HUAWEI RTN IMPLEMENTATION PROTOCOL Site Code local: SiteA# (Fill in your site code plus candidate after the colon and change it in the Header and Footer as well) Site Code far end: SiteB# (Fill in your site code plus candidate after the colon and change it in the Header and Footer as well) Job number: JobNr# (Fill in your job number after the colon and change it in the Header and Footer as well) File name Created by Approved Date document.doc Alcatel Lucent Schweiz AG Network Rollout Mobile Peter Schippel 18.07.2011 MICROWAVE EQUIPMENT

Huawei RTN INome do arquivo:Huawei RTN Implementation Protocol.docmplementation Protocol

  • Upload
    zz2nkt

  • View
    87

  • Download
    4

Embed Size (px)

DESCRIPTION

Nome do arquivo:Huawei RTN Implementation Protocol.doc

Citation preview

HUAWEI RTN

IMPLEMENTATION PROTOCOL

Site Code local: SiteA#(Fill in your site code plus candidate after the colon and change it in the Header and Footer as well)

Site Code far end: SiteB#(Fill in your site code plus candidate after the colon and change it in the Header and Footer as well)

Job number: JobNr#(Fill in your job number after the colon and change it in the Header and Footer as well)

File name Created by Approved Date

document.doc Alcatel Lucent Schweiz AGNetwork Rollout Mobile Peter Schippel 18.07.2011

MICROWAVE EQUIPMENT

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

TABLE OF CONTENTS

1 INSTALLATION AND VERIFICATION DOCUMENTATION.................................................3

2 INDOOR UNIT INSTALLATION..........................................................................................42.1 SYSTEM CONFIGURATION AND CHARACTERISTICS..............................................................42.2 INDOOR UNIT INSTALLATION.............................................................................................52.3 TRANSMISSION CABLING CHECKLIST.................................................................................52.4 INDOOR UNIT GROUNDING...............................................................................................52.5 INDOOR INSTALLATION CHECKLIST....................................................................................62.6 SUPERVISION/RTN-FILES LOADED...................................................................................72.7 IP-ADDRESS INDOOR UNIT..............................................................................................7

3 OUTDOOR UNIT INSTALLATION......................................................................................83.1 IF CABLE INSTALLATION...................................................................................................83.2 OUTDOOR UNIT AND CABLE INSTALLATION........................................................................83.3 METHOD OF INSTALLATION (OUTDOOR UNIT).....................................................................83.4 DISH/ODU..................................................................................................................... 83.5 OUTDOOR INSTALLATION CHECKLIST................................................................................9

4 HUAWEI RTNCOMMISSIONING LINE UP........................................................................104.1 MODULATION SCHEME...................................................................................................104.2 FREQUENCY BAND........................................................................................................104.3 TX SETTINGS...............................................................................................................104.4 RECEIVING LEVEL.........................................................................................................104.5 LINK PERFORMANCE MONITORING (TIME SET 15MIN)........................................................104.6 STATISTICS AND ERROR COUNTERS...............................................................................10

5 DOCUMENTATION IN NETSITE......................................................................................11

6 Confirmation...................................................................................................................... 11

File name Created bydocument.doc Huawei

Page 2 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

1 INSTALLATION AND VERIFICATION DOCUMENTATION This HUAWEI-RTN Link is Installed and Commissioned according to the following Site Specific Documentation:

OptiX RTN 910 Radio Transmission System IDU Quick Installation Guide (Indoor)(V100R003_05) HUAWEI

OptiX RTN 950 Radio Transmission System IDU Quick Installation Guide (Indoor)(V100R003_05) HUAWEI

OptiX RTN 980 Radio Transmission System IDU Quick Installation Guide (Indoor)(V100R003_05) HUAWEI

RTN 910 IDU Quick Installation Guide for Outdoor Cabinets (APM30H&TMC11H Cabinets)(V100R003_01) HUAWEI

RTN 910 IDU Quick Installation Guide for Outdoor Cabinets (OMB Cabinets)(V100R003_01) HUAWEI

RTN 950 IDU Quick Installation Guide for Outdoor Cabinets (APM30H&TMC11H Cabinets)(V100R003_01) HUAWEI

RTN 910 IDU Quick Installation Guide for Outdoor Cabinets (OMB Cabinets)(V100R003_01) HUAWEI

OptiX RTN 900 V100R003 Service Configuration(Weblct) HUAWEI

File name Created bydocument.doc Huawei

Page 3 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

2 INDOOR UNIT INSTALLATION

2.1 System Configuration and Characteristics

RTN910 Classic

RTN950 Classic

RTN950A Classic

RTN905 2E Classic

CSHA Board for RTN910

CSHE Board for RTN910

CSH Board for RTN950

CSHU Board for RTN950

File name Created bydocument.doc Huawei

Page 4 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

CSHO Board for RTN950A

RTN380Classic

RTN360 Classic

File name Created bydocument.doc Huawei

Page 5 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

ISU2 Board

ISX2 Board

ISV3 Board

SP3S Board

SP3D Board

SL1D Board

EM6TA Board

EM6FA Board

EG4 Board

File name Created bydocument.doc Huawei

Page 6 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

EG4P Board

AUX Board

2.2 Indoor Unit InstallationIs in accordance with the procedural document specified in section 1

2.3 Transmission Cabling Checklist

Description checkedHow many E1 are connected from IDU-Interface to DDF 16 32 48 64

