Max. Lifting Capacity: 550 ton x 8.3 mMax. Crane Boom Length: 126 mMax. Luffing Jib Combination: 84 m + 84 m
Model: SL6000
HYDRAULIC CRAWLER CRANE
1
CONFIGURATION
STD Heavy DutyCrane Boom
Max. Lifting Capacity:
450 metric tons x 6.7 m
Max. Boom Length: 42 m
STD Luffing BoomMax. Lifting Capacity:
300 metric tons x 9.0 m
Max. Boom Length: 84 m
STD Long BoomMax. Lifting Capacity:
98 metric tons x 15 m
Max. Boom Length: 108 m
HL Luffing BoomMax. Lifting Capacity:
300 metric tons x 8.5 m
Max. Boom Length: 84 m
HL Heavy DutyCrane Boom
Max. Lifting Capacity:
367.5 metric tons x 8.3 m
Max. Boom Length: 42 m
2
SHL Luffing JibMax. Lifting Capacity:
200 metric tons x 14.4 m
Max. Combination:
84 m + 84 m
SHL Heavy DutyCrane Boom
Max. Lifting Capacity:
550 metric tons x 8.3 m
Max. Boom Length: 42 m
CONTENTS
Configuration ··················· 1
Specifications ···················· 3
General Dimensions ········· 5
STANDARD Boom and Jib Arrangements ················· 7
Working Ranges ·················· 9
Crane Boom Supplemental Data ············16
Luffing Jib Supplemental Data ··········· 17
Heavy Duty Crane BoomLifting Capacities ················· 19
Luffing Boom Lifting Capacities ················· 19
Long BoomLifting Capacities ················· 19
Luffing JibLifting Capacities ················· 20
HEAVY LIFT Boom and Jib Arrangements ················ 23
Working Ranges ··············· 25
Heavy Duty Crane BoomLifting Capacities ················· 31
Long BoomLifting Capacities ················· 31
Luffing Boom Lifting Capacities ················· 32
Luffing JibLifting Capacities ················· 33
SUPER HEAVY LIFT Boom and Jib Arrangements ················ 37
Working Ranges ················ 39
Heavy Duty Crane BoomLifting Capacities ················· 45
Long BoomLifting Capacities ················· 45
Luffing Boom Lifting Capacities ················· 46
Luffing JibLifting Capacities ················· 47
Transportation Plan ············ 53
Parts and Attachments ········ 55
3
SPECIFICATIONS
Model:Hino diesel engine E13C-UV
Type:Water-cooled, direct fuel injection, with turbocharger
Complies with US EPA Tier III.
Displacement: 12.913 liters
Rated Power: 320 kW/2,000 min-1
Max. torque: 1,650 N•m/1,300 min-1
Cooling system: Liquid, recirculating bypass
Starter: 24 V/6 kW
Radiator: Corrugated type core, thermostatically controlled
Air cleaner: Dry type with replaceable paper element
Throttle: Twist grip type hand throttle, electrically actuated
Fuel filter: Replaceable paper element
Batteries: Two 12V x 136Ah/5HR capacity batteries, parallel
connected.
Fuel tank capacity: 600 liters
Six variable displacement piston pumps are driven by heavy-
duty pump drive. Two variable displacement pumps are used in
H1 (main hook hoist) and right hand side propel circuit. Two
variable displacement pumps are used in H2 (auxiliary hook
hoist) and left hand side propel circuit. One of the other two
pumps is used in W1 (boom), W2 (jib) or W3 (SHL mast) hoist
circuit, and the other is used in the swing circuit.
Control: Full-flow hydraulic control system for infinitely variable
pressure to all winches, propel and swing.
Controls respond instantly to the touch, delivering smooth func-
tion operation.
Cooling: Oil-to-air heat exchanger (plate-fin type)
Filtration: Full-flow and bypass type with replaceable element
Electrical system: All wiring corded for easy servicing, individ-
ual fused branch circuits.
Max. relief valve pressure: 31.9 MPa {325 kgf/cm2}
Reservoir capacity: 710 liters
Powered by a hydraulic motor through a planetary reducer.
Brake: A spring-set, hydraulically released multiple-disc brake
is mounted on the boom hoist motor and operated through a
counter-balance valve.
Drum lock: External ratchet for locking drum.
Drum: Double drum, grooved for 28 mm dia. wire rope.
Line speed: Double line on first drum layer
Hoisting/Lowering: 20~2 m/min x 2
Boom hoist reeving: 30 parts of 28 mm dia.high strength
wire rope
Boom backstops: Required for all boom lengths
H1 and H2 drums for load hoist powered by a hydraulic vari-
able plunger motors, driven through planetary reducers.
Brake: A spring-set, hydraulically released multiple-disc brake
is mounted on the hoist motor and operated through a counter-
balance valve.
Drum lock: External ratchet for locking drum.
Drums:
H1 and H2:
640 mm P.C.D. x 1,367.1 mm Lg. wide drum,
grooved for 28 mm wire rope. Rope capacity is 830 m
working length and 1,080 m storage length.
Note: Rope lengths listed above denote drum capacity and may differ from actual rope lengths supplied when machinery is shipped.
Line speed: 110 ~ 3 m/min
Single line on the first layer
Rated line pull: 137 kN {14.0 tf}
Swing unit is powered by hydraulic motor driving spur gears
through planetary reducers (4 sets), the swing system provides
360° rotation.
Swing parking brakes: A spring-set, hydraulically released
multiple-disc brake is mounted on swing motor.
Swing circle: Triple-row roller bearing with an integral internal-
ly cut swing gear.
Swing speed: 0.9 min-1 {rpm}
Torsion-free precision machined upper frame. All components
are located clearly and service friendly. Engine with low noise
level.
Totally enclosed, full vision cab with safety glass, fully
adjustable, high backed seat with a head-rest and armrests,
and intermittent wiper and window washer (roof and front win-
dow).
Cab fittings:
Air conditioner, convenient compartment (for tool), cup holder,
ashtray, cigarette lighter, sun visor, roof blind, tinted glass, floor
mat, foot-rest, shoe tray
Controls:
Five adjustable levers for all winches and swing controls
Power Plant Load Hoist System
Hydraulic System
Boom Hoisting System
Swing System
Upper Structure
Cab & Control
4
Steel-welded carbody with axles. Crawler assemblies are
designed with quick disconnect feature for individual removal
as a unit from axles. Crawler belt tension is maintained by
hydraulic jack force on the track-adjusting bearing block.
Crawler drive: Two independent hydraulic propel drive is built
into each crawler side frame. Each drive consists of a hydraulic
motor propelling a driving tumbler through a planetary gear
box. Hydraulic motor and gear box are built into the crawler
side frame within the shoe width.
Crawler brakes: Spring-set, hydraulically released parking
brakes are built into each propel drive.
Steering mechanism: A hydraulic propel system provides both
skid steering (driving one track only) and counter-rotating steer-
ing (driving each track in opposite directions).
Track rollers: Sealed track rollers.
Shoes (flat): 1,500 mm wide each crawler
Max. travel speed: 1.0/0.4 km/h
Max. gradeability: 20%
Including base machine, counterweights = 180 t, carbody
weights = 50 t, 24 m boom with heavy boom tip and 450 t hook
block. Not include quick connection devise and upper
translifter.
Weight: 424 metric ton
Ground pressure: 136 kPa {1.4 kgf/cm2}
Boom and Jib:
Welded lattice construction using tubular, high-tensile steel
chords with pin connections between sections.
Boom and Jib Length
Min. Length Max. Length
(Min. Combination) (Max. Combination)
STANDARD
Crane Boom 24 m 108 m
Luffing Jib 30 m + 24 m 60 m + 72 m
HEAVY LIFT
Crane Boom 36 m 108 m
Luffing Jib 36 m + 24 m 66 m + 72 m
SUPER HEAVY LIFT
Crane Boom 36 m 126 m
Luffing Jib 36 m + 24 m 84 m + 84 m
Attachment
Main Specifications (Model: SL6000)
Lift Enhancer
HL Mast
STD
-
-
450 t
6.7 m
24 ~ 42 m
300 t
9 m
30 ~ 84 m
90 ~ 108 m
184 t
60 m
72 m
HL
30 m
-
367.5 t
36 ~ 42 m
300 t
36 ~ 84 m
90 ~ 108 m
200 t
66 m
72 m
66˚ ~ 86˚
Hino E13C-UV
320 kW/2,000 min-1 {rpm}
600 liters
110 m/min (1st layer)
137 kN {14.0 tf}
28 mm
830 m
0.9 min-1 {rpm}
1.0/0.6 km/h
6 variable displacement
31.9 MPa {325 kgf/cm2}
710 liters
Approx. 424 t
136 kPa {1.4 kgf/cm2}
Upper: 180 metric tons
Lower: 50 metric tons
SHL
30 m
~250 t
550 t
36 ~ 42 m
300 t
36 ~ 84 m
90 ~ 126 m
200 t
84 m
84 m
Additional Weight
Heavy Duty Crane Boom
Max. Lifting Capacity
Length
Crane Boom
Max. Lifting Capacity
Length
Length
Long Boom
Luffing Jib
Max. Lifting Capacity
Max. Combination (Boom) (Jib)
Luffing Angle
Power Plant
Model
Engine Output
Fuel Tank Capacity
Hoist Winch (H1, H2)
Max. Line Speed
Rated Line Pull (Single line)
Wire Rope Diameter
Wire Rope Length
Swing
Travel
Pumps
Max. Pressure
Hydraulic Tank Capacity
Working Weight*
Ground Pressure*
Counterweight
Working Speed
Hydraulic System
Weight
* Including base machine, counterweights =180 metric ton, carbody weights = 50 metric ton, 24 m boom with heavy boom tip and 450 metric ton hook block. Not include quick connection device and upper translifter.
Lower Structure
Weight
5
GENERAL DIMENSIONS
Crane Boom
SHL CRANE SHL LUFFING
Unit: mm
47
0
9,900
6,8
60
R8,300 1
,50
0
Cra
ne B
oom
Len
gth:
30.
0 -
84.0
m
*1
: 2
,86
0
*2
: 3
,08
0
*1
: 1
,95
0
*2
: 2
,17
0
10,250 2,000
1: Without upper/lower connecting device
2: With upper/lower connecting device
Lift Enhancer
6
Luff
ing B
oom
Len
gth
: 30.0
- 6
0.0
m
Luff
ing J
ib L
ength
: 24.0
- 7
2.0
m
(66° - 86°)Boom Angle
*1
: 2
,86
0
*2
: 3
,08
0
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib Unit: mm
7
STANDARD
Boom
length m (ft) Boom arrangement
30 (98)
36 (118)
42 (138)
48 (157)
54 (177)
66 (217)
78 (256)
60 (197)
72 (236)
84 (276)
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line
installing position when
the fixed jib is used.
indicates the most flexible
combination of insert luffing
booms, which can be modified
to form all shorter luffing boom
arrangements.
6.0
12.0
8T
L
LUL 12.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 8T
LUL 6.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 8T
LUL 12.012.0 12.0 8T
LUL 6.0 12.0 12.0 12.0 12.0 8T
LUL 12.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 12.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 12.0 12.0 8T
LU
LUL 12.0 8T
LUL 6.0 6.0 8T
LUL 6.0 12.0 8T
LUL 6.0 6.0 12.0 8T
LUL 12.012.0 8T
Boom
length m (ft) Boom arrangement
24 (79)
30 (98)
36 (118)
42 (138)
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert heavy duty
booms, which can be modified to form all shorter hevy duty
boom arrangements.
