Setia Precast Sdn Bhd
IBS SCORING IN MALAYSIA
HOW CAN CIDB AND INDUSTRY PLAYERS WORK
HAND IN HAND TO PROMOTE USAGE OF IBS
IBS SCORING SYSTEM & CASE STUDY
1
Setia Precast Sdn Bhd
CONTENT :
1) IBS SCORING SYSTEM2) CASE STUDY 1 – RESIDENTIAL3) CASE STUDY 2 – NON-RESIDENTIAL4) FURTHER ENHANCEMENT TO IBS SCORE SYSTEM5) CONCLUSION
2
Setia Precast Sdn Bhd
1. IBS Scoring System – IBS Score
First Published : January 2005First Revision : April 2010
Objective :-
To provide a systematic and structuredassessment system to measure theusage of IBS in a consistent way.
3
Setia Precast Sdn Bhd
2. Emphasis of IBS Scoring System
- The use of fabricated and precast components.- Off-site production of components- The use of standardised components- Repeatability- Modular Coordination (MC) in building MS1064
4
Setia Precast Sdn Bhd
Components of IBS Scores
Part 1
Structural Systems (Table 1) (50 IBS Points)
Full IBS Factors :- Precast Concrete Columns, Beams &
Slabs- Prefabricated Steel Structures- Timber Framed System
Partial IBS Factors :- Reusable System Formworks for in-
situ concrete structures
Nil IBS Factor :- Timber Formwork
5
Setia Precast Sdn Bhd
IBS Scoring Attributes
Part 1
Roof (Table 1A)
Full IBS Factors :- Prefab Timber Roof Truss - Prefab Metal Roof Truss
Partial IBS Factors :- Precut Metal Roof Truss
Nil IBS Factors :- Timber Roof Trusses
Components of IBS Scores
6
Setia Precast Sdn Bhd
IBS Scoring Attributes
Total Score for Part 1
7
Setia Precast Sdn Bhd
Part 2
Wall Systems(20 IBS Points)
Full IBS Factors :- Precast Concrete Panel- Wall Cladding- Prefabricated Timber Panel- Full Height Galss Panel- Dry Wall System- Pre-Assemble Blockwall
Partial IBS Factors :- In-situ Concrete With Reusable
System Formwork- Blockwork System
Nil IBS Factors :- Common Brickwall
Components of IBS Scores
8
Setia Precast Sdn Bhd
IBS Scoring Attributes
Total Score for Part 2
9
Setia Precast Sdn Bhd
Part 3
Other Simplified Construction Solutions(30 IBS Points)
Emphasis on :
- Utilisation of MS1064 Guidelines
- Horizontal & Vertical Repetition
- Buildability
Components of IBS Scores
10
Setia Precast Sdn Bhd
Case Study 1 - ResidentialSeri Jati Apartment, Setia Alam948 Units, 6 Blocks, 10 Storey Apartment in a single phase development
11
CONSTRUCTION SYSTEMS
Setia Precast Sdn Bhd
Conventional Construction
- Foundation
- Ground Floor
- Transfer Beam
- RC Slab
Precast Components
- Precast Load Bearing Walls
- Precast Non-Bearing Walls
- Precast Staircases & Landing Slabs
- Precast Lift Core Walls
- Precast Bathroom Slabs
- Precast Air-Cond Ledges
In-Situ Typical Floor Slabs
Precast Walls for Roof
Prefabricated Steel Roof Trusses
12
Setia Precast Sdn Bhd
IBS Score for Seri Jati Part 1 :
Part 1 39.1 / 50
Scoring point :
Use Precast Structural Frames
with in-situ concrete floor using
Reusable System Formwork13
Setia Precast Sdn Bhd
IBS Score for Seri Jati Part 2 & 3:
Part 2 18.8 / 20
Part 3 24.0 / 30
81.9 /100
Scoring point :
Use Precast Walls
Follow MS1064
Vertical & Horizontal Repetition14
Setia Precast Sdn Bhd
IBS Score Advantages- Project has high degree of repetitions for both horizontal and vertical plain.- Architectural and Structural designs with precast intention to capitalise on
precast advantages.- High economy of scale with >900 units apartment with a single unit layout.- Construction logistic is fully considered at planning stage
e.g. wall layout, work sequencing, crane’s capacity and movement.
15
Setia Precast Sdn Bhd
IBS Score Disadvantages- Brickwork/plastering in stand alone amenities building, box-out for M&E
services/risers and kitchen/yard walls.- Non-compliance in Modular Coordination for structural elements and
architectural design input.
16
Setia Precast Sdn Bhd
An exciting external facade with different architecture features reduce the
monotonous of the internal repetitive layout.
