HUAWEI TECHNOLOGIES CO., LTD.
www.huawei.com
Author / Email: Elvis(Xiao Bei)/ [email protected] Version: 02(20131022)
Huawei IDS1000 Container Data Center
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 2
Trend & Challenge 1
Huawei Solutions Introduction 3
Successful Cases 4
2 Huawei Solution Features
Content
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 3
Challenges of Conventional DC
Long Deployment
90 Day Average Commissioning
2 Year
Construction
High Power Consumption
2.5PUE
1/3 Energy wasting
Inefficient Managem
ent
Inefficient Management
8×5 Manual
monitoring, alarming
Limited Structure
3-6 kW Difficult to upgrade or expand
Along with the fast development of mobile, internet, and cloud computing, the increasing IT rack capacity and power consumption bring a lot of challenges to conventional DC
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 4
Containerization Fit New DC Construction Trend Well
Containerization is a more thorough modular construction mode
Fast Deployment Gallop at the head, seize
the opportunity
Flexible Expansion Grow with your business
High Density Leading the trend, future -proof
Smart Management Easy to monitor and manage, rest at ease
Cost Saving Less initial investment and
operation cost
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 5
Containerized DC has been widely applied
2005 2006 2007 2008 2009 2010 2011
Enterprise applied containerized DC
HP launched 40’POD
Sun launched Black box
Google Oregon Data center
Microsoft Chicago data center
Huawei launched new generation IDS1000 series
IBM launched PMDC
Huawei Applications:
Huawei launched 1st containerized DC
Sun launched Ice Cube
2012
Togo University
Ghana Gov
Venezuela Gov
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 6
Trend & Challenge 1
Huawei Solutions Introduction 3
Successful Cases 4
2 Huawei Solution Features
Content
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 7
Fast
HD Smart Green Fast Flexible
Fast Deployment, Drives Business Rapidly
8 week Prefabrication in factory
Decoration
Business rapid on-line
Anti-fire
Rack Power
Cooling
1 week Installation on site
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 8
Flexible
Flexible Combination, Come after Customer Requirement
HD Smart Green Fast Flexible
1
3
2
power/Cooling capacity IT load
Easy Copy, Easy Expansion Live in the moment, plan for future
Smooth Upgrade Uninterruptible Upgrade, Accommodate various industry demand
Deploy on-demand Save dispensable investment, raise ROI
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 9
High Density
High Density Solution, Save 80% Land Occupation
Legacy
Huawei
3-6KW
21KW
With 1 Container we put 400kW IT rack, which normally requires 150m2 in conventional way
Cloud Era, Virtualization High density is obvious, overwhelming tide
HD Smart Green Fast Flexible
Space Saving
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 10
Smart
Multi-subsystem monitoring integrated Know well about the running status of DC, Ensure safe operation
HD Smart Green Fast
Visual Management
Energy efficiency management
Temperature nephogram
Capacity management
Flexible
Smart NetEco6000 Management System
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 11
Green
1.20 PUE by Multiple Technologies
HD Smart Green Fast Flexible
More Energy Saving PUE as low as 1.20, more than 50% energy saving
Free cooling Traditional DC
High-Efficiency UPS
Closely coupled cooling
Cold/hot aisle containment
PUE 2.1 2.0 1.5 1.20
Traditional DC IDS1000
50% energy saving
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 12
Excellent Environment Adaptation
Easy Delivery
ISO standard container recognized by classification society, connection ports embedded, convenient to deliver 3rd class road1000km delivery tested
KCC Painting
8 degree anticorrosion (Pass 1000 hour salt spray test as per ASTM B117)
15 year service life
Ultimate Temp.
