HPSR 2009 Road schedule

Embed Size (px)

Citation preview

  • 8/9/2019 HPSR 2009 Road schedule

    1/214

    20

    Chapter 1

    Description Unit

    1.1

    (i) Cum -- 43.60

    (ii) Cum -- 21.80

    (iii) Cum -- 21.80

    (iv) Cum -- 13.40

    1.2

    (i) Cum -- 31.50

    LOADING, UNLOADING, CARRIAGE CRUSING O! "A#ERIALS ANDOU#

    Sr.No.

    Re$erence to

    "ORDSpeci$ications

    La%o&rRate(Rs.)

    #hro&'h

    Rate(Rs.)

    Loain' an Unoain' o$ Li*e,A''re'ate, Stone +o&er, +ricA''re'ate, -anar, +&iin'R&%%ish, Cr&she Sa', Stone $or"asonr /or % "an&a "eans

    Loading of Lime, Aggregate,Stone Boulder, Bric Aggregate,!anar, Building "u##i$%,Cru$%ed Slag, Stone for&a$onr' (or #' manualmean$ including a lead u)to 30m

    Loading of *art%, Sand,&oorum, &anure, +l'a$% #'manual mean$ including a leadu)to 30 m

    nloading of Lime, Aggregate,Stone Boulder, Bric Aggregate,!anar, Building "u##i$%,

    Cru$%ed Slag, Stone for&a$onr' (or #' manualmean$ including a lead u)to 30m

    nloading of *art%, Sand,&oorum, &anure, +l'a$% #'manual mean$ including a leadu)to 30 m

    Loain' an Unoain' o$ Li*e,A''re'ate, Stone +o&er, +ricA''re'ate, -anar, +&iin'R&%%ish, Cr&she Sa', Stone $or

    "asonr /or % "echanica"eans

    Loading of Lime, Aggregate,Stone Boulder, Bric Aggregate,!anar, Building "u##i$%,Cru$%ed Slag, Stone for&a$onr' (or #'

  • 8/9/2019 HPSR 2009 Road schedule

    2/214

    21

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

    (ii) Cum -- 15.0

    (iii) Cum -- 4.85

    1.0

    (i) 1000 o$ -- /3.30

    (ii) 1000 o$ -- /3.30

    1.

    (i) onne -- 55.30

    (ii) onne -- 55.30

    1.

    (i) onne -- 5./0

    (ii) onne -- 5./0

    mec%anical mean$ including a

    lead u)to 30 m lacing ti))er atloading )oint, loading it% frontend loader ecluding time for%aulage and return tri).

    Loading of *art%, Sand,&oorum, &anure, +l'a$% #'mec%anical mean$ including alead u)to 30 m.lacing ti))er atloading )oint, loading it% frontend loader ecluding time for%aulage and return tri).

    nloading of *art%, Sand, Lime

    moorum, Aggregate, StoneBoulder, Bric Aggregate,!anar, Building "u##i$%,&anure, Cru$%ed Slag, +l'a$%,Stone for &a$onr' (or #'mec%anical mean$.

    Loain', Unoain' an Stacin'o$ +rics % "an&a "eans

    Loading of Bric$ #' manualmean$ including a lead u)to 30m

    nloading and Stacing ofBric$ #' manual mean$including a lead u)to 30 m

    Loain' an Unoain' o$ Ce*ent% "an&a "eans

    Loading of Cement #' manualmean$ including a lead u)to 30m

    nloading of Cement #'manual mean$ including a leadu)to 30 m

    Loain' an Unoain' o$Str&ct&ra Stee an Stee +ars %*an&a *eans

    Loading of Structural Steel,Steel Bar$ #' manual mean$including a lead u)to 30 m

    nloading of Structural Steel,Steel Bar$ #' manual mean$including a lead u)to 30 m

  • 8/9/2019 HPSR 2009 Road schedule

    3/214

    22

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

    1.3

    (i) onne -- 65.05

    (ii) onne -- 5.25

    Note: The rate is inclusive of the self weight of drum

    1.4 155

    (i) -- 5.0

    (ii) onne -- 5.0

    1.6

    (i) Cum -- 144.15

    (ii) Cum -- 144.15

    1.7

    (i)

    A i)e -- 42.55

    Loain' an Unoain' o$

    +it&*en Dr&*s % "an&a "eans

    Loading of Bitumen rum$ #'manual mean$ including a leadu)to 30 m

    nloading of Bitumen rum$ #'&anual &ean$ including a leadu)to 30 m

    Loain' an Unoain' o$ #i*%er% "an&a "eans

    nloading of im#er #' manualmean$ including a lead u)to 30m

    nloading of im#er #' manualmean$ including a lead u)to 30m

    Note :Density of wood has been assumed as 900 kg percum. If the density is less the output may be reduced

    proportionately

    Loain' an Unoain' o$ C.C.+ocs, -er%, etc.

    Loading it% care C.C. Bloc$,m Stone, 200 m Stone,Boundar' illar, !er#, C%annel,

    Bond Stone, etc. #' manualmean$ including a lead u)to 30m

    nloading it% care C.C.Bloc$, m Stone, 200 mStone, Boundar' illar, !er#,C%annel, Bond Stone, etc. #'manual mean$ including a leadu)to 30 m

    Loain' an Unoain' o$ &*e8ipes

    Loading of "CC ume )i)e$ #'mec%anical mean$ including alead u)to 30 m

    0010001200mm dia "CCume )i)e

  • 8/9/2019 HPSR 2009 Road schedule

    4/214

    23

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

    B /50mm dia "CC ume )i)e i)e -- 25.50

    C 600500300mm dia ume )i)e i)e -- 18.25

    (ii)

    A i)e -- 1/5.05

    B /50mm dia ume )i)e i)e -- 145.

    C 600500300mm dia ume )i)e i)e -- 10.40

    (iii)

    A i)e -- 2.00

    B /50 mm dia ume )i)e i)e -- 1/.40

    C i)e -- 12.45

    1.15

    7i Surface road. !m. -- 2.30

    7ii n$urfaced 9ra:el road !m. -- 2.80

    7iii !m. -- 5.60

    1.11

    Case9I

    7i Surface road. i)e -- 25.50

    nloading of "CC ume i)e#' manual mean$ including a

    0010001200 mm dia "CCume )i)e$

    nloading of "CC ume i)e#' manual mean$ including alead u)to 30m

    0010001200 mm dia ume)i)e

    600500300 mm dia ume)i)e

    a&a'e e:c&in' Loain' ;Unoain'

    aulage of material$ #' ti))erecluding co$t of loading, unloadingand $tacing.

    !atc%a trac and trac in "i:erBedalla% #ed ; C%oe #ed

    a&a'e e:c&in' Loain' ;Unoain'

    aulage of material$ #' trucecluding co$t of loading, unloadingand $tacing.

    I) &*e pipe 755

  • 8/9/2019 HPSR 2009 Road schedule

    5/214

    24

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

    Case9II

    7ii n$urfaced 9ra:el road i)e -- 30./0

    Case9III

    7iii i)e -- 61./5

    II) &*e pipe 45 ** ia

    Case9I

    7i Surface road. i)e -- 15.30

    Case9II

    7ii n$urfaced 9ra:el road i)e -- 18.40

    Case9III

    7iii i)e -- 3/.05

    III) &*e pipe 355

  • 8/9/2019 HPSR 2009 Road schedule

    6/214

    25

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

    (ii) Cum -- 61.55

    (iii) Cum -- 663.60

    (I>) Cum -- 363.00

    (>) Cum -- 363.00

    1.10

    Cum -- 3/.50

    Note:

    !

    "

    Su))l' of

  • 8/9/2019 HPSR 2009 Road schedule

    7/214

    26

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

    1.1

    Cum -- 432.55

    Note:

    !

    "

    1.1

    Cr&shin' o$ Stone A''re'ates 155

    per cent passin' thro&'h 22. **sieve as per #a%e 55.3 o$#echnica Speci$ications.

    Cru$%ing of $tone #oulder$ of 150mm $i=e in an integrated $tonecru$%ing unit of 200 t% ca)acit'com)ri$ing of )rimar' and$econdar' cru$%ing unit$, #eltcon:e'or and :i#rating $creen$ too#tain $tone aggregate$ 100 )ercent )a$$ing t%roug% 22.4 mm $ie:ea$ )er a#le 500.6 of ec%nical

    S)ecification$ including t%e co$t of$tone.

    #00 cum of stone boulders areneeded to get )$0 cum of stonechips of re*uired si'e.

    90 per cent of above cost will beattributed to the production of )$0cum of stone aggregate and balance0 per cent will be for smaller si'eaggregates and stone dust which

    comes out as a by(product.

    The integrated stone crusherincludes primary and secondarycrushing units.

    Cr&shin' o$ Stone A''re'atesNo*ina Si?e 10.2

  • 8/9/2019 HPSR 2009 Road schedule

    8/214

    2/

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

    > Cum -- 484.40

    >> Cum -- 484.40

    Note:

    !

    "

    1.13

    Cru$%ing of $tone #oulder$ of

    150 mm $i=e in an integrated$tone cru$%ing unit of 200 t%ca)acit' com)ri$ing of )rimar'and $econdar' cru$%ing unit$,#elt con:e'or and :i#rating$creen$ to o#tain $toneaggregate$ of 13.2 mm nominal$i=e a$ )er a#le 500. ofec%nical S)ecification$including t%e co$t of $tone.

    Cru$%ing of $tone #oulder$ of

    150 mm $i=e in an integrated$tone cru$%ing unit of 200 t%ca)acit' com)ri$ing of )rimar'and $econdar' cru$%ing unit$,#elt con:e'or and :i#rating$creen$ to o#tain $toneaggregate$ of 11.2 mm nominal$i=e a$ )er a#le 500. ofec%nical S)ecification$including t%e co$t of $tone.

    #00 cum of stone boulders are

    needed to get )00 cum of stonechips of si'e ".! mm and !% cumstone dust.

    9% per cent of above cost will beattributed to the production of )00cum of stone chips of ".! mm si'eand balance % per cent to the

    production of stone dust whichcomes out as a by(product.

    The integrated stone crusherincludes primary and secondary

    crushing units.

    Cr&shin' o$ Stone A''re'ates 7.** No*ina Si?e as per #a%e55.7 o$ #echnica Speci$ications.

  • 8/9/2019 HPSR 2009 Road schedule

    9/214

    28

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

    Cum -- 50.85

    Cum -- 514.50

    Note:

    !

    "

    1.14 155 Settin' O&t

    (i) !m. 485.60 2346.4

    (ii) !m. 233.80 1068.25

    Cru$%ing of $tone #oulder$ of 150

    mm $i=e in an integrated $tonecru$%ing unit of 200 t% ca)acit'com)ri$ing of )rimar' and$econdar' cru$%ing unit$, #eltcon:e'or and :i#rating $creen$ too#tain $tone aggregate$ of .5 mmnominal $i=e a$ )er a#le 500. ofec%nical S)ecification$ includingt%e co$t of $tone.

    Cru$%ing of $tone #oulder$ of150mm $i=e in an intergrated $tonecru$%ing unit of 200t% ca)acit'

    com)ri$ing of )rimar' and$econdar' cru$%ing unit$, #eltcon:e'or and :i#rating $creen$ too#tain $tone aggregate$ of .5mmnominal $i=e a$ )er ta#le 500. ofec%nical $)ecification$ includingt%e co$t of $tone$.

    #00 cum of stone boulders areneeded to get )00 cum of stonechips of si'e ).$ mm and !% cumstone dust.

    9% per cent of above cost will beattributed to the production of )00cum of stone chips of 9.% mm si'eand balance % per cent to the

    production of stone dust whichcomes out as a by(product.

