Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Simple and quick installation
Key features
Important information
Slip resistanceR10
R10
Slip resistance R10 Superguard®Superguard® resistant
Scu� & stain resistanceSuitable forbathrooms
Suitable for bathrooms Suitable for underfloor heatingSuitable for
1316mm x 191mm x 4.2mm8 Panels per packCoverage 2.01m2Pack Weight: 14.95 kg
HJ-050-JC
B -S1
Slip resistance: DS
No Pentachlorophenol containing products added
No Formaldehyde containing products added
NPD
IMPORTANT VINYL FLOORING FITTING NOTICE
18°c - 27°c
24
Do not open packs until you are ready to install the flooring
Flooring must be stored in the room of installation for at least24hrs before fitting
Packs should be stored in a room with a minimum temperature of 18° - 27°C.
The fitting method for this flooring is unique and layinginstructions must be followed on the reverse of this carton
hrs
• Subfloor must be flat, smooth, clean and permanently dry
• Use spacers to create the required expansion gap (minimum 5mm) around the edge of the room and all fixed objects including door frames, radiator pipes & cabinet legs. Do not install kitchen cabinets on top of the floor
• Always use a dedicated LVT underlay (Laminate/real wood flooring underlays must not be used)
• Mix/shu�e panels from di�erent packs when laying the floor
• All short-end joints should be rolled to ensure they’re fully engaged
• All long joints should be tapped in to place using a mallet and an o�-cut piece of flooring (tapping block). No gaps should be visible on the long joints
• Ensure each row is checked for straightness before starting the following row
• Short joints should be a minimum of 200mm apart from the short-end joint on the previous row
HOWDENSPROFESSIONALLUXURY VINYL
FLOORING
General Instructions
Pre-installation
Installation
Care & Maintenance
HOWDENS PROFESSIONALLUXURY VINYL FLOORING
Clean the subfloor
SMOOTH
GRADUALLY INCREASETEMPERATURE BY 5° PER DAYTO A MAX OF 27°SEEK ADVICE FROM UNDERFLOOR HEATINGMANUFACTURER
CLEAN
DRY
DPM
Water and electric*systems can be used*electric systems must beencased in a minimum of 9mmof levelling compound
UNDERFLOOR HEATING
CONCRETE
CEMENTSCREEDSANHYDRITE
MAX27 C
RH <70%
MOISTURE CONTENT BETWEEN 8-12%
5mm EXPANSION GAP
NOTE:ADDITIONAL EXPANSION
GAP REQUIRED FOR RUNSLONGER THAN 20M
SHEET OR PAINTABLE
10mm EXPANSION GAP (over 200m2)
2m
Max 3mm
ø
0mins
uv
115kgMAX
1
18°c - 27°c
24hrs
LEVELLINGCOMPOUND
SECURE PLYWOOD OVEREXISTING FLOORBOARDS
FLOATING
TOOLS REQUIRED
CHOOSE DIRECTION OF INSTALLATION
DEDICATED LVT UNDERLAY
2 FIRST ROW
Remove the lowerlip from the first rownearest the wall
Take planks from di�erent packs when fitting
Always install a DPMwhere there are concernsover moisture in sub floor
ROLL ALL SHORT JOINTS
Use flooring o�-cut to tap on the long side
Fit into long edge, then slide along and drop down Ensure all panels are fully engaged and straight
3 LAY FIRST ROW 4 USE SPACERS AROUND EDGE
5 MEASURE & CUT 6 CHECK ROW IS STRAIGHT
7 USE OFF-CUT FOR NEXT ROW
>200mm
8 FULLY ENGAGED PANEL JOINTS
25°
25°
9 FIT NEXT PANEL 10 REPEAT OF ALL PANELS
Measure width of panel required - cut with knife*
*Ensure expansion gap is maintained
11 LAST ROW
upside down panel
12 CUTTING AROUND PIPEWORK
No rubber or latex backed mats
No steam mops should be used
Well wrung out mop andcleaning cloth can also be used
Castor cups Felt pads