RTMDH, CABATUAN Description Amount Year Implemented INFRA PROJECTS Upgrading of Emergency Room 1,800,000.0 0 2010 Upgrading of Dietary Complex 1,474,218. 73 2010 Upgrading of Electrical System Constructtion of power house 1,172,609. 54 2011 EQUIPMENT 1 unit Hospital Ambulance 1,700,000. 00 2011 Service Vehicle 1,350,000. 00 2012 B.P. apparatus, aneroid Mobile Type 58,000.00 2011 I.V. stand, stainless steel 56,000.00 2011 2 units Fetal Doppler 154,000.00 2011 Oxygen Regulator 24,800.00 2011 Nebulizer Machine 29,451.00 2012 computer workstation 176,900.00 2010 Airconditioners, 3 tonner, 5 tonner 366,700.00 2011 computer workstation 355,700.00 2012 TOTAL 8,786,397.7 3

 Hospital Investments Under Gov Defensor to Acheive HEART

Embed Size (px)

DESCRIPTION

dsdsdaddasddsadsadasddsadsadsad

Citation preview

RTMDH, CABATUAN

DescriptionAmountYear Implemented

INFRA PROJECTSUpgrading of Emergency Room1,800,000.002010

Upgrading of Dietary Complex 1,474,218.732010

Upgrading of Electrical System Constructtion of power house 1,172,609.54 2011

EQUIPMENT1 unit Hospital Ambulance 1,700,000.00 2011

Service Vehicle 1,350,000.00 2012

B.P. apparatus, aneroid Mobile Type 58,000.00 2011

I.V. stand, stainless steel 56,000.00 2011

2 units Fetal Doppler 154,000.00 2011

Oxygen Regulator 24,800.00 2011

Nebulizer Machine 29,451.00 2012

computer workstation 176,900.00 2010

Airconditioners, 3 tonner, 5 tonner 366,700.00 2011

computer workstation 355,700.00 2012

TOTAL8,786,397.73

IPH POTOTAN

DescriptionAmountYear Implemented

INFRA PROJECTSCompletion of ground floor, main bldg. 2,450,000.00 2010

Completion og OR-DR 4,390,000.00 2010

Construction of Material Recovery Facility & extension of Records Section 315,000.00 2010

Improvement of Storm Drainage 300,000.00 2011

Improvement of Station 1 and Installation of steel gate 120,000.00 2011

Upgrading of Electrical System and Construction of transformer pad16,983,026.25

EQUIPMENTSVarious Hospital Equipment3,848,6752010-2012

28,406,701.25

RPGTMH,GUIMBAL

DescriptionAmountYear Implemented

INFRA PROJECTScompletion of OPD, conference, medical records 1,650,480.91 2010

Construction of transformer pad and upgrading of electrical system1,531,084.222010

Construction of 4 PHIC wards 1,200,000.00 2011

Construction of Conference 1,800,000.00 2011

EQUIPMENTInfant Incubator 298,000.00 2010

Aircons (4 units of 3 tonners) 452,500.00 2012

wheeled stretcher 58,000.00 2010

bedside tables 190,000.00 2011

Mechanical beds (20 units) 398,000.00 2011

Overbed tables (20 units) 68,000.00 2011

Fetal doppler 48,000.00 2011

Oxygen gauge 26,650.00 2011

Sphymomanometer 110,000.00 2011

Mayo table, stainless 39, 200.00 2010

TOTAL 7,981,915.13

SDH, SARA

DescriptionAmountYear Implemented

INFRA PROJECTSRepair/Renovation of wards 1,242,291.57 2010

Upgrading of electrical system and construction of powerhouse1,349,075.832010

EQUIPMENTX-ray machine 3,850,000.00 2011

Ambulance 1,235,000.00 2012

4 Suction Machine 34,200.00 2010

Ambu Bag 72,900.00 2010

EENT Set 37,800.00 2010

12 nebulizers 62,940.00 2010-2011

Oxygen Gauge 69,540.00 2010

Washing machine 44,995.00 2010

2 units Osteorizer 9,999.00 2010

Micro Pippetor 19,000.00 2010

Macro Pippetor 19,000.00 2010

10 units oxygen tank carriage 108,000.00 2011

2 examination and Obstetrics table 22,800.00 2011

2 units emergency cart 160,000.00 2011

2 units wheeled stretcher 162,000.00 2011

3 wheelchairs 17,400.00 2011

30 electric fans and 2 aircons 109,999.00 2011

Gas range39,400.002011

2 surgical suction pump 17,600.00 2012

2 dopplers 46,500.00 2012

chemistry analyzer 262,000.00 2012

8 computer set with printer348,960.002012

Upright freezer33,318.002012

TOTAL 9,374,718.40

DRSPSMDH,CALINOG

DescriptionAmountYear Implemented

INFRA PROJECTSRepair & improvement of OB ward, pedia ward and nurse station 5,000,000.00 2011-2012