-40 to 55 degC
Wide Range
Weather Proof
Class IP56 Double layer adhesive tape for container combination
Optimized container shape, natural favorable outdoor performance
Anti-seismic
9 degree intensity anti-seismic Rigid connection from top to bottom
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 13
Concept-1 Concept-2 Concept-3
Concept-4 Concept-5 Concept-6
Customized Painting & Decoration
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 14
Trend & Challenge 1
Huawei Solutions Introduction 3
Successful Cases 4
2 Huawei Solution Features
Content
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 15
Small DC
Medium-large DC Modular
Medium-large DC
Low-density
Small DC
Fast Solution 4-10 rack/container 5-7.5kW/rack Total Cap.≤100kW
18 rack /IT container 3.5-21kW/rack Total Cap.≥400kW
Standard 3-container
Cluster Deployment
Independent power/cooling container, coping with indoor existing equipment
20ft 40ft
Customized solution
Multi-function Container: Special DC solution, include special functions like office, living
Office Container
Living Container
Cluster: Flexible combination by IT container, power container and cooling container
All-in-one: One container integrate air conditioning, power supply system etc.
General Introduction of IDS1000 Product Family
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 16
Cabinet
Anti-fire System Power System Cooling System
Cabling System
Management System
Container System
Rack System
IDS1000-A All-In-One Container DC Solution
Highly integrated, mobile, convenient container DC solution
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 17
IDS1000-A All-In-One Container DC Solution
Container:Standard 20ft ocean shipping container
Rack:One container support 4-5 racks(5 racks without
UPS)
Cooling:DX precious AC, 2+1backup
Power supply:UPS: N+1 redundancy. Battery: 10 min
Power:Total:30kW . Power density: 7.5kW/rack(rated)
IDS1000-A20 Container:Standard 40ft ocean shipping container
Rack:One container support 8-10 racks(10racks
without UPS)
Cooling:DX precious AC, 4+1backup
Power supply:UPS: N+1 redundancy. Battery: 15 min
Power:Total:60kW . Power density: 7.5kW/rack(rated)
IDS1000-A40
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 18
IDS1000-C Cluster Outdoor DC Solution
Cluster Deployed, high density & high efficiency, scalable outdoor DC Solution
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 19
Container:standard 40’shipping container
Rack:max 18 rack (45U/rack,19”standard installation
width space)
Cooling:chilled water horizontal supply, 20kW/30kW
Power:rack PDU 2N backup
Capacity:maximum 21kW/rack (rated)
IDS1000-C IT Container IDS1000-C Cooling Container
IDS1000-C Cluster Outdoor DC Solution
Container:standard 40’shipping container
Cooling:modular chiller, 3+1 backup, 100kW/unit
Cooling Storage:15min continuous cooling
Free-cooling:Built-in free-cooling coil optional
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 21
IDS1000-C NOC Container IDS1000-C Power Container
IDS1000-C Cluster Outdoor DC Solution Fire Control Tank Displayer Switch
Air Conditioner
Access Control
Escape Door
Container:standard 40’shipping container
Management:42” displayer, monitoring system
Porch:Side door seamlessly connected with IT/power
container
Effectively prevent interior equipment from exterior
environment
Container:standard 20’shipping container
ATS:0.7-1s minimum power switching time
Cooling:20kW cooling capacity, horizontal supply
UPS:modular UPS N+1 backup for singe container,
maximum 400KVA, 96% best efficiency.
Battery: 10 min for single container
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 23
Founding Member of Uptime APAC Uptime Institute and 451 Research, both divisions of The 451 Group, have been strong voices and thought leaders for data center and IT efficiency in the emerging Digital Infrastructure industry. Uptime Institute has developed a body of knowledge on the topic of data center efficiency for data center owners and operators to improve their data center efficiency with actionable, low-cost improvements. Huawei, as APAC founding member of Uptime, is committing to build high availability data center with containerized data center product.
