13
STAR REFINERY REFINERY FIREFIGHTING SYSTEM IMPROVEMENT PROJECT CONTRACT Nº STR-PRM-CTR-016 UNIT Nº 000 CONTRACTOR DOC No: 920858-FI-011-001 SH/OF 1/7 STAR DOCUMENT No. 000-A-ZE-0040001-015 REV 0 HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER MANIFOLD 0 26-Nov-19 Issue for Review ESS ESS OS REV. ISSUE DATE REASON FOR ISSUE PREPARED BY CHECKED BY APPROVED BY

HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

STAR REFINERY REFINERY FIREFIGHTING SYSTEM IMPROVEMENT

PROJECT

CONTRACT Nº STR-PRM-CTR-016

UNIT Nº 000

CONTRACTOR DOC No: 920858-FI-011-001

SH/OF 1/7

STAR DOCUMENT No. 000-A-ZE-0040001-015

REV 0

HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER MANIFOLD

0 26-Nov-19 Issue for Review ESS ESS OS

REV. ISSUE DATE REASON FOR ISSUE PREPARED

BY CHECKED

BY APPROVED

BY

Page 2: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

STAR REFINERY REFINERY FIREFIGHTING SYSTEM IMPROVEMENT

PROJECT

CONTRACT Nº STR-PRM-CTR-016

UNIT Nº 000

CONTRACTOR DOC No: 920858-FI-011-001

SH/OF 2/7

STAR DOCUMENT No. 000-A-ZE-0040001-015

REV 0

TABLE OF CONTENTS

1 GENERAL .............................................................................................................................................3

1.1 PURPOSE ................................................................................................................................................... 3

1.2 OBJECTIVES .............................................................................................................................................. 3

2 REFERENCES ......................................................................................................................................3

2.1 PROJECT DOCUMENTS ............................................................................................................................ 3

2.1.1 Project Specifications ................................................................................................................................ 3

2.1.2 Basis of Design and Project Documents ................................................................................................. 3

2.2 INTERNATIONAL STANDARDS AND CODES .......................................................................................... 4

3 ABBREVIATIONS .................................................................................................................................4

4 DEFINITIONS ........................................................................................................................................5

4.1 GENERAL DEFINITIONS ............................................................................................................................ 5

5 REQUIREMENTS ..................................................................................................................................5

6 FORMULA AND CALCULATION DATA ..............................................................................................5

6.1 GENERAL CRITERIA .................................................................................................................................. 5

6.2 FORMULA ................................................................................................................................................... 6

7 ATTACHMENT ......................................................................................................................................7

Page 3: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

STAR REFINERY REFINERY FIREFIGHTING SYSTEM IMPROVEMENT

PROJECT

CONTRACT Nº STR-PRM-CTR-016

UNIT Nº 000

CONTRACTOR DOC No: 920858-FI-011-001

SH/OF 3/7

STAR DOCUMENT No. 000-A-ZE-0040001-015

REV 0

1 GENERAL

1.1 PURPOSE

The scope of this document is the Fire Water Hydraulic Calculation of 1x 12” Fire Water

Manifolds within Oil Storage Tanks Area (Unit 620 and Unit 640) and Process Units (U-100, U-

110, U-120, U-130, U-140, U-150, U-160, U-190, U-430, U-450, U-662) according to design

specification and standards used in the AEGEAN REFINERY project.

1.2 OBJECTIVES

The purpose of this document is to define and present the guidelines and requirements of fire

water hydraulic calculation for fire protection systems of plant, in conjunction with relevant

project specifications, which will be supplied for DHI QAR Combined Cycle Power Plant Project.

The following values are determined by means of hydraulic calculation within document;

Flow rates

Simultaneous system actuation

Friction losses

System pressures available

Velocities and line sizes

2 REFERENCES

The fire protection system shall be designed and installed in accordance with the following

referenced Codes, Standards and Technical Specifications. The editions of the listed codes are

the current revisions at the date of Contract signature.

