HYDRAULIC REPORT
CAMERON COUNTY S.R. 120, Section A14
Segment 0580, Offset 0000 Over Johnson Run
We submit this report to obtain waterway approval for the 1 !
replacement of the structure herein described.
SITE DATA
1. Location
S.R. 120 crosses Johnson Run at Segment 0580, Offset 0000 in Gibson Township, Cameron County. The site is located north of the. Borough of Driftwood. See project location map at end of report.
I
The project is located in a rural area of Cameron County, with terrain comprised of steep hills. The Johnson Run watershed consists almost entirely of forestland.
Johnson Run is classified as a HQ-CWF stream in 25 Pa. Code 593.91. Disturbance to the natural stream channel will be minimized. Only clean rock will be used for the required rip- rap. Temporary culverts for the stream diversion will consist of clean metal pipes to carry the flow around the construction area.
Traffic will be detoured during construction by utilizing a temporary roadway to be constructed downstream of the structure. The temporary stream diversion culverts will carry the stream flow around the construction area and through the temporary roadway embankment.
The existing structure is a single-span reinforced concrete slab bridge overlayed with bituminous material. The clear span is 14'-O", has a minimum underclearance of 4'-8", and is located on a 90°-00' skew to the roadway. The existing structure has become structurally deficient due to severe spalling of the concrete and deterioration of the steel reinforcement.
The purpose of this project is to remove the existing structure and construct a precast concrete box culvert meeting current design loadings and standards. All work will be performed under contract.
The proposed structure is a precast concrete single-cell box culvert skewed at 85O-00' to the roadway to better fit the alignment of Johnson Run. The clear span will be increased to 15'-0" and the minimum underclearance will be increased to 4'-9".
Cameron County S.R. 120, Section A14 Segment 0580, Offset 0000 Over Johnson Run Page 2
The cross-section of the roadway will be corrected during the project in order to more closely meet current roadway design standards. This correction will result in an increase in the roadway grade approaching and over the proposed structure. No increase in backwater elevation is anticipated due to supercritical flow in Johnson Run and the ability of overtopping flows to be conveyed through the roadside ditch,.
2. Existing Structures
There are no existing structures upstream or downstream of the Johnson Run Bridge.
3. Flood History
There is no known history of the bridge flooding or overtopping during high water events.
4. Fish Habitat
Johnson Run is classified as a High Quality Cold Water Fishery Stream which runs continuous. Fish baffles willbe provided in the bottom slab of the box culvert to aid the fish habitat.
Johnson Run flows continuous with no indications of debris buildup or icing problems.
6. Photographs
See Section i for photographs of project site.
7. Factors Affecting Water Stages
The factor controlling the high water at the project location is the Johnson Run Water Shed Area - 1.57 square miles.
8. Site Inspection
The site was visited on June 9, 2005 ,for the ~nvironrnental and Engineering Field View.
9. Line and Grade
Line and grade approval was not necessary since the roadway grade is not changing.
Cameron County S.R. 120, Section A14 Segment 0580, Offset 0000 Over Johnson Run Page 3
HYDROLOGIC ANALYSIS
The watershed for the project was computed using the Watershed Modeling System (WMS) and verified using U.S.G.S. 7% Minute Quadrangles for Driftwood, PA; Cameron, PA; Sinnemahoning, PA; and First Fork, PA. The drainage area was found to be 1.57 square miles using both methods. (See Appendix A)
The flood discharge calculations were performed in WMS utilizing the HEC-1 model. The results of the analysis were as follows :
The project is not 'located within a detailed FEMA study area. A 25-year design storm is required based on the Design Manual 2 Roadway Classification as a "Rural Minor Arterial". Since there is a residence located approximately 50 feet north (50 feet upstream) of the structure, the 50-year storm event was evaluated to ensure there was no increase in the water surface elevation (WSE) that would affect the residence.
HYDRAULIC ANALYSIS
An in-depth hydraulic investigation was .performed on the existing and proposed structures for the Q2sr QsO, and Qloo design flows utilizing the FHWA Culvert Analysis, HY8 computer model. A summary of this analysis is as follows:
The design flow for the upstream side of the proposed structure produces a WSE of 837.18 ft., compared to the existing WSE of 837.36 ft. This is a reduction in WSE of 2.2 inches from the existing. The velocity through the proposed structure decreases from 13.74 feet per second (fps) to 13.10 fps. Roadway overtopping will occur with both the existing and proposed structure, however the existing structure will begin to overtop with approximately a 20 year storm event while the proposed will not overtop until the 25 year event.
Cameron County S.R. 120, Section A14 Segment 0580, Offset 0000 Over Johnson Run Page 4
Qso (635 cfs)
The design flow produces-a proposed WSE of 837.19 ft. compared to the WSE of 837.91 ft. for the existing structure. The proposed WSE is 8.6 inches lower than the existing for this storm event. Flow velocity through and downstream of the structure is decreased from 14.45 fps to 13.78 fps. The design flow continues to overtop the roadway and flows down the roadside ditch for both the existing and proposed structure.
The design flow produces a WSE of 838.22 ft. which is the same for the proposed and existing structure. The velocity through the structure has been decreased from 15.40 fps to 14.69 fps. Flooding is inevitable both along the roadway and the roadside swale down to a low spot located approximately 200ft northwest of the structure.
CONC LUS IONS
The proposed structure will provide an adequate opening for the runoff from the Johnson Run watershed. The new box culvert will replace the existing' reinforced concrete slab bridge, providing a wider roadway surface, improved safety features, and adequate structural capacity for all current legal loads. The proposed structure provides a larger waterway opening than the existing structure, enhancing the hydraulics of the structure and decreasing the amount of water that overtops the stream banks and flows along the roadside ditch.
RECOMMENDATIONS
We, therefore, request that a waterway permit be granted for the new structure indicated below:
Single-Cell Precast Concrete Box Culvert Clear Span 15.00 feet Minimum Underclearance 4.75 feet Skew 85°00'00"
Cameron County S.R. 1 2 0 , Section A14 Segment 0580, Offset 0000 Over Johnson Run Page 5
TEMPORARY STRUCTURES
A temporary roadway will be used to route traffic around the site during construction of the proposed structure. The water will be carried underneath the temporary roadway for utilizing 2-48" corrugated metal pipes as determined using the nomographs.