Link:http://uptimeinstitute.com/network/apac-network-roster
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 24
IDC Professional Service
Professional Management
Service
Huawei Mature Vertical DC Solution
L4(APPLICATION)
DESKTOP CLOUD E-HEALTH CLOUD E-GOV CLOUD E-LEARNING CLOUD
Network Storage
L2(HARDWARE PLATFORM)
Server
IDS 2000 (MODULAR) IDS 1000 (3 CONTAINERS)
L1(DATACENTER FACILITY)
IDS 1000 (ALL IN ONE)
L3(OS)
Virtualization
Management Automation
Parallel
Distributed
Integration
Planning
Project Management
Optimization
Consulting
Network Management
Business Management
Security Management
Infrastructure
Management
Platform Management
IT Service
Management
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 25
Huawei Containerized DC Won DCD Award
DCD news link: http://www.datacenterdynamics.com/focus/archive/2012/12/datacenterdynamics-greater-china-region-award-winners
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 26
Power Supply: Dual-line Input
External Configuration: 800kVA transformer, D.G. (2N redundancy)
Backup Oil: 8h oil tank (24h oil reserve)
Field Area: 2850m2 (95m*30m),around 500m2 for container DC
IT Container: 2pcs, totally 36 racks, 9kW/Rack
Cooling Container: 2pcs,Chillers 2(N+1) backup
Power Container: 4pcs,2N backup, main UPS(for each container)
200KVA, 2N
Total Load: 324kW
“Huawei containerized cloud desktop DC play an important role to practice of China cloud computing”
Qu Haifeng DCD Jury, DC expertise of China Association for Standardization
Project Introduction
Largest cloud desktop,and Tier 3+ high level design
Huawei Containerized DC Leads The Way
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 27 Page 27
2*20’ power container (200kVA UPS)
1*40’NOC container (monitoring & management)
1*40’ IT container (9kW/rack *18)
1*40’ Cooling container (chillers 3+1 backup)
5000 people cloud desktop module 5000 people cloud desktop module
Five Thousand People Cloud Desktop Module 1pcs 40’IT container, 2pcs 20’power container, 1pcs 40’cooling container, 1pcs 40’ NOC container
Modular Design of Huawei CDC
Cooling Container
IT Container
Power Container
Independent battery
compartment 96% high-efficiency UPS
900mm maintenance aisle
Chilled water close-coupled
cooling, horizontal air supply
High-efficiency modular chiller
15min continuous cooling
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 28
Item Conventional
DC Containerized
DC
IT Capacity (kW) 324 324
Capacity Density (kW/rack)
3 9
Qty. of Rack 108 36
Overall Area(m2) 785 500
CAPEX Conventional
DC Containerized
DC
Rack 0.13X 0.05X
Cooling 0.1X 0.15X
Power 0.27X 0.27X
Fire Suppression, monitoring & cabling
0.12X 0.08X
Consulting and Infrastructure
0.38X 0.17X
Total X 0.72X
OPEX/year Conventional
DC Containerized
DC
Electric Charge 0.69Y 0.49Y
Equipment Maintenance
0.15Y 0.15Y
Manpower 0.17Y 0.08Y
Total Y 0.73Y
Substantial TCO Decrease
Space Saving
Legacy Huawei
36%
Capex Saving
Legacy Huawei
28%
Opex Saving
Legacy Huawei
27%
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 29
Trend & Challenge 1
Huawei Solutions Introduction 3
Successful Cases 4
2 Huawei Solution Features
Content
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 30
Good adaptability to environment, make business developing flexibly and fast. Reduced initial infrastructure investment, saved TCO Help for the improving of informationization & automation
Provides integrated All-In-One 20ft CDC solution Offers a customized painting Did a flexible-expansion design
More than 7 New mines will be exploited in future Poor condition and harsh environments onsite Informationization & Automation in mines develop fast
Huawei CDC helps Codelco Businesses Increasing
Demands & challenges
Huawei solution
Benefit to customer
Codelco Chile is the NO.1 copper producer in the world. The Corporation also controls around 10% of the world reserves of this metal.
