15
HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY- Centre International Partnership Meeting 16.1.2014

HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Embed Size (px)

Citation preview

Page 1: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

HUMPPAProgram Managed Performance Based Maintenance Contract

Espoo Pilot Project 2014 – 2019

Katja Levola, Pirkanmaan ELY-Centre

International Partnership Meeting 16.1.2014

Page 2: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 2Katja Levola

Presentation content

• Background information

• Program Managed Performance Based Maintenance Contract (PBMC) model

• HUMPPA - Pilot project

• Procurement & Tender evaluation procedure

• Contractor’s payment mechanism

• Additional potential incentives

• HUMPPA - Next steps

Page 3: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 3Katja Levola

Finnish Transport Agency (FTA)

• January 2010 – merger of the Finnish Rail Administration, Finnish Road Administration and Finnish Maritime Administration into one organization known as the Finnish Transport Agency.

• Development of maintenance and traffic systems in cooperation with other operators.

• Promote productivity and innovations in the transport sector.

• Responsible for society’s well-being, mobility of the transport system’s network, environmental stewardship and the entire transport system as a whole.

•ELY - Centres transport responsibilities (9 regions)

• In 2010 - Partially composed from the nine Finnish Road Administration regional offices

• Responsible for the mobility of road transport and safety functions

• Responsible for maintenance, transport assets, systems, safety and mobility

• Responsible for the procurement of capital investment projects and all outsourced maintenance contracts.

Page 4: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 4Katja Levola

Area Maintenance Contracts• 81 contracts, 5 year duration

• All publicly tendered

• Quality Control (QC) by contractor

• Winter Maintenance: snow plowing, prevention of slippery conditions or deicing, repairing uneven surfaces, and ensuring the visibility of traffic control equipment

• Summer Maintenance; maintaining gravel roads, traffic signs, vegetation control, grass and brush cutting, repairing surface defects that cause risks to traffic safety

• In addition: continuous monitoring of the road system & other authoritative duties, like emergency response Espoo Pilot

Project

Page 5: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 5Katja Levola

Program Managed PBMC model• Feasibility study during end of 2012.

• Applicable to very demanding type contracts, where there needs flexibility.

•Based upon principles and guidelines from the project management of maintenance contracts, alliance model, and traditional contracts.

• Model is termed “Program Managed PBMC” because the services significantly deviate from traditional projects & includes procurement in the name of the Program Managed PBMC.

• Using a target price concept.

• Committed this new model for a pilot project starting in the fall of 2013.

Page 6: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 6Katja Levola

Client’s goals• Main goal is to provide services from a road users’ perspective and provide flexibility for the implementation of these services.

• Allow for variations during the contract period.

• Better subcontracting management.

• Promote innovation & development.

• Reasonable risk sharing and promote better teamwork/cooperation.

• This new model is expected to be straightforward and is aligned with present day contracts that have the potential to be adaptable.

• Management should be reasonable.

• Amount of inspections should be lower.

Page 7: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 7Katja Levola

Structure of the Program Managed PBMC• Includes many of the typical routine and periodic maintenance services, management and administration services and all related procurement duties.

• The contractor is responsible for the maintenance planning process that needs to be approved and continually modified in a cooperative effort.

• All purchases (product deliverables, performance, service requisitions and subcontracting) will be competitively tendered even alternative bids.

• All subcontracted maintenance activities and procurement are done in the name of the PBMC contractor.

•The client will nevertheless make final decision and approval.

Page 8: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 8Katja Levola

HUMPPA - Pilot project• Pilot project in Espoo area from 2014 – 2019.

• Mainly includes the roads in the cities of Espoo, Kauniainen, Kirkkonummi and outlined parts of Helsinki.

•The contract includes about 850 km of roads• 150 km of pedestrian and bicycle pathways.

• Winter road classification 130 km of dual lane roads of class 1S

• About 200 km of single lane 1S, which includes ramps.