Construction of ER-OPD Complex 11,600,000.00 2011

Upgrading of electrical system3,405,439.152011

Construction of Dietary Building 7,500,000.00 2012

Renovation and Improvement of Laboratory, X-ray & Pharmacy 5,000,000.00 2012

Improvement of Private Rooms and Medical Charity wards 4,000,000.00 2012

EQUIPMENT1 unit anesthesia machine 2,380,000.00 2010

Diagnostic set17,000.002010

1 Desk type Adult sphygmomanometer with stand18,700.002010

1 Desk type pedia sphygmomanometer 10,070.002010

1 electric water pump 2hp59,800.002010

1 unit operating table 368,000.00 2011

1 unit Hospital Ambulance 1,170,000.00 2011

1 unit OR light 298,000.00 2011

30 units hospital beds 644,070.00 2011

X-ray Machine 3,400,000.00 2011

Chemistry Analyzer 262,000.00 2011

1 clinical centrifuge 14,800.00 2012

6 units oxygen gauge with regulator 8,640.00 2012

6 suction apparatus 62,520.00 2012

1 adult resuscitator bag8,400.00 2012

1 pedia resuscitator bag8,450.002012

1 fetal Doppler apparatus15,850.002012

1 hematocrit centrifuge38,000.002012

3 pedia sphygmomanometer with stethoscope17, 400.002012

Refrigerator 8.5 cu ft19,155.002012

TOTAL 45,326,294.15

JMCDH, Balasan

DescriptionAmountYear Implemented

INFRA PROJECTSCompletion of ER/OPD 1,450,000.00 2010

Repair of Nursing Unit 3,112,242.58 2010

Repair of ward complex and Annex building 4,600,000.00 2011

EQUIPMENT5 units BP apparatus 55,320.00 2010-2012

6 Aircons 119,590.00 2010

Microscope6,400.002010

2 counting chamber5,000.002010

6 sphygmomanometer with stethoscope8,970.002010

2 examining table27,574.002010

1 wheeled stretcher with side rails27,000.002010

Hematocrit Centrifuge 149,500.00 2010

1 Autoclave 128,000.00 2010

12 hospital beds 372,000.00 2011

Photocopying machine42,500.002011

3 BP Apparatus12,210.002011

3 Aircon56,690.002011

12 oxygen gauge regulator17,976.002011

12 bedside tables35,998.002011

12 overbed tables55,200.002011

1 suction machine 192,000.00 2011

1 electrolyte machine 368,000.00 2011

1 chemistry analyzer 325,000.00 2011

1 operating table 600,000.00 2011

1 ambulance 1,320,000.00 2012

1 service vehicle 1,200,000.00 2012

14,287,179.58

FRTSMDH, JANIUAY

DescriptionAmountYear Implemented

INFRA PROJECTSRewiring of geriatric bldg 935,000.00 2011

repainting of geriatrict bldg. 300,000.00 2011

completion of dietary bldg and conference room 2,400,000.00 2011

EQUIPMENT1 Ambulance 1,170,000.00 2010

Fetal doppler 15,000.00 2011

3 channel resting ecg machine 133,500.00 2011

Anesthesia Machine 788,000.00 2012

Chemistry Analyzer 262,000.00 2012

Dental unit 119,985.00 2012

Defibrillator 399,998.00 2012

2 ECG Machines 117,000.00 2012

Infant incubator 261,920.00 2012

hematology analyzer 938,000.00 2012

cast cutter machine 72,000.00 2012

Telephone system (PABX)165,300.002012

aneroid sphygmomanometer 35,000.00 2012

8,112,709.00

DVPSMDH, PASSI

DescriptionAmountYear Implemented

INFRA PROJECTSPowerhouse 3,412,199.40 2010

OR/DR complex 3,700,000.00 2011

Renovation of COH Qtr. & Dietary & records Rm 400,000.00 2012

EQUIPMENTDental Unit 370,000.00 2012

Fetal Doppler26,000.00

ECG machine72,000.00

Telephone system (PABX)480,000.00

DR Light280,000.00

OR Table180,000.00

Food conveyor83,000.00

Anesthesia Machine 2,638,888.00 2012

Emergency Trolley 536,000.00 2012

Unicart 308,000.00 2012

X-ray Machine 3,500,000.00 2012

Cautery Machine 320,000.00 2012

OR light 180,000.00 2012

Hematology Analyzer 438,000.00 2012

Blood chemistry analyzer 268,000.00 2012

Ambulance 1,200,000.00 2012

Service Vehicle 1,200,000.00 2012

19,592,087.40

DDH,DUMANGAS

DescriptionAmountYear Implemented

INFRA PROJECTSX-Ray and Lab Bldg. 1,778,569.90 2010

