11
HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00 24 November 2015 SPECIAL CONDITIONS 01050 - 1 DIVISION 1 - GENERAL REQUIREMENTS SECTION 01050 - SPECIAL CONDITIONS SCOPE The specifications describe the work to be done and the material to be provided for performing HVAC testing, adjusting and balancing (“TAB”) services for the construction of the new Science Building Phase II, Eastern Kentucky University, Richmond, Ky. These Special Conditions shall apply to all Divisions of the Specifications. PROJECT DESCRIPTION The new construction is to be a six-story science building. The new science building includes classrooms, teaching laboratories, research laboratories, offices, support spaces, chemical storage areas, and common spaces. The building includes approximately 174,195 gross square feet. The sixth floor is for mechanical equipment only. Building components; extensive laboratory casework and fume hoods and limited fixed laboratory. The HVAC System consists of a variable-air-volume with reheat HVAC system, and on-site chillers (Steam is supplied by the university's central power plant). DEFINITIONS The term "Owner" as used throughout the Specifications and Contract Documents means the Commonwealth of Kentucky, acting through the Finance and Administration Cabinet and its Administrative Agent, the Department for Facilities Management. Marc Avery, PE, 502-782-0312 ( [email protected] ). The term “Engineer" as used throughout the Specifications and Contract Documents means the firm Staggs & Fisher Engineers, 3264 Lochness Dr., Lexington, Ky. 40517 (859) 271-3246 Attn: John Mason ([email protected] ). The term “Prime or General Contractor” as used throughout the Specifications and Contract Documents means D.W Wilburn, Inc. 153 Blue Sky Pkwy., Lexington Ky. 40509, cell Attn: Jeff Edwards, (859) 797-9375 ( [email protected] ).

HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

  • Upload
    others

  • View
    40

  • Download
    1

Embed Size (px)

Citation preview

Page 1: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 1

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01050 - SPECIAL CONDITIONS

SCOPE

The specifications describe the work to be done and the material

to be provided for performing HVAC testing, adjusting and

balancing (“TAB”) services for the construction of the new

Science Building Phase II, Eastern Kentucky University, Richmond,

Ky.

These Special Conditions shall apply to all Divisions of the

Specifications.

PROJECT DESCRIPTION

The new construction is to be a six-story science building. The

new science building includes classrooms, teaching laboratories,

research laboratories, offices, support spaces, chemical storage

areas, and common spaces. The building includes approximately

174,195 gross square feet. The sixth floor is for mechanical

equipment only.

Building components; extensive laboratory casework and fume hoods

and limited fixed laboratory. The HVAC System consists of a

variable-air-volume with reheat HVAC system, and on-site chillers

(Steam is supplied by the university's central power plant).

DEFINITIONS

The term "Owner" as used throughout the Specifications and

Contract Documents means the Commonwealth of Kentucky, acting

through the Finance and Administration Cabinet and its

Administrative Agent, the Department for Facilities Management.

Marc Avery, PE, 502-782-0312 ( [email protected] ).

The term “Engineer" as used throughout the Specifications and

Contract Documents means the firm Staggs & Fisher Engineers, 3264

Lochness Dr., Lexington, Ky. 40517 (859) 271-3246 Attn: John

Mason ([email protected] ).

The term “Prime or General Contractor” as used throughout the

Specifications and Contract Documents means D.W Wilburn, Inc. 153

Blue Sky Pkwy., Lexington Ky. 40509, cell Attn: Jeff Edwards,

(859) 797-9375 ( [email protected] ).

Page 2: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 2

The term “Mechanical Contractor” as used throughout the

Specifications and Contract Documents means Lagco, Inc., PO Box

12510, Lexington, KY 40583, Attn: James Beazley, cell (859) 396-

5635 ( [email protected] ).

The “Commissioning Authority” will be Facility Commissioning

Group, 158 Burt Rd., Lexington. Ky. 40503, (859) 278 5552, Attn:

Kim Kissick, Cell (859) 553-2599, ([email protected]).

The “Building Controls Contractor” will be Johnson Controls,

Inc., 1051 Floyd Dr., Lexington, KY 40505, Attn: Dan Esslinger,

cell (513) 310-3870, ([email protected] ).

The Building Controls Manufacturer will be Johnson Controls.

SUBSTANTIAL COMPLETION DATE

The TAB Agency is responsible for coordinating the TAB work with

the project schedule through the Prime Contractor. The

substantial completion date for work by the Prime Contract is

April 2017. This will be the completion date the TAB Contact.

Included in these documents is a Contractor’s Construction

Schedule for reference (see FTP Site).

DUCT PRESSURE TESTING

Duct Pressure testing will be by Allowance, time adjusted by Unit

Price

Special Note: Duct Pressure Testing (only) on the Vivarium Area

(As shown on Drawing H1.1b) is not a part of this work. The

Vivarium Duct Testing has already been done under a previous

contract.

RELATED DOCUMENTS

Specification Volume 1&2 of 2

Mechanical Specifications: Division 23

Testing & Balancing Section: 230593

Commissioning Sections: 019113

LEED Sections: 01314.01, 018113.13

Specific HVAC Drawings: H1.1 thru H6.2

Also See “Addendum Composite Set.

Addendum: #1,2,3,4,5

Other Documents provided for reference.

Page 3: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 3

ACCEPTED ALTERNATES

Alternate #1.

DOCUMENT ACCESS

A complete set of Bid Documents are available on the

ecommunication web site of the General Contractor -

http://www.lynnimaging.com/eCommunication – User Name: testing123

– Password: balance1 - Select “EKU New Science Building Phase 2”

- Select “Document Library”.

