    Indorama Eleme Petrochemicals LimitedHSEF Monthly Report (January, 2013)

    INDORAMA ELEME PETROCHEMICALS LTD.PORT HARCOURT, NIGERIA

    HSEF

    MONTHLY REPORT(IEPL-HSEF-4.400)

    JANUARY 2013

    Prepared by: HSE&F department

    Record No. EPCL-HSEF-4.400

  • 7/29/2019 Hsef Report Jan 2013

    2/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)2 of 18

    Record No. EPCL-HSEF-4.400

    Contents:

    SectionNo.

    Topics Page No

    1 HIGHLIGHTS OF THE MONTH 31.1 Targets for February , 2013 4

    1.2 Training highlights 5

    2.0 HEALTH STATISTICS

    2.1 PME Data 6

    2.1 Work related illness 7 8

    2.1 Non work related illness 7 - 8

    3.0 SAFETY STATISTICS 8

    3.1 HSE Committee meetings 83.2 incident / accident statistics: 9

    3.3 Activity and area Radiation survey: 10 - 11

    4.0 ENVIRONMENTAL STATISTICS :

    4.1 Noise level monitoring 12

    4.2 BT/VOC survey 13

    4.3 Effluent Quality 14 - 15

    4.4 Ambient air quality monitoring 16

    4.5 Solid waste disposal 16

    5.0 ANNEXURE

    5.1 Annexure -1 Brief Description Incidents 17

    5.2 Annexure 2 Pending compliance from Safety Audit / FARs /Near misses

    17

    List of abbreviations 18

  • 7/29/2019 Hsef Report Jan 2013

    3/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)3 of 18

    Record No. EPCL-HSEF-4.400

    1.0 HIGHLIGHTS OF THE MONTH:

    DPR (Department of Petroleum Resource) officials visited site for license renewal.

    The complex completed 226 Man days free of Lost Time Accident (LTA).

    HSE&F performance assessment for HSE&F performance award schemeconducted for last three months in all plants and departments.

    Assessment for winner of near miss ward scheme done and winner declared.

    One MTC (Medical Treatment Case) injury was recorded in the month of January

    2013. (Please see Annexure I)

    One fire incident reported in the month of January 2013 ( Please see Annexure I)

    Safety meeting conducted in all the plants & departments

    Training on Work permit conducted 15 persons participated.Facility for training to contractors employees made operational at gate A with

    audio visual facility.

    Routine ambient air quality monitoring conducted in IEPL and its host communities

    Routine BT/VOC Survey

    Routine TCLP Analysis carried out on polymer and sludge incinerator ash

    Routine physiochemical and heavy metal analysis of waste water

    Routine waste management.Quarterly stack monitoring conducted.

    Quarterly servicing of fire trucks, Water Tender and UT- 2 truck done.

    Servicing and maintenance of 6Kg / 9Kg portable fire extinguishers in PPU, Project

    office and Fire station done.

    Live firefighting training conducted for 28 nos. employees, 59 nos. Contractor

    security guards.

    Fire prevention training conducted for 28 nos. employees.B.A. Set training conducted for 34 nos. employee.

  • 7/29/2019 Hsef Report Jan 2013

    4/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)4 of 18

    Record No. EPCL-HSEF-4.400

    1.1. TARGETS FOR FEBRUARY, 2013

    S/N Activities Responsibility Areas Target Date

    1.Process safety Management

    coordinators trainingKPP All plants 28.02.2013

    2.Internal process safety Management

    audit.KPP All Plants 28.02.2013

    3. Complex wide Signage up gradation KPP All Plants 28.02.2013

    4.Servicing and maintenance of 6kg / 9

    kg DCP extinguishers.HSS

    Olefins, ETP,

    MMD, PP

    Warehouses, PE

    Warehouses,

    Chemical

    Warehouse and

    Barrie D.

    28/02/13

    5.

    Flushing of underground fire water

    mains

    ( Network )

    HSS

    All complex

    28/02/13

    6.Quarterly servicing of fire trucks,

    Emergency truck and UT-1 truck.

    HSSFire Station

    28/02/13

    7.Routine ambient air quality monitoring NAK

    IEPL Complex and

    host communities

    28/02/2013

    8. Routine TCLP AnalysisNAK ETP

    28/02/13

    9. Routine BT/VOC Survey JS Olefins plant 28/02/13

    10.Physiochemical and heavy metal

    analysis of waste waterNAK

    Okulu Aleto and

    ETP Final

    discharge

    28/02//13

    11. Routine Noise Monitoring JS

    Olefins plant,

    PPU, PE Plant, PE

    W/H and PP Plant.