2.1 PROJECT DOCUMENTS

2.1.1 Project Specifications

STGPS-S4 FIRE PROTECTION AND SAFETY FACILITIES

2.1.2 Basis of Design and Project Documents

920858-PC-105-001 FIRE PROTECTION SYSTEMS DESIGN BASIS

100-A-EB-050250-001 P&ID CDU-VDU (U-100)

110-A-EB-050320-001 P&ID 110/410 SGP/SRCT (SECTION 300)

120-A-EB-050901-001 P&ID NHT/CCR UNIT (U-120/160620TK-001B/C)

130-A-EB-050901-001 P&ID KEROSENE HYDROTREATING UNIT (U-130)

140-A-EB-050901-001 P&ID UNIT 140 (SECTION 200)

150-A-EB-050156-001 P&ID UNICRACKING PROCESS UNIT (U-150) SECTION 300

Page 4: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

STAR REFINERY REFINERY FIREFIGHTING SYSTEM IMPROVEMENT

PROJECT

CONTRACT Nº STR-PRM-CTR-016

UNIT Nº 000

CONTRACTOR DOC No: 920858-FI-011-001

SH/OF 4/7

STAR DOCUMENT No. 000-A-ZE-0040001-015

REV 0

420-A-EB-050901-001 P&ID ARU/SRU/SWS UNIT (U-420/421/430/440/441/442)

450-A-EB-050034-001 P&ID UNIT 450 (SECTION 400)

620-A-EB-050903-001 P&ID CRUDE OIL STORAGE TANK (620TK-001B/C)

640-A-EB-050902-001 P&ID DIESEL EN590 STORAGE AREA (640TK-007A/B)

640-A-EB-050903-001 P&ID DIESEL EN590 STORAGE AREA (640TK-007C/D)

660-A-EB-050902-001 P&ID FLARE AREA B (U660B/661B)

662-A-EB-050011-001 P&ID U-662 (SECTION 100)

2.2 INTERNATIONAL STANDARDS AND CODES

NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

NFPA 14 STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS

NFPA 24 STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES

API 2001 FIRE PROTECTION IN REFINERIES

API 2021 MANAGEMENT OF ATMOSPHERIC STORAGE TANK FIRES

3 ABBREVIATIONS

Lengths (L) Meters (m)

Time (T) Minutes (m)

Pipe Diameter (ø) Inch or mm

Pressure (P) Bar

Pressure loss (P) Bar/m

Flow Meter cubic per hour (m3/h) or gallon per minute (gpm)

Discharge Density Liters per minute and square meter (l/min/m2)

Velocity Meters per second (m/sec)

Temperature Degree centigrade (ºC)

Height elevate Meters (m)

C-factor Friction loss coefficient

Page 5: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

STAR REFINERY REFINERY FIREFIGHTING SYSTEM IMPROVEMENT

PROJECT

CONTRACT Nº STR-PRM-CTR-016

UNIT Nº 000

CONTRACTOR DOC No: 920858-FI-011-001

SH/OF 5/7

STAR DOCUMENT No. 000-A-ZE-0040001-015

REV 0

4 DEFINITIONS

4.1 GENERAL DEFINITIONS

The following words and expressions used in the Specification have the following meanings:

OWNER shall mean STAR Refinery A.Ş. (STAR)

ENGINEER means ÇİMTAŞ.

VENDOR shall mean any part who delivers equipment and materials for

FACILITIES/UNITS

PROJECT means Fixed Fire Fighting system rehabilitation and U-630/640 LPG unit &

Impounding basin area Fire Fighting system rehabilitation of STAR Refinery A.Ş.(STAR) at

Aliağa, TURKEY

FACILITIES/UNITS shall mean the entire facilities, units, and plants where fire fighting

systems to be rehabilitated in conformity with the PROJECT requirements and scope that

ENGINEER meet its liabilities as defined in the agreement on, under, in or through

OWNER’s JOBSITE.

JOBSITE shall mean OWNER’s property land at IZMIR – ALIAĞA, TURKEY on, under, in

or through which the required FACILITIES for rehabilitation of fire fighting systems.

5 REQUIREMENTS

The Hydraulic calculation shall be performed considering the minimum pressure at hose connection points on the fire water manifolds.The minimum pressure at hose connections most remote nozzle is 7 bar (NFPA 24). The pressure and flow required by the system at the point of connection to the water supply system have been verified by Omnicadd HCS 2.3.The results are shown in Calculation Report table. For hydraulic calculation, the following general data has been considered for all calculation: • Minimum Pressure at Hose Connection = 7 bar

• Values “C” for Carbon Steel Pipe = 120 (Table 23.4.4.8.1 of NFPA 13)

• Maximum velocity allowable for Fire Water Mains = 3.5 m/sec.

6 FORMULA AND CALCULATION DATA

6.1 GENERAL CRITERIA

The calculations are performed by a hydraulic calculation software, the procedures described

on NFPA 13 and NFPA 24.