HU
HU
L 6.0 6.0
6.0
12.0
12.0
12.0
8T
HUL 12.012.0 8T
8T
HUL
L
6.0 8T
HUL 6.0
6.0
6.0 8T
HUL 8T
12.0 HUL 8T
Heavy Duty Crane Boom Arrangements
BOOM AND JIB ARRANGEMENTS
Luffing Boom Arrangementsfor Crane
Boom
length m (ft) Boom arrangement
90 (295)
96 (315)
102 (335)
108 (354)
L 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0JU
L 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0JU
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0JU
L 12.012.0 12.0 12.0 12.0 8T 5.0 6.0 6.0JU
L 12.012.0 12.0 12.0 12.0 8T 5.0 6.0 12.0JU
6.0 6.0L 12.0 12.0 12.0 12.0 8T 5.0JU
12.0
L 12.012.0 12.0 12.0 12.0 8T 5.0JU
12.0
L 6.0 12.0 12.0 12.0 12.0 8T 5.0JU
12.0
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
5.0 m (16.4 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
8.0 m (26.2 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Luffing Insert Jib
Luffing Insert Jib
Luffing Insert Jib
Jib Top
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert long booms,
which can be modified to form all shorter long boom
arrangements.
6.0
12.0
8T
L
5.0
6.0
JU
12.0
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 12.0JU
Long Boom Arrangements
8
Boom
length m (ft) Boom arrangement
30 (98)
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line
installing position when
the fixed jib is used.
indicates the most flexible
combination of insert luffing
booms, which can be modified
to form all shorter luffing boom
arrangements.
6.0
12.0
8T
L
LUL 12.0 8T
LUL 6.0 6.0 8T
LUL 6.0 12.0 8T
LUL 6.0 6.0 12.0 8T
LUL 12.012.0 8T
LUL 6.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 8T
LUL 12.012.0 12.0 8T
LUL 6.0 12.0 12.0 12.0 8T
LU
Luffing Boom Arrangements for Luffing
Jib
length ft (m) Jib arrangement
24 (79)
30 (98)
36 (118)
48 (157)
60 (197)
72 (236)
42 (138)
54 (177)
66 (217)
Symbol Jib Length
10.0 m (32.8 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
8.0 m (26.2 ft)
Remarks
Jib Base
Luffing Insert Jib
Luffing Insert Jib
Jib Top
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert luffing jibs,
which can be modified to form all shorter luffing jib
arrangements.
6.0
JU
12.0
6.0 12.0 12.0 12.0 12.0JUJL
6.0 6.0 12.0 12.0 12.0JUJL
6.0 12.0 12.0 12.0JUJL
6.0 6.0 12.0 12.0JUJL
6.0 12.0 12.0JUJL
12.012.0 12.0JUJL
12.012.0 12.0 12.0JUJL
6.0 6.0 12.0JUJL
6.0 12.0JUJL
12.0JUJL
6.0 6.0JUJL
6.0JUJL
12.012.0JUJL
JL
Luffing Jib Arrangements
9
STANDARD
90
80
70
60
50
40
30
20
10
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m
36 m
30 m
24 m
8070605040302010
He
igh
t a
bo
ve
gro
un
d (
m)
2.0 m
H
Center of rotation
Radius from center of rotation (m)
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Heavy Duty Crane Boom
WORKING RANGES
10
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
36 m
30 m
8070605040302010
He
igh
t a
bo
ve
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
90
80
70
60
50
40
30
20
10
Luffing Boom
11
STANDARD
80˚82˚ 70˚ 60˚
50˚
40˚
30˚
90 m
96 m
102 m
108 m
120
110
100
90
80
70
60
50
40
30
20
10
8070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Long Boom
WORKING RANGES
12
73˚
60˚
45˚
73˚
30˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m
42 m48 m
54 m
60 m
66 m
72 m
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)
60 m
30 m
2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 86°
13
STANDARD
63˚
60˚
45˚
63˚ 30˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)
60 m
30 m
2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 76°
WORKING RANGES
14
53˚
40˚
20˚
15˚
15˚
24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m
30 m
36 m
42 m
48 m
54 m
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)
60 m
30 m
2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 66°
15
CRANE BOOM SUPPLEMENTAL
DATA
1. Designed and rated to comply with EN13000.
2. Operating radius is the horizontal distance from centerline
of rotation to a vertical line through the center of gravity of
the load.
3. Deduct weight of hook blocks, slings and all other load han-
dling accessories from main boom ratings shown.
4. Ratings shown are based on freely suspended loads and
make no allowance for such factors as wind effect on lifted
load, ground conditions, out-of-level operating speeds or
any other condition that could be detrimental to the safe
operation of this equipment. The operator, therefore, has
the responsibility to judge the existing conditions and
reduce lifted load and operating speeds accordingly.
5. Ratings are for operation on a firm and level surface, up to
1 % gradient.
6. At radii and boom lengths where no ratings are shown on
chart, operation is not intended nor approved.
7. Boom inserts, guy pipe and guy lines must be arranged as
shown in the "OPERATOR'S MANUAL".
8. Boom hoist reeving is 30 part line.
HL/SHL boom hoist reeving is 18 part line.
9. Boom backstops are required for all boom lengths.
10. The boom should be erected over the front of the crawlers,
not laterally.
11. Ratings inside of boxes are limited by strength of
materials.
12. When erecting and lowering the boom length of 102 m or
over, the blocks for erection must be placed at the end of
the crawlers. (for STD MAST).
13. When erecting and lowering the boom length of 108 m, the
blocks for erection must be placed at the end of the
crawlers. (for HL MAST).
14. The minimum rated show below.
15. (Main Boom Lifting)
The total load that can be lifted is the value for weight of
hook block, slings, and all other load handling accessories
deducted from main boom rating shown.
16. (Main Boom Lifting with Auxiliary Sheave Frame)
The total load that can be lifted is weight of auxiliary sheave
frame, hook block(s), slings, and all other load handling
accessories deducted from main boom ratings shown.
17. (Auxiliary Sheave Lifting)
The total load that can be lifted is weight of auxiliary sheave
frame, hook block(s), slings, and all other load handling
accessories deducted from main boom ratings shown.
18. Ratings shown, but it should not exceed 14.0 ton in case of
one reeve, and it should not exceed 28.0 ton in case of two
reeve.
19. Auxiliary sheave ratings at any radius from center of rotation
are the same as crane ratings shown in table for main boom
when operated at the same radius. But maximum angle is
the same main boom maximum angle.
20. Boom lengths for auxiliary sheave mounting show below.
STD HL SHL
Heavy Crane NONE NONE NONE
Minimum Rated Load
Heavy Duty Crane Standard Crane Long Crane
- 7.7 ton 6.2 ton
STD HL SHL
STD Crane 30 m ~ 84 m 36 m ~ 84 m 36 m ~ 84 m
STD HL SHL
Long Crane 90 m ~ 102 m 90 m ~ 108 m 90 m ~ 120 m
Deduction auxiliary sheave frame
Heavy Duty Crane Standard Crane Long Crane
0.7 ton 0.7 ton 0.7 ton
Deduction auxiliary sheave frame
Heavy Duty Crane Standard Crane Long Crane
0.7 ton 0.7 ton 0.7 ton
16
21. Maximum hoist load for number of reeving parts of line for
hoist rope.
22. Weight of hook block
*1: 6.82 ton: when hanger sheave is not equipped.
*2: To reeve 11 parts of line or over, the hanger sheave (2 ton) is required.
Operation of this equipment in excess of rated loads or
disregard of instruction voids the warranty.
Main Hoist Loads for Standard Boom (Double Drum)
No. of Parts of Line 8 12 16 20 24
Maximum Loads (t) 112.0 164.0 220.0 280.0 300.0
No. of Parts of Line 1 2
Maximum Loads (tons) 14.0 28.0
Auxiliary Hoist Loads
Weight of hook block
Hook block 550/450 ton300 ton 200 ton
120 ton(with hanger sheave) (w/o hanger sheave)
Weight (t) 11.7 9.9 (*1) 7.1 (*2) 4.5
Weight of hook block
Hook block 70 ton 40 ton14 ton
Ball hook
Weight (t) 3.1 2.0 0.9
No. of Parts of Line 36 44
Maximum Loads (t) 450.0 550.0
Main Hoist Loads for Heavy Boom (Double Drum)
No. of Parts of Line 8 12 16 20 24 28
Maximum Loads (t) 112.0 164.0 220.0 280.0 336.0 370.0
Main Hoist Loads (Single Drum)
No. of Parts of Line 1 2 3 4 5
Maximum Loads (t) 14.0 28.0 42.0 56.0 70.0
No. of Parts of Line 6 7 8 9 10
Maximum Loads (t) 84.0 98.0 112.0 126.0 140.0
No. of Parts of Line 11 12 13 14 15
Maximum Loads (t) 152.0 164.0 174.0 184.0 192.0
No. of Parts of Line 16
Maximum Loads (t) 200.0
17
LUFFING JIB SUPPLEMENTAL DATA
1. Designed and rated to comply with EN13000.
2. Operating radius is the horizontal distance from centerline
of rotation to a vertical line through the center of gravity of
the load.
3. Deduct weight of hook blocks, slings and all other load han-
dling accessories from luffing jib ratings shown.
4. Ratings shown are based on freely suspended loads and
make no allowance for such factors as wind effect on lifted
load, ground conditions, out-of-level operating speeds or
any other condition that could be detrimental to the safe
operation of this equipment. The operator, therefore, has
the responsibility to judge the existing conditions and
reduce lifted load and operating speeds accordingly.
5. Ratings are for operation on a firm and level surface, up to
1 % gradient.
6. At radii and boom lengths where no ratings are shown on
chart, operation is not intended nor approved.
7. Boom and jib inserts and guy lines must be arranged as
shown in the "OPERATOR'S MANUAL".
8. Boom hoist reeving is 30 part line.
HL/SHL boom hoist reeving is 18 part line.
Jib hoist reeving is 18 part line.
9. Boom and jib backstops are required for all boom lengths.
10. The boom should be erected over the front of crawlers, not
laterally.
11. Ratings inside of boxes are limited by strength of
materials.
12. When erecting and lowering the boom length of 54 m or
over, the blocks for erection must be placed at the end of
the crawlers. (for STD MAST).
13. The minimum rated load is 4.0 ton.
14. (Luffing Jib Rating Loads)
The total load that can be lifted is the value for weight of
hook block, slings, and all other loads handling accessories
deducted from luffing jib ratings shown.
15. (Luffing Jib Lifting with Auxiliary Sheave Frame)
The total load that can be lifted is the weight of hook block,
slings, and all other loads handling accessories deducted
from luffing jib ratings shown.
16. (Auxiliary Sheave Lifting)
The total load that can be lifted over an auxiliary sheave is
weight of hook block, slings, and all other loads handling
accessories deducted from luffing jib ratings shown, but it
should not exceed 14.0 ton in case of one reeve.
It should not exceed 28.0 ton in case of two reeves.
Boom and jib combinations for auxiliary sheave mounting
are all boom and jib combinations.
Auxiliary sheave ratings at any radius from center of rota-
tion are the same as luffing ratings shown in table for jib
when operated at the same radius.
But maximum angle is the same jib maximum angle.