    The integrated stone crusherincludes primary and secondarycrushing units.

    ')ical #enc%mar a$ )erdraing 200.1 and a$ )erec%nical S)ecification clau$e108.

    ')ical reference )illar a$ )erdraing 200.2 and a$ )erec%nical $)ecification clau$e108

  • 8/9/2019 HPSR 2009 Road schedule

    10/214

    2

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

  • 8/9/2019 HPSR 2009 Road schedule

    11/214

    30

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate(Rs.)

    #hro&'hRate(Rs.)

  • 8/9/2019 HPSR 2009 Road schedule

    12/214

    31

    E##ING

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    13/214

    32

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    14/214

    33

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    15/214

    34

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    16/214

    35

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    17/214

    36

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    18/214

    3/

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    19/214

    38

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    20/214

    3

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    21/214

    40

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    22/214

    41

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    23/214

    31

    Chapter 2

    SI#E CLEARANCE

    Description Unit

    2.1 251

    + "an&a "eans ectare 5,8/2./0 --

    2.2 251

    (I) + "an&a "eans

    7A ectare -- 22,440.10

    7B >n area of t%orn' ?ungle ectare -- 30,18.40

    (II) + "echanica "eans

    7A ectare -- 45,//4./0

    7B >n area of t%orn' ?ungle ectare -- 55,231.10

    2.0 251

    Sr.

    No.

    Re$erence to

    "ORDSpeci$ication

    La%o&r

    Rate

    #hro&'h

    Rate

    Re*ars

    Cearin' Grass an Re*ova o$R&%%ish

    Clearing gra$$ and remo:al ofru##i$% u) to a di$tance of 30 mout$ide t%e )eri)%er' of t%e area a$)er ec%nical S)ecification Clau$e201.

    Cearin' an Gr&%%in' RoaLan

    Clearing and gru##ing road landincluding u)rooting ild :egetation,gra$$, #u$%e$, $%ru#$, $a)ling$and tree$ of girt% u)to 300 mm,remo:al of $tum)$ of $uc% tree$ cutearlier and di$)o$al ofun$er:icea#le material$ and$tacing of $er:icea#le material to#e u$ed or auctioned, u)to a leadof 1000 m including remo:al anddi$)o$al of to) organic $oil not

    eceeding 150 mm in t%icne$$ a$)er ec%nical S)ecification Clau$e201.

    >n area of non-t%orn'?ungle

    >n area of non-t%orn'?ungle

    C&ttin' o$ #rees inc&in'C&ttin' o$ #r&ns, +ranches anRe*ova o$ St&*ps

  • 8/9/2019 HPSR 2009 Road schedule

    24/214

    32

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Re*ars

    A. Lea &pto 155 *

    7i *ac% -- 11/.30

    7ii *ac% -- 21.80

    7iii *ac% -- 410.50

    7i: *ac% -- /62.60

    7: *ac% -- 1,52.00

    7:i 9irt% a#o:e 4500 mm *ac% -- 4,505.35

    +. Lea &pto 1555 *

    7i *ac% -- 12.85

    7ii *ac% -- 25/.40

    7iii *ac% -- 460.60

    7i: *ac% -- 83/./5

    7: *ac% -- 1,6/5.50

    7:i 9irt% a#o:e 4500 mm *ac% -- 4,/14.05

    2. 251

    Cutting of tree$, including cutting oftrun$, #ranc%e$ and remo:al of

    $tum)$ ; root$, refilling,com)action of #acfilling and$tacing of $er:icea#le material #'manual mean$ it% all lift$ a$ )erec%nical S)ecification Clau$e 201.

    9irt% a#o:e 300 mm to600 mm

    9irt% a#o:e 600 mm to

    00 mm9irt% a#o:e 00 mm to1800 mm

    9irt% a#o:e 1800 mm to2/00 mm

    9irt% a#o:e 2/00 mm to4500 mm

    9irt% a#o:e 300 mm to

    600 mm9irt% a#o:e 600 mm to00 mm

    9irt% a#o:e 00 mm to1800 mm

    9irt% a#o:e 1800 mm to2/00 mm

    9irt% a#o:e 2/00 mm to4500 mm

    Uprootin' an Re*ovin' St&*ps; Roots

    )rooting and "emo:ing Stum)$ ;root$, com)action of #acfilling and$tacing of $er:ica#le material #'manual mean$ a$ )er ec%nicalS)ecification Clau$e 201.

  • 8/9/2019 HPSR 2009 Road schedule

    25/214

    33

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Re*ars

    A. Lea &pto 155 *

    7i *ac% --

    66.25

    7ii *ac% -- 108.5

    7iii *ac% -- 224.45

    7i: *ac% -- 436.5

    7: *ac% -- 886.45

    7:i 9irt% a#o:e 4500 mm *ac% -- 2,515.35

    +. Lea &pto 1555 *

    7i *ac% -- 6.15

    7ii *ac% -- 11.40

    7iii *ac% -- 23/.00

    7i: *ac% -- 453./0

    7: *ac% --

    0/.30

    7:i 9irt% a#o:e 4500 mm *ac% -- 2,61./0

    2. 252 Dis*antin' o$ Str&ct&res

    (I) + "an&a "eans

    9irt% a#o:e 300 mm to600 mm

    9irt% a#o:e 600 mm to00 mm

    9irt% a#o:e 00 mm to1800 mm

    9irt% a#o:e 1800 mm to2/00 mm

    9irt% a#o:e 2/00 mm to4500 mm

    9irt% a#o:e 300 mm to600 mm

    9irt% a#o:e 600 mm to00 mm

    9irt% a#o:e 00 mm to1800 mm

    9irt% a#o:e 1800 mm to2/00 mm

    9irt% a#o:e 2/00 mm to4500 mm

    i$mantling of ei$ting $tructure$lie cul:ert$, #ridge$, retainingall$ and ot%er $tructurecom)ri$ing of ma$onr', cementconcrete, ood or, $teel or,including ; and $caffolding%ere:er nece$$ar', $orting t%e

    di$mantled material, di$)o$al ofun$er:icea#le material and$tacing t%e $er:icea#le materialit% all lift$ and lead of 1000 m a$)er ec%nical S)ecification Clau$e202.

  • 8/9/2019 HPSR 2009 Road schedule

    26/214

    34

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Re*ars

    7A Lime Concrete Cum -- 20/.60

    7B Cement Concrete Cum -- 23/.00

    7C Cum -- 538.25

    (II) + "echanica "eans

    7A Cement Concrete Cum -- 36.85

    7B Cum -- 56/.20

    2.3 252 Dis*antin' +ric

  • 8/9/2019 HPSR 2009 Road schedule

    27/214

    35

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Re*ars

    7B Cum -- 1/8.25

    7C Cum -- 148.0

    7 r' "u##le &a$onr' Cum -- 143.00

    7* Cum -- 13/.15

    7+ Cum -- 148.0

    2.6 252 Cum --

    312.10

    2.7 252

    7A >ncluding di$mem#ering onne -- 636./5

    7B *cluding di$mem#ering onne -- 466./0

    7C *ac% 4.30 --

    2.15 252

    >n Lime Cement &ortar 1000o$ 513.85 --

    2.11 252

    >n Cement or Lime &ortar Cum 206.10 --

    "u##le Stone &a$onr' inCement &ortar

    "u##le Stone &a$onr' in&ud &ortar

    i$mantling Stone itc%ing r' Stone S)all$

    i$mantling #oulder$ laid inire crate$ including o)eningof crate$ and $tacingdi$mantled material$

    Dis*entin' /oo @or @ro&'htan pane $i:e in !ra*es o$#r&sses &pto a hei'ht o$ *a%ove pinth eve as per#echnica Speci$ication ca&se252.

    Dis*entin'Stee @or in atpes o$ sections &pto a hei'hto$ * a%ove pinth evee:c&in' c&ttin' o$ rivet astechnica speci$ication ca&se252.

    *tra o:er item$7A and7B forcutting ri:et$

    Scrapin' o$ %rics is*ante$ro* %ric @or inc&in'stacin' as per #echnicaSpeci$ication Ca&se 252.

    Scrapin' o$ Stone $ro*Dis*ante Stone "asonr asper #echnica Speci$icationCa&se 252.

  • 8/9/2019 HPSR 2009 Road schedule

    28/214

    36

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Re*ars

    2.12 252 S

  • 8/9/2019 HPSR 2009 Road schedule

    29/214

    3/

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Re*ars

    2.1 252

    Cum -- 1,516.35

    Note:

    2.13 252 Dis*antin' G&ar Rais

    -- 42.0

    2.14 252 Dis*antin' -er% Stones

    -- 10.55

    2.16 252

    -- 15.0

    2.17 252 Dis*antin' -io*etre Stones

    Dis*antin' o$ Ce*ent Concrete8ave*ents as per #echnica

    Speci$ication Ca&se 252.

    i$mantling of cement concrete)a:ement$ #' mec%anical mean$u$ing )neumatic tool$ #reaing to)iece$ not eceeding 0.02 cum in:olume and $toc )iling atde$ignated location$ and di$)o$alof di$mantled material$ u)to a leadof 1000 m, $tacing $er:icea#leand un$er:icea#le material$$e)aratel'

    The above analysis is for removal of completepavement. In case full depth repair work isre*uired to be done after dismantling, provision of aconcrete saw cutter may be added for 0.!%h.

    i$mantling guard rail$ #' manualmean$ and di$)o$al of di$mantledmaterial it% all lift$ and u)to a leadof 1000 m, $tacing $er:icea#lematerial$ and un$er:icea#le

    material$ $e)aratel' a$ )erec%nical S)ecification Clau$e 202.

    "unningmetre

    i$mantling er# $tone$ #' manualmean$ and di$)o$al of di$mantledmaterial it% all lift$ and u)to a leadof 1000 m a$ )er ec%nicalS)ecification Clau$e 202.

    "unningmetre

    Dis*antin' -er% StoneChannes

    i$mantling er# $tone c%annel$ #'manual mean$ and di$)o$al ofdi$mantled material it% all lift$ andu)to a lead of 1000 m a$ )erec%nical S)ecification Clau$e 202.

    "unningmetre

  • 8/9/2019 HPSR 2009 Road schedule

    30/214

    38

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Re*ars

    7A 5t% m Stone *ac% -- 1/2./5

    7B @rdinar' m Stone$ *ac% -- 106.80

    7C 200 m Stone$ *ac% -- 23.05

    7 Boundar' illar Cum -- 23.05

    2.25 252 Dis*antin' o$ !encin'

    -- 21.40

    2.21 252

    -- /2.55

    Note:

    2.22 252

    i$mantling of ilometre $tone$including cutting of eart%,

    foundation and di$)o$al ofdi$mantled material it% all lift$ andlead u)to 1000 m and #acfilling of)it a$ )er ec%nical S)ecificationClau$e 202.

    i$mantling of #ar#ed irefencing ire me$% fencingincluding )o$t$, foundationconcrete, #acfilling of )it #'manual mean$ including di$)o$al ofdi$mantled material it% all lift$ andu)to a lead of 1000 m, $tacing$er:icea#le material andun$er:icea#le material $e)aratel'a$ )er ec%nical S)ecification

    Clau$e 202.

    "unningmetre

    Dis*antin' o$ CI /ater 8ipeLine

    i$mantling of C> ater )i)e line600 mm dia including di$)o$al it%all lift$ and lead u)to 1000 m and$tacing of $er:icea#le materialand un$er:icea#le material$e)aratel' under $u)er:i$ion ofconcerned de)artment a$ )erec%nical S)ecification Clau$e 202.

    "unningmetre

    The rate analysis does not include any e+cavationin earth or dismantling of masonry works which areto be measured and paid separately.