Page 6: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

STAR REFINERY REFINERY FIREFIGHTING SYSTEM IMPROVEMENT

PROJECT

CONTRACT Nº STR-PRM-CTR-016

UNIT Nº 000

CONTRACTOR DOC No: 920858-FI-011-001

SH/OF 6/7

STAR DOCUMENT No. 000-A-ZE-0040001-015

REV 0

ASME-B36.10 ASTM A106 Grade B Seamless pipes shall be installed for aboveground fire

protection systems. Equivalent lengths of the used fittings as given in NFPA 13, are added to

the actual length of each pipe pathway for input into the pressure drop calculation. Pressure

drop due to friction is calculated for each pathway by using the Hazen-Williams pressure drop

method. All pressure drops through each critical pathway leading to a system are added for a

total pressure drop due to friction.

6.2 FORMULA

Friction loss formula is described in item 23.4.2.1.1 of NFPA 13

𝑃𝑚 = 6.05 × (𝑄𝑚

1.85

𝐶1.85 × 𝑑𝑚4.87) × 105

where: Pm = frictional resistance (bar/m of pipe)

Qm = flow (L/min)

C = friction loss coefficient

dm = actual internal diameter (mm)

Input Data

The following requirements has been considered as input to OmniCADD Software.

1. Assumed Terminal Point head is 22712 45424 lpm (126.000 gpm) at 8 bar. In case of fire one

Ambassador Mobile Monitor (6.000 gpm) and 2 (two) Fire Fighting Truck ( 2x 3.000 gpm) shall

be connected to 1 x 12” + 2 x 6” Fire Water Manifold.

2. Maximum velocity in the underground fire water network is 3.5 m/s

3. Hose Streams for one (1) outlet is required flow and pressure 22712 lpm (6.000 gpm) at 7

bar. Two (2) outlets are required flow and pressure 2 x 11356 lpm ( 2 x 3.000 gpm) at 7

bar.Hose Streams for one (1) outlet (12”) is required flow and pressure 11356 lpm (3.000 gpm)

at 7 bar, for two (2) outlets (6”) are required flow and pressure 5678 lpm (1.500 gpm) at 7 bar

Output Data

The following requirements has been considered as input output to OmniCADD Software.

1. Calculated head is 22712 45424 lpm (612.000 gpm) at 7.2 bar.

2. Calculated maximum velocity in the manifold pipes is 5.110.2 m/s

Page 7: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

STAR REFINERY REFINERY FIREFIGHTING SYSTEM IMPROVEMENT

PROJECT

CONTRACT Nº STR-PRM-CTR-016

UNIT Nº 000

CONTRACTOR DOC No: 920858-FI-011-001

SH/OF 7/7

STAR DOCUMENT No. 000-A-ZE-0040001-015

REV 0

7 ATTACHMENT

Hydraulic Calculation Report is indicated in attached.

Page 8: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

HYDRAULIC CALCULATIONS

for

1 x 12" + 2 x 6" Fire Water Manifold

Contract No.

Date November 26, 2019

Design Data:

Remote Area Location Units (U-100, U-110, U-120, U-130, U-140, U-150, U-160, U-190, U-430, U-450)

Occupancy Classification

Density 0.00 lpm/sq.m

Remote Area Size 0.0 sq.m

Coverage per Sprinkler 0.0 sq.m

Sprinkler K-Factor varies

No. of Sprinkler Calculated 0

In-Rack Demand 0.0 lpm

Source Hose Demand 0.0 lpm

Total Water Including Hose 45424.0 lpm

Name of Contractor

Name of Designer Çimtas Boru Imalatlari ve Ticaret Ltd. Sti.

Address Ata Sb. Mah. Müge Cad. 16600, No: 17 Gemlik / Bursa, Turkey,

Authority Having Jurisdiction 920858-PC-105-001 - Design Basis

Manifold flow rate and required pressure were assumed as 2 x 3.000 gpm and 6.000 gpm @7bar in accordance with Owner Requirements

OmniCADD Hydraulic Calculation Software v. 2.3

Page 9: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

November 26, 2019 03:32 PM STR-PRM-CTR-016 Page: 2

GENERAL RESULTS

Total Water Including Hose 45424.0 lpm

Additional Allowances 45424.0 lpm

Discharge from Sprinklers 0.0 lpm

Source Hose Demand 0.0 lpm

Average Imbalance 0.004 lpm

Maximum Imbalance 0.2 lpm

Maximum Velocity @ Pipe: bl1 10.2 m/s

Maximum Fr. Loss @ Pipe: bl1 0.061 bar/m

Average Density -

Remote Area was not Peaked

Velocity pressures have been used for information only, and are not valid for balancing the system.

