PERHITUNGAN COOLING LOAD m ft 1. MAIN SUBSTATION (2 LANTAI) T1 = 5.8 19.14 m ft T2= 4 13.2 P = 46 151.8 (U) L= (S) DETAIL KALKULASI Asumsi : 3.15 kcal/m2 h C Tout = 36.6 C 97.88 F Tin = 24 C 75.2 F dt = 12.6 22.68 A1 = 736.6 m2 7928.762 ft2 A2 = 508 m2 5468.112 ft2 Q1 = 29235.654 kcal/h Q2 = 20162.52 kcal/h 8121.015 cal/s 5600.7 cal/s 116016.82029 btu/h 80011.6 btu/h 34.805046087 kW 24.00348 kW Equipment 1 = 70.8 kW Equi 2 = 6.33 kW 3.45 1.94 Qatap 1= 19677.42 kcal/h Qatap 2 = 34993.35 kcal/h 5465.95 cal/s 9720.375 cal/s 78086.5617 btu/h 138865.3 btu/h 23.42596851 kW 41.65958 kW Koefisien transmisi kalor untuk beton 200mm tanpa lapisan (k/dx) = Koefisien transmisi kalor untuk atap (k/dx) =

Hvac-cooling Load Amurea II

Embed Size (px)

DESCRIPTION

calculation example

Citation preview

Sheet1PERHITUNGAN COOLING LOADmft1. MAIN SUBSTATION (2 LANTAI)T1 =5.819.14mftT2=413.2hitungan kasar berdasarkan dimensi ruangan :P =46151.8(U)500 BTU/h/m2 dengan tinggi 3malternatif hitungan kasar1314833.33333333BTU/hlantai 1447439.608btu/hr394.45kW134.2318824kW+70.8=205.0318824kW13.4928454553m3/sL=17.5mlantai 2555442.272btu/hr48574.2436389481m3/h57.75fttotal heat gain :166.6326816kW+6.33=172.9626816kW11.3824187002m3/sLV :9kW40976.7073205402m3/hMCC LV :27kWTotal300.864564kW(S)MV :4kWStarter :26kWDETAIL KALKULASICapacitor :4.8kWAsumsi :MV :6kWKoefisien transmisi kalor untuk beton 200mm tanpa lapisan (k/dx) =3.15kcal/m2 h CVSD :0.18kW0.15kWTOTAL77.13kWTOTAL HITUNGAN KASAR471.58kWhitungan WUHUAN278kWrhoAir =1.2kg/m3cp1005J/kg Kqc19.8436766876m3/sTout =36.6C97.88F35437.2360752466m3/hTin =24C75.2Fdt = 12.622.68qc2 =5.7131783414m3/sA1 =736.6m27928.7624ft220567.442029159m3/hA2 = 508m25468.112ft2Q1 =29235.654kcal/hQ2 =20162.52kcal/hTotal 1 =149.5805734736kW8121.015cal/s5600.7cal/sTotal 2 =86.8151728051kW116016.82029btu/h80011.6002btu/hVentilation34.805046087kW24.00348006kW10ACHcable room14490m3/hEquipment 1 =70.8kWEqui 2 =6.33kWKoefisien transmisi kalor untuk atap (k/dx) =3.451.94Qatap 1=19677.42kcal/hQatap 2 =34993.35kcal/h5465.95cal/s9720.375cal/s78086.5617btu/h138865.27725btu/h23.42596851kW41.659583175kWq1 =68498.52958872btu/hrq2 =47240.3652336btu/hr20.5495588766kW14.1721095701kWjumlah kalo manusia per orang =0.13kW5 orang =0.65kW

Sheet1 (2)PERHITUNGAN COOLING LOADmft1. SS utilitasT1 =413.2mftT2=413.2hitungan kasar berdasarkan dimensi ruangan :P =2066(U)500 BTU/h/m2 dengan tinggi 3malternatif hitungan kasar106666.666666667BTU/hlantai 1137998.08btu/hr32kW41.399424kW+13.5=54.899424kW3.6128500355m3/sL=8m13006.2601279318m3/h26.4fttotal heat gain :

MCC LV :13.5kW(S)DETAIL KALKULASIAsumsi :Koefisien transmisi kalor untuk beton 200mm tanpa lapisan (k/dx) =3.15kcal/m2 h C

TOTAL13.5kWTOTAL HITUNGAN KASAR45.5kWhitungan WUHUAN50kWrhoAir =1.2kg/m3cp1005J/kg Kqc12.0767275796m3/sTout =36.6C97.88F7476.2192866524m3/hTin =24C75.2Fdt = 12.622.68qc2 =1.4268073711m3/sA1 =224m22411.136ft25136.5065361194m3/hA2 = 224m22411.136ft2Q1 =8890.56kcal/hQ2 =8890.56kcal/hTotal 1 =31.557121609kW2469.6cal/s2469.6cal/sTotal 2 =21.681194089kW35280.7056btu/h35280.7056btu/hVentilation10.58421168kW10.58421168kW10ACHcable room2880m3/hEquipment 1 =13.5kWEqui 2 =0kWKoefisien transmisi kalor untuk atap (k/dx) =3.451.94Qatap 1=3911.04kcal/hQatap 2 =6955.2kcal/h1086.4cal/s1932cal/s15520.3104btu/h27600.552btu/h4.65609312kW8.2801656kWq1 =9389.3893632btu/hrq2 =9389.3893632btu/hr2.816816809kW2.816816809kWjumlah kalo manusia per orang =0.13kW5 orang =0kW