    Re*ova o$ Ce*ent Concrete8ipe o$ Se@er G&tter

  • 8/9/2019 HPSR 2009 Road schedule

    31/214

    3

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Re*ars

    -- 88.15

    Note:

    2.20 252

    *ac% -- 85.25

    "emo:al of cement concrete )i)eof $eer gutter 1500 mm dia under

    t%e $u)er:i$ion of concernedde)artment including di$)o$al it%all lift$ and u)to a lead of 1000 mand $tacing of $er:icea#le andun$er:icea#le material $e)aratel'#ut ecluding eart% eca:ation anddi$mantling of ma$onr' or$ a$)er ec%nical S)ecification Clau$e202.

    "unningmetre

    The rate analysis does not include any e+cavationin earth or dismantling of masonry works which areto be measured and paid separately.

    Re*ova o$ #eephone

  • 8/9/2019 HPSR 2009 Road schedule

    32/214

    41

    Chapter 0

    EAR#/OR-, EROSION CON#ROL AND DRAINAGE

    Description Unit

    0.1

    051.

    S

  • 8/9/2019 HPSR 2009 Road schedule

    33/214

    42

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Note:

    0. 051.

    Cum -- 1/8.10

    0. 052 (i)

    Cum 55.10 --

    (ii)

    Cum -- 46.40

    In case the earth cutting is done by do'er andpushed for filling in the embankment, the input of

    do'er in the cost of embankment shall be deletedas the same is already provided in the cost ofe+cavation. 1owever, if the earth is dumped bytippers from roadway cutting, the input of do'er forspreading is re*uired to be provided.

    Constr&ction o$ E*%an*ent@ith "ateria O%taine $ro*+orro@ 8its

    Con$truction of em#anment it%a))ro:ed material o#tained from#orro )it$ it% a lift u)to 1.5 m,

    tran$)orting to $ite, $)reading,grading to re

  • 8/9/2019 HPSR 2009 Road schedule

    34/214

    43

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    (iii)

    Cum -- 28.00

    0.3 052.0.3 E:cavation in "arsh Soi

    Cum -- 41.50

    0.4 052.0.11

    Cum -- 28.00

    E:cavation in Soi &sin'ra&ic E:cavator an

    #ippers @ith isposa &pto1555 *

    *ca:ation for roador in$oil it% %'draulic eca:atorof 0. cum #ucet ca)acit'including cutting and loadingin ti))er$, trimming #ottomand $ide $lo)e$, inaccordance it%re

  • 8/9/2019 HPSR 2009 Road schedule

    35/214

    44

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Note:

    0.6 052.0. (i)

    Cum 85.65 --

    (ii)

    Cum -- 48.85

    (iii)

    This item does not include replacement ofunsuitable soil by suitable soil. 2eplacement,

    where re*uired, is to be provided and paidseparately under -lause "0".%.!.

    E:cavation in orinarRoc % *an&a *eans

    *ca:ation in ordinar' rocu$ing manual mean$including loading in a trucand carr'ing of eca:atedmaterial to em#anment $iteit% a lift u)to 1.5 m andlead u to 50 m a$ erE:cavation in Orinar

    Roc @ith Do?er @ith ea&pto 155 *

    *ca:ation for roada' inordinar' roc #' de)lo'ing ado=er -50 including cuttingand )u$%ing t%e cut eart% to$ite of em#anment u)to adi$tance of 100 m 7a:eragelead 50 m, trimming #ottomand $ide $lo)e$ inaccordance it% t%ere

  • 8/9/2019 HPSR 2009 Road schedule

    36/214

    45

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Cum -- 4./5

    0.7 052.0. (i)

    Cum -- 18.50

    Note:

    !

    "

    *ca:ation for roada' inordinar' roc it% %'draulic

    eca:ator of 0. cum #ucetca)acit' including cuttingand loading in ti))er$,tran$)orting to em#anment$ite it% a lift u)to 1.5 m andlead u)to 1000 m, trimming#ottom and $ide $lo)e$ inaccordance it%re

  • 8/9/2019 HPSR 2009 Road schedule

    37/214

    46

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    (ii)

    (A) "an&a "eans Cum -- 515.15

    Note:

    !

    "

    (+) "echanica "eans Cum -- 322./0

    Note:

    !

    "

    (iii)

    E:cavation in ar Roc(%astin' prohi%ite)

    *ca:ation for roada' in%ard roc 7#la$ting)ro%i#ited it% roc#reaer$ including #reaingroc, loading in ti))er$ anddi$)o$al it% a lift u)to 1.5 mand lead u)to 1000 metre$,trimming #ottom and $ide$lo)e$ in accordance it%re

  • 8/9/2019 HPSR 2009 Road schedule

    38/214

    4/

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Cum -- 21.0

    Note: 1

    2

    0.15 052.0.2

    Cum -- 5.80

    0.11 052.0.2

    *ca:ation for roada' in%ard roc it% controlled

    #la$ting #' drilling, #la$tingand #reaing, trimming of#ottom and $ide $lo)e$ inaccordance it%re

  • 8/9/2019 HPSR 2009 Road schedule

    39/214

    48

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    Cum -- 3./0

    0.12 057 #&r$in' @ith Sos

    S

  • 8/9/2019 HPSR 2009 Road schedule

    40/214

    4

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    (i)

    Cum -- 15./0

    050 (ii)

    Cum -- 4/.45

    0.13 051...1

    S

  • 8/9/2019 HPSR 2009 Road schedule

    41/214

    50

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    S"CS58 o#tained from coal orlignite #urning t%ermal )oer

    $tation$ a$ a$te material, $)readand com)acted in la'er of 200 mmt%icne$$ eac% at @&C, all a$$)ecified in >"CS58 and a$ )era))ro:ed )lan$ it% lead u)to1000 m a$ )er ec%nicalS)ecification Clau$e 306.

    6s flyash is available free of costas waste material from Thermal7lants, cost of material has notbeen added.

    The earthcover on sides andintermediate layers of earthsandwiching the flyash have notbeen included in this analysis.The same are re*uired to be

    provided as per approved designand priced seperately asembankment construction.

  • 8/9/2019 HPSR 2009 Road schedule

    42/214

    51

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    0.17 054 (i) S&r$ace Drains in Soi

    (A) "an&a "eans &etre 2.40 --

    Note:

    (+) "echanica "eans &etre -- .00

    (ii)

    (A) "an&a "eans &etre 44.05 --

    (+) "echanica "eans &etre -- 20.65

    (iii)

    (A) "an&a "eans &etre 31.20 --

    (+) "echanica "eans &etre -- 50.00

    Con$truction of unlined$urface drain$ of a:eragecro$$-$ectional area 0.40$

  • 8/9/2019 HPSR 2009 Road schedule

    43/214

    52

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ication

    La%o&rRate

    #hro&'hRate

    0.25 054 Ch&te Drains

    A. &etre 1,132./0 6,84.40

    B &etre 1,34/.25 6,080.0

    Note:

    ro:iding c%ute drain$acro$$ em#anment $lo)e$in a))roc%e$ of #ridge$ andon %ori=ontal cur:e$ a$ )erdraing$.

    ro:iding c%ute drain$acro$$ em#anment $lo)e$in a))roc%e$ of #ridge$ andon %ori=ontal cur:e$ a$ )erdraing$.

    uantities are to be taken as per the designs and

    drawings.

  • 8/9/2019 HPSR 2009 Road schedule

    44/214

    53

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    45/214

  • 8/9/2019 HPSR 2009 Road schedule

    46/214

    55

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    47/214

  • 8/9/2019 HPSR 2009 Road schedule

    48/214

    5/

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    49/214

    58

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    50/214

    5

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    51/214

    60

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    52/214

  • 8/9/2019 HPSR 2009 Road schedule

    53/214

    62

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    54/214

    63

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    55/214

    64

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    56/214

    53

    Chapter

    GRANULAR SU+9+ASES, +ASES (NON9+I#U"INOUS) AND SOU

    Description Unit

    .1 51 Gran&ar S&%9%ase @ith /e Grae "ateria (#a%e 55.1)

    (A) + "i: in 8ace "etho

    (i) !or Grain' I "ateria Cum -- 824.60

    (ii) !or Grain' II "ateria Cum -- 802.80

    (iii) !or Grain' III "ateria Cum -- /81.00

    51 (+) 8ant "i: "etho

    (i) !or Grain' I "ateria Cum -- 84/.00

    (ii) !or Grain' II "ateria Cum -- 831.15

    (iii) !or Grain' III "ateria Cum -- //./0

    Sr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    Con$truction of granular $u#-#a$e #' )ro:iding ell gradedmaterial, $)reading in uniformla'er$ it% ractor mount graderon )re)ared $urface, miing #'mi in )lace met%od it%rota:ator at @&C, and

    com)acting it% $moot% %eelroller to ac%ie:e t%e de$iredden$it', com)lete a$ )erec%nical S)ecification Clau$e401.

    Con$truction of granular $u#-#a$e #' )ro:iding ell gradedmaterial, miing in a mec%anicalmi )lant at @&C, carriage ofmied material to or $ite u)tolead of 1000 m $)reading inuniform la'er$ it% motor graderon )re)ared $urface andcom)acting it% $moot% %eelroller to ac%ie:e t%e de$iredden$it', com)lete a$ )erec%nical S)ecification Clau$e401

  • 8/9/2019 HPSR 2009 Road schedule

    57/214

    54

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    .2 52 i)

    Cum --

    830.0

    ii)

    Cum -- 823.60

    iii)

    Cum -- 816.35

    Grave

  • 8/9/2019 HPSR 2009 Road schedule

    58/214

    55

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    iv) C&* 427.25

    v) C&* 46.05

    vi) C&* 464.05

    Grave"C S //-2008.

    Grave

  • 8/9/2019 HPSR 2009 Road schedule

    59/214

    56

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    .0 50 (i)

    Cum -- /4.60

    ii) C&* 613.0

    Con$truction of gra:elSoil AggregateSu#-#a$eBa$e #' )ro:iding ellgraded material of nominal maimum

    $i=e grading 20 mm a$ )er a#le 2.3 of>"C S //-2008, $)reading in uniformla'er$ it% tractor nount a))ro)rategrading arrangement$ on )re)ared$urface, miing #' mi in )lace met%odat @&C it% tractor mount a))ro)riaterota:ator attac%ment and com)actionit% t%ree %eel 80-100 $tatic rollerca)acit' to ac%ie:e t%e de$ired den$it'com)lete a$ )er $)ecification$contained in ara 2.2, 3.6 and 3./ of>"C S //-2008.

    Grave

  • 8/9/2019 HPSR 2009 Road schedule

    60/214

    5/

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    iii) C&* 605.75

    . 52

    (A) + "an&a "eans Cum -- 310.80

    (+) + "echanica "eans Cum -- 32/.05

    Note: The e+act *uantity of lime shall be as per design.

    Grave

  • 8/9/2019 HPSR 2009 Road schedule

    61/214

    58

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    . 50 Li*e #reate Soi $or S&%9+ase

    Cum -- 622.00

    Note: he exact quantity of lime shall be as per design.

    .3 5 Ce*ent #reate Soi S&%9+ase

  • 8/9/2019 HPSR 2009 Road schedule

    62/214

    5

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    (+) + "echanica "eans Cum -- 84.55

    2) /+" Grain' 2

    (A) + "an&a "eans Cum -- 1,015./0

    (+) + "echanica "eans Cum -- 52.50

    Note: Type 6 /creening can be used in rading !