17. Luffing boom and jib combinations.
Jib Length
24 m 30 m 36 m 42 m 48 m 54 m 60 m 66 m 72 m 78 m 84 m
(79 ft) (98 ft) (118 ft) (138 ft) (157 ft) (177 ft) (197 ft) (217 ft) (236 ft) (256 ft) (276 ft)
30 m (98 ft) ○* ○* ○* ○* ○* ○* ○* ○* ○* × ×
36 m (118 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
42 m (138 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
48 m (157 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
54 m (177 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
60 m (197 ft) ○ ○ ○ ○ ○ ○ ○ ○ ○ ○** ○**
66 m (217 ft) ○*** ○*** ○*** ○*** ○*** ○*** ○*** ○*** ○*** ○** ○**
72 m (236 ft) ○** ○** ○** ○** ○** ○** ○** ○** ○** ○** ○**
78 m (256 ft) × ○** ○** ○** ○** ○** ○** ○** ○** ○** ○**
84 m (276 ft) × ○** ○** ○** ○** ○** ○** ○** ○** ○** ○**
× : All luffing jib combinations which is not allowed.
○ : All luffing jib combinations which is allowed.
○* : Standard-luffing jib combinations which is allowed.
○** : Super heavy lift-Luffing jib combinations which is allowed.
○*** : Heavy lift and Super heavy lift-Luffing jib combinations which is allowed.
Boom
Length
Luffing jib pointhook block
21. Hook block and number of reeving parts of line restriction
(1) The self-weight of luffing jib point hook block must be heavier than or equal to the table below.
(2) Total number of reeving parts of line on luffing jib point hook block must be larger than or equal
to the table below.
Follow the both (1) and (2) above at a same time for the luffing jib operation.
Otherwise luffing jib may tip over the backwards due to lack of weight on front side of boom.
Failure to observe this precaution may lead to the jib tipping backwards and resulted to machine collapsing.
18
18. Maximum hoist load for number of reeving parts of line for
hoist rope.
19. Lifting capacities listed apply only to the machine as origi-
nally manufactured and designed by KOBELCO CRANES
CO.,LTD. Modifications to this machine or use of equipment
other than that specified can reduce operating capacity.
20. Designed and rated to comply with ASME Code B30.5.
No. of Parts of Line 8 12 16
Maximum Loads (t) 112.0 164.0 200.0
Jib Hook (Double Drum)
No. of Parts of Line 1 2 3 4 5
Maximum Loads (t) 14.0 28.0 42.0 56.0 70.0
No. of Parts of Line 6 7 8 9 10
Maximum Loads (t) 84.0 98.0 112.0 126.0 140.0
No. of Parts of Line 11 12 13 14 15
Maximum Loads (t) 152.0 164.0 174.0 184.0 192.0
No. of Parts of Line 16
Maximum Loads (t) 200.0
Jib Hook Loads (Single Drum)
No. of Parts of Line 1 2
Maximum Loads (t) 14.0 28.0
Auxiliary Sheave
Operation of this equipment in excess of rated loads or
disregard of instruction voids the warranty.
Danger!
Weight of hook block
Hook200 ton 120 ton 70 ton
14 tonblock
40 tonBall Hook
Weight (t) 7.05 4.5 3.1 2.0 0.9
SL6000 minimum hook block self-weight and minimum number of reeving parts of line on hook block
Boom Jib Length 24 m 30 m 36 m 42 m 48 m 54 m 60 m 66 m 72 m 78 m 84 m
Length (79 ft) (98 ft) (118 ft) (138 ft) (157 ft) (177 ft) (197 ft) (217 ft) (236 ft) (256 ft) (276 ft)
30 m Hook Block Self-Weight (kg) 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(98 ft) No. of Part Line 13 6 4 2 2 2 2 2 2 2 2
36 m Hook Block Self-Weight (kg) 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(118 ft) No. of Part Line 11 6 4 2 2 2 2 2 2 2 2
42 m Hook Block Self-Weight (kg) 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(138 ft) No. of Part Line 10 9 4 2 2 2 2 2 2 2 2
48 m Hook Block Self-Weight (kg) 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(157 ft) No. of Part Line 9 9 4 2 2 2 2 2 2 2 2
54 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(177 ft) No. of Part Line 9 8 6 2 2 2 2 2 2 2 2
60 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000
(197 ft) No. of Part Line 8 7 7 3 2 2 2 2 2 2 2
66 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(217 ft) No. of Part Line 7 7 6 2 2 2 2 2 2 2 2
72 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(236 ft) No. of Part Line 7 6 6 2 2 2 2 2 2 2 2
78 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(256 ft) No. of Part Line 6 5 2 2 2 2 2 2 2 2
84 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000
(276 ft) No.of Part Line 5 5 3 2 2 2 2 2 2 2
Weight of KOBELCO genuine hook block.
200 t hook block 7,050 kg 70 t hook block 3,100 kg
120 t hook block 4,500 kg 40 t hook block 2,000 kg
Note:
Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or
other structural components.Note:
Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or
other structural components.
BoomLength
(m)WorkingRadius (m)
24.0 30.0 36.0 42.0
6.0 7.0 8.0 9.010.012.014.016.018.020.022.024.026.028.030.034.038.042.0
Reeves
BoomLength (m) Working
Radius (m)
6.0 7.0 8.0 9.010.012.014.016.018.020.022.024.026.028.030.034.038.042.0
Reeves
6.7 m/450.0425.0375.0330.0294.0233.3192.0158.7133.3114.4 97.4
36
7.5 m/390.0365.0325.0292.0232.8191.5158.8133.3114.4 97.3 87.0 78.5 70.7
28.6 m/68.5
36
8.3 m/340.0322.0290.0232.1190.7158.9133.4114.3 97.2 86.9 78.3 70.4 63.7
33.8 m/53.5
28
9.2 m/311.7280.1225.0187.0158.6133.1114.0 97.1 86.4 77.8 69.8 63.1 52.4 44.4
39.0 m/42.624
BoomLength
(m)WorkingRadius (m)
90.0 96.0 102.0 108.0
14.016.018.020.022.024.026.028.030.034.038.042.046.050.054.058.062.066.070.072.0
Reeves
BoomLength (m) Working
Radius (m)
14.016.018.020.022.024.026.028.030.034.038.042.046.050.054.058.062.066.070.072.0
Reeves
15.0 m/98.096.093.090.081.172.664.958.452.944.137.031.026.021.818.114.812.0 9.5 7.2 6.2
7
15.8 m/84.083.781.178.576.070.864.258.352.843.335.830.225.421.317.614.411.6 9.0 6.7
6
16.6 m/70.068.566.364.262.160.057.351.342.135.129.724.920.817.114.011.1 8.5 6.2
5
17.5m /60.058.855.151.448.445.442.940.436.733.228.622.617.312.7 8.7
60.0m /6.8
5
BoomLength
(m)WorkingRadius (m)
30.0 36.0 42.0 48.0 54.0 60.0 66.0 72.0 78.0 84.0
7.0 8.0 9.010.012.014.016.018.020.022.024.026.028.030.034.038.042.046.050.054.058.062.066.0
Reeves
BoomLength (m) Working
Radius (m)
7.0 8.0 9.010.012.014.016.018.020.022.024.026.028.030.034.038.042.046.050.054.058.062.066.0
Reeves
7.7 m/300.0300.0300.0292.1230.2188.9157.8132.4113.4 98.6 86.9 77.3 69.4
28.7 m/66.8
24
8.5 m/300.0300.0291.4229.5188.2157.6132.1113.0 98.3 86.5 76.9 68.9 62.2
33.9 m/51.7
24
9.3 m/300.0278.2222.9184.8156.9131.4112.3 97.5 85.7 76.1 68.1 61.4 50.7 42.6
39.1 m/40.7
24
10.2 m/258.6212.7177.0150.7130.5111.8 96.9 85.1 75.5 67.4 60.7 49.9 41.8 35.4
44.3 m/32.3
20
11.0 m/224.6203.2169.8145.0125.7110.3 96.4 84.6 74.9 66.8 60.1 49.3 41.0 34.6 29.5
49.5 m/25.7
20
11.8 m/197.3194.3163.0139.4121.0106.2 94.2 83.9 74.2 66.1 59.3 48.4 40.2 33.7 28.3 23.8 20.6
54.7 m/19.6
16
12.7 m/175.1156.5134.1116.5102.4 90.7 81.0 72.7 65.4 58.6 47.7 39.4 32.7 27.2 22.6 18.9 15.7
59.9 m/14.4
16
13.5 m/156.1149.9128.6111.9 98.3 87.0 77.6 69.6 62.7 56.7 46.7 38.4 31.4 25.9 21.3 17.5 14.3 11.6
65.1 m/9.712
14.3 m/140.3123.8107.8 94.7 83.9 74.8 67.0 60.3 54.4 44.7 37.0 30.4 24.8 20.2 16.4 13.1 10.3 7.6
12
15.2 m/126.4119.0103.6 91.1 80.6 71.8 64.2 57.7 52.0 42.4 34.9 28.7 23.6 19.0 15.1 11.9 8.8
12
Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
LIFTING CAPACITIES
Heavy Duty Crane Boom Lifting Capacities
Long Boom Lifting Capacities
19
STANDARD
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Unit: ton
Luffing Boom Lifting Capacities
20
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
30.0
Reeves 16 8 8 8 8
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
184.0
173.5
160.5
151.0
141.6
125.3
112.2
100.1
89.8
81.3
93.7
84.2
76.2
69.5
58.8 54.9
47.3
111.6
107.1
97.9
89.3
80.9
73.8
62.5
54.0
47.2
41.8
57.7
49.7
43.5
38.4
34.3
35.1
31.3
28.1
85.2
85.2
78.9
73.1
61.9
53.3
46.6
41.2
36.7
32.7
28.5
48.8
42.6
37.5
33.4
29.9
27.0
24.5
30.2
27.0
24.2
21.9
19.9
67.3
67.3
60.4
52.2
45.5
40.1
34.6
29.5
25.2
21.6
18.6
16.1
36.2
31.9
28.3
25.2
22.6
20.5
18.6
17.1
21.9
19.5
17.5
15.8
14.3
13.0
60.2
58.7
51.8
45.1
39.4
33.0
27.8
23.5
19.8
16.7
14.1
11.9
35.0
30.7
27.1
24.1
21.5
19.3
17.4
15.8
14.4
18.3
16.3
14.5
13.0
11.7
10.6
9.8
30.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
36.0
Reeves 16 8 8 8 8
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
167.8
157.0
148.2
139.4
124.3
111.3
99.8
89.6
81.1
73.8
82.5
74.7
68.1
57.6
45.4
39.6
111.0
103.7
95.0
87.6
80.7
73.6
62.4
53.8
47.1
41.7
56.4
48.6
42.5
37.5
33.4
33.5
29.8
26.7
24.0
84.7
82.7
76.6
71.3
61.5
53.0
46.3
40.9
36.5
32.4
28.1
41.4
36.4
32.4
29.0
26.1
23.7
25.1
22.4
20.1
18.1
16.3
66.8
66.8
58.7
51.9
45.2
39.8
34.4
29.2
24.9
21.2
18.1
15.5
34.8
30.5
27.0
24.0
21.5
19.4
17.5
16.0
17.7
15.8
14.1
12.7
11.3
10.1
59.7
57.0
50.3
44.9
39.2
32.8
27.5
23.1
19.4
16.3
13.6
11.3
29.4
25.8
22.9
20.3
18.2
16.3
14.7
13.4
11.4
14.5
12.8
11.4
10.1
9.1
8.2
36.0
m B
oo
m L
en
gth
