90
0 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1-L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI - Left Lane Lane Designations Increase From Centreline L1 - Divided Hwy, Left of Centreline in Direction of Increasing Chainage C1 - Undivided Hwy R1 - Divided Hwy, Right of Centreline in Direction of Increasing Chainage Roadway Designations from the most recent survey Designations are displayed Roadway-Lane (e.g. C1-R1) and are taken 2004 EBA 2005 EBA 2006 EBA LEGEND PROJECT IRI Data Analysis 2004-2006 CLIENT Alberta Infrastructure and Transportation TITLE Highway 719:02 Undivided C1 Mean Wheel Path IRI DATE 2007-05-18 FILE NO. E31101019 FIGURE A.701 PAGE 1 of 1

Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

  • Upload
    ngokiet

  • View
    219

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 120

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 719:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 719:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.701 PAGE 1 of 1

Page 2: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 70

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 721:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 721:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.702 PAGE 1 of 1

Page 3: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 722:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 722:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.703 PAGE 1 of 1

Page 4: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 723:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 723:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.704 PAGE 1 of 1

Page 5: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 724:04 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 724:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 724:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.705 PAGE 1 of 1

Page 6: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 725:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 725:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.706 PAGE 1 of 1

Page 7: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 160

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 726:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 726:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.707 PAGE 1 of 1

Page 8: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 0.5 1 1.5 2 2.5 30

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 727:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 727:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.708 PAGE 1 of 1

Page 9: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 731:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 731:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 731:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.709 PAGE 1 of 1

Page 10: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 160

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 732:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 160

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 732:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 732:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.710 PAGE 1 of 1

Page 11: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 733:02 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 733:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 733:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.711 PAGE 1 of 1

Page 12: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 733:04 Mean IRI − Right Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 733:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 733:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.712 PAGE 1 of 1

Page 13: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 120

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 735:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 735:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.713 PAGE 1 of 1

Page 14: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 736:02 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 736:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 736:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.714 PAGE 1 of 1

Page 15: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 737:02 Mean IRI − Right Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 737:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 737:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.715 PAGE 1 of 1

Page 16: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 8 90

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 739:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 739:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.716 PAGE 1 of 1

Page 17: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 10 20 30 40 500

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1 C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 740:02 Mean IRI − Right Lane

0 10 20 30 40 500

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1C1−L1 C1−

L2C

1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 740:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 740:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.717 PAGE 1 of 1

Page 18: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 0.2 0.4 0.6 0.8 10

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 741:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 741:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.718 PAGE 1 of 1

Page 19: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 70

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1 R1−

R1

C1−R1 R1−

R1

C1−R2 R1−R2

Chainage (km)

IRI (

mm

/m)

Hwy 742:02 Mean IRI − Right Lane

0 1 2 3 4 5 6 70

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1 L1−

L1

C1−L1 L1−

L1

C1−L2 L1−L2

Chainage (km)

IRI (

mm

/m)

Hwy 742:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 742:02Undivided C1,Divided R1−Rx / L1−Lx

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.719 PAGE 1 of 1

Page 20: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 140

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 743:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 140

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 743:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 743:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.720 PAGE 1 of 1

Page 21: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 744:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 744:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.721 PAGE 1 of 1

Page 22: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 10 20 30 40 50 600

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 744:04 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 744:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.722 PAGE 1 of 1

Page 23: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 150

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 747:01 Mean IRI − Right Lane

0 5 10 150

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 747:01 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 747:01Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.723 PAGE 1 of 1

Page 24: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 35 400

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 747:02 Mean IRI − Right Lane

0 5 10 15 20 25 30 35 400

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 747:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 747:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.724 PAGE 1 of 1

Page 25: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 748:02 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 748:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 748:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.725 PAGE 1 of 1

Page 26: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 748:04 Mean IRI − Right Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 748:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 748:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.726 PAGE 1 of 1

Page 27: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 749:02 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 749:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 749:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.727 PAGE 1 of 1

Page 28: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 160

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 749:04 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 160

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 749:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 749:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.728 PAGE 1 of 1

Page 29: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 750:02 Mean IRI − Right Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 750:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 750:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.729 PAGE 1 of 1

Page 30: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 750:04 Mean IRI − Right Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 750:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 750:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.730 PAGE 1 of 1