    0) /+" Grain' 0

    (A) + "an&a "eans Cum -- 5.50

    (+) + "echanica "eans Cum -- 32.30

    .6 5

    ro:iding, la'ing, $)reading andcom)acting $tone aggregate$ of$)ecific $i=e$ to ater #oundmacadam $)ecification including$)reading in uniform t%icne$$,%and )acing, rolling it% $moot%%eel roller 80-100 in $tage$

    to )ro)er grade and cam#er,a))l'ing and #rooming, $tone$creening#inding material$ to fill-u) t%e inter$tice$ of coar$eaggregate, atering and

    com)acting to t%e re

  • 8/9/2019 HPSR 2009 Road schedule

    63/214

    60

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    1) /+" Grain' 1

    (A) + "an&a "eans Cum -- 83./0

    (+) + "echanica "eans Cum -- 830.55

    2) /+" Grain' 2

    (A) + "an&a "eans Cum -- 4/.0

    (+) + "echanica "eans Cum -- 884./5

    0) /+" Grain' 0

    ro:iding, la'ing, $)reading andcom)acting $tone aggregate$ of$)ecific $i=e$ to ater #oundmacadam $)ecification including$)reading in uniform t%icne$$,%and )acing, rolling it% t%ree%eel 80-100 $tatic roller in$tage$ to )ro)er grade andcam#er, a))l'ing and #rooming,cru$%a#le $creening to fill-u) t%einter$tice$ of coar$e aggregate,atering and com)acting to t%ere

  • 8/9/2019 HPSR 2009 Road schedule

    64/214

    61

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    (A) + "an&a "eans Cum --

    62.55

    (+) + "echanica "eans Cum -- 8.40

    .7 53 /et "i: "acaa*

    + "echanica "eans @ith 1 * ea Cum -- 861.65

    .15 54

    A. Earthen Sho&ers

    ro:iding, la'ing, $)reading andcom)acting $tone aggregate$ of$)ecific $i=e$ to ater #ound

    macadam $)ecification including$)reading in uniform t%icne$$,%and )acing, rolling it% t%ree%eel 80-100 $tatic roller in$tage$ to )ro)er grade andcam#er, a))l'ing and #rooming,cru$%a#le $creening to fill-u) t%einter$tice$ of coar$e aggregate,atering and com)acting to t%ere

  • 8/9/2019 HPSR 2009 Road schedule

    65/214

    62

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    +. ar Sho&ers

    C. 8ave Sho&ers

    .11 56

    7i $ing naturall' occuring gra:el Cum -- 42.40

    7ii $ing 9ra:el mi $oil u$ing Cum -- 428.40

    .12 56

    Gran&ar s&%9%ase

  • 8/9/2019 HPSR 2009 Road schedule

    66/214

    63

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    Cum -- 441.50

    .10 57 Li*e9!ash Sta%ise Soi S&%9%ase

    Cum -- 53.00

    Note:

    ro:iding, la'ing $)reading andcom)acting local material in #loc orlarge di$crete )article$, $uc% a$ anar,

    Laterite, %andla etc. a$ )er a#le400.13 to ater #ound macadam$)ecification including $)reading inuniform t%icne$$, %and )acing, rollingit% t%ree %eel 80-100 $tatic rollerin $tage$ to )ro)er grade and cam#er,a))l'ing and #rooming re

  • 8/9/2019 HPSR 2009 Road schedule

    67/214

    64

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    !

    "

    .1 15

    Cum -- 461.60

    .1 15

    Cum -- 58.00

    .13 15

    -ost of flyash has not been consideredas same will be available free of cost.;nly carriage of flyash has been

    provided.

    4ime < =lyash has been taken as !0per cent of total mass and ratio of limeand flyash as :& for estimatingpurposes. Total *uantities will be as perapproved design.

    Constr&ction o$ S&%9%ase

  • 8/9/2019 HPSR 2009 Road schedule

    68/214

    65

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    Cum -- 512.30

    Note: 7i

    ii

    .14 11 Cr&sher R&n "acaa* +ase

    A) + *i:9in9pace *etho

    7i Cum -- 804.05

    7ii Cum -- 10.55

    +) + *i:in' pant *etho

    7i Cum -- 8.10

    7ii Cum --

    1,011.10

    .16 12 +ric Soin'

    ro:iding la'ing and $)readinggranulated #la$t furnace $lag on a)re)ared $u#-grade )ul:eri$ing adding

    t%e de$igned

  • 8/9/2019 HPSR 2009 Road schedule

    69/214

    66

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    S

  • 8/9/2019 HPSR 2009 Road schedule

    70/214

    6/

    DERS

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    71/214

    68

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    72/214

  • 8/9/2019 HPSR 2009 Road schedule

    73/214

  • 8/9/2019 HPSR 2009 Road schedule

    74/214

    /1

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    75/214

    /2

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    76/214

    /3

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    77/214

    /4

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    78/214

    /5

    Re*ars

    %e rate a$a))lica#le for$u#-gradecon$tructionma' #eado)ted.

  • 8/9/2019 HPSR 2009 Road schedule

    79/214

    /6

    Re*ars

    "ate a$a))lica#le for$u#-#a$e

    andor #a$ema' #eado)ted a$ )era))ro:edde$ign.

    %e rate$ma' #eado)ted a$a))lica#le fordifferentla'er$ of)a:ementde)endingu)ona))ro:edde$ign of)a:ed$%oulder$.

  • 8/9/2019 HPSR 2009 Road schedule

    80/214

    //

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    81/214

    /8

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    82/214

    /

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    83/214

    80

    Re*ars

  • 8/9/2019 HPSR 2009 Road schedule

    84/214

    68

    Chapter

    +ASES AND SUR!ACE COURSES (+I#U"INOUS)

    Description Unit Re*ars

    .1 52 8ri*e Coat

    (i) Lo@ porosit

    S

  • 8/9/2019 HPSR 2009 Road schedule

    85/214

    6

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    (iii) Sedium -uringgrade as per I/:!$ shall be restricted only forsites at sub('ero temperature or for emergencyapplications as directed by the ?ngineer.

    ro:iding and la'ing #ituminou$ macadam it%%ot mi )lant u$ing cru$%ed aggregate$ ofgrading a$ )er a#le 500.4 )remied it%#ituminou$ #inder, tran$)orted to $ite u)to a

    lead of 1000 m laid o:er a )re:iou$l' )re)ared$urface it% )a:er fini$%er to t%e re

  • 8/9/2019 HPSR 2009 Road schedule

    86/214

    /0

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    &

    %

    . 5 +&it9Up Spra Gro&t

    (A) + "an&a "eans

    7> Bitumen 7S-0 S> Bitumen 7S-65 S

  • 8/9/2019 HPSR 2009 Road schedule

    87/214

    /1

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    (A) + "an&a "eans

    (i) No*ina chippin' si?e 10.2**

    7> Bitumen 7S-0 S> Bitumen 7S-65 S>> ol'mer &odified Bitumen SD Crum# "u##er &odified Bitumen S

  • 8/9/2019 HPSR 2009 Road schedule

    88/214

    /2

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    7>> Bitumen 7S-65 S>> ol'mer &odified Bitumen SD Crum# "u##er &odified Bitumen S

  • 8/9/2019 HPSR 2009 Road schedule

    89/214

    /3

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    + "an&a "eans

    7> Bitumen 7S-0 S> Bitumen 7S-65 S>> ol'mer &odified Bitumen SD Crum# "u##er &odified Bitumen S

  • 8/9/2019 HPSR 2009 Road schedule

    90/214

    /4

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    (A) + "an&a "eans

    (i) #pe A

    7> Bitumen 7S-0 S> Bitumen 7S-65 S>> ol'mer &odified Bitumen SD Crum# "u##er &odified Bitumen S

  • 8/9/2019 HPSR 2009 Road schedule

    91/214

    /5

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    (ii) #pe +

    7> Bitumen 7S-0 S> Bitumen 7S-65 S>> ol'mer &odified Bitumen SD Crum# "u##er &odified Bitumen S

  • 8/9/2019 HPSR 2009 Road schedule

    92/214

    /6

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    Note:

    +. + "echanica "eans

    I B #pe A

    7> Bitumen 7S-0 S> Bitumen 7S-65 S>> ol'mer &odified Bitumen SD Crum# "u##er &odified Bitumen S

  • 8/9/2019 HPSR 2009 Road schedule

    93/214

    //

    Description Unit Re*arsSr.No.

    Re$erence o$"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    (ii) Cum 220.25 61.55

    (iii) Cum 264.30 663.60

    Note:

    Su))l' of

  • 8/9/2019 HPSR 2009 Road schedule

    94/214

  • 8/9/2019 HPSR 2009 Road schedule

    95/214

    /

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    (A) Cum 353.50 4,526.40

    3. 155 Roer Co*pacte Concrete 8ave*ent

    Con$truction of un-reinforced, doel ?ointed at

    e)an$ion and con$truction?oint onl', )lain cementconcrete )a:ement,t%icne$$ a$ )er de$ign,o:er a )re)ared $u# #a$e,it% 43 grade cement or an'ot%er t')e a$ )er Clau$e1501.2.2 &30 79rade,coar$e and fine aggregate$conforming to >S383,maimum $i=e of coar$eaggregate not eceeding 25mm, mied in a concrete

    mier of not le$$ t%an 0.2cum ca)acit' anda))ro)riate eig% #atc%eru$ing a))ro:ed mi de$ign,laid in a))ro:ed fied $ideformor 7$teel c%annel,la'ing and fiing of 125micron t%ic )ol't%ene film,edge$, $teel )late$including le:elling t%eformor a$ )er draing,$)reading t%e concrete it%$%o:el$, rae$, com)acted

  • 8/9/2019 HPSR 2009 Road schedule

    96/214

    80

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    Cum 322.30 3,441.45

    Note:

    3.3 155

    SS383, t%e $i=e ofcoar$e aggregate not eceeding25 mm it% minimum aggregatecement ratio of 51 mm and it%minimum cemnt content of 310g )er cum, aggregate gradationto #e a$ )er a#le 602.2 after#lending, miing in concrete mierat o)timum moi$ture content,tran$)orting to $ite, la'ing it%%eel #arro$ or $teel )an$ orit% mec%anical )a:er,

    com)acting it% 80-100 $moot% %eel, tandem :i#rator'roller, to ac%ie:e, t%e de$ignedfleural $trengt%, fini$%ing andcuring a$ )er draing$ andec%nical S)ecification Clau$e1502

    8hen curing compound is used &(days water curingwill be done

    Rectan'&ar Concrete +oc

    8ave*ent&anufacturing, la'ing of cementconcrete #loc$ of $i=e 0.450 m 0.300 m 0.15 m of CementConcrete 7C.C. &30 garde and$)reading 25 mm t%ic $andunder neat% and filling ?oint$ it%$and on ei$ting (.B.&. #a$e a$)er ec%nical S)ecification Clau$e1503.

    In case curing compound is usedin places where there is scarcity of

    water, the water curing will beused for &(days and rate analysiswill be amended accordingly

    -arriage of -.-. block to site of ispayable seperately as per -hapterof carriage of material frommanufacturing site to the site ofwork.

  • 8/9/2019 HPSR 2009 Road schedule

    97/214

    81

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate

    3.4 155

    (1) Snterlocing Concrete Bloca:ement$ %a:ing t%icne$$80 mm a$ )er draing$ andec%nical S)ecificationClau$e 1504.

    ro:iding and La'ing of>nterlocing Concrete Blcoa:ement$ %a:ing t%icne$$60 mm a$ )er draing andec%nical S)ecificationClau$e 1504

    -arriage of interlocking blocks ispayable seperately as per -hapterof carriage of material frommanufacturing site to the site ofwork.