    28/02/13

    12.Socializing for BSC 5 Star Audit for

    EnvironmentNAK

    for HOFs &

    HODs28/02/13

  • 7/29/2019 Hsef Report Jan 2013

    5/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)5 of 18

    Record No. EPCL-HSEF-4.400

    1.2 .TRAINING HIGHLIGHTS:

    TrainingPrograms

    Target for2012

    (Nos. ofpersonnel)

    YTD (%) Jan

    First Aid Training 140 0 0

    Live Fire Fighting747 13 87

    Safety Training540 4 25

    Safety Induction(Contractors / Visitors)

    NA 330 330

    2.0 HEALTH STATISTICS:

  • 7/29/2019 Hsef Report Jan 2013

    6/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)6 of 18

    Record No. EPCL-HSEF-4.400

  • 7/29/2019 Hsef Report Jan 2013

    7/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)7 of 18

    Record No. EPCL-HSEF-4.400

    PATIENTS TREATMENT CATEGORIES

    Sr.No.

    Description No. of persons

    2.1 TOTAL NUMBER OF PERSONS / PME CHECKED 122

    IEPL (Expats) 30IEPL (Local) 36

    DEPENDANTS (Expats) 0

    DEPENDENTS (Locals) 0

    SECURITY 34

    CONTRACTORS 22

    2.2 WORK RELATED ILLNESS 0IEPL (Expats) 0

    IEPL (Local) 0

    DEPENDANTS (Expats) 0

    DEPENDENTS (Locals) 0

    SECURITY 0CONTRACTORS 0

    2.3 NON WORK RELATED ILLNESS 121IEPL (Expats) 30

    IEPL (Local) 36

    DEPENDANTS (Expats) 0

    DEPENDENTS (Locals) 0

    SECURITY 34

    CONTRACTORS 21

    2.4 HOSPITALIZATION 22.5 PERIODIC MEDICAL EXAMINATION 22.6 REFERRAL 22.7 INDUSTRIAL ACCIDENT 12.8 MINOR SURGERY 02.9 EXCUSE DUTY 22.10 IMMUNIZATION 42.11 STAFF TRAINING 02.12 NURSES TRAINING 0

  • 7/29/2019 Hsef Report Jan 2013

    8/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)8 of 18

    Record No. EPCL-HSEF-4.400

    3.0. SAFETY STATISTICS:

    Month Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

    Frequencyrate 0

    Severity rate0

    Total LTA Free Days (As on 31.01.2013): - 266 Days.

    Last Lost Time Incident was on : 20. 06. 2012 (Canteen)

    3.1 HSE Committee meetings at Plant Levels were conducted as indicated below.

    PLANT LEVEL SAFETY MEETING

    Olefins PP PE PPUO QAQCLab

    Workshop MMD Bagging

    : Conducted. X : Not Conducted.

  • 7/29/2019 Hsef Report Jan 2013

    9/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)9 of 18

    Record No. EPCL-HSEF-4.400

    3.2 INCIDENT / ACCIDENT STATISTICS:

    Minor fire (Plant)

    Minor fire (Nonplant)

    Major fire (Plant)

    Major fire (Nonplant)

    Gas leakage

    Minor Injury (NonPlant)

    Minor injury(Plant)

    Nearmiss (Plant)

    Lost time (plant)

    Lost Time (Nonplant)

    Month Jan

    Minor fire (Plant) 1

    Minor fire (Non plant) 0

    Major fire (Plant) 0

    Major fire (Non plant) 0

    Gas leakage 0

    Minor Injury (Non Plant) 0

    Minor injury (Plant) 1

    Nearmiss (Plant) 10

    Lost time (plant) 0

    Lost Time (Non plant) 0

  • 7/29/2019 Hsef Report Jan 2013

    10/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)10 of 18

    Record No. EPCL-HSEF-4.400

    3.3 ACTIVITY AND AREA RADIATION SURVEY:

    3.3.1 POLYPROPYLENE (PP) PLANT

    s/n Tag no. Source serialno.

    Equipmentno.