= PROJECT LOCATION
CAMERON COUNTY, GIBSON TWP. S.R. 0120 SEC. A14
SEGMENT 0580 OFFSET 0000
HY8 CULVERT DESIGN - PROPOSED STRUCTURE 1 15 ' - 0" X 5 ' - 9" PRECAST CONCRETE BOX CULVERT - 10 0 YR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 10:00:34
FILE DATE: 8/23/2006 FILE NAME: 120PRBX-100
FHWA CULVERT ANALYSIS HY-8, VERSION 6.1
I I I I I C I SITE DATA I CULVERT SHAPE, MATERIAL, INLET 1 I u l I I L I INLET OUTLET CULVERT I BARRELS I V I ELEV. ELEV. LENGTH I SHAPE SPAN RISE MANNING INLET
I INO. ( (ft) (ft) (ft) ( MATERIAL (ft) (ft) n TYPE
I 1 1 1832.42 829.69 51.50 1 1 R C B
I 15.00 4.75 .012 CONVENTIONAL I
1 I I I
SUMMARY OF CULVERT FLOWS (dfs) FILE: 120PRBX DATE: 8/23/2006
ELEV (ft) 832.42 833.79 834.60 835.32 835.96 836.56 837.15
25a$b? 837.18 837.83 838.04
goavp 838.22
'2 2 5 Y R 837.18
TOTAL 0.0
77.6 155.2 232.8 310.4 388.0 465.6 471.0 620.8 698.4 776.0 468.9
6 ROADWAY ITR 0.0 . 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.02 3 0.0 71.23 4 0.0 123.06 4 0.0 179.49 4 0.0 OVERTOPPING
SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: 120PRBX DATE: 8/23/2006
HEAD ELEV (ft) 832.42 833.79 834.60 835.32 835.96 836.56 837.15 837.18 837.83 838.04 838.22
HEAD ERROR (ft)
0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.006 '-0.002 -0.003 -0.003
TOTAL FLOW (cfs)
0.00 77.60 155.20 232.80 310.40 388.00 465.60 471.00 620.80 698 .'40 776.00
FLOW ERROR ( c ~ s )
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.58 0.89 1.50 1.58
% FLOW ERROR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.34 0.14 0.21 0.20
c1> TOLERANCE (ft) = 0.010 c2> TOLERANCE ( 8 ) = 1.000
HY8 CULVERT DESIGN - PROPOSED STRUCTURE 2 1 5 ' - 0 " X 5'-9" PRECAST CONCRETE BOX CULVERT - 1 0 0 YR EVENT
CURRENT DATE: 08-23-2006 FILE DATE: 8/23/2006 CURRENT TIME: 10:00:34 FILE NAME: 120PRBX-100
PERFORMANCE CURVE FOR CULVERT 1 - 1( 15.00 (ft) BY 4.75 (ft)) RCB
DIS - HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL CRIT. OUTLET TW OUTLET TW FLOW ELEV. -DEPTH DEPTH TYPE DEPTH DEPTH DEPTH DEPTH VEL. VEL. (cfs) (ft) (ft) (ft) <F4> (ft) (ft) (ft) (ft) (fps) (fps)
0.00 832.42 0.00 0.00 0-NF 0.00 0.00 0.00 0.00 0.00 0.00 77.60 833.79 1.37 1.37 1-S2n 0.31 0.94 0.40 0.74 12.86 6.63 155.20 834.60 2.18 2.18 1-S2n 0.55 1.50 0.70 1.12 14.87 8.53 232.80 835.32 2.90 2.901-S2n 0.70 1.96 0.96 1.43 16.17 9.84 310.40 835.96 3.54 3.541-S2n 0.85 2.37 1.22 1.70 16.90 10.87 388.00 836.56 4.14 4.141-S2n 0.99 2.76 1.46 1.94 17.78 11.72 465.60 837.15 4.73 4.731-S2n 1.10 3.11 1.70 2.18 18.25 12.50 469.40 837.18 4.76 4.76 5-S2n 1.10 3.13 1.72 2.37 18.21 13.10 548.68 837.82 5.40 5.40 5-S2n 1.22 3.47 1.95 2.57 18.75 13.68 573.84 838.04 5.62 5.62 5-S2n 1.26 3.58 2.03 2.75 18.88 14.20 594.93 838.22 5.80 5.80 5-S2n 1.29 ' 3.66 2.06 2.92 19.22 14.69
El. inlet face invert 832.42 ft El. outlet invert 829.69 ft El. inlet throat invert 0.00 ft El. inlet crest 832.42 ft
* * * * * SITE DATA * * * * * CULVERT INVERT * * * * * * * * * * * * * * INLET STATION 0.00 ft INLET ELEVATION 832.42 ft OUTLET STATION 51.43 ft OUTLET ELEVATION 829.69 ft NUMBER OF BARRELS 1 SLOPE (V/H) 0.0531 CULVERT LENGTH ALONG SLOPE 51.50 ft
* * * * * CULVERT DATA SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . BARREL SHAPE BOX BARREL SPAN 15.00 ft BARREL RISE 4.75 ft BARREL MATERIAL CONCRETE BARREL MANNING'S n 0.012 INLET TYPE CONVENTIONAL INLET EDGE AND WALL SQUARE EDGE (30-75 DEG. FLARE) INLET DEPRESSION NONE
HY8 CULVERT DESIGN - PROPOSED STRUCTURE 3 1 5 ' - 0 " X 5 ' - 9 " PRECAST CONCRETE BOX CULVERT - 1 0 0 YR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 10:00:34
FILE DATE: 8/23/2006 FILE NAME: 120PRBX-100
TAILWATER
***** USER DEFINED CHANNEL CROSS-SECTION FILE NAME: l2OPRDS MAIN CHANNEL AND LT & RT OVER BANKS FILE DATE: 8/21/2006 LEFT CHANNEL BOUNDARY 3 RIGHT CHANNEL BOUNDARY 8 MANNING n LEFT OVER BANK 0.080 MANNING n MAIN CHANNEL 0.040 MANNING n RIGHT OVER BANK 0.080 SLOPE OF CHANNEL 0.0530 ft/ft
CROSS-SECTION COORD. NO.