    ?dge blocks may be cast(in(situ.5rick masonry toe wall or --block "00 mm + "00 mm + %0mm or any other shape can alsobe used and their cost shall beanalysed3included accordingly

    %e rate$ for $u#-grade, $u#-#a$eand #a$e cour$e can #e taenfrom C%a)ter$ 3 and 4

    A e:tra over ite* o$ ce*entconcrete $oorin'< pa*ents $ors&pp an appication o$snthetic $i%re (8oetster 12**Recron 0 S or e&ivaent)proper *i:e @ith san >or7>>>or7>Dor7D

    "ate a$ )er item o.11.4->>7>or7>>

    8aintin' t@o coatsinc&in' pri*e coat onne@ concrete s&r$ace

    8roviin' e'e stones on vaesie o$ $or*ation as perra@in' an #echnicaSpeci$ication Ca&se 1356.2.3

  • 8/9/2019 HPSR 2009 Road schedule

    114/214

    6

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    S

  • 8/9/2019 HPSR 2009 Road schedule

    115/214

    /

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    6.1 Cum /1.80 484.20

    6.1 Cum /1.80 4/8.00

    6.13 ./0 61.60

    6.14 15./0 86.0

    6.16 18./0 /8.60

    Stone soin' proper han9pace $iin' interstices @ithspas an consoiatin' @ithpo@er roa roer to there&este 'raient an co*%erinc&in' spreain' @aterin'an roin' o$ %inin' *aterias*oor&* or earth etc. co*peteas per 8.8/D speci$ication.155 ** sprea thicness($inishe @or inc&in'*aterias an a%o&r)

    Stone soin' proper han9

    pace $iin' interstices @ith-harana stone anconsoiatin' @ith po@er roaroer to the re&este 'raientan co*%er inc&in'spreain' @aterin' an roin'o$ %inin' *aterias *oor&* orearth etc. co*pete as per8.8/D speci$ication. 155 **sprea thicness ($inishe @orinc&in' *aterias an a%o&r)

    8roviin' r stone -haranarain c* @ie co*pete @ith2 c* sie stone co*pete asper 8.8/D speci$ication

    er"unni

    ng&etre

    8roviin' r stone -haranarain c* @ie inc&in' 2c* sie stone ai in ce*ent*orrte 1B3 (1 ce*entB 3 san)co*pete as per 8.8/Dspeci$ication

    er"unni

    ng&etre

    8roviin' r stone -haranarain 35 c* @ie co*pete @ith2 c* sie as per 8.8/Dspeci$ication

    er"unni

    ng&etre

  • 8/9/2019 HPSR 2009 Road schedule

    116/214

    8

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    6.17 25.0 115.208roviin' r stone -haranarain 35 c* @ie inc&in' 2c* sie stone ai in ce*ent*orrte 1B3 (1 ce*entB 3 san)co*pete as per 8.8/Dspeci$ication

    er"unni

    ng&etre

  • 8/9/2019 HPSR 2009 Road schedule

    117/214

    Chapter 7

    8I8E CUL>ER#S

    Description Unit

    7.1 1155 ; 055 E:cavation $or Str&ct&res

    Cum 128.15 128.15

    7.2 1155 ; 655 +ein' $or 8ipe

    (i)

    "ate a$ )er item o.11.47>> Cum 346.10 2,/./0

    (ii) #pe + (!irst Cass) +ein'

    "ate a$ item o.11.27>or7>> Cum 4/./5 522.5

    7.0 11155

    Sr.

    No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate

    #hro&'h

    Rate Re*ars

    *art%or in eca:ation forfoundation of $tructure$ u)to 3 mde)t% a$ )er draing and tec%nical$)ecification Clau$e 1104 includding$etting out, con$truction of $%oringand #racing, remo:al of $tum)$ andot%er deleteriou$ matter, dre$$ing of$ide$ and #ottom and #acfilling it%a))ro:ed material.

    Rate asapplicablefor thetype ofsoil/rockare to betaken

    #pe A (Concrete Crae)+ein'

    Lain' concrete crae%ein' @ith ".1 GraeCe*ent concrete as perca&se 115(I)

    Lain' (Ist cass) %ein' on@a co*pacte san*oor&* or approve'ran&ar *ateria as perca&se 115(ii)

    8roviin' an ain' rein$orce

    ce*ent concrete pipe N82 as peresi'n in sin'e Ro@.

  • 8/9/2019 HPSR 2009 Road schedule

    118/214

    100

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    A 1200mm dia &etre /6.15 3,013./0

    B 1000mm dia &etre 4/./0 2,2/5./0

    C 00mm dia &etre 38.25 1,/5./0

    /50mm dia &etre 28.65 1,254.05

    * 600mm dia &etre 22.0 33./0

    7. 1155

    A 1200mmdia &etre 182.80 6,058.40

    B 1000mm dia &etre 114.5 4,56./0

    C 00mm dia &etre 2.00 3,66.0

    /50mmdia &etre 5/.50 2,50/.0

    * 600mm dia &etre 4/.50 1,868./0

    7. 1155

    ro:iding and la'ing reinforcedcement concrete )i)e 2 forcul:ert$ on fir$t cla$$ #edding ofgranular material in $ingle roincluding fiing collar it% cementmortar 12 #ut ecluding eca:ation,)rotection or, #ac filling, concreteand ma$onar' or in %ead all$and )ara)et$ clau$e 1108.

    8roviin' an ain'rein$orce ce*ent concretepipe N82 $or c&verts on $irstcass %ein' o$ 'ran&ar*ateria in o&%e ro@inc&in' $i:in' coar @ithce*ent *ortar 1B2 %&te:c&in' e:cavation,protection @or, %ac $iin',concrete an *asonar @orin hea @as an parapets

    ca&se 1153.

    8roviin' an Lain' Rein$orceCe*ent Concrete 8ipe N80 as peresi'n in Sin'e Ro@

  • 8/9/2019 HPSR 2009 Road schedule

    119/214

    101

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    A 1200 mm dia &etre /6.15 4,005.0

    B 1000 mm dia &etre 4/.0 3,/03.50

    C 00mm dia &etre 38.25 3,088.0

    /50 mm dia &etre 28.65 2,312.80

    * 600mm dia &etre 22.0 1,/2.80

    7.3 1155

    A 1200 mm dia &etre /6.15 4,/31.0

    B 1000 mm dia &etre 4/.0 3,45.50

    C 00mm dia &etre 38.25 3,5/2.0

    /50mm dia &etre 28.65 2,48.05

    * 600 mm dia &etre 22.0 2,458.10

    ro:iding and la'ing reinforcedcement concrete )i)e 3 forcul:ert$ on fir$t cla$$ #edding ofgranular material in $ingle roincluding fiing collar it% cementmortar 12 #ut ecluding eca:ation,)rotection or$, #acfilling,concrete and ma$onr' or$ in %eadall$ and )ara)et$ Clau$e 1106.

    8roviin' an Lain' Rein$orceCe*ent Concrete 8ipe N8 as peresi'n in Sin'e Ro@

    ro:iding and la'ing reinforcedcement concrete )i)e 4 forcul:ert$ on fir$t cla$$ #edding of

    granular material in $ingle roincluding fiing collar it% cementmortar 12 #ut ecluding eca:ation,)rotection or$, #acfilling,concrete and ma$onr' or$ in %eadall$ and )ara)et$ Clau$e 1106.

  • 8/9/2019 HPSR 2009 Road schedule

    120/214

    102

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    7.4 1155

    A 1200 mm dia &etre 182.80 8,042.80

    B 1000 mm dia &etre 114.5 /,426.25

    C 00mm dia &etre 2.00 6,13.35

    /50mm dia &etre 5/.50 4,625.40

    * 600mm dia &etre 4/.50 3,586.0

    7.6 1155

    A 1200 mm dia &etre 182.80 ,44.80

    B 1000 mm dia &etre 114.5 /,10.25

    C 00 mm dia &etre 2.00 /,161.30

    /50mmdia &etre 5/.50 5,85.0

    * 600mm dia &etre 4/.50 4,1/.0

    8roviin' an Lain' Rein$orceCe*ent Concrete 8ipe N80 as perDesi'n in Do&%e Ro@

    ro:iding and la'ing reinforcedcement concrete )i)e 3 forcul:ert$ on fir$t cla$$ #edding ofgranular material in dou#le roincluding fiing collar it% cementmortar 12 #ut ecluding eca:ation,)rotection or$, #acfilling,concrete and ma$onr' or$ in %eadall$ and )ara)et$ a$ )er Clau$e1106.

    8roviin' an Lain' Rein$orceCe*ent Concrete 8ipe N8 as perDesi'n in Do&%e Ro@

    ro:iding and la'ing reinforcedcement concrete )i)e 4 forcul:ert$ on fir$t cla$$ #edding ofgranular material in dou#le roincluding fiing collar it% cementmortar 12 #ut ecluding eca:ation,)rotection or$, #acfilling,concrete and ma$onr' or$ in %eadall$ and )ara)et$ a$ )er Clau$e1106.

  • 8/9/2019 HPSR 2009 Road schedule

    121/214

    103

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    7.7 1155

    A 500 mm dia &etre 21.45 /56.30

    B 300mm dia &etre 1/.20 510.10

    7.15 1155

    A 500 mm dia &etre 21.45 1,482.30

    B 300mm dia &etre 1/.20 8/3.10

    7.11 1155

    7A 500 mm dia &etre 21.45 2,08/.30

    7B 300mm dia &etre 1/.20 1,236.10

    Lain' Ce*ent Concrete 8ipe N82(%&rrie con&its) on $irst cass%ein' o$ 'ran&ar *ateriainc&in' $i:in' coar @ith ce*entsan *ortar 1B2 %&t e:c&in'e:cavation, protection @ors,%ac$iin', concrete an*asonar @or in hea @a anparapets

    Lain' Ce*ent Concrete 8ipe N80(%&rrie con&its) on $irst cass%ein' o$ 'ran&ar *ateriainc&in' $i:in' coar @ith ce*entsan *ortar 1B2 %&t e:c&in'e:cavation, protection @ors,%ac$iin', concrete an*asonar @or in hea @a anparapets

    Lain' Ce*ent Concrete 8ipe N8(%&rrie con&its) on $irst cass%ein' o$ 'ran&ar *ateriainc&in' $i:in' coar @ith ce*entsan *ortar 1B2 %&t e:c&in'e:cavation, protection @ors,%ac$iin', concrete an*asonar @or in hea @a anparapets

  • 8/9/2019 HPSR 2009 Road schedule

    122/214

    104

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    7.12 1155 ; 655

    "ate a$ )er item o.11.4-171 Cum 346.10 2,28.35

    7.10 1155 ; 355

    (A)

    cum 551.80 3,221.45

    (+)

    cum 62/.80 3,62.10

    7.1 1155 ; 455

    (A) In 1B ce*ent *ortar

    cum /56.10 2,338.00

    (+)

    cum 85.30 2,88.55

    7.1 1155 ; 355

    258.10 36.50

    8ain Ce*ent Concrete "15 (1B0B3no*ina *i:) in evein' co&rse%eo@ open $o&nation o$ ea@as as per ra@in's ; #echnicaSpeci$ication Ca&se 1157

    +ric "asonr /or in ce*ent*ortar in $o&nation o$ ea @asco*pete e:c&in' pointin' anpasterin' as per ra@in' antechnica speci$ication Ca&se1157

    +ric "asonr in 1B ce*ent*ortar

    "ate a$ )er item o.11.5 7iiC%a)ter 11

    +ric "asonr in ce*ent9i*e *ortar (1B5.B.)

