PENDING HYDROPOWER PROJECTS ISLAND / GRID REGION PROVINCE CITY / MUNICIPALITY COMPANY NAME PROJECT NAME STATUS POTENTIAL CAPACITY (MW) LUZON CAR Apayao Cabugao Pan Pacific Renewable Power Phils., corp. Apayao-Abulog For Contract negotiation 600.00 Conner Sierra Madre Water Corporation Nabaunggan For submision of lacking documentary requirements. 0.00 Benguet Atok Benguet Electric Cooperative, Inc. Lok-o for financial evalaution 0.00 Baguio City Benguet Electric Cooperative, Inc. Bued River For evaluation of financial requirements 0.00 Bokod Hedcor, Inc. Bokod 1 For Contract negotiation 14.70 Bokod 2 For Contract negotiation 10.00 Itogon SN-Aboitiz Power-Benguet Binga For Contract negotiation 100.00 Kabayan Hedcor, Inc. Eddet For Contract negotiation 5.00 Sabangan Hedcor Sabangan, Inc. Sabangan For Contract negotiation 13.20 Tuba AV Garcia Power System, Inc. Bacayao River Prepared letter for submission of lacking documentary requirements within 30-days. 0.00 Keyte River Prepared letter for submission of lacking documentary requirements within 30-days. 0.00 Hedcor, Inc. Irisan 1 For Contract negotiation 3.80 Tuba 1 For Contract negotiation 4.20 Tuba 2 For Contract negotiation 18.90 Solutions UsingRenewable Energy (SURE), Inc,. Pellmell For submission of lacking documentary requirements within the 30-day period. With letter dated February 18, 2011. 0.00 Tublay Hedcor, Inc. Tublay For Contract negotiation 9.80 Ambukao Sn Aboitiz Power-Benguet, Inc. Ambuklao For Contract negotiation 105.00 Ifugao Asipolo Hedcor, Inc. Cadaclan For Contract negotiation 16.20 Kiangan ENERHIGHLANDS Corp. Asin River For final evaluation , such as legal and financial requirements 4.00 Hungduan For legal and financial evaluation 4.40 Ibulao River 1 For legal and financial evaluation 6.00

Hydro Power Projects 2011

Embed Size (px)

Citation preview

Page 1: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON CAR Apayao CabugaoPan Pacific Renewable Power

Phils., corp.Apayao-Abulog For Contract negotiation

600.00

Conner Sierra Madre Water Corporation NabaungganFor submision of lacking documentary

requirements. 0.00

Benguet AtokBenguet Electric Cooperative,

Inc.Lok-o for financial evalaution

0.00

Baguio CityBenguet Electric Cooperative,

Inc.Bued River

For evaluation of financial

requirements 0.00

Bokod Hedcor, Inc. Bokod 1 For Contract negotiation 14.70

Bokod 2 For Contract negotiation 10.00

Itogon SN-Aboitiz Power-Benguet Binga For Contract negotiation 100.00

Kabayan Hedcor, Inc. Eddet For Contract negotiation 5.00

Sabangan Hedcor Sabangan, Inc. Sabangan For Contract negotiation 13.20

Tuba AV Garcia Power System, Inc. Bacayao River

Prepared letter for submission of

lacking documentary requirements

within 30-days. 0.00

Keyte River

Prepared letter for submission of

lacking documentary requirements

within 30-days. 0.00

Hedcor, Inc. Irisan 1 For Contract negotiation 3.80

Tuba 1 For Contract negotiation 4.20

Tuba 2 For Contract negotiation 18.90

Solutions UsingRenewable

Energy (SURE), Inc,.Pellmell

For submission of lacking

documentary requirements within

the 30-day period. With letter dated

February 18, 2011. 0.00

Tublay Hedcor, Inc. Tublay For Contract negotiation 9.80

Ambukao Sn Aboitiz Power-Benguet, Inc. Ambuklao For Contract negotiation105.00

Ifugao Asipolo Hedcor, Inc. Cadaclan For Contract negotiation 16.20

Kiangan ENERHIGHLANDS Corp. Asin RiverFor final evaluation , such as legal and

financial requirements 4.00

Hungduan For legal and financial evaluation 4.40

Ibulao River 1 For legal and financial evaluation 6.00

Page 2: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON CAR Ifugao Kiangan PNOC- Renewables Corporation Bangbang

Prepared letter for submission of

lacking documentary requirements

within 30-days. 8.60

Tinoc Sta. Clara Power Corporation Tinoc 5 (Lower Luhong) For Contract negotiation6.00