Included are Drawings, Specifications, Addendum and available

Submittals.

EXHAUST HOODS

Chemical Fume hoods in the Science Laboratories.

ASHRAE 110 Test to be conducted by others.

Commissioning Authority

The TAB Contractor is responsible for certain aspects of

the commissioning process for this project. These include,

but are not limited to: completion of Checkout and Start-up

Plans, participation in equipment start-up, attendance at

commissioning progress meetings, response to Resolution

Tracking Forms, response to Corrective Action Report,

participation in Owner Training, participate in TAB

verification and participation in Functional and Seasonal

Testing.

Supplemental Services associated with the Commissioning

Process:

1. Attend project Progress Meetings as needed. The

Commissioning Meetings will occur during regularly

scheduled Construction Progress Meetings.

2. Seasonal Testing; The TAB Agency will need to provide assistance with 4 HVAC-related seasonal functional

tests as identified in the Commissioning Plan. It is

anticipated to require 6 hours of assistance.

Page 4: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 4

3. Functional Testing; The TAB Agency will need to

provide assistance with HVAC-related functional tests

as identified in the Commissioning Plan

NOTE: Times listed for this task are estimates. Actual

compensation will be determined as stated in the Allowance

section below.

Unanticipated Services

Work not anticipated in the Base Bid Documents. This may

include; repeated testing needed due to the equipment not

ready for of passing the initial tests, additional services

requested by the Owner or Engineer, etc.

ALLOWANCES

Include in the Base Bid an Allowance for 70 Hours for Duct Air

Pressure Testing, Supplemental Services, Unanticipated Services

and related Travel Time.

The Contract price will be adjusted (more or less) an amount

equal to the net difference between the Allowance amount and the

actual documented amount based on the listed Unit Price: with no

Overhead and Profit line charge.

The Contactor is to document all time spent in association with

this Allowance. Upon completion of the Allowance Work, present

to the Engineer a documented Change Order to properly adjust the

Contract Price. A TAB ALLOWANCE LOG is provided to facilitate

this documentation. Indicate which line items are repeats of

work; not ready, failed, etc., as this will be back-charged to

the appropriate Contractor.

REPORTS

The TAB Agency will submit the final TAB report for review by the

Engineer. All outlets, devices, HVAC equipment, etc., will be

identified, along with a numbering system corresponding to report

unit identification. The TAB Agency will submit a National

Project Performance Guaranty assuring that the project systems

were tested, adjusted and balanced in accordance with the project

specifications and National Standards.

At completion and prior to final payment; Provide the National

Project Performance Guaranty certificate (AABC “National

Page 5: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 5

Performance Guaranty”, NEBB “Quality Assurance Program”

certificate) , submit 3 hard copies of the Final TAB Report and 3

digital (Compact Disc - PDF Format) copies of the Final TAB

Report.

PAYMENT

- Partial payments up to 90% of the Contact Amount may

be requested (invoiced) and may be approved as

appropriate for the acceptable work completed.

- The final 10% will be paid upon approval and

submission of the Final Report, and all other closeout

items.

Show each item of equipment or task completed, in general,

as an individual line item on the Invoice.

All invoicing is to be on the official State Invoice Form

(SAS-25). The final invoice is to be accompanied by a

completed, signed and notarized Final Affidavit (B-210-13 –

see sample (contract) --- Affidavit for Bidders, Offerors

and Contractors (small purchase)). The forms can be found

in the Kentucky.gov web site under the Electronic Forms

section:

Planroom:

http://finance.ky.gov/services/stateplan/Pages/Construction

FormsandInformation.aspx

Page 6: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 6

LIST OF UNIT PRICES

Unit Prices shall include the furnishing of all labor,

materials, supplies, services and shall include all items

of cost, overhead and profit for the Contractor and any

Subcontractor involved, and shall be used uniformly

without modification for either additions or deductions.

DESCRIPTION OF WORK

QUANTITY UNIT PRICE

1. ADDITONAL WORK &

DUCT LEAK TESTING __HOUR__ $_____________/Hr .

Includ ing Travel, Eq uip m ent & Mat er ials

Est im at ed Num b er o f hours f o r Duct Leak Test ing (in f o rm at ion on ly)

____________Hr .

NOTE: The Travel Tim e Hour ly Rat e includes t he t ransport at ion

cost (i.e . m ileage f or an equipped service vehicle.

Cars and m inim ally equipped light t rucks w ill be at t he norm al

t ravel St at e Travel rat e plus Travel Tim e).

END OF SECTION 01050

Page 7: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 7

TAB ALLOWANCE LOG

This log is to track the Specified Allowance Work associated with the Testing & Balancing Contract – normally duct pressure testing, unanticipated work or special work related to the Commissioning effort. Update this log as the work is completed; then attach the updated log with each invoice. Submit related Change Orders as appropriate.

Project Title: New Science Building Phase 2 - Eastern Kentucky University

Agency:__430__ Fund: C73Y ______ Allowance:__70 Hours

DATE TASK (INDICATE IF THIS IS A REPEAT) UNITS WORKED UNIT PRICE TOTAL _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ GRAND TOTAL (This Page)

Page 8: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 8

NET CHANGE ORDER:(This Page)________________________________________________

PAGE _____ OF _____ SAMPLE FINAL AFFIDAVIT:

Page 9: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 - 9

Page 10: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 -

10

Page 11: HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00

HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.

ACC# 430-C73Y-KU59-00 24 November 2015

SPECIAL CONDITIONS 01050 -

11