    "ate a$ )er item o.11.5 7iiiC%a)ter 11

    Stone "asonr /or in ce*ent*ortar in $o&nation o$ ea @as

    co*pete as per ra@in' antechnica speci$ication Cas&e1157

    "ate a$ )er item o.11.6 7>>7ii C%a)ter 11

    In ce*ent9i*e *ortar(1B5.B.)

    "ate a$ )er item o.11.6 7>>7:i C%a)ter 11

    8ointin' @ith Ce*ent "ortar (1B0)on %ric@or as per technicaspeci$ication Ca&se 310.0

    "ate a$ )er item o.12.2 of C%a)ter12

    10$

  • 8/9/2019 HPSR 2009 Road schedule

    123/214

    105

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    7.13 1155 ; 355

    352.80 1,042.50

    7.14 1155 ; 055

    cum 4/./5 522.5

    7.16

    m 23.80 223.00

    8asterin' @ith Ce*ent "ortar(1B), 1 ** thic on %ric@or ins&%str&ct&re as per technicaspeci$ication

    "ate a$ )er item o.12.3 of C%a)ter12

    10$

  • 8/9/2019 HPSR 2009 Road schedule

    124/214

    10/

    Chapter 15

    #RA!!IC SIGNS, "AR-INGS AND O#ER ROAD A88UR#ENANCES

    Description Unit

    15.1 1455

    i) 0.30 0.40

    ii) En'ish an Ro*an

    0.20 0.25

    15.2 1455, 055, 655 #ra$$ic Si'ns

    A.

    Sr.

    No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate

    #hro&'h

    Rate

    Re*ar

    8rintin' Ne@ Letters an!i'&res o$ an Shae

    rinting ne letter and figure$ ofan' $%ade it% $'nt%etic enamel)aint #lac or an' ot%er a))ro:edcolour to gi:e an e:en $%ade a$)er draing$ and ec%nicalS)ecification Clau$e 1/01

    ini ("atras co**asan the ie not to %e

    *eas&re an pai $or.a$ etters sha %eco&nte as ha$ on)

    er.Cm%eig%t

    )er letter

    ')%en$, comma$ and t%elie not to #e mea$ured and)aid for.

    er.Cm%eig%t

    )er letter

    Retro9re$ectorise #ra$$ic

    Si'ns

  • 8/9/2019 HPSR 2009 Road schedule

    125/214

    108

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    71

    i *ac% 114.35 1,02.40

    ii *ac% 114.35 1,860.20

    iii 600 mm circular *ac% 114.35 1,88/.85

    i: *ac% 114.35 1,30./5

    : *ac% 114.35 1,885.00

    :i *ac% 114.35 1,04.60

    :ii *ac% 114.35 1,/2.55

    ro:iding and fiing of retro-reflectori$ed cautionar',mandator' and informator'$ign a$ )er >"C6/ made ofenca)$ulated len$ t')ereflecti:e $%eeting :ideClau$e 1/01.2.3 fied o:eraluminium $%eeting, 1.5 mmt%ic $u))orted on a mild$teel angle iron )o$t /5 mm /5 mm 6 mm firml' fiedto t%e ground #' mean$ of)ro)erl' de$ignedfoundation it% &15 gradecement concrete 450 mm 450 mm 600 mm, 600 mm

    #elo ground le:el a$ )erdraing$ and ec%nicalS)ecification Clau$e 801

    00 mme

  • 8/9/2019 HPSR 2009 Road schedule

    126/214

    10

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    72

    i *ac% 6.50 1,4/4.0

    ii *ac% 6.50 1,432./0

    iii 600 mm circular *ac% 6.50 1 ,38./5

    i: *ac% 6.50 1,503.25

    : *ac% 6.50 1,45/.50

    :i *ac% 6.50 1,4//.10

    :ii *ac% 6.50 1,545.05

    ro:iding and fiing of retro-reflectori$ed cautionar',mandator' and informator'$ign a$ )er >"C6/ made ofenca)$ulated len$ t')ereflecti:e $%eeting :ideClau$e 1/01.2.3, fied o:eraluminium $%eeting, 1.5 mmt%ic $u))orted on 9> )i)e50 mm dia firml' fied to t%eground #' mean$ of)ro)erl' de$ignedfoundation it% &-15 gradecement concrete 450 mm 450 mm 600 mm, 600 mm#elo ground le:el a$ )er

    draing$ and ec%nicalS)ecification Clau$e 1/01

    00 mme

  • 8/9/2019 HPSR 2009 Road schedule

    127/214

    110

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    73

    i *ac% 135.15 1,213.25

    ii *ac% 135.15 1,1/1.00

    iii 600 mm circular *ac% 135.15 1,18./0

    i: *ac% 135.15 1,241.60

    : *ac% 135.15 1,15.85

    :i *ac% 135.15 1,215.45

    :ii *ac% 135.15 1,283.40

    Note:

    ro:iding and fiing of retro-reflectori$ed cautionar',mandator' and informator'$ign a$ )er >"C6/ made ofenca)$ulated len$ t')ereflecti:e $%eeting :ideClau$e 1/01.2.3, fied o:eraluminium $%eeting, 1.5 mmt%ic $u))orted on "CCo$t 100 mm 100 mmfirml' fied to t%e ground #'mean$ of )ro)erl' de$ignedfoundation it% &15 gradecement concrete 450 mm 450 mm 600 mm, 600 mm#elo ground le:el a$ )er

    a))ro:ed draing Clau$e1/01

    00 mme

  • 8/9/2019 HPSR 2009 Road schedule

    128/214

    111

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    !

    "

    +.

    i *ac% 105./5 1,66.40

    The rate for e+cavation, cementconcrete >(%, 2-- >(% in /ub(structure, steel re(inforcementand painting may be taken fromrespective -hapters.

    The depth of foundation and*uantity of cement concrete in thefoundation are indicative. Thesemay be increased for areashaving higher wind velocities likein coastal areas. This isapplicable to all road signs anddirections boards.

    Se*i Re$ective #ra$$ic

    Si'ns

    ro:iding and fiing of $emireflecti:e cautionar',mandator' and informator'$ign #oard a$ )er >"C6/made of 1.5 mm t%ic &SS%eet dul' $to:e %itecolour in front and gra'colour on #ac it% redreflecti:e #order of 65 mmidt% and re

  • 8/9/2019 HPSR 2009 Road schedule

    129/214

    112

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    ii *ac% 105./5 1,541.50

    iii 600 mm circular *ac% 105./5 1,642.0

    i: *ac% 105./5 1,800.25

    : *ac% 105./5 1,632.50

    :i *ac% 105./5 1,/40.40

    :ii *ac% 105./5 1,53.60

    Note:

    !

    "

    15.0 1455, 655 ; 055

    A.

    600 mme./. /heet givenat i to viii may be adopted as

    per site re*uirement and inaccordance with I2-()$.

    The rate for e+cavation, cementconcrete >(%, and painting maybe taken from respective-hapters.

    The depth of foundation and

    *uantity of cement in thefoundation are indicative. Thesemay be increased for areashaving higher wind velocities like

    Direction an 8aceIenti$ication si'ns &pto 5.7s* si?e %oar

    Retro9re$ectorise #ra$$icSi'ns

  • 8/9/2019 HPSR 2009 Road schedule

    130/214

    113

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    7i S

  • 8/9/2019 HPSR 2009 Road schedule

    131/214

    114

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    7iii S%, 2-- >% in /ub(structure, steel re(inforcementand painting may be taken fromrespective -hapters.

    The depth of foundation and*uantity of cement concrete in thefoundation are indicative. Thesemay be increased for areashaving higher wind velocities like

    in coastal areas. This isapplicable to all road signs anddirections boards.

    Se*i9re$ective #ra$$ic

  • 8/9/2019 HPSR 2009 Road schedule

    132/214

    115

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    *ac% 120.40 2,583.35

    Note:

    15. 1455, 655 ; 055

    A.

    Direction an paceinenti$ication si'ns &p to5.7 s* si?e %oar

    ro:iding and erectingdirection and )laceidentification$ of $emireflecti:e $ign #oard$ a$ )er>"C6/ made of 2 mm t%ic&.S. S%eet dul' $to:eenameled )aint in %itecolour in front and gre'colour on #ac it% redreflecti:e #order of /0 mmidt% and re

  • 8/9/2019 HPSR 2009 Road schedule

    133/214

    116

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    7i S

  • 8/9/2019 HPSR 2009 Road schedule

    134/214

    11/

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    7iii S%, 2-- >% in /ub(structure, steel re(inforcementand painting may be taken fromrespective -hapters.

    The depth of foundation and*uantity of cement concrete in thefoundation are indicative. Thesemay be increased for areashaving higher wind velocities likein coastal areas. This is

    applicable to all road signs anddirections boards.

    Se*i9Re$ective #ra$$icsi'ns

  • 8/9/2019 HPSR 2009 Road schedule

    135/214

    118

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    *ac% 141.00 2,88/.45

    Note:

    15. 1455

    Direction an paceienti$ication si'ns *orethan 5.75 s* si'n %oar

    ro:iding and erectingdirection and )laceidentification of $emireflecti:e $ign #oard$ a$ )er>"C-6/ made of 2 mm t%ic

    &.S. S%eet dul' $to:eenameled )aint %ite colourin front and gre' colour on#ac it% reflecti:e #orderof /0 mm idt% andre

  • 8/9/2019 HPSR 2009 Road schedule

    136/214

  • 8/9/2019 HPSR 2009 Road schedule

    137/214

    120

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    S"C25,fied in )o$ition including fini$%ingand lettering #ut ecluding)ainting a$ )er draing andec%nical S)ecification Clau$e1/04

  • 8/9/2019 HPSR 2009 Road schedule

    138/214

    121

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    Note:

    !

    15.12 1455, 655 ; 055

    ."mt. 2/.10 313./0

    Note:

    15.10 1455, 655 ; 055

    In case of soft ground, a properfoundation may be provided as

    per approved design. In casefoundation is re*uired to be

    provided, the items of e+cavationand foundation concrete arere*uired to be measured and paidseparately.

    In case local stone is to be usedin place of precast 2-- stones,then rate of cement concrete andsteel reinforcement may bedeleted.

    G.I +ar%e /ire !encin' 1.2 *

    hi'h

    ro:iding and fiing 1.2 m %ig% 9>#ar#ed ire fencing it% 1.8 m"CC )o$t$ 150 mm 150 mm)laced e:er' 3 m centre-to-centrefounded in &15 grade cementconcrete, 0.6 m #elo groundle:el, e:er' 15t% )o$t, la$t #utone end )o$t and corner )o$t$%all #e $trutted on #ot% $ide$and end )o$t on one $ide onl'and )ro:ided it% %ori=ontalline$ and 2 diagonal$ intero:en

    it% %ori=ontal ire$, fied it% 9>$ta)le$, turn #ucle$ etc.com)lete a$ )er Clau$e 1/05.

    -ost of e+cavation for foundation and foundationconcrete to be added separately in the costestimate as per approved design. The rate forthese items may be taken from respective-hapters.

    G.I +ar%e /ire !encin' 1.6 *

    hi'h

  • 8/9/2019 HPSR 2009 Road schedule

    139/214

    122

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    "mt 3/.30 433.40

    Note:

    15.1 1455, 655 ;055

    "mt 60./0 1,436./0

    15.1 1455, 655 ; 055

    ro:iding and fiing 1.8 m %ig% 9>#ar#ed ire fencing it% 2.4 m"CC &15 grade 150 mm 150mm concrete )o$t )laced e:er' 3m centre-to-centre founded in&15 grade cement concrete, 0.6m #elo ground le:el, e:er' 15t%)o$t, la$t #ut one end )o$t andcorner )o$t $%all #e $trutted on#ot% $ide$ and end )o$t on one$ide onl' and )ro:ided it% 12%ori=ontal line$ and 2 diagonal$intero:en it% %ori=ontal ire$,fied it% 9> $ta)le$, turn #ucle$etc. com)lete a$ )er Clau$e1/05.