17
Setia Precast Sdn Bhd
No columns and projected beams
Consistent squareness
Consistent quality
Steel moulds provide consistent quality
in architecture features
18
Setia Precast Sdn Bhd
Case Study 2 – Non-ResidentialHospital Kuala Lumpur (SACCHKL)
FLOOR HEIGHT : 9 STOREYS
FLOOR AREA : 600,000 SQ
USAGE : DAY CARE SPECIALIST CENTRE
COME WITH OPERATION THEATRES
: BUILT IN 3 FLOORS OF INTERNAL CARPARKS
OTHERS : SEPARATE M&E BLOCKS
19
Setia Precast Sdn Bhd
ACCHKL - Method to Achieve 70% IBS Score Requirementa) Columns : Sizes are too heavy for lifting if in precast
components.Cast in-situ using aluminium formwork
b) Beams : Precast components by Setia Precast
c) Slabs : All wet areas are in-situ constructionOther areas used Precast Hollow Core Slabby Eastern Pretech supported by PC Beamsfrom Setia Precast
20
Setia Precast Sdn Bhd
ACCHKL - Method to Achieve 70% IBS Score Requirementd) Walls : Structural walls used aluminium formwork & other internal and external walls
Lightweight Blocks
e) Staircases : Precast
21
Setia Precast Sdn Bhd
Part 1
39.2 / 50
Part 2
15.0 / 30
Part 3
16.0 / 20
Total
70.2 /100
IBS Score :
22
Setia Precast Sdn Bhd
Crane Passage
Internal Crane Passage – Maximise Cranage Radius
Area 1
Area 1
Area 2
Area 1 : Construction up to Roof Level
Area 2 : Remain void for crane movement while
constructing Area 1.: Construct each bay up to RF
and crane retreat to next bay and repeat sequence.
Area 1
Area 1
Area 1 Area 1
Area 2
Logistic Planning to resolve proximity of existing buildings and roads
23
Setia Precast Sdn Bhd
Completed External Facade
24
Setia Precast Sdn Bhd
Completed Internal Views
25
Setia Precast Sdn Bhd
Further Enhancement to IBS Score System1. Prefabrication
a) Bathroom Pods/Prefabricated Pre-finished Volumetric Construction (PPVC )
- Truly industrialised system of construction, prefabrication and assembled at factory.
- Eliminate on-site brickworks, plastering, tilings, waterproofing, site wirings and plumbing works and fittings the smallest room with the most number of trades.
- Previous IBS Score (2005) allows a maximum of 1 point at Part 3 Prefabricated Components.
- Proposed to increase IBS points at Part 2 as it comes complete with wall system and finishes.
26
Setia Precast Sdn Bhd
Further Enhancement to IBS Score System
b) Off-site prefabrication of reinforcement cage for columns, beams and walls
- To consider additional points under previous IBS Score Part 3 (Other labour savingproduct / solution).
27
2. Elimination of Labour Intensive Process
a) Use of skin walls/cladding to conceal wirings and pipings, instead of traditional hacking and plastering.
- Process is clean and systematic- Good quality finished surface- No hacking of RC walls and brickworks
Setia Precast Sdn Bhd
Further Enhancement to IBS Score System
28
Setia Precast Sdn Bhd
b) Replacement of brickwalls by using Dry Wall System (including cementitiouspanels and gypsum boards).
- Bricklaying is a labour intensive process- Involved lot of construction logistic in moving bricks, sand, cement, water, mixing
equipment, scaffoldings etc. for work to be executed.- Wet & dirty- Dry wall system is clean, fast, labour efficient and quality is easily control
Where apply as a full replacement for brickwalls, should be incentively considered under previous IBS Score Part 3 (Other labour saving solution).
29
Setia Precast Sdn Bhd
2005 2010
a) Propose Revision to IBS Score Part 3 2010
- Reinstate 2005 Part 3 Item 3 (Other Prefabricated Component and Labour SavingSolution) to include more prefab structural / finished components e.g.prefab staircases, prefab bathroom unit & unitized building modules.
3. Revision of IBS Score 2010
30
Setia Precast Sdn Bhd
Conclusion
To target a higher IBS Score :
1) Design shall be modular coordinated, compliance to MS1064 (Utilisation of Standardise Components).
2) Developers & Contractors to plan for the use of IBS from the beginning includingany simplified construction method.
3) Prefabrications where possible.
4) Minimise labour intensive works where possible e.g. brickwork & plastering.
5) Developers should have a preference for IBS construction so that the project sitesare cleaner, less labour intensive and better quality.
6) Contractors should always be looking at more efficient construction methods.