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Unit: tonLuffing Jib Lifting Capacity
21
STANDARD
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
42.0
Reeves 12 8 8 8 8
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
15.4 m/156.2
151.0
142.7
134.4
121.0
110.0
99.3
89.1
80.6
73.4
72.9
66.4
56.2
48.3 43.1
37.6
96.6
92.1
85.0
78.8
73.4
62.2
53.7
47.0
41.6
47.4
41.4
36.5
32.5
29.2
27.8
24.8
22.2
19.9
84.1
80.2
74.4
69.2
60.7
52.7
46.0
40.6
36.2
32.0
27.7
40.1
35.2
31.3
27.9
25.0
22.6
20.6
20.1
17.9
16.0
14.3
12.9
66.3
65.1
57.0
50.4
44.9
39.5
34.0
28.8
24.4
20.8
17.6
15.0
33.2
29.1
25.6
22.7
20.3
18.2
16.4
14.9
13.6
15.8
13.9
12.3
10.8
9.5
8.4
59.2
55.3
48.9
43.5
38.7
32.4
27.1
22.7
19.0
15.8
13.1
10.8
27.9
24.5
21.6
19.1
17.0
15.1
13.6
12.3
11.2
12.6
11.0
9.6
8.4
7.4
6.6
5.7
42.0
m B
oo
m L
en
gth
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
48.0
Reeves 12 8 8 8 8
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
16.2 m/143.5
137.4
129.6
116.9
106.4
97.7
88.8
80.3
73.2
71.1
64.8
54.7
47.1
35.2
30.9
96.0
89.1
82.3
76.4
71.2
61.8
53.3
46.6
41.2
45.9
40.0
35.3
31.4
28.1
25.0
22.2
19.7
17.6
82.4
77.6
72.0
67.1
58.9
51.9
45.4
40.2
35.9
31.4
27.1
38.6
33.9
29.9
26.5
23.7
21.2
19.1
17.6
15.6
13.8
12.2
10.9
65.7
63.0
55.2
48.8
43.6
39.2
33.5
28.3
23.9
20.2
17.1
14.4
27.6
24.2
21.4
19.0
16.9
15.2
13.7
12.3
11.7
10.1
8.8
7.6
6.5
58.6
53.5
47.3
42.2
37.9
31.9
26.6
22.2
18.4
15.2
12.5
10.2
26.3
23.0
20.1
17.8
15.7
13.9
12.4
11.1
10.1
9.1
7.8
6.7
48.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Unit: tonLuffing Jib Lifting Capacity
LIFTING CAPACITIES
22
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
54.0
Reeves 12 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
132.2
124.8
112.8
102.8
94.5
87.3
80.0
72.8 63.0
53.2
45.7
32.1
28.1
93.7
86.1
79.6
74.0
69.0
60.6
52.9
46.2
40.9
43.8
38.5
33.8
29.9
26.7
23.9
19.5
17.2
15.2
13.6
74.0
69.7
65.0
57.0
50.6
45.2
39.9
35.5
30.7
26.4
31.9
28.0
24.8
22.1
19.7
17.7
13.1
11.5
10.0
8.8
7.7
64.2
60.9
53.4
47.2
42.2
37.9
32.7
27.6
23.2
19.6
16.5
13.8
25.9
22.7
19.9
17.6
15.6
13.9
12.4
11.0
58.1
51.7
45.8
40.8
36.6
31.2
25.9
21.5
17.8
14.6
11.9
9.6
21.5
18.7
16.4
14.4
12.7
11.2
9.9
8.9
8.0
54.0
m B
oo
m L
en
gth
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
60.0
Reeves 12 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
17.8 m/121.3
120.1
108.7
99.3
91.3
84.5
78.6
72.5
51.3
44.2
38.4
25.1
22.0
90.4
83.2
77.0
71.5
66.7
58.7
52.3
45.8
40.5
36.1
31.6
27.9
24.8
22.2 14.4
12.7
11.1
72.4
67.3
62.8
55.2
49.0
43.9
39.6
34.8
29.8
25.6
29.8
26.4
23.3
20.7
18.4
16.4
14.7
10.9
9.4
8.0
6.9
58.3
51.5
45.6
40.7
36.6
31.7
26.7
22.4
18.8
15.8
13.1
23.8
21.1
18.4
16.2
14.3
12.6
11.2
10.0
8.8
47.7
44.2
39.4
35.3
30.1
25.0
20.7
17.1
14.0
11.3
9.0
7.0
19.4
17.0
14.8
13.0
11.3
9.9
8.7
7.7
6.8
60.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Unit: tonLuffing Jib Lifting Capacity
23
HEAVY LIFT
Boom
length m (ft) Boom arrangement
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
72 (236)
84 (276)
66 (217)
78 (256)
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line
installing position when
the fixed jib is used.
indicates the most flexible
combination of insert luffing
booms, which can be modified
to form all shorter luffing boom
arrangements.
6.0
12.0
8T
L
1UL 6.0 6.0 12.0 12.0 12.0 12.0 8T
1UL 6.0 6.0 12.0 12.0 12.0 8T
1UL 6.0 6.0 12.0 12.0 8T
1UL 12.012.0 12.0 8T
1UL 12.012.0 12.0 12.0 8T
1UL 12.012.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 8T
1UL 6.012.0 12.0 8T
1UL 12.0 12.0 8T
1UL 6.06.0 12.0 8T
1UL 6.0 12.0 8T
1U
Boom
length m (ft) Boom arrangement
36 (118)
42 (138)
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert heavy duty
booms, which can be modified to form all shorter heavy duty
boom arrangements.
6.0
12.0
U
UL 6.0 6.012.0 8T
UL 6.0 12.0 8T
UL 12.0 12.0 8T
8T
L
Heavy Duty Crane Boom Arrangements
Luffing Boom Arrangementsfor Crane
Boom
length m (ft) Boom arrangement
90 (295)
96 (315)
102 (335)
108 (354)
L 6.012.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 12.012.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 12.012.012.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0U
12.0
L 12.012.012.0 12.0 12.0 8T 5.0U
12.0
L 6.012.012.0 12.0 12.0 8T 5.0U
12.0
L 6.012.012.0 12.0 12.0 8T 5.0 6.0U
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
5.0 m (16.4 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
8.0 m (26.2 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Luffing Insert Jib
Luffing Insert Jib
Luffing Insert Jib
Jib Top
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert long booms,
which can be modified to form all shorter long boom
arrangements.
6.0
12.0
8T
L
5.0
6.0
U
12.0
Long Boom Arrangements
BOOM AND JIB ARRANGEMENTS
24
Symbol Mast Length
9.0 m (29.5 ft)
12.0 m (39.4 ft)
10.0 m (32.8 ft)
Remarks
Mast Base
Insert Mast
Mast Top
12.0
UM
ML
ML
12.0
UM
Boom
length m (ft) Boom arrangement
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
66 (217)
LUL 6.012.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 8T
LUL 6.012.0 12.0 8T
LUL 12.06.0 12.0 8T
LUL 6.0 12.0 8T
LUL 12.0 12.0 8T
LUL 12.012.0 12.0 8T
LUL 12.012.0 12.0 12.0 8T
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line installing position when
the fixed jib is used.
indicates the most flexible combination of insert luffing booms,
which can be modified to form all shorter luffing boom
arrangements.
6.0
12.0
8T
L
LU
Luffing Boom Arrangements for Luffing
Jib
length m (ft) Jib arrangement
24 (79)
30 (98)
36 (118)
48 (157)
60 (197)
72 (236)
42 (138)
54 (177)
66 (217)
Symbol Jib Length
10.0 m (32.8 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
8.0 m (26.2 ft)
Remarks
Jib Base
Luffing Insert Jib
Luffing Insert Jib
Jib Top
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert luffing jibs,
which can be modified to form all shorter luffing jib
arrangements.
6.0
JU
12.0
6.0 6.0 12.0 12.0JUJL
12.012.0 12.0JUJL
6.0 12.0 12.0 12.0JUJL
6.0 12.0 12.0JUJL
6.0 6.0 12.0JUJL
6.0 12.0JUJL
6.0 6.0JUJL
6.0JUJL
12.0JUJL
12.012.0JUJL
6.06.0 12.0 12.0 12.0JUJL
12.012.0 12.0 12.0JUJL
6.0 12.0 12.0 12.0 12.0JUJL
JL
Luffing Jib Arrangements
HL MAST
25
HEAVY LIFT
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m
36 m
90
80
70
60
50
40
30
20
10
8070605040302010
He
igh
t a
bo
ve
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Heavy Duty Crane Boom
WORKING RANGES
26
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
36 m
90
80
70
60
50
40
30
20
10
8070605040302010
He
igh
t a
bo
ve
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Boom
27
HEAVY LIFT
80˚82˚ 70˚ 60˚
50˚
40˚
30˚
90 m
96 m
102 m
108 m
120
110
100
90
80
70
60
50
40
30
20
10
8070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Long Boom
WORKING RANGES
28
73˚
60˚
45˚
73˚
30˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m
42 m48 m
54 m
60 m
66 m
72 m
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)
66 m
36 m
2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 86°
29
HEAVY LIFT
63˚
60˚
45˚
63˚ 30˚
15˚
15˚
24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m
42 m48 m
54 m
60 m
66 m
72 m
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)
66 m
36 m
2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 76°
WORKING RANGES
30
53˚
45˚
53˚ 30˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m
30 m
36 m
42 m
48 m
54 m
60 m
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)
66 m
36 m
2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 66°
BoomLength
(m)WorkingRadius (m)
36.0 42.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
8.3 m/367.5330.0286.4225.4184.9156.0134.4117.7104.1 93.2 84.0 76.2 69.5 63.5
33.8 m/58.7
28
9.2 m/323.3286.9225.9185.2156.1134.3117.4103.9 92.8 83.6 75.9 69.1 63.3 58.2 53.7 49.7
39.0 m/47.824
BoomLength
(m)WorkingRadius (m)
90.0 96.0 102.0 108.0
14.016.018.020.022.024.026.028.030.032.034.036.038.040.044.048.052.056.060.064.068.072.076.080.0
Reeves
BoomLength (m) Working
Radius (m)
14.016.018.020.022.024.026.028.030.032.034.036.038.040.044.048.052.056.060.064.068.072.076.080.0
Reeves
15.0 m/98.098.098.098.089.981.073.566.961.156.051.547.443.539.933.828.924.721.218.215.413.010.8 8.9
80.1 m/7.27
15.8 m/98.098.098.097.587.478.871.565.159.454.449.945.942.339.033.228.324.220.717.614.812.410.2 8.3 6.7
7
16.6 m/84.084.084.084.075.968.762.356.851.847.543.540.036.731.126.422.418.915.913.310.9 8.9 7.0
6
17.5 m /84.084.084.081.973.866.760.555.150.346.042.138.735.530.025.321.418.015.012.410.0 8.0 6.2
6
Note:
Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or
other structural components.
Note:
Designed and rated to comply with EN13000 .
Ratings shown in are determined by the strength of the boom or
other structural components.