Upgrading of electrical system1,436,063.13

EQUIPMENTService Vehicle 848,500.00 2010

Concrete water tank 356,379.69 2010

Chemistry analyzer 268,000.00 2012

Dental unit 224,000.00 2012

6 unit aircons 292,000.00 2012

electrolyte analyzer 268,000.00 2012

30 hospital beds 534,000.00 2012

operating light 390,000.00 2012

anesthesia machine 984,499.00 2012

2 operating tables 330,000.00 2012

computers 158,400.00 2012

TOTAL 7,868,411.72

DRYLMH, LAMBUNAO

DescriptionAmountYear Implemented

INFRA PROJECTSCompletion of OPD complex 914,153.00 2011

Primary line completion 500,000.00 2011

upgrading of x-ray, pharmacy and lab complex 6,706,449.35 2012

Temporary Drs' quarter373,522.002012

Construction of 10 private rooms2,600,0002012

Sewerage treatment system400,0002012

power house240,0002012

upgrading of emergency room3,000,0002012

upgrading of cadaver holding area240,0002012

completion of dietary bldg. 1,594,000.00 2012

construction of admin bldg. 12,000,000.00 2012

const. of female dorm 5,500,000.00 2012

const of male dorm, laundry and housekeeping 3,000,000.00 2012

EQUIPMENTDental Units 240,000.00 2010

UPS, LCD Monitors, Printers69,827.002010

Office Tables and chairs150,320.002010

Grass cutter33,740.002010

Lawn mower20,400.002010

Wall fans38,850.002010

Food conveyor 155,500.00 2010

Infant incubators 350,000.00 2010

2 ambulance 2,192,000.00 2010-2012

shuttle van 1,110,000.00 2011

Manual resuscitator for pedia and adult22,400.002011

Oxygen gauge regulator15,600.002011

Digital camera49,495.002011

Photocopier and developer55,000.002011

Computer set, Table, Laptop and Printer131,145.002011

Conference tables and chairs288,000.002011

X-ray machine 3,500,000.00 2011

Generator 690,000.00 2011

ECG Machine 260,000.00 2011

Chemistry analyzer 288,000.00 2011

Aircons 150,025.00 2011

400 amp automatic transfer switch 150,000.00 2012

Patient charts14,350.002012

Mobile compact LED Light350,000.002012

2 Computer sets and HIMS800,000.002012

48,192,776.35

BVDH,BAROTAC VIEJO

DescriptionAmountYear Implemented

INFRA PROJECTSrenovation of Lab, x-ray, pharmacy 1,780,000.00 2010

Construction of housekeeping area, parking, repair bay 3,300,000.00 2012

Upgrading of electrical system1,193,190.672011

EQUIPMENT1 unit food conveyor 140,107.50 2012

1 uoperating light 545,000.00 2012

1 suction machine 163,200.00 2012

1 chemistry analyzer 348,000.00 2012

1 blood bank ref 110,000.00 2012

autoclave machine 264,499.00 2012

Anesthesia machine1,400,000.002012

OR Light545,000.00

Portable Suction machine55,900.00

TOTAL 9,844,897.17

ADH,ALEOSAN

DescriptionAmountYear Implemented

INFRA PROJECTSConstruction of Septic Tank 163,000.00 2011

Upgrading of OR-DR 10,600,000.00 2011-2012

Upgrading of OPD, Pharmacy and Laboratory Services2,768,945.842011

EQUIPMENTChemistry analyzer 318,000.00 2011

Digital copier36,500.00

Washing machine44,586.00

Refrigerator18,289.00

Anesthesia Machine 2,400,000.00 2012

Ambulance 1,320,000.00 2012

Utility vehicle 1,200,000.00 2012

Generator set 658,500.00 2012

OR light 785,000.00 2012

Infant incubator 400,000.00 2012

20,730,820.84

TOTAL HOSPITAL INVESTMENT INFRASTRUCTUREEQUIPMENT

RTMDH, CABATUAN4,446,828.274,339,569.46

IPH, POTOTAN24,558,026.253,848,625.00

RPGTMH,GUIMBAL6,181,565.131,850,350.00

SDH, SARA2,591,361.406,783,351.00

DRSPSMDH,CALINOG36,505,439.158,820,855.00

JMCDH, BALASAN9,162,242.585,124,937.00

FRTSMDH, JANIUAY4,805,000.003,307,709.00

DVPMDH, PASSI CITY7,152,199.4012,439,888.00

DDH, DUMANGAS2,614,633.035,253,778.69

DRYLMDH, LAMBUNAO37,068,124.3511,124,652

BVDH, BAROTAC VIEJO6,273,190.673,571,706.50

ADH, ALEOSAN13,531,945,847,198,875.00

TOTAL154,890,639.2373,664,296.65