E1 Test loops removed

Ethernet Cable or optical fiber among IDU, BBU, Router (if needed), [straight cable] done N/A

Notes on Transmission Cabling

2.4 Indoor Unit Grounding

Is in accordance with the procedural document specified in section 1

2.5 Indoor Installation checklist

Description Checked

General Appearance of Indoor Unit

Indoor Unit correctly labelled with Link_ID, Frequency and IP-Address

IF cable correctly marked & connected to the Indoor unit

P&E cable and outdoor optical fiber correctly marked & connected to the Indoor unit

Grounding of 19” Transmission Rack

Power cable connected to Indoor Unit

Checked Circuit Breaker Rating and Labelled at main DC supply

File name Created bydocument.doc Huawei

Page 7 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

Cables arranged, secured to cable tray and labelled

Sync Cables on XPIC-Link connectedNotes on Indoor Installation Check

File name Created bydocument.doc Huawei

Page 8 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

2.6 Supervision/RTN-Files Loaded

Description checked

RTN-Files are loaded to the Indoor Unit

Ethernet cabling is done a to the Switch/Router

GNOC can ping the RTN GNE if DCN is readyNotes on RTN-Supervision

2.7 IP-Address Indoor UnitIP-Address_______ . _______ . _______ . _______ . Sub-mask_______ . _______ . _______ . _______ .

2.8 IP-Address for RTN380 (E-Band) or RTN360 (V-Band)IP-Address_______ . _______ . _______ . _______ . Sub-mask_______ . _______ . _______ . _______ .

File name Created bydocument.doc Huawei

Page 9 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

3 OUTDOOR UNIT INSTALLATION

3.1 IF Cable installation

Length (m)No. of

Grounding Kits

5D cable (up to 120m)

RG 214 cable (up to

100m)

Other (up to 300-350 m)See below

Allowed cable types:

Up to: Andrew Eupen NK Cable RFS

300 m 3/8 “ Hiflex FSJ2-50 EC2-50-HF RFF 3/8” - 50 SCF38-50 350 m 1/2 “ Hiflex FSJ4-50B EC4-50-HF RFF 1/2” - 50 SCF12-50

3.2 P&E Cable and outdoor optical fiber installation

Length (m)No. of

Grounding Kits

P&E cable (up to 100m)

Outdoor fiber (up to 150m)

3.3 Outdoor Unit and Cable Installation Is in accordance with the procedural document specified in section 1

3.4 Method of Installation (Outdoor Unit)Roof mounting Wall mounting

Tower installation Pole installation

3.5 Dish/ODU

Description checked

Dish Size 30cm 60cm 80cm 120cm

Vendor RFS Andrew

Polarisation Horizontal Vertical Dual polarization

Horizontal Vertical Dual polarization

Hardware Attenuator 10dB (52GHz) N/A 1 x 10dB 2 x 10dB

File name Created bydocument.doc Huawei

Page 10 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

Outdoor Installation Checklist

Description Checked

General appearance of outdoor Unit

IF cable correctly marked and connected to the outdoor unit

P&E cable and outdoor optical fiber correctly marked & connected to the outdoor unit

Grounding kits are installed in the specified location

All external connectors and cables checked for correct sealing

Grounding of outdoor unit and alignment unit

Outdoor Unit is labelled, designating Direction and Link Information

File name Created bydocument.doc Huawei

Page 11 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

4 HUAWEI RTNCOMMISSIONING LINE UP

4.1 Modulation Scheme

QPSK 16-QAM 32-QAM 64-QAM 128-QAM 256-QAM

512-QAM 1024-QAM 2048-QAM

4.2 Frequency Band

7MHz 14 MHz 28 MHz 56 MHz 250 MHz 500 MHz

4.3 TX Settings

adjusted to expected Checked

TX Frequency TXMHz# MHz TXMHz# MHz

TX Power TXdBm# dBm TXdBm# dBmTX Power Control dBm ATPC MTPC

4.4 Receiving LevelReceived Signal level should be +/- 2dB from calculated value provided by Transmission Planning.If the required level is not achievable, contact the transmission planner for further checks.

indicated expected o.k.

RX Level IndRXdBm# dBm ExpRXdBm# dBm

4.5 Link Performance Monitoring (Time set 15min)

ES Error Second Passed Ok

SES Severely Error Second Passed Ok

UAS Unavailable Second Passed Ok

BBE Background Block Error Passed Ok

OFS Out of Frame Seconds Passed Ok

5 DOCUMENTATION IN NETSITE

Implementation Protocol stored in NetSite (A- and B-End) Checked

File name Created bydocument.doc Huawei

Page 12 of 13

Microwave Equipment Site Code: SiteA#HUAWEI RTN Site Code B-side: SiteB#

Job number: JobNr#

Photos from Indoorunit, TRM-Rack and Outdoorunit/Dish stored in NetSite (A- and B-End) Checked

Photos from DDF/ODF/EDF stored in NetSite (A- and B-End) Checked

Photos from Monitor-Cabling stored in NetSite (Master) Checked

6 CONFIRMATION

This is to confirm that all of the above listed points are done in order to the current Guidelines, and that this document is filled in correctly.

ON BEHALF OF:

Implementation Subcontractor Company:

________________________________________________________________________