1 2 3 4 5 6 7 8 9
******* UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL
FLOW W.S.E. FROUDE DEPTH VEL. (cfs) (ft) NUMBER (ft) (f/s) 0.00 829.69 0.000 0.00 0.00
77.60 830.43 1.389 0.74 6.63 155.20 830.81 1.469 1.12 8.53 232.80 831.12 1.514 1.43 9.84 310.40 831.39 1.545 1.70 10.87 388.00 831.63 1.568 1.94 11.72 465.60 831.87 1.588 2.18 12.50 471.00 832.06 1.602 2.37 13.10 620.80 832.26 1.616 2.57 13.68 698.40 832.44 1.627 2.75 14.20 776.00 832.61 1.637 2.92 14.69
Note: Shear stress was calculated using R.
SHEAR (psi) 0.00 2.45 3.72 4.74 5.63 6.43 7.21 7.84 8.48 9.09 9.67
HY8 CULVERT DESIGN - PROPOSED STRUCTURE 4 15'-0" X 5'-9" PRECAST CONCRETE BOX CULVERT - 100 YR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 10:00:34
F I L E DATE: 8/23/2006 F I L E NAME: 120PRBX-100
ROADWAY OVERTOPPING DATA
ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH 36.00 ft
* * * * * USER DEFINED ROADWAY PROFILE CROSS-SECTION X Y COORD. NO. ft ft
1 0.00 837.18 2 25.00 837.18 3 50.00 837.46 4 75.00 837.90 5 100.00 838.33 6 125.00 838.68 7 150.00 838.91 8 161.68 839.02 9 168.26 839.09
10 175.00 839.15 11 191.61 8.3 9 . 44 12 200.24 , . 839.60 13 208.88 839.77 14 225.00 840.11
HY8 CULVERT DESIGN - PROPOSED STRUCTURE 1 1 5 ' - 0 " X 5'-9"RECAST CONCRETE BOX CULVERT - 5 0 YR 'EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:41:30
FILE DATE: 8/23/2006 FILE NAME: 120PRBX-50
FHWA CULVERT ANALYSIS HY-8, VERSION 6.1
I
I C I SITE DATA i CULVERT SHAPE, MATERIAL, INLET i " I I / L ( INLET ' OUTLET CULVERT / BARRELS
1 V ( ELEV. ELEV. LENGTH ( SHAPE SPAN RISE MANNING INLET I
(NO. 1 (ft) (ft) (ft) 1 MATERIAL (ft) (ft) n TYPE I
I 1 ( 832.42 829.69 51.50 1 1 RCB I
15.00 4.75 .oi2 CONVENTIONALI
SUMMARY OF CULVERT FLOWS (cf s )
ELEV (ft) 832.42 833.62 834.33 834.93 835.50 836.01 836.50 836.99
2S'gR 837.19 837.66 837.87 837.18
TOTAL 0.0 63.5
127.0 1'90. 5 254.0 317.5 381.0 444.5 471.0 571.5 635.0 468.9
FILE: l2OPRBX DATE: 8/23/2006
6 ROADWAY ITR 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.00 1 0.0 0.03 5 0.0 41.59 4 0.0 80.22 4 0.0 OVERTOPPING
SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: 12OPRBX DATE: 8/23/2006
HEAD ELEV (ft) 832.42 833.62 834.33 834.93 835.50 836.01 836.50 836.99 837.19 837.66 837.87
HEAD ERROR (f t)
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000'
-0.005 -0.005 -0.004
TOTAL FLOW (cf S)
0.00 63.50
127.00 190.50 254.00 317.50 381.00 444.50 471.00 571.50 635.00
FLOW ERROR ( c ~ s )
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.38 1.79 1.66
I FLOW ERROR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.29 0.31 0.26
el> TOLERANCE (ft) = 0.010 <2> TOLERANCE ( % ) = 1.000
HY8 CULVERT DESIGN - PROPOSED STRUCTURE 2 15'-0" X 5'-9" PRECAST CONCRETE BOX CULVERT - 50 YR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:41:30
FILE DATE: 8/23/2006 FILE NAME: 120PRBX-50
PERFORMANCE CURVE FORCULVERT 1 - 1( 15.00 (ft) BY 4.75 (ft)) RCB
DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL CRIT. OUTLET TW OUTLET TW FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH DEPTH DEPTH VEL. VEL. (cfs) (ft) (ft) (ft) cF4> (ft) (ft) (ft) (ft) (fps) (fps)
0.00 832.42 0.00 0.00 0-NF 0.00 0.00 0.00 0.00 0.00 0.00 63.50 833.62 1.20 1.20 1-S2n 0.25 0.82 0.35 0.66 12.08 6.15
127.00 834.33 1.91 1.91 1-S2n 0.49 1.31 0.59 1.00 14.39 7.94 190.50 834.93 2.51 2.51 1-S2n 0.61 1.71 0.81 1.27 15.59 9.18 254.00 835.50 3.08 3.08 1-S2n 0.74 2.08 1.04 1.51 16.33 10.15 317.50 836.01 3.59 3.59 1-S2n 0.86 2.41 1.24 1.72 17.07 10.95 381.00 836.50 4.08 4.081-S2n 0.98 2.72 1.42 1.92 17.86 11.65 444.50 836.99 4.57 4.571-S2n 1.07 3.02 1.62 2.18 18.33 12.50 469.59 837.19 4.77 4.77 5-S2n 1.10 3.13 1.72 2.28 18.21 12.82 528.12 837.65 5.23 5.23 5-S2n 1.19 3.38 1.88 2.44 18.69 13.32 553.12 837.86 5.44 5.445-S2n 1.23 3.49 1.96 2.60 18.82 13.78
El. inlet face invert 832.42 ft El. outlet invert 829.69 ft El. inlet throat invert 0.00 ft El. inlet crest 832.42 ft
* * * * * SITE DATA * * * * * CULVERT INVERT INLET STATION INLET ELEVATION OUTLET STATION OUTLET ELEVATION NUMBER OF BARRELS SLOPE (v/H) CULVERT LENGTH ALONG SLOPE
* * * * * CULVERT DATA SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . BARREL SHAPE BOX
1
BARREL SPAN 15.00 ft BARREL RISE 4.75 ft BARREL MATERIAL CONCRETE BARREL MANNING'S n 0.012 INLET TYPE CONVENTIONAL INLET EDGE AND WALL SQUARE EDGE (30-75 DEG. FLARE) INLET DEPRESSION NONE
HY8 CULVERT DESIGN - PROPOSED STRUCTURE 3 15'-0" X 5'-9" PRECAST CONCRETE BOX CULVERT - 50 YR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:41:30
FILE DATE: 8/23/2006 FILE NAME: 120PRBX-50
TAILWATER
* * * * * USER DEFINED CHANNEL CROSS-SECTION BILE NAME: 120PRDS MAIN CHANNEL AND LT & RT OVER BANKS FILE DATE: 8/21/2006 LEFT CHANNEL BOUNDARY 3 RIGHT CHANNEL BOUNDARY 8 MANNING n LEFT OVER BANK 0.080 MANNING n MAIN CHANNEL 0.040 MANNING n RIGHT OVER BANK 0.080 SLOPE OF CHANNEL 0.0530 ft/ft
CROSS-SECTION COORD. NO.
1 2 3 4 5 6 7 8 9
******* UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL
FLOW W.S.E. FROUDE DEPTH (cfs) (ft) NUMBER (ft) 0.00 829.69 0.000 0.00
63.50 830.35 1.366 0.66 127.00 830.69 1.446 1-00 190.50 . 830.96 1.492 1.27 254.00 831.20 1.523 1.51 317.50 831.41 1.547 1.72 381.00 831.61 1.566 1.92 444.50 831.87 1.588 2.18 471.00 831.97 1.596 2.28 571.50 832.13 1.607 2.44 635.00 832.29 1.618 2.60
Note: Shear stress was calculated using R
VEL. SHEAR (f/s) (psf) 0.00 0.00 6.15 2.17 7.94 3.30 9.18 4.20 10.15 4.99 10.95 5.70 11.65 6.36 12.50 7.21 12.82 7.54 13 -32 8.08 13.78 8 -60
HY8 CULVERT DESIGN - PROPOSED STRUCTURE 4 15 ' - 0" X 5 ' - 9" PRECAST CONCRETE BOX CULVERT - 50 YR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:41:30
FILE DATE: 8/23/2006 FILE NAME: 120PRBX-50
ROADWAY OVERTOPPING DATA
ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH 36.00 ft
* * * * * USER DEFINED ROADWAY PROFILE CROSS-SECTION X Y COORD. NO. ft ft
1 0.00 837.18 2 25.00 837.18 3 50.00 837.46 4 75.00 837.90 5 100.00 838 -33 6 125.00 838.68 7 150.00 838.91 7 161.68 839.02 9 168.26 839.09
10 175.00 839.15 11 191.61 839.44 12 200.24 839.60 13 208.88 839.77 14 225.00 840.11
HY8 CULVERT DESIGN - EXISTING STRUCTURE 14'-0" SINGLE SPAN R C SLAB BRIDGE - lOOYR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09 :32 :25
FILE DATE: 8 /23 /2006 FILE NAME: 120EXBR-100
FHWA CULVERT ANALYSIS HY-8, VERSION 6 . 1
I I I
I C I 1
SITE DATA I CULVERT SHAPE, MATERIAL, INLET I l u l I I L ( INLET OUTLET CULVERT I BARRELS I V ( ELEV. ELEV. LENGTH ( SHAPE SPAN RISE MANNING INLET
1 [NO- 1 (ft) (ft) (ft) 1 MATERIAL (ft) (ft) n TYPE
1 1 1 1 832 .42 8 3 0 . 8 3 30 .00 ( 1 RCB
1 1 4 . 0 0 4 .67 .012 CONVENTIONALI
SUMMARY OF CULVERT FLOWS (cf S) FILE : l2OEXBR DATE: 8 /23 /2006
ELEV (ft) TOTAL 1 2 3 4 5 6 ROADWAY ITR 832 .42 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 .00 1 833 .86 77 .6 77 .6 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 1 834 .70 1 5 5 . 2 1 5 5 . 2 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 1
835 .46 232'.8 232 .8 0 . 0 0 .0 0 . 0 0 . 0 0 . 0 0 .00 1 836 .13 310 .4 310 .4 0 . 0 0 . 0 . O . O 0 . 0 0 . 0 0 .00 1
836 .78 3 8 8 . 0 3 8 8 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 . 0 .00 1 8 3 7 . 3 3 4 6 5 . 6 453 .0 0 . 0 0 .0 0 . 0 0 . 0 0 . 0 1 0 . 2 4 4
JS ' fR837.36 471 .0 456 .3 0 . 0 0 . 0 0 . 0 0 . 0 0 .0 1 2 . 5 3 3 837 .88 6 2 0 . 8 5 1 4 . 5 0 .0 0 . 0 0 .0 0 . 0 0 . 0 104 .32 4 838 .06 698 .4 5 3 4 . 5 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 1 6 1 . 1 5 4
~ ~ Q Y Q 838.22 776 .0 551 .4 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 . 222 .13 4
;;3by~ 837 .10 , 4 2 6 . 1 4 2 6 . 1 0 . 0 0.0 0 . 0 0 . 0 0 .0 OVERTOPPING
SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: l2OEXBR DATE: 8 /23 /2006
HEAD HEAD TOTAL FLOW % FLOW ELEV (ft) ERROR (ft) FLOW (cf s) ERROR (cfs) ERROR 832 .42 0 .000 0 .00 0 . 0 0 0 .00 8 3 3 . 8 6 0 .000 77 .60 0 .00 0 . 0 0 8 3 4 . 7 0 0 . 0 0 0 155 .20 0 .00 0 . 0 0
8 3 5 . 4 6 0 .000 232.80 0 .00 0 . 0 0
836 .13 0 .000 310.40 0 .00 0 . 0 0