31
HEAVY LIFT
LIFTING CAPACITIESHeavy Duty Crane Boom Lifting Capacities
Long Boom Lifting Capacities
Counterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 11 m to 16 m
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 11 m to 16 m
Unit: ton
32
BoomLength
(m)WorkingRadius (m)
36.0 42.0 48.0 54.0 60.0 66.0 72.0 78.0 84.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.058.060.062.064.066.068.070.072.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.058.060.062.064.066.068.070.072.0
Reeves
8.5 m/300.0300.0286.5224.9184.0154.8132.9116.0102.4 91.3 82.0 74.2 67.5 61.6
33.9 m/56.6
24
9.3 m/300.0287.1225.3184.2154.9132.9115.9102.2 91.1 81.8 74.0 67.2 61.4 56.3 51.7 47.7
39.1 m/45.6
24
10.2 m/280.5225.0183.8154.6132.6115.5101.9 90.7 81.4 73.5 66.8 60.9 55.8 51.3 47.3 43.6 40.4 37.4
44.3 m/37.0
24
11.0 m/252.1224.6183.3153.9132.0114.8101.2 90.1 80.8 72.9 66.1 60.3 55.1 50.6 46.6 43.0 39.7 36.8 34.1 31.6
49.5 m/29.9
20
11.8 m/225.4221.9183.0153.4131.4114.3100.6 89.6 80.3 72.4 65.7 59.8 54.7 50.2 46.1 42.5 39.3 36.3 33.7 31.2 29.0 26.9 25.0
54.7 m/24.3
20
12.7 m/199.7178.8152.7129.7113.5 99.8 88.6 79.3 71.5 64.8 58.9 53.8 49.3 45.3 41.7 38.4 35.5 32.8 30.4 28.1 26.0 24.1 22.4 20.7
59.9 m/19.2
16
13.5 m/178.2171.2147.4128.5112.6 98.9 87.7 78.3 70.4 63.8 58.0 52.8 48.3 44.3 40.7 37.5 34.5 31.8 29.3 27.1 25.0 23.0 21.2 19.5 18.0 16.6 15.4
65.1 m/14.8
16
14.3 m/160.6142.2124.1109.5 97.3 87.1 77.6 69.7 63.0 57.1 52.0 47.4 43.6 40.0 36.7 33.7 31.0 28.5 26.1 23.9 21.8 20.0 18.3 16.7 15.3 14.0 12.8 11.7 10.6
70.3 m/10.512
15.2 m/145.2137.0119.7105.6 93.8 84.0 75.5 68.2 61.8 56.1 51.1 46.4 42.6 39.0 35.6 32.7 30.0 27.3 24.9 22.6 20.6 18.7 16.9 15.3 13.9 12.5 11.2 10.0 8.8 7.7
12
Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Boom Lifting Capacities Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 11 m to 16 m
Unit: ton
33
HEAVY LIFT
LIFTING CAPACITIES
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
36.0
Reeves 16 12 8 8 8
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
14.4 m/200.0
193.2
181.9
170.3
159.4
141.1
126.4
114.4
103.2
93.9
85.9
96.0
87.3
79.9
68.2
54.8
48.2
132.7
120.5
110.2
101.4
92.1
84.3
71.7
62.2
54.7
48.7
65.9
57.0
50.1
44.5
39.9
40.4
36.2
32.6
29.7
101.5
96.5
89.3
83.0
70.9
61.3
53.8
47.7
42.7
38.6
35.1
48.1
43.3
38.7
34.8
31.6
28.8
30.5
28.3
25.7
23.5
21.6
76.0
74.1
68.8
60.2
52.7
46.6
41.6
37.4
33.8
30.8
28.2
25.9
40.5
37.4
33.5
30.2
27.4
25.0
22.9
21.0
22.8
22.0
20.0
18.3
16.8
15.5
64.3
60.0
54.2
49.3
45.1
41.1
36.9
33.4
30.3
27.7
25.4
23.4
35.0
33.0
29.7
26.9
24.5
22.3
20.5
18.8
17.4
19.4
19.4
17.7
16.2
14.9
13.7
36.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
42.0
Reeves 16 12 8 8 8
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Ra
diu
s (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
15.4 m/181.6
175.9
166.1
156.3
140.0
125.4
113.5
102.7
93.4
85.5
85.4
78.2
66.6
57.8 52.5
46.1
116.7
106.9
98.4
91.2
83.8
71.3
61.8
54.3
48.4
55.5
48.7
43.2
38.7
35.0
34.1
30.9
28.0
25.6
94.1
93.1
86.7
80.6
70.4
60.9
53.4
47.4
42.4
38.3
34.8
46.7
42.1
37.6
33.8
30.6
27.8
25.5
25.7
24.1
22.0
20.2
18.6
74.9
73.6
66.9
59.1
52.3
46.3
41.3
37.1
33.5
30.5
27.9
25.7
39.1
36.2
32.4
29.2
26.5
24.1
22.0
20.2
18.7
20.9
20.5
18.6
17.0
15.5
14.3
61.0
58.9
54.0
48.9
45.0
40.8
36.7
33.1
30.0
27.4
25.1
23.1
33.7
32.0
28.7
26.0
23.6
21.5
19.7
18.0
16.6
17.4
17.4
16.3
14.8
13.5
12.3
11.2
42.0
m B
oo
m L
en
gth
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 16 m
Unit: ton
34
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
48.0
Reeves 16 12 8 8 8
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
16.2 m/167.4
160.1
150.8
135.8
123.4
112.6
102.2
92.9
85.0
83.4
76.3
65.0
56.3
43.9
38.9
113.0
103.6
95.5
88.4
82.3
70.9
61.4
53.9
48.0
53.9
47.3
41.9
37.5
33.8
32.1
29.0
26.2
23.8
90.2
88.0
84.1
78.3
68.5
60.5
53.1
47.0
42.1
37.9
34.5
45.1
40.8
36.4
32.6
29.5
26.8
24.6
23.8
22.5
20.4
18.6
17.1
67.3
66.0
62.9
57.4
51.2
45.9
41.0
36.8
33.3
30.2
27.6
25.4
33.2
31.1
28.2
25.5
23.2
21.1
19.4
17.8
16.5
16.5
15.0
13.7
12.5
11.6
58.4
56.3
53.8
48.6
44.8
40.4
36.4
32.8
29.8
27.2
24.9
22.9
32.3
30.0
27.1
24.6
22.4
20.5
18.8
17.2
15.8
13.5
13.5
12.7
11.5
10.4
9.5
48.0
m B
oo
m L
en
gth
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
54.0
Reeves 12 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius
(m)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
154.3
145.5
131.2
119.3
109.4
101.0
92.4
84.5 74.3
63.2
54.7
41.4
36.7
109.3
100.2
92.5
85.7
79.8
69.9
60.9
53.5
47.6
51.7
45.8
40.5
36.2
32.6
29.6
26.7
24.3
22.0
20.1
80.7
78.2
75.6
66.5
58.9
52.6
46.7
41.7
37.6
34.2
38.2
34.8
31.5
28.4
25.8
23.5
19.0
18.2
16.6
15.2
14.1
63.1
61.8
58.7
55.2
49.6
44.6
40.3
36.5
33.0
30.0
27.4
25.1
31.8
28.9
26.1
23.7
21.6
19.8
18.2
16.8
12.6
12.6
11.4
10.3
9.3
8.6
55.1
52.9
50.3
47.5
43.4
39.2
35.5
32.4
29.5
26.9
24.6
22.6
27.2
25.1
22.7
20.6
18.8
17.1
15.7
14.4
13.4
9.8
9.8
9.3
8.3
7.4
6.7
54.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 16 m
Unit: ton
35
HEAVY LIFT
LIFTING CAPACITIES
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
60.0
Reeves 12 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
17.8 m/141.8
140.3
126.7
115.4
105.9
97.8
90.8
84.0
61.4
53.1
46.6
34.5
30.7
103.2
97.0
89.5
83.0
77.3
67.8
60.2
53.1
47.1
43.2
38.7
34.9
31.3
28.4 21.7
19.7
18.0
76.5
74.2
71.7
64.4
57.1
51.0
46.0
41.3
37.2
33.8
36.1
32.5
29.3
26.6
24.3
22.4
20.6
16.8
15.6
14.1
12.8
11.7
58.2
55.3
52.1
48.1
43.2
39.0
35.4
32.3
29.6
27.1
24.8
29.7
26.7
24.1
21.8
19.8
18.0
16.5
15.1
14.1
10.5
10.3
9.1
8.1
7.2
6.5
49.4
47.0
44.3
41.6
37.9
34.4
31.3
28.6
26.3
24.2
22.4
20.6
25.7
23.1
20.8
18.8
17.0
15.5
14.1
12.9
11.9
60.0
m B
oo
m L
en
gth
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
66.0
Reeves 12 8 8 8 8
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Ra
diu
s (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
18.5 m/131.7
122.2
111.4
102.3
94.5
87.8
82.0
57.5
50.8
45.0
28.0
25.4
95.3
91.5
86.5
80.3
74.8
65.6
58.2
52.2
46.7
40.1
35.9
32.3
29.3
26.8 18.4
16.6
15.0
13.7
71.3
68.1
66.6
61.6
55.2
49.3
44.5
40.3
36.9
33.4
33.4
29.9
26.9
24.4
22.2
20.3
18.7
12.5
11.4
10.2
9.1
8.3
55.1
52.2
49.0
45.7
41.7
37.6
34.2
31.2
28.6
26.3
24.4
24.4
21.9
19.7
17.8
16.1
14.7
13.4
12.3
46.4
44.0
41.4
38.8
36.2
33.1
30.1
27.5
25.3
23.3
21.5
20.1
23.4
20.9
18.8
16.9
15.2
13.7
12.4
11.2
10.2
9.4
66.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 16 m
Unit: ton
36
Boom
length m (ft)Boom arrangement
90 (295)
114 (374)
126 (413)
96 (315)
120 (394)
102 (335)
108 (354)
L 6.012.012.0 12.0 12.0 12.0 8T 5.0 6.0 6.0 12.0U
L 6.012.012.0 12.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.012.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 12.012.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 12.012.012.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0U
12.0
L 12.012.012.0 12.0 12.0 8T 5.0U
12.0
L 6.012.012.0 12.0 12.0 8T 5.0U
12.0
L 6.012.012.0 12.0 12.0 12.0 8T 5.0 12.012.0U
L 6.012.012.0 12.0 12.0 12.0 8T 5.0 6.0 12.0 12.0U
L 6.012.012.0 12.0 12.0 8T 5.0 6.0U
mark shows the guy line installing position when
the fixed jib is used.
indicates the most flexible combination of insert
long booms, which can be modified to form all
shorter long boom arrangements.
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
5.0 m (16.4 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
8.0 m (26.2 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Luffing Insert Jib
Luffing Insert Jib
Luffing Insert Jib
Luffing Top
6.0
12.0
8T
L
5.0
6.0
U
12.0
Boom
length m (ft)Boom arrangement
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
72 (236)
84 (276)
66 (217)
78 (256)
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line
installing position when
the fixed jib is used.
indicates the most flexible
combination of insert luffing
booms, which can be modified
to form all shorter luffing boom
arrangements.
6.0
12.0
8T
L
1UL 6.0 6.0 12.0 12.0 12.0 12.0 8T
1UL 6.0 6.0 12.0 12.0 12.0 8T
1UL 6.0 6.0 12.0 12.0 8T
1UL 12.012.0 12.0 8T
1UL 12.012.0 12.0 12.0 8T
1UL 12.012.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 8T
1UL 6.012.0 12.0 8T
1UL 12.0 12.0 8T
1UL 6.06.0 12.0 8T
1UL 6.0 12.0 8T
1U
Boom
length m (ft)Boom arrangement
36 (118)
42 (138)
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert heavy duty
booms, which can be modified to form all shorter heav duty
boom arrangements.