    -ost of e+cavation for foundation and foundationconcrete to be added separately in the costestimate as per approved design. The rate forthese items may be taken from respective-hapters.

    #&%&ar Stee Raiin' on"ei&* /ei'ht Stee Channe(IS"C series) 155 ** : 5 **

    ro:iding, fiing and erecting 50mm dia $teel )i)e railing in 3 ro$dul' )ainted on medium eig%t$teel c%annel$ 7>S&C $erie$ 100mm 50 mm, 1.2 m %ig% a#o:eground, 2 m centre-to-centre,com)lete a$ )er a))ro:eddraing$ Clau$e 1/06

    #&%&ar Stee Raiin' on8recast RCC posts, 1.2 * hi'ha%ove Gro&n Leve

  • 8/9/2019 HPSR 2009 Road schedule

    140/214

    123

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    ."mt. /6.60 1,1/2.15

    15.13 1455

    *ac% 1,641.00 ,142./5

    ro:iding, fencing and erecting 50mm dia )ainted $teel )i)e railingin 3 ro$ on )reca$t &-20 grade"CC :ertical )o$t$ 1/5 mm 1/5mm 1.8 m %ig% 71.2 m a#o:e9l it% 3 %ole$ 50 mm dia for)i)e, fied 2 m centre-to- centrecom)lete a$ )er a))ro:eddraing$ Clau$e 1/06

    8roviin' an !i:in' Lo'o o$8"GS 8roect

    ro:iding and fiing of t')ical&9SG informator' $ign #oardit% Logo a$ )er &@"

    $)ecification$ and draing. %ree&S late$ of 1.6 mm t%ic, to)and middle )late dul' elded it%&S flat iron 25mm 5m $i=e on#ac on edge$. %e loer )lateill #e elded it% &S angle ironframe of 25mm 25mm 5mm.%e angle iron frame of t%e loermo$t )late and flat iron frame ofmiddle )late ill #e elded to 2no$. /5mm /5 mm of 12 S(9$%eet tu#e$ )o$t$ dul' em#eddedin cement concrete &-15 grade#loc$ of 450mm 450mm 600mm, 600mm #elo groundle:el. %e to) mo$t diamond)late ill #e elded to middle)late #' 4/mm 4/mm of 12S(9 $teel )late tu#e. All &.S.ill #e $to:e enameled on #ot%$ide$. Lettering and )rintingarro$, #order etc. ill #e )aintedit% read' mied $'nt%eticenamel )aint of $u)erior

  • 8/9/2019 HPSR 2009 Road schedule

    141/214

    124

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    Note:

    15.14 S&''estive #ra$$ic Cone

    *ac% 1.10 46/.55

    15.16 S&''estive R&*%e Strips

    S

  • 8/9/2019 HPSR 2009 Road schedule

    142/214

    125

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    *ac%

    a i:er$ion one m a%ead

    # raffic $ign a%ead

    c "oad a%ead clo$ed

    d &en at or

    e "oad narrof n-e:en road

    g Sli))er' road

    % Loo$e c%i))ing$

    i i:er$ion

    ? o not enter

    "oad clo$ed

    l Sto)

    m Slo

    n S)eed limit

    Note:

    15.25 S&''estive

    ro:i$ion and fiing of traffic $ign$for limited )eriod at $uita#lelocation$ in con$truction =onecom)ri$ing of arning =one,a))roac% tran$ition =one, oring=one and terminal tran$ition =oneit% a minimum di$tance of 2-3 mfrom t%e edge of t%e carriagea'.%e #ottom edge of t%e loe$t$ign )late to #e not le$$ t%an 2 ma#o:e t%e road le:el, fied on 600mm 600 mm 6 mm angle iron)o$t, founded and in$talled a$ )era))ro:ed de$ign and draing$,remo:ed and di$)o$ed of aftercom)letion of con$truction or,

    all a$ )er >"CS55-2001.

    +olloing t')e$ of $ign$ arere

  • 8/9/2019 HPSR 2009 Road schedule

    143/214

    126

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'h

    RateRe*ar

    *ac% 2.5 202.60ro:iding and fiing of road $tud100 100 mm die ca$t inaluminium, re$i$tant to corro$i:eeffect of $alt and grit, fitted it%len$e reflector$, in$talled inconcrete or a$)%altic $urface #'drilling %ole$ 30 mm u)to a de)t%of 600 mm and #edded in a$uita#le #ituminou$ grout ore)o' mortar, all a$ )er BS8/37art 4 1/3.

  • 8/9/2019 HPSR 2009 Road schedule

    144/214

    126

    Chapter 11

    !OUNDA#ION

    Description Unit

    11.1 055 E:cavation $or Str&ct&res

    I. Orinar soi

    7i )to 3 m de)t% Cum 128.15 --

    Note:

    !

    "

    7ii 3 m to 6 m de)t% Cum 152.20 --

    Sr.

    No.

    Re$erence to"ORD

    Speci$ications

    La%o&r

    Rate

    #hro&'h

    Rate Re*ars

    *art%or in eca:ation for$tructure$ a$ )er draing andtec%nical $)ecification$ Clau$e305.1 including $etting out,con$truction of $%oring and#racing, remo:al of $tum)$ andot%er deleteriou$ material anddi$)o$al u)to a lead of 50 m,dre$$ing of $ide$ and #ottom and#acfilling in trenc%e$ it%eca:ated $uita#le material.

    -ost of dewatering may beadded, where re*uired, up to 0

    per cent of labour cost.6ssessment for dewatering shallbe made as per site conditions.

    The cost of shoring andshuttering, where needed, maybe added B " per cent on cost ofe+cavation for open foundation.

    The e+cavated earth if foundsuitable, can be used partly forbackfilling in trenches A partly forroad work. 1ence cost ofdisposal has not been addede+cept for marshy soil. This note

    is common to all cases of item. e+cluding . C

  • 8/9/2019 HPSR 2009 Road schedule

    145/214

    12/

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    Note:

    !

    II.

    )to 3 m de)t% Cum 160.20 --

    Note:

    III. ar roc (re&irin' %asti Cum 213./5 2/.60

    Note:

    I>. ar roc (%astin' prohi% Cum 80.10 443.10

    Note:

    >. "arsh soi Cum 240.25 --

    Note:

    !

    "

    -ost of dewatering may beadded, when needed, up to %

    per cent of labour cost.

    -ost of shoring and shuttering,where needed, may be taken B0 per cent on cost ofe+cavation for open foundation.

    Orinar roc (notre&irin' %astin')

    -ost of dewatering upto 0 per cent of labourcost may be added, where re*uired as per sitecondition.

    -ost of dewatering B 0 per cent of a

  • 8/9/2019 HPSR 2009 Road schedule

    146/214

    128

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    &

    11.2 055 ; 1255

    I. San $iin' Cum 4/./5 522.5

    II. Cum 82.15 --

    Note:

    !

    11.0 055 ; 1255

    8.C.C 'rae " 1

    Cum 40/.00 2,48./0

    >arshy soil is generaly availableupto " m depth. The rate has,therefore, been done upto " mdepth of e+cavation. =or deepere+cavation refer analysis in item..

    !iin' in $o&nation trenchesas per ra@in' an technicaspeci$ication Ca&se 05.0.7

    Earth $iin' (!or *arsh

    soi)

    -ost of transportation of good*uality earth has not beenincluded. ;nly labour forcarrying carted earth with a leadof %0 m to the foundation pits hasbeen taken in the rate. The costof carted earth may be workedout separately if the same is notavailable from the ad@oining area.

    5ackfilling of foundation trenchesshall normally be done withe+cavated earth. The cost of thisoperation is included in item ..

    ;nly in case the e+cavatedearth is not of suitable *uality,sand filling or backfilling withcarted earth may be resorted to

    !iin' ann&ar space aro&n$ootin' in roc as per technicaspeci$ication Ca&se 1250..0.

    ominal mi 12.557andmiing

  • 8/9/2019 HPSR 2009 Road schedule

    147/214

    12

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    11. 655 ; 1255

    I. 8.C.C 'rae " 15

    7i ominal mi 136 Cum 346.10 2,28.35

    7ii Cum 40/.00 2,8/.40

    II. 8.C.C 'rae " 1

    7i ominal mi 712.55 Cum 346.10 2,/./0

    7ii Cum 40/.00 2,48./0

    III. 8.C.C. 'rae " 25

    7i ominal mi 7124 Cum 346.10 3,424.50

    7ii Cum 40/.00 3,3/5.50

    I>. R.C.C 'rae " 25 1B2B Cum 36/.5 3,55./0

    >. Cum 36/.05 3,4.40

    vi 8CC 'rae "91(1B2.B) Cum 346.10 2,/3.40

    11. 355 ; 1255

    >. Cum 551.80 3,423.25

    S&%9anasis

    Cum 11.00 2,33.00

    >>. Cum 551.80 3,221.45

    8roviin' concrete $orpain

  • 8/9/2019 HPSR 2009 Road schedule

    148/214

    130

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    S&%9anasis

    Cum 11.00 2,26.00

    >>>. Cum 626.80 3,62.10

    S&%9anasis

    Cum 355.85 3,582.85

    11.3 455 ; 1255

    I.

    7i >n 13 cement mortar Cum 822.55 2,/55.30

    7ii >n 14 cement mortar Cum 822.55 2,503.00

    7iii >n 15 Cement mortar Cum 822.55 2,36/.20

    7i: >n 16 Cement mortar Cum 822.55 2,250.80

    7: >n 18 Cement mortar Cum 822.55 2,134.35

    7:i Cum 328.0 3,012.60

    Note:

    II.

    7i >n 13 cement mortar Cum /56.10 2,615.50

    7ii >n 14 cement mortar Cum /56.10 2,338.00

    7iii >n 15 cement mortar Cum /56.10 2,188.60

    Cement mortar 14 71 cement 4$and

    Bric ma$onr' in cement-lime-mortar 710.54.5

    Cement-lime-mortar 10.54.5 71cement 0.5 lime )utt' 4.5 $and

    Stone *asonr @or in ce*ent*ortar in $o&nation co*pete

    as per ra@in' an technicaspeci$ications Ca&ses 452,45, 1252 ; 1250.