Tinoc 6 (Wangwang) For Contract negotiation 6.00

Lamut ENERHIGHLANDS Corp. Ibulao River 2 For legal and financial evaluation 8.00

Lamut River For legal and financial evaluation9.00

Lagawe &

Mayoyao

Sn Aboitiz Power-Niueva Ecija,

Inc.Alimit For legal and financial evaluation

100.00

Kalinga Pinukpuk Sierra Madre Water Corporation Babaca For payment of processing fee35.00

Tabuk DPJ Engineers & Consultants BulanaoFor submission of lacking

documentary requirements 0.30

BuloFor submission of lacking

documentary requirements 0.30

Hydrotec Renewables, Inc. Chico RIS 1

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.68

Chico RIS 2

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.83

TinglayanPan Pacific Renewable Power

Phils., corp.Tinglayan For Contract negotiation

4.30

Mountain

ProvinceBarlig

Asiapac Green Renewable

Energy Corp.Tanudan For Contract negotiation

4.00

MabungaoSoutheast Asia Renewable Power

Corp.Mabungao For payment of processing fee

5.70

Page 3: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON CARMountain

ProvinceMalecom

Southeast Asia Renewable Power

Corp.Malecom For payment of processing fee

1.50

MaligSoutheast Asia Renewable Power

Corp.Malig For payment of processing fee

0.80

NatoninSoutheast Asia Renewable Power

Corp.Pantor For payment of processing fee

1.20

ParacelisAsiapac Green Renewable

Energy Corp.Siffu (Lower) For Contract negotiation

8.00

Siffu (Upper) For Contract negotiation 8.00

(blank)Asiapac Green Renewable

Energy Corp.Dicapan

For evaluation of financial

requirements 3.00

I Ilocos Norte Solsona Sierra Madre Water Corporation Labugaon For payment of processing fee20.00

Sigay Hedcor, Inc. Marcos For payment of processing fee 7.80

Ilocos Sur Alilem Sta. Clara Power Corporation Alilem For Contract negotiation 4.50

Quirino Sta. Clara Power Corporation Quirino For Contract negotiation 10.00

Sugpon Sta. Clara Power Corporation Danac For Contract negotiation 3.00

Marcos Hedcor, Inc. Sigay For payment of processing fee 7.50

La Union San Gabriel Hedcor, Inc. San Gabriel For Contract negotiation 2.60

Tubao LGU of Tubao Tubao For Contract negotiation 1.00

Pangasinan Asingan Hydrotec Renewables, Inc. Agno 1 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 3.70

San Manuel Hydrotec Renewables, Inc. Agno 2 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.42

II Cagayan GonzagaPan Pacific Renewable Power

Phils., corp.Baua 1 River For Contract negotiation

4.44

Page 4: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON II Isabela Cordon PhilCarbon, Inc. Magat F

For submission of lacking

documentary requirements. ( MOA

with NIA) 0.60

JonesGreenPower Resources

corporationDibuluan For Contract negotiation

17.00

Ramon Hydrotec Renewables, Inc.2.16 MW Magat Hydro

Project

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 2.16

6.93 MW Magat Hydro

Project

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 6.93

Magat Baligatan 3 For Contract negotiation 7.39

SN-Aboitiz Power-Benguet 360 MW Magat Hydro For Contract negotiation360.00

Roxas Hydrotec Renewables, Inc. Magat C RIS 1

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 2.30

Magat D RIS 2

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.69

San AgustinGreenPower Resources

corporationDabubu For Contract negotiation

10.00

San Mariano ENERHIGHLANDS Corp. Catalangan 1 Legal evaualution on-going 5.50

Catalangan 2 Legal evaualution on-going 2.70

First Isabela Renewable Energy

CorporationCalumangan For legal and financial evaluation

1.20

Page 5: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON II Isabela San MarianoGreenPower Resources

corporationDisabungan For Contract negotiation

9.00

Isabela Power Corporation Ilaguen 2For submission of lacking

documentary requirements 10.00

San Mariano &

San GuillermoIsabela Power Corporation Ilaguen on-going financial evaluation

25.00

Dinapigue Isabela Power Corporation Ilaguen 3For submission of lacking

documentary requirements 7.00

Ilaguen 4For submission of lacking

documentary requirements 6.00

Quirino CabbaroguisGreen Energy Management

HoldingsDiduyon For Contract negotiation

332.00

(blank)First Pacific Renewable Energy

CorporationCabarvan For legal and financial evaluation

1.50

Conwap For legal and financial evaluation

Manglad For legal and financial evaluation 2.80

Nueva Vizcaya Quezon SN Aboitiz -Nueva Ecija, Inc. Lower Magat For legal and financial evaluation 26.00