6.0
12.0
U
UL 6.0 6.012.0 8T
UL 6.0 12.0 8T
UL 12.0 12.0 8T
8T
L
Heavy Duty Crane Boom Arrangements
Luffing Boom Arrangements for Crane
Long Boom Arrangements
BOOM AND JIB ARRANGEMENTS
37
SUPER HEAVY LIFT
Jib
length m (ft)Jib arrangement
24 (79)
30 (98)
36 (118)
48 (157)
60 (197)
72 (236)
84 (276)
42 (138)
54 (177)
66 (217)
78 (256)
Symbol Jib Length
10.0 m (32.8 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
8.0 m (26.2 ft)
Remarks
Jib Base
Luffing Insert Jib
Luffing Insert Jib
Jib Top
mark shows the guy line installing position when the fixed jib
is used.
indicates the most flexible combination of insert luffing jibs,
which can be modified to form all shorter luffing jib
arrangements.
6.0
JU
12.0
6.012.0 12.0 12.0 12.0 12.0JUJL
6.012.0 12.0 12.0 12.0JUJL
6.0 6.012.0 12.0 12.0JUJL
6.0 12.0 12.0 12.0JUJL
6.0 6.0 12.0 12.0JUJL
6.0 12.0 12.0JUJL
12.0 12.0JUJL
6.0 6.0 12.0JUJL
6.0 6.0JUJL
6.0JUJL
12.0JUJL
6.0 12.0JUJL
12.0 12.0 12.0 12.0JUJL
12.0 12.0 12.0JUJL
6.0 6.012.0 12.0 12.0 12.0JUJL
12.0 12.0 12.0 12.012.0JUJL
JL
Symbol Mast Length
9.0 m (29.5 ft)
12.0 m (39.4 ft)
10.0 m (32.8 ft)
Remarks
Mast Base
Insert Mast
Mast Top
12.0
UM
ML
16.0 m52.5 ft
12.0
UM
ML
ML
12.0
UM
ML
12.0
UM
13.0 m42.7 ft
11.0 m36.3 ft
Luffing Jib Arrangements
SHL MAST
Boom
length m (ft)Boom arrangement
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
72 (236)
84 (276)
78 (256)
66 (217)
LUL 6.012.0 12.0 12.0 12.0 8T
LUL 6.012.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 8T
LUL 6.012.0 12.0 8T
LUL 6.06.0 12.0 8T
LUL 6.0 12.0 8T
LUL 12.0 12.0 8T
LUL 12.012.0 12.0 8T
LUL 12.012.0 12.0 12.0 8T
LUL 12.012.0 12.0 12.0 12.0 8T
LUL 6.012.0 12.0 12.0 12.0 12.0 8T
Symbol Boom Length
9.0 m (29.5 ft)
8.0 m (26.2 ft)
6.0 m (19.7 ft)
12.0 m (39.4 ft)
1.0 m (3.3 ft)
Remarks
Boom Base
Tapered Boom
Insert Boom
Insert Boom
Boom Top
mark shows the guy line installing position when
the fixed jib is used.
indicates the most flexible combination of insert luffing booms,
which can be modified to form all shorter luffing boom
arrangements.
6.0
12.0
8T
L
LU
Luffing Boom Arrangements for Luffing
38
39
SUPER HEAVY LIFT
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m
36 m
90
80
70
60
50
40
30
20
10
8070605040302010
He
igh
t a
bo
ve
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Heavy Duty Crane Boom
WORKING RANGES
40
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
36 m
90
80
70
60
50
40
30
20
10
8070605040302010
He
igh
t a
bo
ve
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Boom
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
90 m
96 m
102 m
108 m
114 m
120 m
126 m
130
120
110
100
90
80
70
60
50
40
30
20
10
110100908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Long Boom
WORKING RANGES
41
SUPER HEAVY LIFT
84 m
36 m
73˚
73˚
60˚
45˚
15˚
30˚
15˚24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m78 m
84 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
100908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 86°
42
84 m
36 m
63˚
63˚
60˚
45˚
15˚
30˚
15˚
24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m78 m
84 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
110100908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 76°
WORKING RANGES
43
SUPER HEAVY LIFT
78 m
36 m
53˚
53˚
45˚
15˚
30˚
15˚
24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
110 120100908070605040302010
Heig
ht
ab
ove g
rou
nd
(m
)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1:
2.8
6 m
*2:
3.0
8 m
1: Without upper/lower connecting device
2: With upper/lower connecting device
Luffing Jib
Boom Angle: 66°
44
Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
BoomLength
(m)WorkingRadius (m)
36.0 42.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
8.3 m/550.0544.9511.1428.0367.7321.8285.5255.6228.2205.8187.2170.5154.2139.6
33.8 m/127.4
44
9.2 m/523.4510.0427.0366.6320.8284.9255.9228.5206.0187.3171.4157.8146.0135.7126.3115.7
39.0 m/110.544
BoomLength
(m)WorkingRadius (m)
36.0 42.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
8.3 m/550.0544.9537.4461.6396.6347.3308.5277.3250.3225.9204.5184.3166.7151.0
33.8 m/137.7
44
9.2 m/526.0519.0460.5395.6346.3307.6276.4250.5226.0205.6188.4173.6160.7149.1136.6125.1
39.0 m/119.544
BoomLength
(m)WorkingRadius (m)
36.0 42.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
8.3 m/550.0544.9537.4511.5439.6385.3342.4307.9279.5250.7224.9201.5178.8157.9
33.8 m/139.6
44
9.2 m/527.3519.9503.7438.8384.2341.4306.9278.5253.5230.9211.7195.2179.2164.0148.3132.8
39.0 m/124.844
Note:
Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength
of the boom or other structural components.
BoomLength
(m)WorkingRadius (m)
90.0 96.0 102.0 108.0
14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0 32.0 34.0 36.0 38.0 40.0 44.0 48.0 52.0 56.0 60.0 64.0 68.0 72.0 76.0 80.0 84.0 88.0 92.0 96.0100.0104.0108.0112.0
Reeves
BoomLength (m) Working
Radius (m)
14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0 32.0 34.0 36.0 38.0 40.0 44.0 48.0 52.0 56.0 60.0 64.0 68.0 72.0 76.0 80.0 84.0 88.0 92.0 96.0100.0104.0108.0112.0
Reeves
15.0 m/98.098.098.098.098.098.098.098.098.096.392.789.286.083.475.969.264.259.655.452.450.248.146.3
80.1 m/44.2
7
15.8 m/98.098.098.098.098.098.097.793.189.084.279.874.969.865.055.748.143.840.738.136.034.533.332.231.430.8
85.3 m/30.6
7
16.6 m/84.084.084.084.084.084.084.084.084.084.081.177.374.868.263.058.454.250.147.145.042.841.038.937.936.9
90.5 m/36.2
6
17.5 m /84.084.084.084.084.083.980.176.673.269.966.462.960.154.851.347.644.641.838.936.534.633.031.230.329.328.5
95.7 m/28.0
6
114.0
18.3 m /80.079.478.778.077.376.675.975.272.269.366.563.758.853.450.347.745.142.740.939.237.636.135.134.333.632.930.9
100.9 m/30.4
6
120.0
19.2 m /70.070.070.069.368.768.067.366.063.060.257.855.150.347.244.542.340.238.436.935.634.333.332.431.731.130.530.128.2
106.1 m/27.2
5
126.0
20.0 m /60.059.358.557.857.053.851.148.445.743.441.939.437.034.732.731.029.628.427.426.525.825.124.623.923.522.922.322.0
111.3 m/21.85
Long Boom Lifting Capacities
45
SUPER HEAVY LIFT
LIFTING CAPACITIESHeavy Duty Crane Boom Lifting Capacities
Counterweight: 180.0 tonCarbody weight: 50.0 tonPallet weight: 250.0 ton x 11 m
Unit: ton
Counterweight: 180.0 tonCarbody weight: 50.0 tonPallet weight: 250.0 ton x 13 m
Unit: ton
Counterweight: 180.0 tonCarbody weight: 50.0 tonPallet weight: 250.0 ton x 16 m
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 250.0 ton x 11 m, 13 m, 16 m
Unit: ton
BoomLength
(m)WorkingRadius (m)
36.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.0
Reeves
BoomLength (m)
Working Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.0
Reeves
8.5 m/300.0
300.0
300.0
300.0
300.0
300.0
283.9
253.4
226.0
203.6
185.0
168.6
152.2
137.6
33.9 m/124.8
24
9.3 m/300.0
300.0
300.0
300.0
300.0
282.9
253.8
226.3
203.8
185.1
169.2
155.6
143.8
133.5
124.2
113.6
39.1 m/107.9
24
10.2 m/300.0
300.0
300.0
300.0
281.9
252.9
226.3
203.7
184.9
169.0
155.4
143.6
133.2
124.1
116.0
108.7
102.1
95.5
44.3 m/94.2
24
8.5 m/300.0
300.0
300.0
300.0
300.0
300.0
300.0
275.4
248.1
223.7
202.5
182.3
164.7
149.0
33.9 m/135.1
24
9.3 m/300.0
300.0
300.0
300.0
300.0
300.0
274.4
248.3
223.8
203.4
186.2
171.4
158.5
147.1
134.5
123.0
39.1 m/116.9
24
10.2 m/300.0
300.0
300.0
300.0
300.0
273.4
247.7
223.6
203.2
185.9
171.1
158.2
147.0
137.1
128.2
120.3
112.4
103.6
44.3 m/102.2
24
8.5 m/300.0
300.0
300.0
300.0
300.0
300.0
300.0
300.0
277.5
248.9
223.0
199.8
177.0
156.1
33.9 m/136.8
24
9.3 m/300.0
300.0
300.0
300.0
300.0
300.0
300.0
276.6
251.3
228.6
209.5
193.0
177.2
161.9
146.4
130.7
39.1 m/122.1
24
10.2 m/300.0
300.0
300.0
300.0
300.0
300.0
275.6
251.0
228.3
209.1
192.6
178.4
165.9
154.9
145.1
134.3
123.2
111.0
44.3 m/109.1
24
11.0 m/280.0
280.0
280.0
280.0
280.0
251.7
225.8
203.2
184.4
168.4
154.8
142.9
132.6
123.4
115.3
108.0
101.4
95.5
90.1
85.2
49.5 m/81.7
20
11.0 m/280.0
280.0
280.0
280.0
280.0
272.2
246.5
223.1
202.6
185.2
170.4
157.5
146.3
136.3
127.5
119.6