Page 31: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 750:06 Mean IRI − Right Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 750:06 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 750:06Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.731 PAGE 1 of 1

Page 32: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 751:02 Mean IRI − Right Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 751:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 751:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.732 PAGE 1 of 1

Page 33: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 751:04 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 751:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 751:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.733 PAGE 1 of 1

Page 34: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 752:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 752:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.734 PAGE 1 of 1

Page 35: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1 R1−

R1

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 752:04 Mean IRI − Right Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1 L1−

L1

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 752:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 752:04Undivided C1,Divided R1−R1 / L1−L1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.735 PAGE 1 of 1

Page 36: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1 C1−

R2

C1−

R1

C1−R2 C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 753:02 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 753:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 753:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.736 PAGE 1 of 1

Page 37: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 753:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 753:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.737 PAGE 1 of 1

Page 38: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 754:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 754:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 754:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.738 PAGE 1 of 1

Page 39: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 35 400

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 754:04 Mean IRI − Right Lane

0 5 10 15 20 25 30 35 400

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 754:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 754:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.739 PAGE 1 of 1

Page 40: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 754:06 Mean IRI − Right Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 754:06 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 754:06Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.740 PAGE 1 of 1

Page 41: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 0.5 1 1.5 2 2.5 3 3.5 4 4.50

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 756:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 756:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.741 PAGE 1 of 1

Page 42: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 757:02 Mean IRI − Right Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 757:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 757:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.742 PAGE 1 of 1

Page 43: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 140

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 757:04 Mean IRI − Right Lane

0 2 4 6 8 10 12 140

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 757:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 757:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.743 PAGE 1 of 1

Page 44: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 0.5 1 1.5 2 2.5 3 3.5 4 4.50

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 758:02 Mean IRI − Right Lane

0 0.5 1 1.5 2 2.5 3 3.5 4 4.50

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 758:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 758:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.744 PAGE 1 of 1

Page 45: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 759:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 759:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 759:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.745 PAGE 1 of 1

Page 46: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 759:04 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 759:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 759:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.746 PAGE 1 of 1

Page 47: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 8 90

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 760:02 Mean IRI − Right Lane

0 1 2 3 4 5 6 7 8 90

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 760:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 760:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.747 PAGE 1 of 1

Page 48: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 761:02 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 761:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 761:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.748 PAGE 1 of 1

Page 49: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 160

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 761:04 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 160

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 761:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 761:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.749 PAGE 1 of 1

Page 50: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 80

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 761:06 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 761:06Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.750 PAGE 1 of 1

Page 51: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 762:02 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 762:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 762:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.751 PAGE 1 of 1

Page 52: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 763:02 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 763:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 763:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.752 PAGE 1 of 1

Page 53: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 764:02 Mean IRI − Right Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 764:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 764:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.753 PAGE 1 of 1

Page 54: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 765:02 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 765:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 765:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.754 PAGE 1 of 1

Page 55: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 766:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 766:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.755 PAGE 1 of 1

Page 56: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 766:04 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 766:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.756 PAGE 1 of 1

Page 57: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 766:06 Mean IRI − Right Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 766:06 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 766:06Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.757 PAGE 1 of 1

Page 58: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 766:10 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 766:10Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.758 PAGE 1 of 1

Page 59: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 766:12 Mean IRI − Right Lane

0 5 10 15 20 25 30 350

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 766:12 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 766:12Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.759 PAGE 1 of 1

Page 60: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 769:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 769:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.760 PAGE 1 of 1

Page 61: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 8 90

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 770:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 770:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.761 PAGE 1 of 1

Page 62: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 770:04 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1 C1−L2 C1−

L1

Chainage (km)

IRI (

mm

/m)

Hwy 770:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 770:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.762 PAGE 1 of 1

Page 63: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 770:06 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 770:06 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 770:06Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.763 PAGE 1 of 1

Page 64: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 771:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 771:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 771:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.764 PAGE 1 of 1

Page 65: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 771:03 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 771:03 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 771:03Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.765 PAGE 1 of 1

Page 66: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 120

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 771:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 771:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.766 PAGE 1 of 1

Page 67: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 771:06 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 771:06 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 771:06Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.767 PAGE 1 of 1

Page 68: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 772:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 772:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.768 PAGE 1 of 1

Page 69: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 774:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 774:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.769 PAGE 1 of 1

