015 15:35(UTC)

The back wall atkitchen, dining, livingroom is been preppedfor painting10/02/2015 15:04(UTC)

The back wall tobedroom's windowsneed to be covered10/02/2015 15:04(UTC)

10/08/2015 14:33(UTC)

10/08/2015 14:34(UTC)

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 4 of 18

Page 6: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Painting - RightPainting - RightPainterPainter

Painting - RightPainting - RightPainterPainter

The old fence post hasbeen removed, and theholes have beenpatched.10/02/2015 15:06(UTC)

The right frontdownspout has beenremoved. The holes forboth the downspout andthe old fence post thatused to be mounted tothe wall have beenpatched.10/02/2015 15:07(UTC)

Exterior wall prep forpainting has not startedyet.10/02/2015 15:05(UTC)

10/08/2015 14:34(UTC)

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 5 of 18

Page 7: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Master ShowerMaster Shower Master ShowerMaster Shower

Upgrade Master Shower from dated dated tiles and agedpan.

No change from prior

Overview of entry.10/02/2015 15:14(UTC)

Staging of removedmaterials.10/02/2015 15:14(UTC)

10/08/2015 14:44(UTC)

10/08/2015 14:47(UTC)

Master Shower - FloorMaster Shower - FloorTilerTiler

Master Shower - FloorMaster Shower - FloorTilerTiler

Ready to be mudded.10/02/2015 15:14(UTC)

10/08/2015 14:44(UTC)

Incomplete Incomplete

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 6 of 18

Page 8: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Master Shower - PanMaster Shower - PanTilerTiler

Master Shower - PanMaster Shower - PanTilerTiler

10/02/2015 15:15(UTC)

Wall: galvanized wirestapled up untilneoprene liner isinstalled.10/02/2015 15:15(UTC)

10/08/2015 14:45(UTC)

10/08/2015 14:46(UTC)

Incomplete Incomplete

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 7 of 18

Page 9: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Master Shower - WallMaster Shower - WallTilerTiler

Master Shower - WallMaster Shower - WallTilerTiler

Shower: waterproofwalls installed andnailed to studs. Waterbarrier added and finalgalvanized steel affixed.10/02/2015 15:15(UTC)

Back wall. Shower nichewill be added after thewall is mudded.10/02/2015 15:16(UTC)

10/08/2015 14:46(UTC)

10/08/2015 14:46(UTC)

10/08/2015 14:47(UTC)

LightingLighting LightingLighting

Remove dated metal framed box lights with recessed cans. No change from prior

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 8 of 18

Page 10: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Lighting - Master VanityLighting - Master VanityElectricianElectrician

Lighting - Master VanityLighting - Master VanityElectricianElectrician

No original observation Ready for final painting.

The recessed light boxhas been textured andis now setting.10/02/2015 15:18(UTC)

The texturing matchesthe surrounding wallsnicely.10/02/2015 15:18(UTC)

2 recessed can lightsinstalled10/08/2015 14:48(UTC)

Box has been texturedand prime painted.Ready for final coat.10/08/2015 14:49(UTC)

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 9 of 18

Page 11: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Lighting - Guest BathLighting - Guest BathElectricianElectrician

Lighting - Guest BathLighting - Guest BathElectricianElectrician

The original fanmounted in the wall hasbeen removed. The holehas been filled and hasbeen textured and isnow drying.10/02/2015 15:20(UTC)

The recessed light boxhas been textured and 2recessed can light holeshave been cut.10/02/2015 15:19(UTC)

10/08/2015 14:50(UTC)

10/08/2015 14:50(UTC)

10/08/2015 14:50(UTC)

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 10 of 18

Page 12: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Lighting - KitchenLighting - KitchenElectricianElectrician

Lighting - KitchenLighting - KitchenElectricianElectrician

The corner edges willnot be taped andtextured, instead we aregoing to use a similartrim to those on thecabinet at the horizontaland vertical surfaces tocover wall board joints.10/02/2015 15:23(UTC)

The kitchen recessedbox has 6 recessed canholes cut.10/02/2015 15:21(UTC)

10/08/2015 14:51(UTC)

10/08/2015 14:51(UTC)

The recess box needs tobe taped and textured.10/02/2015 15:22(UTC)

10/08/2015 14:52(UTC)

10/08/2015 14:52(UTC)

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 11 of 18

Page 13: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Lighting - GarageLighting - GarageElectricianElectrician

Lighting - GarageLighting - GarageElectricianElectrician

Consider addingsupplemental florescentlight over washer/ dryerarea as well.10/02/2015 18:31(UTC)

The propose retro fit isto take the 8' longkitchen fluorescentlights and bring theminto the garage andmount them.10/02/2015 15:29(UTC)

10/08/2015 14:53(UTC)

The 3 car garage is verypoorly lit with 2incandescent singlebulb lights.10/02/2015 15:28(UTC)

10/08/2015 14:53(UTC)

ElectricElectric ElectricElectric

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 12 of 18

Page 14: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Electric - Attic FanElectric - Attic FanElectricianElectrician

Electric - Attic FanElectric - Attic Fan

Have requested a costestimate from thecontractor to install athermostaticallycontrolled attic fan tocontrol heat in thesummer.10/02/2015 16:07(UTC)