112.4
106.0
100.1
94.7
49.5 m/89.7
20
11.0 m/280.0
280.0
280.0
280.0
280.0
280.0
274.4
250.2
227.5
208.3
191.9
177.6
165.1
154.1
144.3
135.5
127.6
120.4
113.1
104.6
49.5 m/97.3
20
11.8 m/280.0
280.0
280.0
280.0
279.7
250.7
225.6
203.0
184.1
168.1
154.4
142.5
132.1
123.0
114.8
107.5
101.0
95.0
89.6
84.7
80.2
76.0
72.1
54.7 m/70.8
20
11.8 m/280.0
280.0
280.0
280.0
280.0
271.3
245.6
222.7
202.2
184.8
170.0
157.1
145.8
135.8
127.0
119.1
112.0
105.5
99.6
94.3
89.4
84.8
80.6
54.7 m/79.2
20
11.8 m/280.0
280.0
280.0
280.0
280.0
280.0
273.5
249.7
227.1
207.8
191.3
177.0
164.5
153.5
143.7
134.9
127.0
119.9
113.4
107.4
102.0
96.9
90.0
54.7 m/87.2
20
Palette weight
13 m 16 m11 m
42.0Palette weight
13 m 16 m11 m
48.0Palette weight
13 m 16 m11 m
54.0Palette weight
13 m 16 m11 m
60.0Palette weight
13 m 16 m11 m
BoomLength
(m)WorkingRadius (m)
66.0
12.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.058.060.062.064.066.068.070.072.074.076.0
Reeves
BoomLength (m)
Working Radius (m)
12.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.058.060.062.064.066.068.070.072.074.076.0
Reeves
12.7 m/280.0
280.0
280.0
278.4
249.4
224.9
202.2
183.3
167.2
153.5
141.6
131.2
122.0
113.9
106.6
100.0
94.1
88.7
83.8
79.2
75.1
71.2
67.6
64.3
59.9 m/61.4
20
13.5 m/252.0
252.0
252.0
252.0
248.1
224.1
201.4
182.4
166.3
152.6
140.7
130.2
121.1
112.9
105.6
99.0
93.1
87.6
82.7
78.2
74.0
70.2
66.6
63.3
60.2
57.3
54.6
65.1 m/53.2
20
14.3 m/213.5
213.5
213.5
213.5
213.5
200.8
181.7
165.7
151.9
140.0
129.5
120.3
112.1
104.8
98.2
92.3
86.9
81.9
77.4
73.2
69.4
65.8
62.5
59.4
56.5
53.8
51.3
48.9
46.7
70.3 m/46.4
16
12.7 m/280.0
280.0
280.0
280.0
269.9
244.3
221.9
201.3
184.0
169.1
156.1
144.9
134.9
126.0
118.1
111.0
104.5
98.7
93.3
88.4
83.9
79.7
75.8
72.2
59.9 m/69.0
20
13.5 m/252.0
252.0
252.0
252.0
252.0
243.0
221.0
200.4
183.0
168.1
155.1
143.8
133.9
125.0
117.1
109.9
103.5
97.6
92.2
87.3
82.8
78.6
74.7
71.1
67.8
64.7
61.7
65.1 m/60.2
20
14.3 m/213.5
213.5
213.5
213.5
213.5
213.5
199.7
182.3
167.3
154.4
143.1
133.1
124.2
116.3
109.1
102.7
96.8
91.4
86.5
82.0
77.8
73.9
70.3
67.0
63.9
60.9
58.2
55.6
53.2
70.3 m/52.8
16
12.7 m/280.0
280.0
280.0
280.0
280.0
272.2
248.4
226.1
206.8
190.3
176.0
163.5
152.5
142.7
133.9
126.0
118.8
112.3
106.4
100.9
95.9
91.3
87.0
83.0
59.9 m/77.8
20
13.5 m/252.0
252.0
252.0
252.0
252.0
252.0
247.1
225.1
205.8
189.3
175.0
162.5
151.4
141.6
132.8
124.9
117.7
111.2
105.3
99.8
94.8
90.2
85.9
81.9
78.2
74.7
71.5
65.1 m/69.4
20
14.3 m/213.5
213.5
213.5
213.5
213.5
213.5
213.5
205.0
188.5
174.2
161.6
150.6
140.8
132.0
124.0
116.9
110.4
104.4
99.0
94.0
89.3
85.1
81.1
77.4
73.9
70.7
67.6
64.7
62.0
70.3 m/61.7
16
15.2 m/182.8
182.8
182.8
182.8
182.8
182.8
180.8
164.7
150.9
138.9
128.5
119.2
111.0
103.7
97.1
91.2
85.7
80.8
76.3
72.1
68.2
64.7
61.4
58.3
55.4
52.7
50.2
47.8
45.6
43.4
41.4
75.5 m/40.0
16
15.2 m/182.8
182.8
182.8
182.8
182.8
182.8
182.8
181.2
166.3
153.3
142.0
132.0
123.1
115.1
108.0
101.5
95.6
90.3
85.3
80.8
76.6
72.8
69.2
65.8
62.7
59.8
57.0
54.4
52.0
49.7
47.6
75.5 m/46.0
16
15.2 m/182.8
182.8
182.8
182.8
182.8
182.8
182.8
182.8
182.5
173.0
160.5
149.4
139.6
130.8
122.9
115.7
109.2
103.3
97.8
92.8
88.2
83.9
79.9
76.2
72.7
69.5
66.4
63.6
60.9
58.3
55.9
75.5 m/54.2
16
Palette weight
13 m 16 m11 m
72.0Palette weight
13 m 16 m11 m
78.0Palette weight
13 m 16 m11 m
84.0Palette weight
13 m 16 m11 m
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
46
Luffing Boom Lifting Capacities Counterweight: 180.0 ton, Carbody weight: 50.0 ton
Pallet weight: 250.0 ton x 13 m
Unit: ton
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
36.0
Reeves 16 12 8 8 8 8
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
14.4 m/200.0
193.2
181.9
175.5
169.5
163.4
158.1
155.5
145.9
129.4
98.3
154.6
149.5
143.8
125.2
105.7
94.6
139.6
133.8
126.8
120.7
115.5
111.2
104.4
89.9
78.0
64.8
105.8
101.8
95.6
86.7
78.8
82.3
74.8
68.4
63.0
101.5
99.3
97.1
94.4
88.2
81.9
75.6
69.4
63.7
56.8
45.3
78.9
78.9
76.1
70.4
64.7
58.5
66.5
61.1
56.4
52.3
48.7
76.0
74.1
72.1
69.5
65.6
61.7
58.1
53.9
48.0
42.9
38.4
32.1
68.8
68.8
67.7
59.8
53.2
47.6
42.7
38.3
53.3
50.0
46.4
43.2
40.4
37.5
54.8
53.1
51.2
49.0
46.6
44.6
42.2
39.7
37.4
35.1
31.6
28.5
23.5
52.0
50.0
46.8
44.0
41.4
39.1
37.0
34.9
31.5
28.5
39.0
39.0
38.6
36.0
33.7
30.8
27.8
48.4
47.2
45.8
42.7
39.7
37.0
34.5
32.3
30.3
28.5
26.8
25.3
22.8
19.1
39.9
38.3
35.9
33.6
31.6
29.7
28.1
26.5
25.1
23.8
22.6
31.9
31.0
29.3
27.7
26.3
24.9
23.8
36.0
m B
oo
m L
en
gth
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
42.0
Reeves 16 12 8 8 8 8
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
15.4 m/190.6
187.1
181.8
177.2
169.7
164.4
158.2
146.3
132.6
108.4
153.0
141.7
123.3
109.0 102.9
92.1
127.7
122.6
117.2
111.8
106.2
95.3
85.2
76.4
67.6
102.4
94.5
85.3
77.5
70.9
72.6
66.4
61.1
56.5
94.1
93.1
90.6
87.7
81.5
75.1
68.8
62.9
57.5
52.6
47.2
84.5
83.4
75.7
69.1
63.5
58.7
51.6
59.2
54.6
50.6
47.1
44.0
74.9
73.6
70.4
66.7
62.8
58.9
54.9
51.1
47.5
43.2
38.7
33.5
72.9
72.9
66.9
61.3
54.9
49.0
43.9
39.4
35.3
52.2
48.2
44.7
41.6
38.9
36.4
52.0
50.2
48.1
45.8
43.1
41.1
38.8
36.5
34.3
32.2
30.3
28.5
24.7
49.7
47.9
44.9
42.3
39.9
37.7
35.7
32.6
29.5
26.5
42.8
39.8
37.0
34.6
32.3
30.3
28.4
46.2
44.9
43.3
41.6
39.7
37.2
34.7
32.5
30.4
28.6
26.9
25.3
21.5
17.6
41.6
39.8
37.1
34.7
32.6
30.6
28.8
27.2
25.7
24.3
23.1
33.1
32.1
30.3
28.6
27.1
25.7
24.4
23.3
42.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: ton
LIFTING CAPACITIES
47
SUPER HEAVY LIFT
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
48.0
Reeves 16 12 8 8 8 8
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
16.2 m/190.8
186.6
181.8
174.2
165.1
152.8
141.6
131.6
117.7
150.5
139.4
121.3
107.2
89.4
80.8
119.4
114.7
109.7
104.5
99.4
89.4
80.1
71.9
64.9
104.0
92.8
83.7
76.1
69.6
70.2
64.2
59.1
54.7
90.2
88.0
85.4
82.7
76.9
70.8
64.9
59.3
54.3
49.7
45.8
88.9
81.8
74.2
67.8
62.3
57.5
53.4
57.1
52.7
48.8
45.4
42.4
67.3
66.0
62.9
59.5
55.8
52.0
48.4
44.6
41.7
38.8
36.1
33.8
70.5
65.5
60.0
55.3
51.1
45.9
41.2
36.9
46.3
43.0
40.0
37.3
34.9
32.7
49.7
47.9
45.8
43.6
41.3
39.0
36.7
34.5
32.4
30.4
28.6
26.9
24.6
50.9
49.0
45.9
43.1
40.6
38.4
36.3
33.7
30.5
27.5
38.1
35.4
33.0
30.8
28.9
27.1
25.4
44.1
42.8
41.3
39.6
37.6
36.0
34.1
32.3
30.5
28.7
27.0
24.7
20.1
16.1
39.0
37.5
35.1
32.9
31.0
29.1
27.5
26.0
24.6
23.3
32.2
31.3
29.5
27.9
26.2
24.6
23.1
48.0
m B
oo
m L
en
gth
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
54.0
Reeves 16 8 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
191.0
179.8
167.2
155.0
143.6
133.0
123.6
115.5 136.7
118.9
105.1
86.4
78.0
110.4
105.9
101.2
96.3
91.5
82.1
73.5
65.9
59.4
101.8
90.9
81.9
74.4
68.1
62.7
61.8
56.8
52.5
48.7
80.7
78.2
75.6
69.9
64.2
58.7
53.6
48.9
44.8
41.2
79.9
72.5
66.2
60.9
56.2
52.1
50.5
46.7
43.4
40.5
37.9
63.1
61.8
58.7
55.2
51.6
48.0
44.5
41.2
38.2
35.4
32.9
30.7
67.1
63.9
58.5
53.9
49.8
46.3
42.3
37.9
40.9
38.1
35.5
33.2
31.1
29.1
46.9
45.1
42.9
40.7
38.4
36.1
33.9
31.7
29.7
27.8
26.1
24.5
23.0
50.6
49.9
46.9
44.0
41.4
39.1
37.0
34.9
31.5
28.5
36.1
33.5
31.2
29.2
27.3
25.5
24.0
22.5
42.0
40.6
39.0
37.3
35.4
33.6
31.7
29.9
28.1
26.5
24.9
23.3
18.6
14.6
40.0
38.4
35.9
33.6
31.6
29.7
28.0
26.5
25.0
23.7
19.2
32.6
30.3
28.3
26.4
24.7
23.1
21.7
20.3
54.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: ton
48
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
60.0
Reeves 12 8 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
17.8 m/162.3
161.4
150.8
140.5
130.7
121.7
113.5
106.4
116.7
103.1
92.3
75.3
68.6
103.2
99.1
94.8
90.4
86.0
77.4
69.5
62.5
56.6
89.0
80.2
72.9
66.7
61.4 54.6
50.4
46.8
76.5
74.2
71.7
66.4
61.0
55.9
51.1
46.7
42.8
39.5
78.2
70.9
64.7
59.5
54.9
50.9
47.4
48.3
44.7
41.6
38.7
36.2
58.2
55.3
52.1
48.7
45.3
42.0
38.9
36.1
33.5
31.1
29.1
63.5
61.9
57.1
52.5
48.6
45.1
42.0
39.2
35.2
39.0
36.2
33.7
31.5
29.5
27.6
44.5
42.7
40.7
38.5
36.3
34.0
32.0
30.0
28.1
26.3
24.7
23.2
21.4
47.6
46.3
44.9
42.2
39.8
37.4
34.9
32.6
