Lawrence Berkeley National Laboratory Integrated Safety Management Systems Review August 8-9, 2006 Partnership Agreement between LBNL and UCB Concerning EH&S Policy and Procedures. Howard Hatayama EH&S Division Director. UCB/LBNL Partnership Agreement for ES&H Policy and Procedure. Background - PowerPoint PPT Presentation
Citation preview
Lawrence Berkeley National Laboratory
Integrated Safety Management Systems ReviewAugust 8-9, 2006
Partnership Agreementbetween LBNL and UCB Concerning
EH&S Policy and Procedures
Howard Hatayama
EH&S Division Director
UCB/LBNL Partnership Agreementfor ES&H Policy and Procedure
Background– Around 600 UC Berkeley Researchers are associated with LBNL
• Materials Sciences ~200• Physical Biosciences ~200• Chemical Sciences ~100• Other Divisions balance
– The Department of Energy expects that its safety systems will be applied anywhere, to anyone performing DOE-funded work
– Likewise, UCB has safety systems covering work at the UCB campus– Agreements between LBNL and UC Berkeley covering EH&S issues have
existed for many years, prior to 2004 the agreement was signed in June, 1993
UCB/LBNL Partnership Agreement
for ES&H Policy and Procedure
Official Signature Date is 15 March, 2004Official Signature Date is 15 March, 2004..
How does the Partnership Agreement
affect Campus Researchers?
• LBNL standards and requirements apply in LBNL space, and UCB standards and requirements apply in UCB (Appendix I) space
• Donner, Calvin and Potter Street are considered LBNL space
• Other UCB space in which LBNL work is performed is considered UCB space (this space is called “Appendix I” space)
Implementation:
Partnership Agreement
• Responsibility for EHS in any space rests with the line manager (Principal Investigator) of that space.
• DOE’s Integrated Safety Management System applies to all LBNL work, wherever and by whomever it is performed. – This means that researchers have a
certain responsibility to their LBNL Division for DOE work performed in UCB Space
Implementation:Partnership Agreement
• The programs at LBNL and UCB are both consistent with ISM.
• Conformance with UCB requirements fulfills the obligation to DOE.
• Conformance must be documented to LBNL.
Implementation:Partnership Agreement
How will this ultimately be accomplished?– Job Hazards Questionnaire: anyone with an LBNL appointment
must take the on-line JHQ. The JHQ has a provision asking where the individual works (LBNL, UCB, both). The JHQ reflects UCB training requirements for workers at UCB, LBNL requirements for workers at LBNL.
– Training: LBNL training applies at LBNL, UCB training applies at UCB. LBNL’s system tracks both. LBNL and UCB will cooperate on classes with interest to both.
– Self-Assessments: UCB’s existing annual self-assessment requirement fulfills this; LBNL Divisions should get a copy of the form.
– Validation: UCB will validate inspections of Appendix I spaces.
Additional Points
Other significant points– Students are specifically called out as individuals for whom
the Principal Investigator is responsible.– Principal Investigators, having primary responsibility for
EHS, may exceed the minimum requirements of the Partnership Agreement at any time.
– Inspections will be conducted by the EH&S office overseeing the space. Other EH&S office may accompany and comment.
– Accidents will be co-investigated when necessary. – EH&S responsibilities during Construction, Renovation and
Maintenance have been clarified.
Summary
– Existing practice of UCB setting standards for UCB spaces, and LBNL setting standards for LBNL spaces, is maintained.
– ISM responsibility for LBNL research in App. I space is confirmed; consists of conforming with UCB requirements.
– LBNL and UCB cooperating on procedures to make both sides benefit.