SOURCE : s1Static Pressure 9.0 barResidual Pressure 8.0 barFlow 45424.0 lpmHose Allowance 0.0 lpmAvailable Pressure 8.0 barRequired Pressure 7.2 barSafety Factor 9.8%, 0.8 barWater Flowing 45424.0 lpm

OmniCADD Hydraulic Calculation Software v. 2.3

Page 10: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

November 26, 2019 03:32 PM STR-PRM-CTR-016 Page: 3

Water Curves for Src : s1

End Head Pressure Responce 0 @ 0 - D : 0 @ 45424Demand Curve @ Src : s1 0.1 @ 0 - C : 7.2 @ 45424Supply Curve @ Src : s1 A : 9 @ 0 - B : 8 @ 45424

Curve Values - X : bar @ lpm

0

0

7000

7000

13500

13500

18500

18500

22500

22500

26000

26000

29500

29500

32500

32500

35500

35500

38000

38000

40500

40500

43000

43000

45500

45500

0 0

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

BAR

LPM

A

B

C

D

OmniCADD Hydraulic Calculation Software v. 2.3

Page 11: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

November 26, 2019 03:32 PM STR-PRM-CTR-016 Page: 4

NODES

# Type Value Elevationm

Xm

Ym

Res. Pres.bar

Dischargelpm

s1 Src [...] 0.0 0.0 0.0 7.2 0.0o2 Hose 11356.0 1.5 -0.5 0.6 6.4 11356.0o5 Hose 22712.0 1.5 -0.5 0.1 6.9 22712.0o3 Hose 11356.0 1.5 -0.5 -0.6 6.4 11356.0n4 Node - 1.5 0.0 0.6 7.1 -n6 Node - 1.5 0.0 0.1 7.1 -n1 Node - 1.5 0.0 0.0 7.1 -n5 Node - 1.5 0.0 -0.6 7.1 -

OmniCADD Hydraulic Calculation Software v. 2.3

Page 12: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

November 26, 2019 03:32 PM STR-PRM-CTR-016 Page: 5

PIPES

## Type Value Elevation

m

Res.Pres.

bar

Discharge

lpm

MaterialHWC

Fittings

SizeNom.Diam.Int.Diam.

LengthEq.Length

Total Lengthm

Fr.Loss

bar/m

Pres.Fr.LossPres.Elev.LossPres.Vel.Loss

bar

Flow

lpm

Velocity

m/s

TypeStart/End Nodes

bl2 o2 Hose 11356.0 1.5 6.4 11356.0 Sch40 6 0.5 0.061 0.637 -11356.0 10.2 Branch Linen4 Node - 1.5 7.1 - 120 152.284 10.0 0.000

TG 153.934 10.5 0.514 bl1 o3 Hose 11356.0 1.5 6.4 11356.0 Sch40 6 0.5 0.061 0.637 -11356.0 10.2 Branch Line

n5 Node - 1.5 7.1 - 120 152.284 10.0 0.000 TG 153.934 10.5 0.514

bl5 o5 Hose 22712.0 1.5 6.9 22712.0 Sch40 12 0.5 0.007 0.150 -22712.0 5.0 Branch Linen6 Node - 1.5 7.1 - 120 304.569 20.1 0.000

TG 309.645 20.6 0.126 fm1 n1 Node - 1.5 7.1 - Sch40 16 1.5 0.010 0.014 -45424.0 6.6 Feed Main

s1 Src [...] 0.0 7.2 0.0 120 406.802 0.0 0.147 TG 381.000 1.5 0.219

fm4 n4 Node - 1.5 7.1 - Sch40 16 0.5 0.001 0.000 -11356.0 1.7 Feed Mainn6 Node - 1.5 7.1 - 120 406.802 0.0 0.000

T 381.000 0.5 0.014 fm6 n6 Node - 1.5 7.1 - Sch40 16 0.1 0.006 0.001 -34068.0 5.0 Feed Main

n1 Node - 1.5 7.1 - 120 406.802 0.0 0.000 T 381.000 0.1 0.123

fm5 n5 Node - 1.5 7.1 - Sch40 16 0.6 0.001 0.000 -11356.0 1.7 Feed Mainn1 Node - 1.5 7.1 - 120 406.802 0.0 0.000

T 381.000 0.6 0.014

OmniCADD Hydraulic Calculation Software v. 2.3

Page 13: HYDRAULIC CALCULATION FOR 1 x 12” + 2 x 6” FIRE WATER …

November 26, 2019 03:32 PM STR-PRM-CTR-016 Page: 6

FLOW DIAGRAM

n4

n6

n1

n5

s1

o2

o5

o3

OmniCADD Hydraulic Calculation Software v. 2.3