    Date of Manufacture Monthly Average (fortnightly)reading((Sv/hr)

    1 LE-6012 M-8081 / 5888 06-D-601 1992 2.97

    2 LE-6013 M-8163/8162 06-D-602/603 19922.14

    3 LE-5007 / 5008 M-6994 06-D-501 1992 1.78

    4 LSL-3107 M-6288 06-F-301 1992 1.44

    5 LE-3005 M-6505 /6504 06-CY-301 1992 2.65

    6 LE-3006 M-6880 06-CY-301 1992 2.28

    7 LE-3108 M-6663 06-F-301 1992 0.18

    8 LAHH-3109 M-6629 06-F-301 1992 0.42

    9 AC-2401 M-6661 06-R-201 1992 0.14

    10 AC-2501 M-6662 06-R-202 1992 0.16

    3.2 POLYETHYLENE (PE) PLANT

    s/n Tag no. Sourceserial no.

    Equipmentno.

    Date of Manufacture Monthly Average(fortnightly) reading

    ((Sv/hr

    1 LT-1154 7383, 7384,7385, 7386

    S-401 1991 3.22

    2 LT-1158 M8062 S-402-1 1996 0.20

    3 LT-1658 M8068 S-402-2 1996 0.14

    4 LT-1163 9510GG S-403-1 (STRAIGHT) 1993 0.20

    5 LT-1663 9503GG S-403-2 (STRAIGHT) 1993 0.22

    6 LT-1162 9499GG S-403-1 (CONE) 1993 0.09

    7 LT-1662 9504GG S-403-2 (CONE) 1993 0.08

    8 REMOVEDFROM TAG LT-1162

    9398GG OUTSIDE BUNKER 19930.07

    9 REMOVEDFROM TAG LT-1662

    9385GG OUTSIDE BUNKER 19930.08

    TLVs

    -Classified Personnel (Radiation worker)- 25 Sv/hr

    -Unclassified Personnel (Members of the public)- 7.5 Sv/hr

    Sv/hr microserviets per hour

  • 7/29/2019 Hsef Report Jan 2013

    11/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)11 of 18

    Record No. EPCL-HSEF-4.400

    4.0 ENVIRONMENTAL STATISTICS :

    4.1 NOISE LEVEL MONITORING

    PLANT NAME SOURCE EQUIPMENT

    NOISE LEVEL at Micro level

    (dBA)At source 5 meter

    OLEFINS BOILER Area 1-K-12A/1-P-

    50A/B/C

    91 82.1

    1-K-12B 85.5 84.0

    1-K-12C 88.0 85.5

    Compressors K1 94.0 91.5

    K2/K3 93.5 82.5

    Caustic area Walkway 85.5 83.0

    De-propanizer 81.5 78.1

    PE PLANT Blender/Silo Grd

    floor

    North end 88.1 84.0

    South end 92.1 89.0Extruder Train-2 91.1 82.5

    Operators table

    (inside cubicle)

    74.0

    --

    PP PLANT Co-polymer reactor Reactor 401 90.0 85.5

    Extruder house 6-D-801 92.1 86.0

    Silo/compressor 85.5 81.0

    PE Bagging Classifier 90.1 86.5

    Bagging Machines Sewing m/c (on/off) 88.1/78.9 75.1

    POWER PLANT GTG Inside 88.1 82.0

    outside (stacks) 85.0 82.1

    Purging air filter 98.5 86.5Nitrogen Plant Plant entrance. 84.2 82.0

    Control Room 64.6 -

    Compressors

    25-K-1 F

    90.1 84.8

    TLV for Noise is 85db (A)Recommended to use ear protection above the TLV.