• The remaining road network is comprised of roads classified as II and III.

• The Espoo contract area is a highly travelled road network.

• Another challenge is the coastal area, because of changing weather.

Page 9: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 9Katja Levola

Procurement process• Contractor selection process is done in two phases.

• Prequalified bidders tenders were send a preliminary proposal in October 2013.

• Only the preliminary quality portion were submitted to the client-end of October.

• Next the client went through bilateral negotiations were intended to develop the invitation to tender documents, versus official contract negotiations.

• The second stage was to finalize the invitation to tender documents.

• Invitation to tender by the end of January 2014.

• The proposal due date is planned to be submitted by April 1, 2014.

• Wining tender is expected to be evaluated within one week.

• A signed contract is expected by the middle of May 2014.

Page 10: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 10Katja Levola

Tender evaluation procedureCategory Selection Factors Max.

possible score

Weighting Factor

Weighted Score

A1. Quality of the Maintenance Management Plans

A.1.1 Evaluation of management plans, functional descriptions and initial quality points, and depot locations, inventory of accessories

10 9 90

A.1.2 Contractor’s procurement and philosophy

10 6 60

A.1.3 Contractor’s responsiveness and commitments, as well as management to the weather conditions

10 2 20

A.1.4 Contractor’s personnel training and development

10 3 30

Subtotal of A.1 20 200 A2. Key Personnel

A.2.1 Service and organizational capacities

10 5 50

A.2.2 Key Personnel Exams 10 5 50 Subtotal of A.2 10 100

B. Bidders Price

B. Target Price 10 70 700 Subtotal of B 70 700

Total Score 100 1000

Page 11: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 11Katja Levola

Tender evaluation procedure• Using a competitive, negotiated method.

• Award is based upon most overall economically beneficial.

• Evaluation factors are 20% for quality, 10% of key personnel and 70% for the price portion.

• The quality assessment is evaluated from the submitted quality plans.

• The key personnel is composed of the service and organizational capabilities evaluation and by an examination.

• The “target price” is composed of all related procurement costs, management and administration, as well as the management service fee.

+ +

= TARGET PRICE, €

Page 12: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 12Katja Levola

Contractor’s payment mechanism

• The fixed management fee includes overhead costs, risks and profit margin.

• Contract management and administrative costs portion includes the contract management & administrative costs & office and information technology costs.

• The procurement costs include all related purchases, like all related sub-contracting, service contracts, and construction and maintenance services.

Guaranteed

Maximum Price

Target Price

0

ANY EXCESS TO NEXT YEAR

REALIZED COSTS

30% to CONTRACTOR, 70% to CLIENT

70% by CLIENT, 30% by CONTRACTOR

CONTRACTOR PAYS, OR TRANSFER COSTS

TO NEXT YEAR’S COSTS

CONTRACTOR gets 30% up to €250k, TRANSFER

Page 13: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 13Katja Levola

Additional potential incentives

One existing incentive scheme & three new incentive potentials

• The first possible incentive is for the road user satisfaction and innovation, maximum of 2% of the target price.

NEW INCENTIVES:

• Incentive for providing good maintenance services, maximum of €15000 per each contract year.

• Incentive for worker and road user safety, maximum of €15000 per each contract year.

• Incentive for safety accidents explained & evaluated, €20000 per each contract year.

 

 

Page 14: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 14Katja Levola

HUMPA – next steps

• Request for tenders sent by January 1, 2014

• Tender due date of April 1, 2014

• Contract signed by Mid-May 2014

• Contract start date of October 1, 2014

 

Page 15: HUMPPA Program Managed Performance Based Maintenance Contract Espoo Pilot Project 2014 – 2019 Katja Levola, Pirkanmaan ELY-Centre International Partnership

Pirkanmaa ELY-Centre 15Katja Levola

Thank you!

Katja Levola+358 400 277 812

[email protected]