836 .78 0 .000 388 . O O 0 . 0 0 0 . 0 0
8 3 7 . 3 3 - 0.009 465.60 2 .39 0 . 5 1
837 .36 -0 .006 471.00 2 . 2 0 0 . 4 7
837 .88 - 0.004 620.80 1 . 9 4 0 . 3 1
838 .06 -0 .004 698.40 2 . 7 2 0 . 3 9 838 .22 -0 .003 776 .00 2 . 5 1 0 . 3 2
<1> TOLERANCE (ft) = 0 . 0 1 0 <2> TOLERANCE ( 0 ) = 1 . 0 0 0
HY8 CULVERT DESIGN - EXISTING STRUCTURE 14'-0" SINGLE SPAN RC SLAB BRIDGE - lOOYR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:32:25
FILE DATE: 8/23/2006 FILE NAME: 120EXBR-100
PERFORMANCE CURVE FORCULVERT 1 - 1( 14.00 (ft) BY 4.67 (ft)) RCB
DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL CRIT. OUTLET TW OUTLET TW FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH DEPTH DEPTH VEL. VEL. (cfs) (ft) (ft) (ft) cF4> (ft) (ft) (ft) (ft) (fps) (fps)
0.00 832.42 0.00 0.00 0-NF 0.00 0.00 0.00 0.04 0.00 0.00 77.60 833.86 1.44 1.44 1-S2n 0.34 0.99 0.47 0.84 11.88 6.92
155.20 834.70 2.28 2.281-S2n 0.57 1.57 0.83 1.27 13.42 8.93 232.80 835.46 3.04 3.04 1-S2n 0.73 2.05 1.15 1.63 14.43 10.31 310.40 836.13 3.71 3.711-S2n 0.90 2.49 1.46 1.95 15.23 11.40 388.00 836.78 4.36 4.36 1-S2n 1.03 2.88 1.74 2.24 15.88 12.30 452.98 837.33 4.91 4.915-S2n 1.13 3.20 1.98 2.53 16.35 13.12 456.28 837.35 4.93 4.93 5-S2n 1.14 3.21 1-99 2.77 16.34 13.74 514.54 837.87 5.45 5.455-S2n 1.23 3.48 2.18 3.01 16.84 14.35 534.52 838.06 5.64 5.645-S2n 1.26 3.57 2.26 3.25 16.88 14.90 551.36 838.22 5.80 5.80 5-S2n 1.29 3.65 2.32 3.47 17.00 15.40
El. inlet face invert 832.42 ft El. outlet invert 830.83 ft El. inlet throat invert 0.00 ft El. inlet crest 832.42 ft
* * * * * SITE DATA ***** ' CULVERT INVERT * * * * * * * * * * * * * * INLET STATION 0.00 ft INLET ELEVATION 832.42 ft OUTLET STATION 29.96 ft OUTLET ELEVATION 830.83 ft NUMBER OF BARRELS 1 SLOPE (v/H) 0.0531 CULVERT LENGTH ALONG SLOPE 30.00 ft
***** CULVERT DATA SUMMARY BARREL SHAPE BARREL SPAN BARREL RISE BARREL MATERIAL BARREL MANNING'S n INLET TYPE INLET EDGE AND WALL INLET DEPRESSION
. . . . . . . . . . . . . . . . . . . . . . . . BOX 14.00 ft 4.67 ft
CONCRETE 0.012 CONVENTIONAL SQUARE EDGE (30-75 DEG. FLARE) NONE
HY8 CULVERT DESIGN - EXISTING STRUCTURE 14'-0" SINGLE SPAN RC SLAB BRIDGE - lOOYR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:32:25
FILE DATE: 8/23/2006 FILE NAME: 120EXBR-100
TAILWATER
* * * * * USER DEFINED CHANNEL CROSS-SECTION FILE NAME: 120EXDS MAIN CHANNEL AND LT & RT OVER BANKS FILE DATE: 8/18/2006 LEFT CHANNEL BOUNDARY 4 RIGHT CHANNEL BOUNDARY 10 MANNING n LEFT OVER BANK 0.080 .MANNING n MAIN CHANNEL 0.040 MANNING n RIGHT OVER BANK 0.080 SLOPE OF CHANNEL 0.0530 ft/ft
CROSS-SECTION COORD. NO.
* * * * * * * UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL
FLOW W.S.E. FROUDE DEPTH VEL.
(cfs) (ft) NUMBER (ft) (f/s) 0.00 830.87 0.000 0.04 0.00
77.60 831.67 1.371 0.84 6.92 155.20 832.10 1.433 1.27 8.93 232.80 832.46 1.462 1.63 10.31 310.40 832.78 1.480 1.95 11.40 388.00 833.07 1.491 2.24 12.30 465.60 833.36 1.499 2.53 13.12 471.00 833.60 1.504 2.77 13.74
620.80 833.84 1.507 3.01 14.35 698.40 834.08 1.509 3.25 14.90 776.00 834.30 1.511 3.47 15.40
Note: Shear stress was calculated using R.
SHEAR ipsf 0.00 2.66 4.08 5.27 6.32 7.28 8.23 9.02 9.83
10.61 11.35
HY8 CULVERT DESIGN - EXISTING STRUCTURE 4 14'-0" SINGLE SPAN RC SLAB BRIDGE - lOOYR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:32:25
FILE DATE: 8/23/2006 FILE NAME: 120EXBR-100
ROADWAY OVERTOPPING DATA
ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH 28.00 ft
* * * * * USER DEFINED ROADWAY PROFILE CROSS - SECTION X Y COORD. NO. f t ft
1 0.00 837.10 2 25.00 837.10 3 50.00 837.40 4 75.00 837.70 5 100.00 838.05 6 125.00 838.30 7 150.00 838.50 8 168.26 838.70 9 175.00 838.80
10 191.61 839.30 11 200.24 839.40 12 203.88 839.50 13 225.00 839.90
HY8 CULVERT DESIGN - EXISTING STRUCTURE 14'-0" SINGLE SPAN RC SLAB BRIDGE - 50YR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:34:31
FILE DATE: 8/23/2006 FILE NAME: 120EXBR-50
FHWA CULVERT ANALYSIS HY-8, VERSION 6.1
I I I I I c I SITE DATA 1 CULVERT SHAPE, MATERIAL, INLET . I I W I I I L I INLET OUTLET CULVERT / BARRELS I V I ELEV. ELEV. LENGTH I SHAPE SPAN RISE MANNING INLET
I I N O . 1 (ft) (ft) (it) I MATERIAL (ft) (ft) n TYPE
I ( 1 1 832.42 830.83 30.00 1 1 RCB
I 14 .00 4 . 6 7 .012 CONVENTIONAL(
I I I
SUMMARY OF CULVERT FLOWS (cf s) FILE: 120EXBR DATE: 8/23/2006
ELEV ( f t ) TOTAL 1 2 3 4 5 6 ROADWAY ITR 832.42 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1 833.68 63.5 63.5 0.0 0.0 0.0 0.0 0.0 0.00 1 834.42 127.0 127.0 0.0 0.0 0.0 0.0 0.0 0.00 1 835.06 190.5 190.5 0.0 0.0 0.0 0.0 0.0 0.00 1 835.65 254.0 254.0 0.0 0.0 0.0 0.0 0.0 0.00 1 836.19 317.5 317.5 0.0 0.0 0.0 0.0 0.0 0.00 1 836.72 381.0 381.0 0.0 0.0 0.0 0.0 0.0 0.00 1 837.22 444.5 440.3 0.0 0.0 0.0 0.0 0.0 3.35 5
JSYR 837.35 471.0 456.2 0.0 0.0 0.0 0.0 0.0 12.34 4 837.73 571.5 499.2 0.0 0.0 0.0 0.0 0.0 69.70 4
S O V R 837-91 635.0 518.5 0.0 0.0 0.0 0.0 0.0 113.97 4 837.10 426.3 426.3 0.0 0.0 0.0 0.0 0.0 OVERTOPPING
SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: l2OEXBR DATE: 8/23/2006
HEAD HEAD TOTAL FLOW % FLOW ELEV (ft) ERROR (ft) FLOW (cis) ERROR (ci s) ERROR 832.42 0.000 0.00 0.00 0.00
833.68 0.000 63.50 0.00 , 0.00 834'. 42 0.000 127.00 0.00 0.00
835.06 0.000 190.50 0.00 0.00
835.65 0.000 254.00 0.00 0.00
836.19 0.000 317.50 0.00 0.00
836.72 0.000 38i. 00 0.00 0.00
837.22 -0.004 444 .50 0.86 0.19 837.35 -0.007 471.00 2.48 0.53 837.73 -0.006 571.50 2.60 0.45 837.91 -0.004 635.00 2.56 0.40
<I> TOLERANCE (it) = 0.010 <2> TOLERANCE ( % ) = 1.000
HY8 CULVERTDESIGN - EXISTING STRUCTURE 1 4 ' - 0 " SINGLE SPAN RC SLAB BRIDGE - 50YR EVENT
CURRENT DATE: 08-23-2006 FILE DATE: 8/23/2006 CURRENT TIME: 09:34:31 FILE NAME: 120EXBR-50
PERFORMANCE CURVE FORCULVERT 1 - 1( 14.00 (ft) BY 4.67 (ft)) RCB
HEAD- INLET OUTLET DIS- CHARGE WATER CONTROL CONTROL FLOW NORMAL CRIT. OUTLET TW OUTLET TW FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH DEPTH DEPTH VEL. VEL. (cfs) (ft) (ft) (ft) <F4> (ft) (ft) (ft) (it) (ips) (ips)
El. inlet face invert 832.42 it ~ l . outlet invert 830.83 ft El. inlet throat invert 0.00 ft El. inlet crest 832.42 ft
***** SITE DATA ***** CULVERT INVERT ************** INLET STATION 0.00 ft INLET ELEVATION 832.42 ft OUTLET STATION 29.96 ft OUTLET ELEVATION 830.83 ft NUMBER OF BARRELS 1 SLOPE (v/H) 0.0531 CULVERT LENGTH ALONG SLOPE 30.00 ft
* * * * * CULVERT DATA SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . BARREL SHAPE BOX BARREL SPAN 14.00 ft BARREL RISE 4.67 ft BARREL MATERIAL CONCRETE BARREL MANNING'S n 0.012 INLET TYPE CONVENTIONAL INLET EDGE AND WALL SQUARE EDGE (30-75 DEG. FLARE) INLET DEPRESSION NONE
HY8 CULVERT DESIGN - EXISTING STRUCTURE 14'-0" SINGLE SPAN RC SLAB BRIDGE - SOYR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:34:31
FILE DATE: 8 /23 /2006 FILE NAME: 120EXBR-50
TAILWATER
* * * * * USER DEFINED CHANNEL CROSS-SECTION FILE NAME: 120EXDS MAIN CHANNEL AND LT & RT OVER BANKS FILE DATE: 8 /18 /2006 LEFT CHANNEL BOUNDARY 4 RIGHT CHANNEL BOUNDARY 1 0 MANNING n LEFT OVER BANK 0.080 MANNING n MAIN CHANNEL 0.040 MANNING n RIGHT OVER BANK 0.080 SLOPE OF CHANNEL 0.0530 f t / f t
CROSS-SECTION COORD. NO.
1 2 3 4 5 6 7 8 9
1 0 11 1 2 1 3 1 4
* * * * * * * UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL
FLOW W.S.E. FROUDE DEPTH VEL. SHEAR ( c f s ) ( f t ) NUMBER ( f t ) ( f / s ) ( p s f ) 0 . 0 0 8 3 0 . 8 7 0 .000 0 .04 0 .00 0 . 0 0
. 6 3 . 5 0 8 3 1 . 5 8 1 . 3 5 2 0 . 7 5 6 . 4 2 2 . 3 5 1 2 7 . 0 0 8 3 1 . 9 6 1 . 4 1 6 1 . 1 3 8 . 3 0 3 - 6 1 1 9 0 . 5 0 832 .27 1 . 4 4 8 1 . 4 4 9 . 6 1 4 . 6 4 254 .00 8 3 2 . 5 5 1 . 4 6 8 1 . 7 2 1 0 . 6 3 5 . 5 6 317 .50 8 3 2 . 8 1 1 . 4 8 1 1 . 9 8 1 1 . 4 9 , 6 . 4 1 3 8 1 . 0 0 833 .04 1 . 4 9 0 2 . 2 1 1 2 . 2 2 7 . 1 9 4 4 4 . 5 0 8 3 3 . 3 6 1 . 4 9 9 2 . 5 3 1 3 . 1 2 8 . 2 3 4 7 1 . 0 0 833 .48 1 .502 2 . 6 5 1 3 . 4 5 8 .64 571 .50 8 3 3 . 6 9 1 . 5 0 5 2 . 8 6 1 3 . 9 7 9 .32 6 3 5 . 0 0 833 .89 1 . 5 0 8 3 . 0 6 1 4 . 4 5 9 . 9 8
Note: Shear stress w a s c a l c u l a t e d using R.
HY8 CULVERT DESIGN - EXISTING STRUCTURE 14'-0" SINGLE SPAN RC SLAB BRIDGE - 50YR EVENT
CURRENT DATE: 08-23-2006 CURRENT TIME: 09:34:31
FILE DATE: 8/23/2006 FILE NAME: 120EXBR-50
ROADWAY OVERTOPPING DATA
ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH 28.00 ft
***** USER DEFINED ROADWAY PROFILE CROSS-SECTION X Y COORD. NO. f t f t
1 0.00 837.10 2 25.00 837.10 3 50.00 837.40 4 75.00 837.70 5 100.00 838.05 6 125.00 838.30 7 150.00 838.50 8 168.26 838.70 9 175.00 838.80
10 191.61 839.30 11 200.24 839.40 12 203.88 839.50 13 225.00 839.90
Summary Data Sheet
Location Data
Channel Data
County I
I Cameron Location - U.S.G.S. Map j Driftwood Latitude 1 41°21' 30" Longitude j 78" 07' 48" Present ADT: 71 8 !year: 2006
Municipality 1 Gibson Twp. State Route - Section i 00120-A14 Station I 848+73.50 I
SegmentIOffset I 058010000 I I
Future ADT: 862!~ear: 2016
River Basin (US-ACOE) Susquehanna
I
I
Stream Name I Johnson Run
iydr
Stream Slope ! 5.29% @ Structure Normal Stream Flow D e ~ t h
I I
Side Slope (looking downstream) Type of Channel i Trapezoidal
I Average TOD Width I 22'
lology ! PennDOT study: FEMA (if applicab1e)i Other: N/A
Hydrology Method Used I I I
I HEC-1 1 N/ A I
Left: ! 1.5:1
Right: i 1.5:1
I I I
I 1.57 mi2 Drainage Area I I
QlO (CFS) I I I I
I 326 I I
425 (CFS) * I I 47 1 I 1 I I
I
Q50 (CFS) I m 635 I I 1 .
0100 (CFS) I I I
I 776 I I
Stream Bed Elevation at Inlet 1 832.42' @ Proposed
EXISTING STRUCTURE PROPOSED STRUCTURE
Skew
Stream Bed Elev. -500' upstream
Average Bottom Width I
I 1 0' Exact Dist. ! 317.0' Elevation j 846.0'
Stream Bed Elev. -500' downstream
I
Average Stream Channel Depth ' 1 4'
Exact ~ i s t . j 290.0'
Elevation 81 7.0'
- Minimum Underclearance I I 4.67' Lenrrth of Channel Im~acted I I 40.0'
I
High Water Elev. and Date 1 . Unknown
I Minimum Underclearance I 4.75' I
Length of Channel Im~acted I 72.0'
*Indicate Design Return Period with a J at the appropriate year. Or if year is not shown, fill in Design Return Period in blank row. Form Version: 7/16/2001
I
I 1 Number of Spans Low Chord Elevation I
I 837.09' Hydraulic Method Used I HY8
--
loo! 776.0j 838.22'j 15.40 Overtopping 1 426.1 j 837.10'1 13.10
I Number of Spans 1 I Low Chord Elevation I 837.17'
Hydraulic Method Used I HY8 WSE I Velocity Return Period* Return Period*
loo! 776.01 838.22'1 14.69 Overtopping 1 468.61 837.18'; 13.101
* 251 471.0i 837.36'! 13.74 50; 635.01 837.91'; 14.45
Q I WSE ( Velocity Q
~ * 25j . 471.01 837.18'1 13.10
50; 635.01 837.19'! 13.78
EX
TR
AC
T
DA
TE
: 1
2/
06
/2
00
5
RO
AD
WA
Y
MA
NA
GE
ME
NT
S
YS
TE
M
PA
GE
N
UM
BE
R:
2 7
P
RI
NT
D
AT
E:
12
/15
/20
03
S
LD
C
OU
NT
Y/S
R
- A
NN
UA
L
PR
IN
T
CO
UN
TY
: C
AM
ER
ON
DI
R:
B
T
OT
AL
L
EN
: 3
5.
41
4
MI
.
DI
ST
:
02
-4
S
R:
1
20
L
EF
T
MU
N:
DR
IFT
WO
OD
B
R
IG
HT
M
UN
: D
RIF
TW
OO
D
B
14
65
76
F
T
14
65
76
F
T
I
06
00
/0
74
0
01
8
"D
IA
C
lR
C
CO
NC
R
14
58
36
F
T
14
58
36
F
T
1 0
0
01
05
0
00
0
90
0+
00
m
06
00
0
00
0
LE
NG
TH
(A
H
24
98
B
K
23
81
)
14
57
30
F
T
I
14
57
4 0
FT
0
59
0/
22
75
0
15
"
DI
A
Cl
RC
M
ET
AL
14
47
85
F
T
14
47
85
F
T
I
05
90
/1
33
0
01
8
"D
IA
C
lR
C
ME
TA
L
14
46
55
F
T
14
46
55
F
T
I I
05
90
/1
20
0
01
8
"D
IA
C
lR
C
ME
TA
L
14
39
55
F
T
14
39
55
F
T
05
90
/0
50
0
01
8
"D
IA
C
lR
C
CO
NC
R
14
34
55
F
T
1
0
00
10
5
0
00
0
87
6+
11
~
05
90
/0
00
0 L
EN
GT
H(
AH
2
38
1
BK
2
74
6)
1
43
34
3
FT
0
58
0/
26
34
G
l9S
ON
T
1
42
88
5
FT
1
42
88
5
FT
I
05
80
/2
17
6
02
4
"D
IA
C
lR
C
CO
NC
R
555-6
05
8O
/OO
17
B
MS
EN
1
2/0
12
0/0
58
0/0
.00
0
14
07
09
F
T
1
0
00
10
5
0
00
0
84
8+
66
J
OH
NS
ON
R
UN
R
MS
BG
1
2
01
20
/0
58
0/
00
00
o
05
80
/0
00
0
LE
NO
TH
(A
L
27
46
B
K
33
69
)
1-4_
0-.5
-4-0
-_F
_T__
0 0
0
1 5
D-I~
c~
IR
c-~
.