  • 7/29/2019 Hsef Report Jan 2013

    12/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)12 of 18

    Record No. EPCL-HSEF-4.400

    4.2 BT/VOC SURVEY:LOCATION UOM BENZENE TOLUENE VOC

    C-5 Hydrogenation Unit

    Pumps 1P90A to 1P98B

    walkway

    ppm 1.1 0.0 0.1

    1-P-42 ppm 1.0 0.0 0.0

    Walkway by 1-D-80 ppm 0.0 0.0 0.0

    C-9

    Bottom ground Area 1P39A

    to 1P37B

    ppm 0.0 0.1 0.0

    1-P-35B ppm 0.1 0.0 0.1

    K-3 bottom area ppm 1.2 0.1 0.0

    D-41 bottom area ppm 0.0 0.0 0.1

    C-7

    Bottom ground floor ppm 0.0 0.1 1.0

    Re-boiler Platform ppm 0.0 1.0 0.0

    C-5

    Bottom ground floor ppm 0.0 1.0 0.0

    Re-boiler Platform ppm 0.0 0.0 0.1

    C-4

    Bottom ground floor ppm 0.0 0.1 0.0

    Driers DR-1/2 A/B & 1-F-1B ppm 0.0 1.2 0.0

    DMFS Walkway by 1-D-47/E-

    37

    ppm 1.1 1.0 0.1

    K-1

    K1 floor/E25-E28-1E20A/B ppm 0.0 0.0 0.1

    Note: Benzene TLV: TWA=0.5ppm, STEL=2.5ppm. Toluene TWA=50 ppm (ACGIH)

    Reading taken between 5 m 10 m around emission source(s)

    Use of full face with Organic cartridge recommended in area with reading >TLV

  • 7/29/2019 Hsef Report Jan 2013

    13/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)13 of 18

    Record No. EPCL-HSEF-4.400

    4.3 EFFLUENT QUALITY :

    i) pH

    Month Jan.13

    Nos. of off- spec. 0/31

    iii) TSS

    Month Jan.13

    Nos. of off- spec. 0/31

  • 7/29/2019 Hsef Report Jan 2013

    14/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)14 of 18

    Record No. EPCL-HSEF-4.400

    iii) BOD

    Month Jan.13

    Nos. of off- spec. 0/31

    iv) COD

    Month Jan.13

    Nos. of off- spec. 0/31

  • 7/29/2019 Hsef Report Jan 2013

    15/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)15 of 18

    Record No. EPCL-HSEF-4.400

    4.4AMBIENT AIR QUALITY MONITORING: (EXTERNAL AGENCY)

    Parameters UOM

    Standards. In side Stations Outside Stations

    FMENV DPRNear

    Gate.

    Near

    W/Bridge

    Flare

    Stack

    (North)

    Near

    AGIP AKPAJO ALETO

    SO2 g/m3 260 350 0.00 0.00 0.00 0.00 5.26 0.00

    NO2 g/m3 75-113 400 6.31 4.89 12.75 4.34 4.59 2.33

    CO g/m3 22.8 30 2.21 2.65 0.00 1.2 0.00 3.78

    H2S g/m3

    - -0.1

    0.080.11 0.00 1.90 0.60

    CxHy g/m3 3-160 - 0.00 1.54 0.00 0.00 1.20 0.00

    VOC g/m3 6000 - 0.00 2.68 3.91 1.05 3.31 0.00

    NH3 g/m3 0.5-1.0 0.5-1.0 0.03 0.00 0.13 0.00 0.38 0.18

    TSPM g/m3 600 230 14.74 17.48 20.13 17.79 32.04 27.44

    4.5FLUE GAS MONITORING: (EXTERNAL AGENCY)

    Parameters UOMIFC

    Standard

    Stacks

    PolymerIncine-rator

    SludgeIncine-rator

    GTG Stack OlefinsHeaterStack(1-H-1B)

    Olefins Boiler Stack

    GT-01

    GT-04 A B C

    SOxmg/Nm 500 1.58 ND 0.00 0.00 0.00 0.00 24.38 0.00

    NOxmg/Nm 300

    18.22 ND 94.53 100.22 91.11 151.93 158.53 184.96

    COmg/Nm --

    40.28 ND 0.00 0.00 0.00 0.00 0.00 0.00

    H2Smg/Nm --

    0.25 ND 0.00 0.00 0.00 0.00 0.00 0.00

    CxHymg/Nm --

    0.00 ND 0.00 0.00 0.00 0.00 4.32 0.00

    VOCmg/Nm --

    0.00 ND 0.00 0.00 0.00 0.00 0.00 0.00

    ND: Not done (Unit was not running)

  • 7/29/2019 Hsef Report Jan 2013

    16/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)16 of 18

    Record No. EPCL-HSEF-4.400

    4.6SOLID WASTE DISPOSAL:

    Waste. Type. UOM.Quantity/

    month

    Quantity/

    Year (2013)Disposal Method.

    Metal Scrap. Scrap. Kg 1580 1580 Sale.Wooden Scrap. Scrap. Kg Nil Nil Sale.

    Plastic Scrap.( Including torn

    bags)Scrap.

    Kg940 940 Sale.

