HOULDER LIMITEDSubsea Opportunities in Renewable Energy

.

2

Who are weHoulder is an independent, innovative, applied engineering company with a global range. We respond to client requirements for the design, build, and enhancement of marine assets.

How we workFrom concept to completion, our fully thought-through engineering solutions are founded on experience, intellect and practical know-how.We offer a value-added service, built on our deep understanding of what works in the marine environment.

What we offerHoulder will provide a responsive, cost-effective engineering, construction and project management service for your marine asset.

HOULDER LTD.

ww

w.s

hips

pott

ing.

com

Copyright Houlder Ltd27/01/2015

OUR MARKETS

OUR OPERATIONSWorldwide, 4 Business Streams operating out of 5 locations, 200 staff:

OUR CLIENTS

Oil and Gas Offshore Renewables Commercial & Marine Defence

HSEQ

16/02/2015Copyright Houlder Ltd 4

HEALTH & SAFETYWorkplaceSite/vesselSafety in DesignStatistics

QUALITYISO 9001:2008 accreditationQA and QC Investing in HUB and PDMManagement, Design, FabricationRegistered FPAL

ENVIRONMENTDesign considerationsInstallation considerationsISO 2015 14001: applying for

SAFETY IS OUR #1 PRIORITY IN EVERYTHING WE DO.

.Concept

EngineeringSurvey &

DesignFabricate &

InstallOperate & Maintain Remove

Handling Systems

Hull & Structure

Tanks & Pipes

Cranes & Davits

Moorings

Topsides Equipment

VDL Upgrades/ Deck Extensions/ Hull mods.

Crane Pedestals/ Design of Davits

Skidding & Overboarding Systems/ Carousels

System Modifications/ replacements

5

System Upgrades/ vessel interface

Integration of 3rd party equipment

Structural Integrity Manage-

ment

Fabric Maint’ce

OPE & MEOperations Support Services

Removal Vessel

Selection

Option-eering

Decon-structionIn-service

support

Integrity plans

Copyright Houlder Ltd27/01/2015

Houlder designed and supplied a pair of gripper arms (150t lateral force) to position offshore wind turbine piles during installation.• 300t of complex fabricated steel• Bespoke hydraulics >2m cylinders• Specialised Control System / Software• Highly engineered mechanical componentsCarefully selected Supply Chain:• Fabricators• Marine Paint Specialists• Fluid Power Suppliers• Site Services• Electrical Installers• Controls System Integrators

Monopile Installation Equipment

.

1500 Te Modular Carousel

Copyright Houlder Ltd 727/01/2015

.

Offshore Renewables -Subsea Opportunities / Challenges

Copyright Houlder Ltd 827/01/2015

.

Offshore Wind

Copyright Houlder Ltd 927/01/2015

• Geotechnical investigations• Surveys

• Seismic• Sonar• Video• Magnetic• UXB

• Site preparation• Scour protection

• Anchor & mooring design (floating)

• Installation of subsea elements

.

Offshore Wind- Interconnection & Power Export

1027/01/2015 Copyright Houlder Ltd

• Cables• Cable connectors• Cable protection systems

• Bend Stiffeners• Bend Restrictors• Seals

• Cable installation• Trenching• Rock cutting• Jetting• J/I tube pull in• Monitoring /ROV / divers• Quadrants

8 – 80 rule8% of capex: 80% Insurance claims

.

TidalWhere it starts getting interesting

All of offshore wind challenges +

• Water + Electricity = problems• Seabed

• Soft stuff typically gone. Rock. Sometimes fractured.• Foundation design

• GBA (handling)• Rock socket (ROV installed)• Monopile stump (surface or ROV)

• Installation (foundation then turbine)• Installing in ‘a hurricane’

• Generator in water• Keep it protected/dry

• Power conditioning• Interconnection

• Sub sea ‘pod’?• Surface platform?

• Cable protection – HOW?

.

12

Wave powerIf tidal is too easy…

Most of tidal’s challenges +

• No common theme/approach• Dynamic range of operation

• Design for median / high / low / swell / chaotic / nearshore / deepwaterwaves

• Surface obstruction• Foundation design

• No standard• Often in tension• Hugely varying loads

• Installation (foundation ->generator)• Installing on ‘rollercoaster’

• Distance from shore/water depth• Cable/power runs• Installation again

• Storm survival mode

.

13Copyright Houlder Ltd

COMMON REQUIREMENTS• Cables Cables Cables – often new and innovative in design• Cable protection systems

• Exiting device• Intra devices

• Cable connectors & ancilliaries• HV subsea connectors – low cost, easily used/replaced

• Cable installation – intra-device

• Foundations, moorings & scour protection• Seals – water ingress protection & monitoring systems• Bearings• Motors, winches• Generators, power conditioning • Power collection hub, transformers & export• Subsea intervention systems – ROVs /divers

.

14

INSPECTION, REPAIR & MAINTENANCE

Copyright Houlder Ltd27/01/2015

• Highly capable ROV’s• High current capability, quick to deploy• Tracked for sea bed ops?• Preferably flexible for multi-role interventions• Highly trained operatives

• Vessels capable of maintaining solid platform in adverse conditions

• ‘Kit’ designed with remote conditioning monitoring, control & selected redundancy

• Cohesive IRM strategies• Retrieval strategies

• Heavy lift / flotation / piecemeal

.

•SPS Planning•Written scheme of examination/SIMP

•Life Extension planning

• SPS Coordination• NDT Inspections• Mods& Upgrades• Deadweight

Survey/Inclining Test• Emergency support

• Analyses of Strength, fatigue, redundancy • Airgap, Stability &

Hydrodynamics• Structural Risk

Assessments

• Survey reports• Modification as-builts• Incident outcomes• Inspection reports• Model of current

condition

Asset Databank

Assess-ment

Integrity Strategy

Work Program

1527/01/2015 Copyright Houlder Ltd

Through-Life Asset SupportAsset Integrity Management (AIM)

.

Is that it?

OTEC

Energy Island

Reverse Osmosis

Sub Sea Energy storage

Wind powered ‘tidal’ turbines with on board NH3 or Alkane production

A combination of any other techs

.

17

For further information on the contents of this presentation, please contact:

Colin Pearce, Business [email protected]

www.houlderltd.com