47
Irina Stipanovic, Assist. Professor University of Twente Managing Director, Infra Plan Consulting, Meho Sasa Kovacevic, Professor of Geotechincal Engineering, University of Zagreb Faculty of Civil Engineering Ken Gavin, Professor of Subsurface Engineering, TU Delft How to use new technologies for assessing the condition of transport infrastructure?

How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Irina Stipanovic, Assist. Professor University of TwenteManaging Director, Infra Plan Consulting,

Meho Sasa Kovacevic, Professor of GeotechincalEngineering, University of Zagreb Faculty of Civil Engineering

Ken Gavin, Professor of Subsurface Engineering, TU Delft

1

How to use new technologies for assessing the condition of transport infrastructure?

Page 2: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Content of the lecture

2

Short Introduction Problems On-going research Case-study

Page 3: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

CV short• 2000 – Graduated at University of Zagreb

• 2009 – PhD “Prediction of service life of reinforced concrete structures in marine environment”

• 2001 – 2007 University of Zagreb Faculty of Civil Engineering, Research and Teaching Assistant

• 2007 – 2011 Institut IGH d.d., Head of Materials Laboratory, Head of R&D department

• 2011 – 2012 University Twente, Post doc researcher

• 2012 – today, Assist. Prof. University Twente CME Dept.

• 2016 – Infra Plan consulting Ltd. in Croatia3

Page 4: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Research topics

• Infrastructure Management• Climate Change Impacts• Risk Assessment • Decision Support Models

4

Page 5: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

• Scouring of the railway bridge, Croatia, 2009

• Ireland, slope failure, 2007 Malahide viaduct, Dublin to Belfast line, 2009

Climate Change Impacts on railway infrastructure

5

Page 6: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Freezing Rain in Slovenia (town of Postojna), November 2013

Landslide triggered by a major flood event 2014, Bosnia

6

Page 7: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

• Flooding of a motorway junction in June 2013 at Deggendorf, Germany

• Flood caused the collapse of one bridge which hit another one, Zavidovici, Bosnia 2014

7

Page 8: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Rockfalls due to the extensive rainfall and high temperatures – incidents in Croatia

8

Page 9: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

9

Page 10: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Impact on railway infrastructure – heat waves

Buckling of the rails

10

Page 11: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

SMART Rail 2011-2014

DESTinationRAIL 2015-2018

GoSAFERail 2016-2019

SAFE-10-T 2017-2020

European projects2011 - 2020

11

Page 12: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

12

DESTination Rail Approach - FACT

FINDANALYSECLASSIFYTREAT

DESTination RAIL Decision Support Tool for Rail Infrastructure

Page 13: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Decision Support Tool

13

Page 14: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

14

GoSAFE Rail Project Aim

GoSAFE RAIL Global Safety Management Framework for Rail Operations

Page 15: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

15

• Safety + Mobility• Object detection and micro-mobility planning

GoSAFE Rail Project Concept

GoSAFE RAIL Global Safety Management Framework for Rail Operations

Page 16: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Near Miss concept

16

Page 17: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

SAFE-10-T Multi-modal approach

17

Entrance to the railway Tunnel Brajdica

Entrance to the 4-lane-road Tunnel Pecine – 1260 m long, built in 2006.

SAFE-10-T Safety of Transport Infrastructure on the TEN-T Network

Page 18: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Monitoring Systems for Obstruction Detection

University of Zagreb Faculty of Civil EngineeringInfra Plan consulting

18

Page 19: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

19

Monitoring Systems

1) A multi-sensor train mounted system utilising highresolution cameras and image processing techniques will bedeployed to identify hazards such as animals, humans orother objects that block the track.

2) Fixed camera systems will be used at critical points such aslevel crossings and tunnel entrances.

Page 20: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

20

3) LIDAR scanners complemented with radar systems operating at arange of frequencies to detect obstructions will be tested on theCroatian Rail network.

The need for multiple-sensor approach comes from the fact that everysingle-sensor system has certain disadvantage which limits itscapability. This is of importance since high demands are made on themeasurement range, precision and response time.

4) Implementation of drones into the object detection monitoringsystem

Monitoring Systems

Page 21: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

21

Page 22: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

24

Obstruction detection using image processing

Page 23: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

25

Obstruction detection using image processing

Page 24: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

26

Obstruction detection using image processing

Page 25: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

27

Obstruction detection using image processing

Page 26: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Remote surveying of slopes and flood protection embankments

28

Page 27: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Introduction

Remote surveying (sensing) is the science andtechnology of obtaining information about an object,area or phenomenon through capturing, processingand analysing data from various sensors located inspace, air or on the ground without touching it.

Space Air Ground

Page 28: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

MethodsUAS used for embankment surveying field test is rotary wing DJI Phantom 4 Pro.

Page 29: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

33

UAS - DronesInteractive procedure for infrastructure surveying

Page 30: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Application

• Remote surveying• Monitoring of transport infrastructure

(damages, changes in vegetation, landslides, rockfalls, slopes, bridges…)

• Risk assessment• Maintenance planning

34

Page 31: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

35

• 'standard' means of visual examination is walking along the railway and noticingirregularities

• in the case of high or steep slope embankments, important information can easilybe overlooked

Typical problem of embankment instability - image recorded with UAV, as a part of the repair project on railway track in Croatia

landslide due to inadequate drainage

cross section for calculations

clogged drainagechannel

deformation of the existingsupport (driven rails and wooden sleepers)

Landslide monitoring and assessment

Page 32: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

36

Collection of data using unmanned aerial vehicleFlight plan:

UAS - Drones

Doljan notch mapping usingUAS:• 56 pictuers

Page 33: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

37

Collection of data using unmanned aerial vehicleGenerating point cloud:

UAS - Drones

Page 34: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

38

Generating cross sections areas and volumes Export of geometry to any CAD or design sooftware:

UAS - Drones

Page 35: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

39

UAS - DronesMapping Jurdani rockfall:• 175 pictures• Ground Sampling Distance (GSD): 0.48 cm

Page 36: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

40

UAS - DronesJurdani rockfall

Page 37: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Field approachPart of river Sava embankment in Zagreb was chosenfor a test field.

Page 38: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Results• A total of 117 images were taken.

Page 39: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Results• All images were geo-located at the time of

exposure and overall area covered by imagesduring the flight was 3.69 hectare.

• Image processing time took 90 minutes• Flight time 30 minutes• GSD: 2.26 cm• Number of 3D points created: 7.304.850

Page 40: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Results• 3D polyline, surface and volume calculation

Page 41: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Results• Digital Terrain Model DTM & Digital Surface Model

DSM

Page 42: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Results• High resolution orthophoto map of testing area

Page 43: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Results• Generated contours in *.dwg format exported in

Auto CAD

Page 44: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Results• Overlapped orthomasaic in “Google earth”

Page 45: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Results• 3D Mash

Page 46: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

50

Collection of data using unmanned aerial vehicle

Advantages:• 3D geometry in high accuracy • ability to customize to user needs – variety of outputs (risk

assessment, monitoring, design…)• provides research and recording of inaccessible areas

(hazardous terrain)• in case of loss of the aircraft, the pilot life is not in danger

Disadvantages:• high costs in the case of crash or damage• inability to measure in all weather conditions• Legislation• Amount of data

Implementation of UAS – Drones in IMs practices

Page 47: How to use new technologies for assessing the condition of … Stipanovic... · 2017. 10. 16. · • 2016 – Infra Plan consulting Ltd. in Croatia 3. Research topics • Infrastructure

Thank you for your attention!

51

[email protected]@infraplan.hr