-c~
oN
~%
~
J /&9 &
F
-T
05
70
2
72
0
01
5
"D
IA
C
lR
C
CO
NC
R
13
98
b 2
FT
0
57
0/
25
12
0
15
"
DI
A
Cl
RC
C
ON
CR
1
39
51
5 FT
05
70
/2
17
5
01
5
"D
IA
C
lR
C
CO
NC
R
-.
13
92
>0
F
T
05
70
/1
93
0
01
5
"D
IA
C
lR
C
CO
NC
R
13
88
80
F
T
05
70
/1
54
0
01
5
"D
IA
C
lA
C
CO
NC
R
13
83
40
F
T
05
70
/1
00
0
02
4
"D
IA
C
lR
C
ME
TA
L
ESTIMATED PEAK RATES OF RUNOFF PSU-IV METHOD - Version 4.0
COUNTY: CAMERON SR-SECTION: 0120/A14
MUNICIPALITY: GIBSON TOWNSHIP SEGMENT/OFFSET: 0580/0000
USGS QUADRANGLE: DRIFTWOOD STATION: 848+73.50
STREAM NAME: JOHNSON RUN HIGHWAY CLASS: A r t e r i a l
L a t i t u d e o f rain age Area cen t ro id : 41" 21' 30" ~ o n g i t u d e o f raina age Area cen t ro id : 78" 7 ' 48"
~ e g i o n umber: ~ e g i o n 2 Drainage Area (sq . m i ) : 1.57 Percent o f Forest (%): 95 s td . Dev ia t i on ~y (Plate 2) : .262 skew c o e f f i c i e n t ( p l a t e 3) : .42
Using t h e Equation f o r Ybar from able 1.1 Ybar = 1.90 + 0.81 Log A - 0.0021 FOR
where A (Drainage Area) i s i n sq. m i . and FOR (Percent Forest) i s i n %.
Ybar = 1.859
YEAR KY M R unadjusted Q (ftA3/s)
NOTE: he discharges l i s t e d are f o r a normal watershed a t a 50 percent confidence l i m i t , except *SO0 which i s (1.7 * 4100) .
Comments: PERFORMED BY JKK
Date: 7/7/2006
~ l l references r e f e r t o t h e Psu-IV Research Report.
I
Page 1
ZO
NE
C
ZON
E C
1*
**
**
**
**
**
**
**
**
f*
**
t*
t*
**
C*
**
**
**
**
**
**
* FLOOD HYDROGRAPH PACKAGE
(HEC-1)
t
MAY
1991
VERSION 4.0.1E
f
RUN DATE
TIME
*******t*t***t****t**********************
X
XX
XM
U[
X
xxxxx
X
X
X
X
X
X
XX
X
X
X
X
X
XX
XX
XX
X XXXX
X
xxxxx
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
xxxx
x xxxxx
XX
X
U.S. ARMY CORPS OF ENGINEERS
t
HYDROLOGIC ENGINEERING CENTER
t
609 SECOND STREET
t
DAVIS, CALIFORNIA 95616
t
(916) 551-1748
t
t**tt***t**tttt**t**tt*tt************t+
**
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HECl (JAN 73), HEClGS, HEClDB, AND HEClKW.
THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE.
THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY,
DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL
LOSS RATE:GREEN
AN
D AMPT INFILTRATION
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
LINE
HEC-1 INPUT
ID HEC-1 Analysis usinq
WM
S -
ID Johnson Run
ID
~O-YLQ~
&8
TT
ll
sM \
\/~
/Gs
KK
2R
CNAME
2 C
KO
0
0
0.0
0
RN
2 R
ZZ
PAGE
1
....
. 10
SCHEMATIC DIAGRAM OF STREAM NETWORK
INPUT
LINE
(V) ROUTING
(-
--
>) DIVERSION OR PUMP FLOW
NO.
( . )
CONNECTOR
(c
--
-)
RETURN OF DIVERTED OR PUMPED FLOW
(***) RUNOFF ALSO COMPUTED AT THIS LOCATION
..........................................
* FLOOD HYDROGRAPH PACKAGE (HEC-1)
MAY
1991
VERSION 4.0.1E
* RUN DATE
TIME
....
....
....
....
....
....
....
....
....
....
.
HEC-1 Analysis using WMS
Johnson Run
25-year storm
OUTPUT CONTROL VARIABLES
IPRNT
0 PRINT CONTROL
IPLOT
0 PLOT CONTROL
QSCAL
0. HYDROGRAPH PLOT SCALE
HYDROGRAPH TIME DATA
NMIN
6 MINUTES IN COMPUTATION INTERVAL
IDATE
1JAN94 STARTING DATE
ITIME
0000 STARTING TIME
NQ .
300 NUMBER OF HYDROGRAPH ORDINATES
NDDATE
2JAN94 ENDING DATE
NDTIME
0554 ENDING TIME
ICENT
19 CENTURY MARK
COMPUTATION INTERVAL
0.10 HOURS
TOTAL TIME BASE
29.90 HOURS
U.S. ARMY CORPS OF ENGINEERS
HYDROLOGIC ENGINEERING CENTER
609 SECOND STREET
DAVIS, CALIFORNIA 95616
(916) 551-1748
ENGLISH UNITS
DRAINAGE AREA
SQUARE MILES
PRECIPITATION DEPTH
INCHES
LENGTH, ELEVATION
FEET