    Co&rse r&%%e *asonr(1st sort)

    >n cement-lime-$andmortar 710.54.5

    uantity of re*uired chips has not been providedfor separately as it is assumed that the same willbe availble from dressing of stones

    Co&rse r&%%e *asonr(2n sort)

  • 8/9/2019 HPSR 2009 Road schedule

    149/214

    131

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    7i: >n 16 cement mortar Cum /56.10 2,060.50

    7: >n 18 cement mortar Cum /56.10 1,32.45

    7:i Cum 85.30 2,88.55

    III. Rano* R&%%e "asonr

    7i >n 13 cement mortar Cum 64.35 2,540.50

    7ii >n cement mortar 14 Cum 64.35 2,263.05

    7iii >n cement mortar 15 Cum 64.35 2,113.60

    7i: >n cement mortar 16 Cum 64.35 1,85.60

    7: Cum //.50 2,823.60

    Note:

    11.4 1555 ; 1255 onne 1,3/6.80 64,142.80

    11.6 1555 ; 1255 onne 1,3/6.80 64,142.80

    11.7 1555 ; 1255 onne 1,3/6.80 61,3/0.80

    >n cement-lime-mortar710.54.5

    >n cement lime mortar710.54.5

    uantity of re*uired chips has not been providedfor separately as it is assumed that the same willbe availble from dressing of stones

    S&ppin', $ittin' an pacin'SD %ar rein$orce*ent in$o&nation co*pete as perra@in's an technicaspeci$ications Ca&ses 1555an 1252

    S&ppin', $ittin' anpacin'#"# %ar rein$orce*entin $o&nation co*pete as perra@in's an technicaspeci$ications Ca&ses 1555an 1252

    S&ppin', $ittin' an pacin'"S %ar rein$orce*ent in

    $o&nation co*pete as perra@in's an technicaspeci$ications Ca&ses 1555an 1252

  • 8/9/2019 HPSR 2009 Road schedule

    150/214

    132

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    11.15 655 ; 1255 Cum 346.10 2,33/.20

    11.11 655 ; 1255 Cum 346.10 2,346.15

    11.12 655 ; 1255 Cum 346.10 2,068.20

    11.10 655 ; 1255 Cum 346.10 1,33.60

    11.1 655 ; 1255 Cum 346.10 2,08/.10

    8roviin' an Lain' concrete$or pain

  • 8/9/2019 HPSR 2009 Road schedule

    151/214

    133

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    11.1 655 ; 1255 Cum 346.10 2,30.20

    11.13 655 ; 1255 Cum 482.5 1,84/.30

    8roviin' an Lain' ce*entconcrete 1BB6 @ith 1 pa*san c&rin' co*pete inc&in'the cost o$ $ar*@or $orpain

  • 8/9/2019 HPSR 2009 Road schedule

    152/214

    134

    Chapter 12

    SU+S#RUC#URE

    Description Unit

    12.1 355

    >. >n 13 cement mortar Cum 5/.35 3,54.40

    >>. >n 14 Cement mortar Cum 5/.35 3,382.50

    >>>. >n 15 cement mortar Cum 5/.35 3,268.40

    S&%9anasis

    11.00 1,53.00

    >D. Cum 658.15 3,810.60

    12.2 355 10 S

  • 8/9/2019 HPSR 2009 Road schedule

    153/214

    135

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    12. 355 10 Sn 13 cementmortar

    >n 14 cementmortar

    >n cement mortar

    715

    >n cement limemortar 716

    >n cement limemortar 718

    >n cement limemortar 7154.5

  • 8/9/2019 HPSR 2009 Road schedule

    154/214

    136

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    II.

    7i Cum /3.0 2,/46.25

    7ii Cum /3.0 2,454.0

    7iii Cum /3.0 2,28.00

    7i: Cum /3.0 2,163.55

    7: Cum /3.0 2,02.10

    7:i Cum 02.25 3,043.50

    III.

    7i Cum /2.05 2,66/.55

    7ii Cum /2.05 2,3/6.20

    7iii Cum /2.05 2,21.30

    7i: Cum /2.05 2,084.0

    7: Cum 83/.40 2,64.80

    12.6 655

    !or hei'ht &pto *

    I. 8.C.C 'rae " 1

    7i Cum 366.10 3,1/0.60

    II 8CC 'rae " 1

    (i) Cum 430.50 3,118.85

    Co&rse R&%%e*asonr (2n sort)

    >n cement mortar713

    >n 14 cementmortar

    >n cement mortar715

    >n cement mortar716

    >n cement mortar718

    >n cement lime

    mortar 710.54.5Rano* r&%%e*asonr

    >n cement mortar713

    >n 14 cementmortar

    >n cement mortar715

    >n cement mortar716

    >n cement limemortar 710.54.5

    8ain

  • 8/9/2019 HPSR 2009 Road schedule

    155/214

    13/

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    III. 8.C.C. 'rae " 25

    (i) Cum 366.10 3,505.0

    (ii) Cum 380.20 3,/61./0

    I>

    (i) Cum 430.50 3,5/0.30

    (ii) Cum 44/.05 3,/0/.0

    >

    7i )to 5m %eig%t Cum 38.15 3,803.10

    7ii 5m to 10m %eig%t Cum 404.15 3,4./0

    7iii A#o:e 10m %eig%t Cum 423.10 4,135.00

    >I

    7i )to 5m %eig%t Cum 38.15 4,18/.30

    7ii 5 to 10m %eig%t Cum 403.30 4,348./0

    7iii A#o:e 10m %eig%t Cum 423.10 4,552./5

    Note: i

    ii

    ominal mi 71247i u)to 5m %eig%t

    ominal mi 1247and mied7iia#o:e 5m to 10m%eig%t

    8.C.C. 'rae " 25(1B2B)

    and mi u)to 5m%eig%t

    and mi for %eig%t#e'ond 5m to 10m

    R.C.C 'rae " 25(1B2B)no*ina *i:

    RCC Grae "9

    2(1B1.B0)

    The cost of formwork has beenincreased for more height toaccount for cost of side supportto formwork.

    ?+tra e+penditure on structures

    which are more than % mheight is to cater for costinvolved for approaching the

  • 8/9/2019 HPSR 2009 Road schedule

    156/214

    138

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    12.7 1555 onne 1,444.60 64,210.60

    12.15 1555 onne 1,444.60 64,210.60

    12.11 1555 onne 1,444.60 61,438.60

    12.12 355 o$. 6.35 18./0

    S&ppin', $ittin' an pacin'SD %ar rein$orce*ent (!e1) in s&%str&ctr&eco*pete as per ra@in'san technica speci$icationCa&ses 1552, 155, 1515 ;1252

    S&ppin', $ittin' an pacin'#"# %ar rein$orce*ent (!e1) in s&%str&ctr&eco*pete as per ra@in'san technica speci$icationCa&ses 1552, 155, 1515 ;1252

    S&ppin', $ittin' an pacin'@ith "S %ar rein$orce*ent(!e 1) in s&%str&ctr&eco*pete as per ra@in'san technica speci$icationCa&ses 1552, 155, 1515 ;1252

    8roviin' @eephoes in %ric*asonr

  • 8/9/2019 HPSR 2009 Road schedule

    157/214

    13

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    12.10 355 o$. 5.00 253./0

    12.1 1255

    > 9ranular material Cum 164.50 481.30

    >> Sand' material Cum 166.30 641.50

    12.1 1255 Cum 16/.0 563.0

    8roviin' @eaphoes in %ric*asonr < stone *asonr

  • 8/9/2019 HPSR 2009 Road schedule

    158/214

    140

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    12.13 1255 0.01 3.80

    Note:

    12.14 355

    "mt 23.80 223.00

    12.16 1255 *ac% 132.45 314./5

    12.17 355 10S

  • 8/9/2019 HPSR 2009 Road schedule

    159/214

    141

    Description UnitSr.No.

    Re$erence to"ORD

    Speci$ications

    La%o&rRate

    #hro&'hRate Re*ars

    12.21 Cum 3/2./5

    12.22 Cum 5.10

    A e:tra over ite*s o$Rein$orce*ent ce*entconcrete (%ea*s< co&*ns

  • 8/9/2019 HPSR 2009 Road schedule

    160/214

    143

    Chapter 10

    SU8ERS#RUC#URE

    Description Unit

    10.1 655

    I. R.C.C 'rae " 25

    (i)

    > )to 5m %eig%t Cum 424.55 4,148.85

    >> 5m to 10m %eig%t Cum 442.20 4,321./0

    >>> A#o:e 10m %eig%t Cum 45.0 4,44.60

    (ii)

    > )to 5m %eig%t Cum 46.60 4,06/.20

    >> 5m to 10m %eig%t Cum 48.20 4,236.65

    >>> A#o:e 10m %eig%t Cum 508./0 4,406.10

    (iii)

    > )to 5m %eig%t Cum 424.55 3,3.60

    >> 5m to 10m %eig%t Cum 442.20 4,160.00

    >>> A#o:e 10m %eig%t Cum 45.0 4,326.40

    II. R.C.C " 2 1B1.B0

    > )to 5m %eig%t Cum 424.55 4,458.60

    >> 5m to 10m %eig%t Cum 442.20 4,/25.5

    >>> A#o:e 10m %eig%t Cum 45.0 4,15.00

    Note:

    Sr.

    No.

    Re$erence to"ORD

    speci$ications

    La%o&r

    Rate

    #hro&'h

    Rate

    8roviin' an ain'rein$orce ce*ent concrete ins&perstr&ct&re as per ra@in'an technica speci$icationsCa&ses 655, 125. an125.

    !or no*ina *i:

    1B2B

    !or no*ina *i:1B2B (an *i:e)

    !or esi'n *i: RCC" 25 1B2B

    This analysis will hold good for concrete ofnominal mi+ ::" also

  • 8/9/2019 HPSR 2009 Road schedule

    161/214

    144

    Description UnitSr.No.

    Re$erence to"ORD

    speci$ications

    La%o&rRate

    #hro&'hRate

    III. R.C.C. Grae " 05 1B1B0

    > )to 5m %eig%t Cum 424.55 4,/6.80

    >> 5m to 10m %eig%t Cum 442.20 4,68.50

    >>> A#o:e 10m %eig%t Cum 45.0 5,16/.25

    >D "CC 9rade & 30 112 Cum 353.80 3,/4.80

    Note:

    !

    10.2 1555 onne 1,866.55 64,/84.55

    10.0 1555 onne 1,866.55 64,/84.55

    uantity of cement provided forvarious components of thesuperstructure is for estimating

    purpose only. 6ctual *uantity ofcement will be as per approvedmi+ design. /imilarly *uantity for

    corase and fine aggregates is forestimating purpose and thee+act *uantity shall be as perthe mi+ design use of design mi+in place of nominal mi+ ofconcrete of > !0 and highergrader shall be prepared.Nominal mi+ of grades > !0 and> !% is to be used withade*uate supervision and*uality control re*uirements-lause #0" technicalspecification

    =or higher grades like > !% and> "0, if adopted, design mi+ isrecommended.

    S&ppin', $ittin', an pacin'SD %ar rein$orce*ent ins&perstr&ct&re co*pete asper ra@in' an technicaspeci$ications Ca&ses 1552,1515 an 1252

    S&ppin', $ittin', an pacin'#"# %ar rein$orce*ent ins&perstr&ct&re co*pete asper ra@in' an technicaspeci$ications Ca&ses 1552,1515 an 1252

  • 8/9/2019 HPSR 2009 Road schedule

    162/214

    145

    Description UnitSr.No.

    Re$erence to"ORD

    speci$ications

    La%o&rRate

    #hro&'hRate

    10. 1555 onne 1,866.55 62,012.55

    10. 655 Cum 34.60 8,43.05

    10.3 655 "mt. 111.50 2,318./0

    Cum 300.20 3,20/.0

    Note:

    !

    10.4 1255 "mt. 124.60 2,8/2.85

    Note:

    S&ppin', $ittin', an pacin'"S %ar rein$orce*ent ins&perstr&ct&re co*pete asper ra@in' an technicaspeci$ications Ca&ses 1552,1515 an 1252

    8roviin' an ain' ce*entconcrete @earin' co&rse " 05'rae inc&in' rein$orce*entco*pete as per ra@in' antechnica speci$icationsCa&ses 655 an 1253.0

    Constr&ction o$ R.C.C. raiin'o$ " 2 'rae in cast9in9sit&@ith 25 ** no*ina si?ea''re'ate, tr&e to ine an'rae, toerance o$ verticaraiin' post not to e:cee 1 in55, centre9to9centre spacin'%et@een vertica posts not toe:cee 2555 ** as perra@in' an technicaspeci$ications Ca&ses 655,755 an 1256.0

    S&% Anasis $or Rate o$Concrete

    m length is the total linearlength adding both sides of !+!m span

    uantities of material have beenadopted from standard plans of>;2T1 vide drawing No/D3!0!

    8roviin' $ittin' an $i:in'*i stee raiin' co*pete as