Page 70: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 80

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5L1

−L1

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 775:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 775:02Undivided C1,Divided L1−L1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.770 PAGE 1 of 1

Page 71: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 776:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 776:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 776:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.771 PAGE 1 of 1

Page 72: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 8 90

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 777:01 Mean IRI − Right Lane

0 1 2 3 4 5 6 7 8 90

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 777:01 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 777:01Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.772 PAGE 1 of 1

Page 73: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 8 9 100

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 777:04 Mean IRI − Right Lane

0 1 2 3 4 5 6 7 8 9 100

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 777:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 777:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.773 PAGE 1 of 1

Page 74: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 778:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 778:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 778:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.774 PAGE 1 of 1

Page 75: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1 C1−R2 C1−

R1

R1−

R1

C1−R1 R1−

R1

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 779:02 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1 C1−L2 C1−

L1L1

−L1

C1−L1 L1−

L1

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 779:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 779:02Undivided C1,Divided R1−R1 / L1−L1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.775 PAGE 1 of 1

Page 76: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 80

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 780:02 Mean IRI − Right Lane

0 1 2 3 4 5 6 7 80

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 780:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 780:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.776 PAGE 1 of 1

Page 77: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 781:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 781:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.777 PAGE 1 of 1

Page 78: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 0.5 1 1.5 2 2.5 30

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 782:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 782:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.778 PAGE 1 of 1

Page 79: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 100

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 783:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 783:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.779 PAGE 1 of 1

Page 80: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 10 20 30 40 50 600

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 785:02 Mean IRI − Right Lane

0 10 20 30 40 50 600

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 785:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 785:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.780 PAGE 1 of 1

Page 81: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 140

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 791:02 Mean IRI − Right Lane

0 2 4 6 8 10 12 140

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 791:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 791:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.781 PAGE 1 of 1

Page 82: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 1 2 3 4 5 6 7 8 90

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 791:05 Mean IRI − Right Lane

0 1 2 3 4 5 6 7 8 90

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 791:05 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 791:05Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.782 PAGE 1 of 1

Page 83: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 30 35 40 450

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 791:06 Mean IRI − Right Lane

0 5 10 15 20 25 30 35 40 450

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 791:06 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 791:06Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.783 PAGE 1 of 1

Page 84: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 791:08 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 791:08 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 791:08Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.784 PAGE 1 of 1

Page 85: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 792:02 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 792:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 792:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.785 PAGE 1 of 1

Page 86: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 792:04 Mean IRI − Right Lane

0 2 4 6 8 10 12 14 16 180

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 792:04 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 792:04Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.786 PAGE 1 of 1

Page 87: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 20

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 795:02 Mean IRI − Right Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 795:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.787 PAGE 1 of 1

Page 88: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 795:06 Mean IRI − Right Lane

0 5 10 15 20 25 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 795:06 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 795:06Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.788 PAGE 1 of 1

Page 89: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 797:02 Mean IRI − Right Lane

0 5 10 15 20 250

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 797:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 797:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.789 PAGE 1 of 1

Page 90: Hwy 719:02 Mean IRI − Left Lane 5 4.5 4 IRI (mm/m) 0.5 00 … 2 4 6 8 10 12 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 C1−L1 Chainage (km) IRI (mm/m) Hwy 719:02 Mean IRI − Left Lane Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−R1

Chainage (km)

IRI (

mm

/m)

Hwy 799:02 Mean IRI − Right Lane

0 5 10 15 200

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

C1−L1

Chainage (km)

IRI (

mm

/m)

Hwy 799:02 Mean IRI − Left Lane

Lane Designations Increase From Centreline

L1 − Divided Hwy, Left of Centreline in Direction of Increasing ChainageC1 − Undivided HwyR1 − Divided Hwy, Right of Centreline in Direction of Increasing ChainageRoadway Designations

from the most recent surveyDesignations are displayed Roadway−Lane (e.g. C1−R1) and are taken

2004 EBA2005 EBA2006 EBA

LEGENDPROJECT

IRI Data Analysis 2004−2006

CLIENT

Alberta Infrastructure and Transportation

TITLE

Highway 799:02Undivided C1

Mean Wheel Path IRIDATE 2007−05−18 FILE NO. E31101019 FIGURE A.790 PAGE 1 of 1