29.5
26.3
31.7
29.5
27.5
25.7
24.1
22.5
21.1
40.0
38.6
37.1
35.4
33.6
31.9
30.1
28.3
26.6
25.1
23.6
21.8
17.1
13.1
41.6
39.8
37.1
34.7
32.5
30.5
28.7
27.1
25.6
24.2
19.3
28.6
26.5
24.8
23.2
21.7
20.3
19.0
17.8
60.0
m B
oo
m L
en
gth
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
66.0
Reeves 12 8 8 8 8 8
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
18.5 m/144.7
137.9
128.7
120.0
111.9
104.5
98.0
114.0
100.7
90.1
65.6
60.2
95.3
91.5
87.5
83.3
79.2
71.4
64.1
57.7
52.3
86.8
78.2
71.0
64.9
59.8 52.0
48.0
44.5
41.4
71.3
68.1
66.6
61.6
56.6
51.7
47.3
43.2
39.6
36.5
76.1
69.0
63.0
57.8
53.4
49.5
46.0
42.4
39.3
36.6
34.2
32.1
55.1
52.2
49.0
45.7
42.4
39.3
36.4
33.7
31.2
29.1
27.1
59.1
55.4
51.0
47.1
43.7
40.6
37.9
35.5
34.1
31.7
29.6
27.6
25.9
24.3
41.9
40.1
38.1
36.0
33.8
31.7
29.7
27.7
25.9
24.2
22.7
21.4
19.6
45.1
44.0
42.5
41.7
38.8
36.1
33.7
31.5
29.5
26.2
27.5
25.6
23.9
22.3
20.9
19.5
18.3
35.9
34.4
32.7
31.0
29.3
27.5
25.9
24.3
22.8
21.4
20.1
15.6
11.6
8.3
39.1
37.6
35.1
32.9
30.9
29.1
27.5
25.9
24.5
19.1
24.7
23.0
21.4
20.0
18.7
17.4
16.3
66.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: ton
49
SUPER HEAVY LIFT
LIFTING CAPACITIES
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
72.0
Reeves 12 8 8 8 8 8
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
114.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
114.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
19.2 m/130.3
127.2
119.3
111.7
104.5
98.0
92.2
111.2
98.2
87.9
62.5
57.3
84.5
80.9
77.3
73.6
66.6
60.1
54.3
49.3
45.4
84.4
76.0
69.0
63.1
58.1
53.7 45.4
42.1
39.1
36.5
66.6
64.6
62.4
57.8
53.2
48.8
44.7
40.9
37.6
34.7
67.0
61.1
56.1
51.8
47.9
44.6
41.6
37.0
34.4
32.1
30.1
28.2
51.2
48.5
45.6
42.5
39.5
36.7
34.0
31.6
29.2
27.2
25.5
54.9
51.3
49.3
45.5
42.2
39.3
36.6
34.2
29.5
27.5
25.7
24.0
22.5
39.5
37.8
35.9
33.9
31.9
29.9
28.0
26.2
24.5
22.9
21.5
20.2
17.6
42.7
41.8
40.4
39.7
37.4
34.8
32.4
30.3
28.3
25.6
25.5
23.6
22.0
20.5
19.1
17.9
16.7
33.8
32.4
30.8
29.2
27.4
25.9
24.3
22.9
21.5
19.9
18.3
13.9
10.0
37.0
36.2
35.8
33.7
31.6
29.7
28.0
26.4
24.8
18.7
13.1
22.7
21.1
19.6
18.2
17.0
15.8
14.7
13.7
72.0
m B
oo
m L
en
gth
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
78.0
Reeves 8 8 8 8 8 8
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
114.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
114.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
30.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
20.6 m/102.8
99.2
93.8
88.5
83.4
78.6
69.5
59.8 94.5
84.4
74.2
64.2
48.9
45.2
77.9
74.7
71.3
68.0
61.6
55.6
50.4
45.8
42.2
73.9
66.6
59.1
52.6
46.6 42.8
39.7
36.9
34.4
59.4
57.4
53.1
48.9
44.8
41.1
37.7
34.6
32.0
29.9
64.9
59.2
53.2
47.9
43.2
39.0
35.0
34.7
32.3
30.1
28.1
26.4
47.7
45.1
42.4
39.5
36.7
34.0
31.5
29.0
27.1
25.2
23.6
51.3
49.7
47.4
44.0
40.8
37.9
35.3
33.0
30.9
27.4
25.5
23.8
22.2
20.7
19.4
37.0
35.3
33.5
31.6
29.7
27.8
26.0
24.3
22.7
21.2
19.9
18.7
15.6
39.5
38.2
36.7
35.9
33.5
31.2
29.1
27.2
24.5
18.7
21.7
20.1
18.7
17.4
16.2
15.1
14.1
31.6
30.2
28.6
27.1
25.5
24.0
22.5
21.1
19.8
18.6
16.3
12.1
8.4
34.9
34.2
33.7
32.6
31.3
29.9
28.4
27.0
23.6
17.9
12.6
19.3
19.2
17.8
16.5
15.3
14.2
13.2
78.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: ton
50
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
84.0
Reeves 8 8 8 8 8 8
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
Reeves
Wo
rkin
g R
ad
ius (
m) W
ork
ing
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
30.0 42.0 54.0 66.0 72.0 78.0Jib length (m) Jib length (m)
21.4 m/92.8
90.8
83.7
77.4
71.7
66.6
57.6
49.6
73.6
63.6
55.1
47.2
75.6
72.6
69.5
65.9
58.8
51.9
45.9
40.7
35.8
64.0
56.3
49.8
44.2
39.2
55.5
53.7
49.9
46.0
42.3
38.9
35.7
32.9
29.5
26.2
55.5
49.4
44.2
39.7
35.7
32.1
28.8
40.9
38.4
35.9
33.4
31.0
28.8
26.7
24.8
23.2
21.7
20.5
45.2
43.2
40.9
38.4
36.0
33.5
29.6
25.6
38.2
36.2
34.1
31.9
29.8
27.8
25.9
24.1
22.5
21.0
19.8
18.7
42.0
40.5
39.1
37.2
35.2
33.0
30.6
27.1
23.7
20.0
34.0
32.5
30.8
29.0
27.3
25.5
23.9
22.4
20.9
19.6
18.4
17.3
13.5
36.3
35.3
33.9
33.1
31.6
29.8
27.8
24.8
21.8
17.7
84.0
m B
oo
m L
en
gth
Note: Designed and rated to comply with EN13000.
Ratings shown in are determined by the strength of the boom or other structural components.
Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: tonLIFTING CAPACITIES
51
SUPER HEAVY LIFT
52
53
TRANSPORTATION PLAN
Base machine with mast and
lower translifter
without upper/lower
connecting devices.
Base machine (1)
Base machine (2)
Weight
Width
Height
(Machine)
Length
64,000 kg
3.0 m
3.4 m
14.25 m
Base Machine
Upper Structure (1)
Upper Structure (2)
Weight
Width
Height
(Machine)
Length
45,300 kg
3.0 m
2.37 m
14.25 m
Upper structure with mast
and upper connecting
devices.
Base machine with lower
translifter without
upper/lower connecting devices
and mast.
Upper structure and upper
connecting devices
without mast.
Upper Structure
Upper translifter: 2,400 kg
Lower translifter: 2,300 kg
Upper connecting device: 900 kg
Lower connecting device: 2,500 kg
Attachments
Weight
Width
Height
(Machine)
Length
51,500 kg
3.0 m
3.4 m
11.67 m
Weight
Width
Height
(Machine)
Length
32,000 kg
3.0 m
2.37 m
11.67 m
Weight
Width
Height
(Boom)
29,300 kg
3.0 m
2.9 m
With
1 x 12 m insert boom
1 x 12 m insert jib
2 x counterweights
54
55
PARTS AND ATTACHMENTS
Heavy Boom Top
Weight: 4,910 kg
3,390
2,600
1,510
Luffing Boom Top
Weight: 5,520 kg
4,450
2,590
2,530
Crawler
Weight: 40,000 kg Width: 1,500 mm
11,490
1,500
1,790
1,910
Crane Mast (Standard)
Weight: 12,460 kg
2,440
1,330
11,500
Dimensions: mm Weight: kg
14,2503,400
12 m Insert Boom
With 12 m guy line x 4
Weight: 6,570 kg
12,220 3,000
2,840
8 m Tapered Boom
With 8 m guy line x 2
Weight: 5,150 kg
8,220
3,000
2,840
9 m Boom Base
With H1, H2 and W2 winches including ropes,
guide sheave, and boom backstop
Weight: 29,280 kg
9,340 3,000
3,560
6 m Insert Boom
With 6 m guy line x 4
Weight: 3,760 kg
6,220 3,000
2,840
2,470
6,860
670
7,300
2,450
1,020
Base Counterweight
Weight: 20,000 kg
1,900
2,450
480
Counterweight
Weight: 10,000 kg
Base Pallet Weight
Weight: 11,000 kg
2,960
2,390 460
Base Carbody Weight
Weight: 5,400 kg
Base Machine
With mast and lower translifter without upper/lower
connecting devices.
Weight: 64,000 kg Width: 3,000 mm
2,990
1,360
7,370
Carbody
With upper/lower connecting devices.
Weight: 22,610 kg Width: 2,990 mm
56
Dimensions: mm Weight: kg
10 m Jib Base
Weight: 3,780 kg
10,290 2,490
1,990
6 m Insert Jib
Weight: 1,470 kg
6,140 2,490
1,990
2,060
12 m Insert Jib
Weight: 2,680 kg
12,140 2,490
1,990
2,060
8 m Jib Top
Weight: 3,690 kg
8,670
2,490
1,990
9 m Mast Base
Weight: 13,700 kg
9,360
3,050
2,530
12 m Insert Mast
With guy line
Weight: 5,650 kg
12,240
2,990
2,340
10 m mast top
With guy line
Weight: 10,080 kg
10,850
2,860
2,620
2,340
5 m insert boom for long boom
Attachments Weight
1,790 kg
1,840 kg
3,040 kg
2,010 kg
Dimensions (L x W x H)
1,990 kg
650 kg
Hanger sheave
Note: Estimated weights may vary ± 2%.
Rear strut top
Front strut base
Front strut top
Auxiliary sheave
Rear strut base
2,410 kg
5,180 mm x 2,490 mm x 2,230 mm
6,820 mm x 2,590 mm x 1,620 mm
7,460 mm x 1,640 mm x 1,330 mm
8,080 mm x 1,530 mm x 2,090 mm
2,380 mm x 1,130 mm x 910 mm
2,760 mm x 2,130 mm x 760 mm
7,060 mm x 1,530 mm x 1,390 mm
Other Attachments
57
58
17-1, Higashigotanda 2-chome, Shinagawa-ku, Tokyo 141-8626 JAPAN
Tel: +81-3-5789-2130 Fax: +81-3-5789-3372
Bulletin No. SL6000-2SPEC-EU2 090501IF Printed in Japan
HYDRAULIC CRAWLER CRANE
KOBELCO is the corporate mark used by Kobe Steel on a variety of products
and in the names of a number of Kobe Steel Group companies.
Note: Standard equipment may vary depending on your areas or countries.
Due to our policy of continual product improvements all designs and specifications are subject to change without advance notice.
Copyright by KOBELCO CRANES CO., LTD. No part of this catalog may be reproduced in any manner without notice.
Inquiries To: