HQ Developments Limited c/o Feargal O’Sullivan,
Arup,
Albert Quay,
Cork
26 June 2019
Re: Design Submission for Horgans Quay, Railway Street, Cork (the “Development”)
(the “Design Submission”) / Connection Reference No: CDS19002038
Dear Feargal,
Many thanks for your recent Design Submission.
We have reviewed your proposal for the connection(s) at the Development. Based on the
information provided, which included the documents outlined in Appendix A to this letter, Irish
Water has no objection to your proposals.
This letter does not constitute an offer, in whole or in part, to provide a connection to any Irish
Water infrastructure. Before you can connect to our network you must sign a connection
agreement with Irish Water. This can be applied for by completing the connection application
form at www.water.ie/connections. Irish Water’s current charges for water and wastewater
connections are set out in the Water Charges Plan as approved by the Commission for
Regulation of Utilities (CRU)(https://www.cru.ie/document_group/irish-waters-water-charges-
plan-2018/).
You the Customer (including any designers/contractors or other related parties appointed by you)
is entirely responsible for the design and construction of all water and/or wastewater
infrastructure within the Development which is necessary to facilitate connection(s) from the
boundary of the Development to Irish Water’s network(s) (the “Self-Lay Works”), as reflected in
your Design Submission. Acceptance of the Design Submission by Irish Water does not, in any
way, render Irish Water liable for any elements of the design and/or construction of the Self-Lay
Works.
If you have any further questions, please contact your Irish Water representative:
Name: PJ Murphy
Phone: 022 52267
Email: [email protected]
Yours sincerely,
Maria O’Dwyer Connections and Developer Services
Appendix A
Document Title & Revision
HQDPR-ARP-ZZ-XX-DR-C-0011-P02 Overall Site and Phasing Layout
HQDPR-ARP-ZZ-XX-DR-C-1400-C02 Proposed Foul Drainage Layout
HQDPR-ARP-ZZ-XX-DR-C-1500-C02 Proposed Water Main Layout
HQDPR-ARP-ZZ-XX-DR-C-3304-P02 Proposed Foul Drainage Longitudinal Sections
Standard Details/Code of Practice Exemption: N/A
For further information, visit www.water.ie/connections
Notwithstanding any matters listed above, the Customer (including any appointed
designers/contractors, etc.) is entirely responsible for the design and construction of the Self-Lay
Works. Acceptance of the Design Submission by Irish Water will not, in any way, render Irish
Water liable for any elements of the design and/or construction of the Self-Lay Works.
M
M
M
FFL: 3.60m
FFL: 5.40m
FFL: 4.40m
FFL: 4.40m
FFL: 4.15m
F
F
L
: 5
.4
0
m
FFL: 4.80m
FFL: 4.80m
FFL: 4.50m
FFL: 4.50m
FFL: 4.65mFFL: 4.80m
FFL: 3.60m
FFL: 3.95m
FFL: 4.40m
FFL: 4.40m
LP
LP
LP
LP
LP
LP
LPLP
EP
G
A
T
E
G
A
T
E
R
G
R
G
R
G
R
G
R
G
Phase 1
Hotel and Retail Development
Phase 3
Residential Development
Phase 1
Office Development
Phase 2
Retail Development
NOTE:
This application is in relation to Phase 1
only which is the first phase of the
overall development.
HQDOQ
Office
HQDNQ
Hotel
HQDNQ
Retail
HQDRQ
Residential
HQDNQ
Residential
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Arup Job No
Suitability
Name
Project Title
Client
© Arup
Rev Date By Chkd Appd
Rev
Drawing Title
Scale at A1
Role
HQDPR-ARP-ZZ-XX-DR-C-0011
P02252901-00
S2 - Suitable for Information
Civil
1:500
Overall Site and Phasing Layout
for Irish Water Connection Application
HQ
Horgan's Quay
One Albert Quay
Cork, Ireland
Tel +353 (0)21 427 7670 Fax +353 (0)21 427 2345
www.arup.com
N
/ /P01 11 04 19 D.F. F.O'S. J.D.
Irish Water Connection Application
Legend:
Site Location Boundary
Phase 1 Buildings Extents
Phase 2 Buildings Extents
Phase 3 Buildings Extents
Notes:
1. This drawing is to be read in conjunction with
the Connection Application form to Irish Water
and all other relevant documents as part of
application.
/ /P02 07 06 19 D.F. F.O'S. J.D.
Issued to Irish Water
R
A
M
P
U
P
T
OP
L
A
T
F
O
R
M
4
R
A
M
P
U
P
T
O
P
L
A
T
F
O
R
M
5
LP
LP
LP
LP
LP
LP
LP
LP
LPLP
EP
G
A
T
E
G
A
T
E
R
G
R
G
R
G
R
G
R
G
R
A
M
P
U
P
T
OP
L
A
T
F
O
R
M
4
R
A
M
P
U
P
T
O
P
L
A
T
F
O
R
M
5
LP
LP
LP
LP
LP
LP
LP
LP
LPLP
EP
G
A
T
E
G
A
T
E
R
G
R
G
R
G
R
G
R
G
M
M
M
FFL: 3.60m
FFL: 5.40m
FFL: 4.40m
FFL: 4.40m
FFL: 4.15m
F
F
L
: 5
.4
0
m
FFL: 4.80m
FFL: 4.80m
FFL: 4.50m
FFL: 4.50m
FFL: 4.65mFFL: 4.80m
FFL: 3.60m
FFL: 3.95m
FFL: 4.40m
FFL: 4.40m
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F1
F1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F1
F1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F
1
F1
F1
F1
F
F
F
F
F
F
F
F
F
F
F
F
FF
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
Proposed Foul Backdrop
Connection to Cork Main
Drainage Interceptor
ManholeExisting Culvert
Connection to
Main Drainage
C.L.=2.998
I.L.=-0.184
Proposed Manhole Constructed over the line of
the Existing Drain for the Proposed Diversion.
Contractor is to excavate and confirm the invert
level prior to any diversion works.
Proposed Foul Water
Manhole to intercept existing
foul drain from Kent Station
Existing stone culvert
measured at approximately
780 x 780mm in cross section
Proposed Foul Water
Manhole to intercept existing
foul drain from Kent Station
Proposed Foul Water Manhole
to intercept existing foul drain
from Kent Station
Proposed Manhole Constructed over the line
of the Existing Drain for the Proposed Diverted
Drain to connect into.
Contractor is to excavate and confirm the
invert level prior to any diversion works.
Proposed Surface Water Drain to
connect to Diverted Drain as Shown.
Refer to Surface Water Drainage
Layout for Information.
Proposed Grease
Interceptor
Refer to Note 6
Existing Culvert
to be diverted
as shown
Cork Main Drainage
Siphon Chamber
Existing drain to be
removed following
diversion works
Existing drains to be
removed following
diversion works
GT
1
8
0
0
m
m
Ø
In
te
rc
e
p
to
r
1050mmØ Interceptor
FWMH13
CL: 4.60
IL: 1.05
FWMH10
CL: 4.50
BD IL: 2.33
IL: 1.36
FWMH12
CL: 4.50
IL: 2.50
FWMH18
CL: 4.50
IL: 2.80
FWMH19
CL: 4.50
IL: 2.45
FWMH4
CL: 4.40
IL: 1.92
FWMH7 - T2
CL: 4.40
IL: 2.75
FWMH9
CL: 4.40
BD IL: 2.70
IL: 1.65
FWAJ8
CL: 4.40
IL: 3.50
FWMH1
CL: 4.30
IL: 2.75
FWMH2
CL: 4.30
IL: 2.61
FWMH3
CL: 4.30
IL: 2.42
FWMH14
CL: 4.15
IL: 0.91
FWMH20
CL: 3.70
IL: 2.06
FWMH15
CL: 3.70
IL: 0.63
FWMH16
CL: 3.60
IL: 0.47
FWMH17
CL: 3.50
BD IL: 1.86
IL: 0.23
FWMH21
CL: 3.40
IL: -0.06
150m
m
150m
m
150m
m
2
2
5
m
m
2
2
5
m
m
225m
m
225m
m
2
2
5
m
m
1
5
0
m
m
1
5
0
m
m
2
2
5
m
m
2
2
5
m
m
2
2
5
m
m
2
2
5
m
m
2
2
5
m
m
1
5
0
m
m
1
5
0
m
m
1
5
0
m
m
3
0
0
m
m
3
0
0
m
m
300m
m
9
0
0
m
m
9
0
0
m
m
9
0
0
m
m
9
0
0
m
m
9
0
0
m
m
FWAJ1
CL: 4.60
IL: 3.50
2
2
5
m
m
FWAJ2
CL: 4.60
IL: 3.50
2
2
5
m
m
FWMH8
CL: 4.40
IL: 2.27
FWMH22
CL: 4.14
IL: 0.782*
FWMH23
CL: 4.16
IL: 0.484*
FWMH24
CL: 4.18
IL: 0.449*
FWMH25
CL: 3.82
IL: 0.231*
FWMH26
CL: 3.60
IL: 0.086*
FWMH27
CL: 3.50
IL: -0.021*FWMH28
CL: 3.30
IL: -0.092*
Ex. MH
CL: 4.073
IL: 1.248*
IL 300dia : 3.173*
FWAJ3
CL: 4.60
IL: 3.50
FWAJ4
CL: 4.60
IL: 3.50
FWAJ5
CL: 4.60
IL: 3.50
FWAJ6
CL: 4.60
IL: 3.50
FWAJ7
CL: 4.60
IL: 3.50
F
F
F
F
F
F
F
FW MH6 - T2
CL: 4.60
IL: 3.60
F
F
2
2
5
m
m
EX FWMH
CL: 3.40
IL: -0.23 BD
IL: -1.60
FWMH11
CL: 4.50
IL: 3.00
FWMH5
CL: 4.40
IL: 1.86
G
T
1
5
0
m
m
FWMH6
CL: 4.40
IL: 3.15
Proposed Grease
Interceptor
Refer to Note 6
F
F
F1
F1
F
F
Proposed Foul Drain
Proposed Foul Manhole
Type 1
Proposed Foul Manhole
Type 2
Existing Main Drainage
Network
Existing Drainage to be
Diverted and Removed
Proposed Grease
Interceptor
Proposed Foul Drain
Access Chamber
MH FW xx - T1
GT
MH AJ
F
MH FW xx - T2
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Arup Job No
Suitability
Name
Project Title
Client
© Arup
Rev Date By Chkd Appd
Rev
Drawing Title
Scale at A1
Role
HQDPR-ARP-ZZ-XX-DR-C-1400
C02252901-00
A4 - Approved as Stage Complete
Civil
1:500
Proposed Foul
Drainage Layout
HQ
Horgan's Quay
One Albert Quay
Cork, Ireland
Tel +353 (0)21 427 7670 Fax +353 (0)21 427 2345
www.arup.com
Notes:
1) This drawing shall be read in conjunction with all
other releveant specifications & drawings
including civil site drawings.
2) All foul water pipework shall be Polypipe
Polysewer and Rigisewer pipework and fittings,
or similar approved.
3) Drains designed to achieve a min. self-cleansing
velocity of 0.75m/s
4) All pipes and manholes shall be constructed as
per construction details drawings.
5) All manhole covers shall be Noroc ductile iron
covers by EJ Covers with a load classification
D400 to IS EN 124.
6) All discharges from food preparation areas shall
be treated for FOG in a grease interceptor
designed in accordance with BS EN 1825.
External Grease Trap Units to be stainless steel
units by Kent Stainless supplied with D400
covers. Covers are to be recessed in paved
areas.
7) Proposed Foul Water AJ chambers to be Wavin
Range 315 IC or similar approved.
8) Proposed Foul Water Manhole Type 2 to be
Wavin Range 600 IC or similar approved.
9) For Longitudinal sections to drainage line refer to
Drawing No. HQDPR-ARP-ZZ-XX-DR-C-3304
Legend:
N
/ /P04 15 01 19 J.B. F.O'S. J.D.
Revisions as Clouded
/ /P05 18 02 19 J.B. F.O'S. J.D.
Issued for Planning
/ /P06 07 03 19 J.B. F.O'S. F.O'S
Issued for Construction Approval
/ /P07 12 03 19 J.B. F.O'S. J.D.
Issued for Pre-Connection Enquiry
/ /P08 13 03 19 J.B. F.O'S. J.D.
Issued for Partial Construction
/ /P09 11 04 19 D.F. F.O'S. J.D.
Irish Water Connection Application
N.B.
All cover levels shown on this drawing are
indicative only. The contractor shall coordinate
the final level with the landscape architect.
/ /P10 12 04 19 D.F. F.O'S. J.D.
Issued for Partial Construction
/ /C01 18 04 19 C.F. D.F. F.O'S
Issued for Construction (Status A4)
Note that the construction and installation of all
wastewater drains, manholes and chambers are to
be carried out in accordance with the Wastewater
Infrastructure Standard Details by Irish Water.
If any discrepancies are found between the Irish
Water Standard Details and the details provided
then the Irish Water Standard Details shall govern.
C02
/ /C02 17 06 19 C.F. D.F. F.O'S
Issued for Construction (Status A4)
M
M
M
FFL: 3.60m
FFL: 5.40m
FFL: 4.40m
FFL: 4.40m
FFL: 4.15m
F
F
L
: 5
.4
0
m
FFL: 4.80m
FFL: 4.80m
FFL: 4.50m
FFL: 4.50m
FFL: 4.65mFFL: 4.80m
FFL: 3.60m
FFL: 3.95m
FFL: 4.40m
FFL: 4.40m
LP
LP
LP
LP
LP
LP
LP
LP
LPLP
EP
R
E
S
V
P
G
A
T
E
G
A
T
E
R
G
R
G
R
G
R
G
R
G
W
W
W
W
W
H
H
M
H
H
H
M
W9
W9
W
9
W
9
W
9
W
9
W
W
W
W
W
W
W
M
M
M
W
W
W
W
W
M
H
W
W
W
W
W
W
W
W
W
W
W
W
W
W
H
W
W
W
W
W
W
W
W
W
W
W
W
BM
H
Existing 180mm O.D. HPPE Watermain
Existing 180mm O.D. HPPE Watermain
Existing Hydrant
CONNECTION No. 1
Proposed watermain is to be connected
to existing watermain. Sluice valves and
thrust blocks to be constructed as per
Irish Water Requirements.
Proposed 200mm O.D.
HDPE Watermain
SV
Proposed 200mm O.D.
HDPE Watermain
P
r
o
p
o
s
e
d
1
8
0
m
m
O
.
D
.
H
D
P
E
m
a
i
n
Existing watermain
Existing 600mmØ trunk watermain
Existing watermain
Contractor is to determine
the route and extent of the
existing watermain and
remove if necessary
Existing watermain supply
is to be removed back to
the exisiting main.
TB
Proposed 110mmØ
O.D. HDPE Watermain
SV
TB
Proposed 200x100 unequal tee for
proposed connection to the office block
SV
SV
SV
BM
SV
Proposed Irish Water Bulk Water
Meters and associated valves in
accordance with Irish Water
requirements
Proposed bulk water meters and
associated valves in accordance
with Irish Water requirements
125mmØ O.D. Blank End on Iarnrod
Eireann Site for potential future
extension. Refer to STD-W-05 of Irish
Waters Details for Information.
Proposed Irish Water Meters and
associated valves in accordance
with Irish Water requirements
Proposed Surface Water
Storage Tank
22°
22°
22°
22°
SV
Proposed 200mm O.D.
HDPE Watermain
H
Existing Hydrant
Proposed Bulk Water Meter to
office block in accordance with
Irish Water requirements.
Proposed 200mm equal tee
Proposed 180mm
O.D. HDPE main
BM
Proposed 200mm equal tee
Proposed taper
BM
Proposed taper
22°
22°
Proposed Hydrant
Proposed 180mmØ
O.D. HDPE Dry Riser
Proposed 110mm O.D. HDPE Watermain
connection for office building
Proposed 160mm O.D.
HDPE Watermain connection
for residential building
Watermain connection size
for residential building TBC
Watermain connection
size for hotel TBC
Watermain connection
sizes for retail units TBC
AV
S
c
V
W
O
Proposed washout hydrant detail with
scour valve chamber as per Irish
water standard detail STD-W-30A
Proposed non-return valve as
per Irish water requirements
Proposed non-return valve as
per Irish Water requirements
N
R
V
N
R
V
Proposed air valve as per Irish
Water standard details to be
positioned at high point of network
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
H
H
H
H
H
H
H
W
W
W
W
W
W
W
W
W
H
W
M
W
W9
TB
H
SV
Existing Watermain
Proposed Watermain
Proposed Dry Riser
Proposed Hydrant
Proposed Thrust Block
Existing Hydrant
Proposed Boundary Box with
Meter as per Irish Water Details
Proposed Bulk Irish Water
Meter
Proposed Sluice Valve
Proposed Air Valve chamber
Proposed Non-return valve
Proposed Scour
Valve and Wash-out
Chambers
BM
AV
ScV WO
W
NRV
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Arup Job No
Suitability
Name
Project Title
Client
© Arup
Rev Date By Chkd Appd
Rev
Drawing Title
Scale at A1
Role
HQDPR-ARP-ZZ-XX-DR-C-1500
C02252901-00
A4 - Approved as Stage Complete
Civil
1:500
Proposed Watermain
Layout
HQ
Horgan's Quay
One Albert Quay
Cork, Ireland
Tel +353 (0)21 427 7670 Fax +353 (0)21 427 2345
www.arup.com
Notes:
1. This drawing shall be read in conjunction with all
other relevant engineering specifications &
drawings including civil site drawings.
2. All potable water pipework shall be HDPE, SDR
17 pipework and fittings. Fire water pipework
shall be HDPE, SDR 11 pipework and fittings.
3. Thrust blocks shall be constructed where
identified on the layout.
4. Sluice valves shall be installed on all branch
connections and on fire hydrant branch
connections. All valves shall be Anti-clock closing
5. A water meter shall be installed on the
potable supply for each property. The meter
shall be as per Irish Water requirements.
6. All sluice valves and chambers are to be
constructed as per Irish Water Requirements
7. This drawing should be read in conjunction with
all Irish Water specifications and standard
construction drawings.
8. Separation distances required shall be as per
Irish Water requirements. Ref to Irish Water
standard details drawing STD-W-11 for
information.
Legend:
N
/ /P01 20 06 18 B.M. F.O'S. J.D.
Issued for Review & Comment
/ /P02 23 07 18 B.M. F.O'S. J.D.
Issued for Tender
/ /P03 05 10 18 JTC F.O'S. J.D.
Issued for Construction Approval
/ /P04 15 01 19 J.B. F.O'S. J.D.
General Revisons
/ /P05 18 02 19 J.B. F.O'S. J.D.
Issued for Planning
/ /P06 12 03 19 J.B. F.O'S. J.D.
Issued for Pre-Connection Enquiry
/ /P07 11 04 19 D.F. F.O'S. J.D.
Irish Water Connection Application
/ /P08 12 04 19 C.F. D.F. F.O'S.
Issued for Partial Construction
/ /C01 18 04 19 C.F. D.F. F.O'S
Issued for Construction (Status A4)
/ /C02 17 06 19 D.F. F.O'S. J.D.
Issued for Construction (Status A4)
Note that the construction of all watermains, valves, hydrants,
water meters, chambers, marker posts etc. are to be carried out
in accordance with the Water Infrastructure Standard details by
Irish Water. If any discrepancies are found between the Irish
Water Standard Details and the details provided then the Irish
Water Standard Details shall govern.
C02
C02
C02
C02
C02
C02
FW MH
1
4.300m
-1.600m
150Ø
Proposed Foul Drain Diversion Along Western Drainage Line - Longitudinal Section
SCALE 1:500 (Horz.); 1:100 (Vert.)
4.300m
4.300m
4.400m
4.400m
4.500m
4.600m
4.150m
2.610m
2.420m
1.920m
1.620m
1.360m
1.050m
0.910m
1:100
Polypipe
Ridgisewer
-2.00m O.D.
FW MH
2
FW MH
3
FW MH
4
FW MH
9
FW MH
10
FW MH
13
FW MH
14
Proposed Pipe
Material
Existing Invert
Level
Proposed Invert
Levels
Cover
Level
Pipe Ø
Pipe Slope
FW MH
15
FW MH
16
FW MH
17
FW MH
21
EX FW
MH
3.700m
0.600m
3.600m
0.440m
3.500m
1.860m
3.400m
-0.060m
3.400m
-0.230m
2.750m
0.230m
150Ø 150Ø 225Ø 225Ø 225Ø 225Ø 225Ø 225Ø 225Ø 300Ø 300Ø
Ex MH
4.073m
approx 780x780
Proposed Foul Drain Diversion Along Eastern Drainage Line - Longitudinal Section
SCALE 1:500 (Horz.); 1:100 (Vert.)
4.140m
4.160m
4.180m
3.820m
0.782m
*
0.484m
*
0.449m
*
0.231m
*
1:120
Polypipe
Ridgisewer
-1.00m O.D.
FW MH
28
FW MH
29
FW MH
30
FW MH
31
Proposed Pipe
Material
Existing Invert
Level
Proposed Invert
Levels
Cover
Level
Pipe Ø
Pipe Slope
FW MH
32
FW MH
33
FW MH
34
Ex MH
3.600m
0.086m
*
3.500m
-0.021m
*
3.300m
-0.092m
*
2.998m
-0.184m
1.248m
*
900Ø
MH
on Iarnrod
Eireann Lands
1:150
900Ø 900Ø 900Ø 900Ø 900Ø 900Ø
Existing Stone Culvert Drain on Iarnrod Eireann Lands
2.330m
4.400m
1.86m
FW MH
5
150Ø
Proposed Backdrop
Proposed Backdrop
Proposed Backdrop
Approximate Ground Level
Proposed Foul Drain
Notes:
1) All foul water pipework shall be Polypipe
Polysewer and Rigisewer pipework and fittings,
or similar approved U.N.O.
2) All pipes and manholes shall be constructed in
accordance with Irish Water construction details.
3) All manhole covers shall be Noroc ductile iron
covers by EJ Covers with a load classification
D400 to IS EN 124.
4) This drawing is to be read in conjunction with all
other relevant drawings and specifications.
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Arup Job No
Suitability
Name
Project Title
Client
© Arup
Rev Date By Chkd Appd
Rev
Drawing Title
Scale at A1
Role
HQDPR-ARP-ZZ-XX-DR-C-3304
P02252901-00
S2 - Suitable for Information
Civil
As Shown
Proposed Foul Drainage
Longitudinal Sections
HQ
Horgan's Quay
One Albert Quay
Cork, Ireland
Tel +353 (0)21 427 7670 Fax +353 (0)21 427 2345
www.arup.com
/ /P01 05 10 18 JTC F.O'S. J.D.
Issued for Construction Approval
/ /P02 11 04 19 D.F. F.O'S. J.D.
Irish Water Connection Application