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 31
Good mobility, meets special demands of field prospecting Reduce huge infrastructure investments, capable to shift flexibly with project. Response fast to increasing business demand of customer itself.
Provides integrated All-In-One DC solution Offers a customizing power system design Prefabricated components, modular design, standardized products, shorten
the delivery period
Portable demands in field prospecting Reliability on anti-vibration and dust & water proof Completed in 4 month, ensure business on-line
Demands & challenges
Huawei solution
Benefit to customer
Petrobras, founded in October 3 1953 , is the largest oil company in Brazil. Petrobras hell Brazil oil exploration, development, production, transport and enterprise operation and management. It is Brazil government-enterprise integration of State-owned enterprises.
Container DC makes Petrobras Businesses more flexible
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 32
Cluster container DC solution, IT container can be easyly expanded Intelligent management platform-NetEco, access control system and Video
subsystem 2N redundancy design and modular design Integrated All-In-One IDC solution and Standard 40ft ISO container
Security hierarchy design High availability and Scalability Fast deployment
High Security,fast deployment High availability and smooth expansion High density for various customers’ requirements/
Challenges & demands
Huawei solution
Benefit to customer
Vert is planning to build a new IDC data center,need fast deployment , smooth expansion for future development.
Container Data Center for Vert IDC
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 33
Comparing traditional way of construction, save 47% cost. Sufficient utilize space (Deploy on existing parking zone.) Low PUE(≤ 1.55), green & energy-saving, saving OPEX
IDS1000 container date center solution Independent chilled-air container, lower demands for ground and environment. Prefabricated components, modular design, standardized products, shorten
the delivery period
Reliability on anti-vibration and dust & water proof No existing buildings to deploy data center Green & energy-saving
Challenges & demands
Huawei solution
Benefit to customer
Mackenzie University is the largest private University in Brazil, as history advances, it also develops multimedia education and other new forms of education, so a new data center is needed for the E-education system.
Container Data Center Runs the E-education in Mackenzie University
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 34
Guatemala IT Operator
Conventional DC construction period is too long, customer hope
the data center can be put into use within the year
Public security is not stable, need special protection
Customer Requirements & Challenges
Huawei Solution
Benefits for Customer
Provide All-in-one container DC
On-site installation service
Filed construction advanced, ensure fast deployment
Business deployed very fast, in response to IT service requirement.
Save space, and allow future expansion step by step, meet
increasing business demand.
Cloud Business in Guatemala ONYX Group
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 35
Utopia Technology, associated with a global distribution organization, which is located in central Manchester With over 50,000 sq foot of office and warehousing space. It need a data center to support the growing business.
One step solution, only need to prepare power, water, network and site, Fast deployment <1 week on site, total deployment period < 5 months, Outdoor deployed without building, saving investment, Intelligent manage system NetEco, easy to manage and monitoring.
All in one container solution, deployed in outdoor, Integrated all the system of data center, supporting 60kw IT load, Deployment period less than 5 months.
Integrated DC solution, supporting 50KW IT load, Fast deployment, running business within half a year, No building, can be deployed outdoor .
Challenges & Demands
Huawei Solution
Benefits
Container Data Center fast running business for Utopia Technology
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 36
Challenges & Demands
Fast deployment, be ready to run as soon as possible No existing buildings space to deploy the data center Green & energy-saving .
Huawei Solution
Benefits to Customer
1(power)+1(cooling)+2(IT) 4 containers data center solution Secured power supply , the integration of grid + generator + UPS Chilled-air type container to manage the heat
Fast deployment, total deployment period <12 week Less civil work to deploy the containers, construction reduced Green, PUE <1.5, saves 40% energy& OPEX in 5 years. Diesel generator + UPS ensures stable & continuous power
Power Container
Cooling Container
IT Container
IT Container
Ghana government
Container Data Center Speeds Ghana up to be E-government
Thank you www.huawei.com
Copyright©2013 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.