    Decontaminated

    Containers.Scrap Nos. 566 566 Sale.

    Spent Alumina.Solid

    Waste.MT 132 132

    Stored in designated

    location within the

    premises

    Incinerated Waste. Hazardous Kg 2220 2220 Incinerated.

    Waste Oil Scrap LTR 2800 2800Sale./incineration

    Molecular Sieve Solid waste MT Nil. 17.5Stored in designated

    location within the

    premises

    Medical waste Hazardous Kg 10.1 10.1 Incinerated.

    5.0 ANNEXURE

    5.1 Annexure -1 Incidents - FireType of incident : Minor fire

    Date : 10-12-2012

    Non-Plant : New IRC club (Bush bar)

    Description: The straws laid on the roof of the bush bar ignited when a welding work was in progress. The flamingfire spread on 10 m x 8 m area of the roof.

    Control measure to prevent recurrence:1. Bunch of highly combustible straw must be removed and then the welding job to be started.2. Fire extinguisher and buckets of water for fire fighting must never be forgotten before starting any hot

    work like this.

    Annexure -1 Incidents - Injury

    Type of incident : medical Treatment case

    Date : 08-01-2013

    Plant : Chemical warehouse

    Description: During unloading gas cylinder finger got caught in between cage and the cylinder.

    Control measure to prevent recurrence:i. Proving handle at cage frame. Training the person for right method.

  • 7/29/2019 Hsef Report Jan 2013

    17/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)17 of 18

    Record No. EPCL-HSEF-4.400

    5.2 Annexure -2 Pending compliance from Safety Audit / FARs / Near misses

    Department Pending Responsibility Target Date / Remarks

    All plants Training of Safe handling of GasCylinders.

    KPP 28.02.2013

    PPOU Construction of flange guard onacid pumps in ETP

    A.K. Gupta / PhoolSingh/ M. Putta

    31/03/2013(Installation going on.Material received earlier isfinished. New order made)

    Olefins / PP /offsite

    Facility of close loop for Lab.Sampling

    Mr. Stoica Ichim / Mr.A Mohapatra / Mr.S.K. Dave.

    Survey started.Job will be completed inTAM

    General Traffic safety managementownership to be decided

    HSS/ RB Discussion between HOF-HSE & Security headongoing

    PE plant MOC of drain pit and drain dykearrangement to be executed.(Vaporizer fire FARrecommendation)

    Mr. A.B. RAO

    Will be completed duringTAM

    All Plants All cases of short bolts, less boltsand use of dissimilar materials as

    bolts and nuts to be corrected bymechanical group

    All plants mechanicalsectional heads Will be completed during

    TAM

    Electrical/Polymer andchemicalwarehouse.

    All 10 years old capacitors of theelectrical lamp fixtures to bereplaced with new metalliccapacitors.

    Mr H. Sood31/03/2013Job is in progress

  • 7/29/2019 Hsef Report Jan 2013

    18/18

    IEPL/HSE/MR/01/13Monthly HSEF Report

    ( for internal circulation only)18 of 18

    List of Abbreviations:

    ACGIH : American Confrence of Governmental Industrial Hygienist

    BOD : Biological oxygen demand

    BSC : British Safety CouncilBT/VOC : Benzene, Toluene & Volatile Organic compounds

    COD : Chemical oxygen demand

    DCP : Dry chemical powder

    FMENV : Federal Ministry of Environment

    HAZOP : Hazard operability studies

    GIT : Gastro intestinal tract

    HSE&F : Health, Safety, Environment & Fire

    IFC : International Finance Corporation

    INDSOP : Indorama Safety Observation Process

    JSA : Job Safety Analysis

    LEL : Lower Explosive Limit

    LOTO : Lock out tag out

    LPD : Low point drain

    LTA : Lost Time Accident

    NESREA : National Environmental Standards and RegulationsEnforcement Agency

    ONSEM : Onsite emergency management

    PME : Periodical \medical examination

    PPE : Personal protective equipment

    PTW : Permit to work

    RTI : Respiratory Tract Infection.

    STEL : Short term exposure limit

    TAM : Turn around maintenance

    TCLP : Toxic characteristics leachate procedure

    TLV : Threshold limit value

    TSPM : Total suspended particulate matter

    TSS : Total suspended solids

    TWA : Time weighted average

    UOM : Unit of measure

    UTI : Urinary Tract Infection

    *** End of Report****