Purchase off-the-shelfattic fan.10/02/2015 22:42(UTC)

LandscapingLandscaping LandscapingLandscaping

Landscaping - Lawn To GardenLandscaping - Lawn To GardenLandscaperLandscaper

Landscaping - Lawn To GardenLandscaping - Lawn To GardenLandscaperLandscaper

10/02/2015 19:36(UTC)

Local water districtoffering lawn to gardenrebates.10/02/2015 19:38(UTC)

Attic Fan Attic Fan

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 13 of 18

Page 15: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Landscaping - Front LawnLandscaping - Front LawnLandscaperLandscaper

Landscaping - Front LawnLandscaping - Front LawnLandscaperLandscaper

10/02/2015 14:37(UTC)

10/02/2015 14:37(UTC)

Outside MaintenanceOutside Maintenance Outside MaintenanceOutside Maintenance

Outside Maintenance - Right TapOutside Maintenance - Right TapHandymanHandyman

Outside Maintenance - Right TapOutside Maintenance - Right Tap

The tap has a constantleak and needs to bereplaced.10/02/2015 15:40(UTC)

Repair Repair

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 14 of 18

Page 16: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Outside Maintenance - Crawl Space VentsOutside Maintenance - Crawl Space VentsHandymanHandyman

Outside Maintenance - Crawl Space VentsOutside Maintenance - Crawl Space Vents

1 crawl space vent hasno fine wire mesh andwill need to be installedto control rodentaccess.10/02/2015 15:42(UTC)

The 2nd crawl spacevent has a fine meshthat has been damaged.Remove and replace.10/02/2015 15:43(UTC)

Outside Maintenance - Abandoned SpaOutside Maintenance - Abandoned SpaHandymanHandyman

Outside Maintenance - Abandoned SpaOutside Maintenance - Abandoned SpaHandymanHandyman

The spa was abandonedat house sale 4 yearsago.10/02/2015 15:44(UTC)

The fill has compactedand now the tile at priorwater line is showing.Fill with dirt.10/02/2015 15:45(UTC)

10/08/2015 14:42(UTC)

Repair Repair

Incomplete OK

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 15 of 18

Page 17: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Outside Maintenance - Front SprinklerOutside Maintenance - Front SprinklerHandymanHandyman

Outside Maintenance - Front SprinklerOutside Maintenance - Front SprinklerHandymanHandyman

10/02/2015 18:14(UTC)

Repair broken sprinklerat driveway to walkwayentry.10/02/2015 15:49(UTC)

10/08/2015 14:41(UTC)

Outside Maintenance - Front ElectricOutside Maintenance - Front ElectricHandymanHandyman

Outside Maintenance - Front ElectricOutside Maintenance - Front ElectricHandymanHandyman

10/02/2015 18:15(UTC)

The front decorativecolumn, that also held alight, has beendemolished. Removeelectrical wiring.10/02/2015 15:50(UTC)

10/08/2015 14:41(UTC)

Inside MaintenanceInside Maintenance Inside MaintenanceInside Maintenance

Replace Repair

Replace Repair

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 16 of 18

Page 18: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Inside Maintenance - Kitchen FaucetInside Maintenance - Kitchen FaucetHandymanHandyman

Inside Maintenance - Kitchen FaucetInside Maintenance - Kitchen FaucetHandymanHandyman

New 3-hole chromefinish faucet purchased.10/02/2015 18:19(UTC)

10/02/2015 15:25(UTC)

10/08/2015 14:55(UTC)

Inside Maintenance - Wet BarInside Maintenance - Wet BarHandymanHandyman

Inside Maintenance - Wet BarInside Maintenance - Wet BarHandymanHandyman

The wet bar faucet isshowing signs of age.10/02/2015 15:26(UTC)

Repair or replaceexisting combo spigotand 2 control knobfaucet.10/02/2015 15:26(UTC)

Replace OK

Repair

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 17 of 18

Page 19: Home Upgrade: Weekly Comparison Progress Reports3-eu-west-2.amazonaws.com/imfuna-langur/wp-content/...2015/10/08  · Home Upgrade: Weekly Comparison Progress Report 2112 Walnut Ct

Inside Maintenance - Internal Garage DoorInside Maintenance - Internal Garage DoorHandymanHandyman

Inside Maintenance - Internal Garage DoorInside Maintenance - Internal Garage DoorHandymanHandyman

Repair or replace withnew piece furnishedwith door handle kit.10/02/2015 18:21(UTC)

The family to garage firedoor handle has beenreplaced. Currently thedoor does not latchclosed and will need tobe fixed.10/02/2015 15:27(UTC)

10/08/2015 14:56(UTC)

Repair OK

PRESENT AT INSPECTIONPRESENT AT INSPECTION PRESENT AT INSPECTIONPRESENT AT INSPECTION

Present at this Inspection Present at this Inspection

Home Upgrade: Weekly Comparison Progress ReportHome Upgrade: Weekly Comparison Progress Report2112 Walnut Ct. Walnut Hills ST 12345

Weekly Progress 10/02/2015Weekly Progress 10/02/2015 Weekly Progress 10/08/2015Weekly Progress 10/08/2015

Page 18 of 18