KayapaFirst Pacific Renewable Energy

CorporationPandang For legal and financial evaluation

2.40

DupaxFirst Pacific Renewable Energy

CorporationBiduk For legal and financial evaluation

2.50

III Aurora CasiguranAlternergy Viento Partners

CorporationAmro River For Contract negotiation

3.00

Bataan MarivelesSoutheast Asia Renewable Power

Corp.Mariveles For payment of processing fee

1.10

Bulacan Angat Hydrotec Renewables, Inc. Bayabas River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 1.23

Page 6: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON III Bulacan Bustos Hydrotec Renewables, Inc. Angat River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 5.54

Norzagaray First Gen Premier Energy Corp. Angat For Contract negotiation300.00

San Agustin Hydrotec Renewables, Inc. San Miguel River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.44

(blank)Metropolitan Waterworks and

sewerage SystemAngat -Umiray

For evaluation of legal and financial

requirements 1.50

Nueva Ecija General Tiño First Gen Luzon Power Corp. Balintingon For Contract negotiation 30.00

Masiway Hydrotec Renewables, Inc. Casecnan

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 7.70

Palayan Hydrotec Renewables, Inc. Pampanga 1 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 2.72

Pampanga 2 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.37

Pantabangan First Gen Prime Energy Corp.Pantabangan Pump

Storage PlantFor Contract negotiation

300.00

Page 7: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON III Nueva Ecija Penaranda Hydrotec Renewables, Inc. Peñaranda River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 1.91

KayapaFirst Pacific Renewable Energy

CorporationNasignan For legal and financial evaluation

1.80

Pampamga San Juan Bano Hydrotec Renewables, Inc. Pampanga RIS River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 3.70

IV-A Laguna Majayjay Majayjay Hydro Power Co., Inc. MajayjayFor evaluation of legal and financial

requirements 2.00

Sinilioan Sierra Madre Water CorporationLlano and Lagunlan

Multi RiverFor payment of processing fee

6.00

Siniloan Sierra Madre Water Corporation

Siniloan Multi River

Hydro Power/Bulk

Water ( Co-Product)

For evaluation of legal and financial

requirements.35.00

Quezon General Nakar Kanan Hydroelectric PowerCorp. Kanan River For Contract negotiation150.00

Rizal Antipolo Hydrotec Renewables, Inc. Hinulugang River For Contract negotiation 2.24

Marikina Hydrotec Renewables, Inc. Marikina 1 River For Contract negotiation 1.89

Marikina 2 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 2.17

Nangka 1 River For Contract negotiation 1.85

Nangka 2 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 2.16

Page 8: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON IV-A Rizal Marikina Hydrotec Renewables, Inc. Nangka 3 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 2.70

Nangka 4 River For Contract negotiation 1.08

Montalban Hydrotec Renewables, Inc. Montalban 1 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 5.78

Montalban 2 River For Contract negotiation 1.85

Morong Hydrotec Renewables, Inc. Uugong River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.96

Rodriguez Hydrotec Renewables, Inc. Marikina Upper 1 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 3.47

Marikina Upper 2 River For Contract negotiation6.87

San Mateo Hydrotec Renewables, Inc. Marikina 3 River For Contract negotiation 2.46

IV-B Oriental Mindoro NaujanPhilippine Hybrid Energy System,

Inc.Mag-asawang Tubig A

0.00

Mag-asawang Tubig B 0.00

San Teodoro Mindoro Grid Corporation Baltan River

For submission of lacking

documentary requirmenst with 30-

day period 0.00

Page 9: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON IV-B Oriental Mindoro Victoria Century Peak Energy Corporation Aglubang

For submission of lacking

documentary requirmenst with 30-

day period 0.00

Palawan El NidoAlternegy Viento Partners

CorporationNagcalicalit For Contract negotiation

0.12

Alternergy Viento Partners

CorporationBatacalan For Contract negotiation

0.15

Bulalakao-1 North

RiverFor Contract negotiation

0.34

Bulalakao-2 South

RiverFor Contract negotiation

0.44

Romblon RomblonRomblon Electric Cooperative,

Inc.Cantingas on-going financial evaluation

0.90

San AgustinSunwest Water & Eletrcic Co.,

Inc.Hinugasan

For submission of lacking

documentary requirmenst with 30-

day period 0.60

NCR Metro Manila Marikina Hydrotec Renewables, Inc. Marikina 4 River For Contract negotiation 2.59

Marikina 5 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 1.89

Marikina 6 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 1.24

Pasig Hydrotec Renewables, Inc. Pasig River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 4.07

Page 10: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

LUZON NCR Metro Manila Quezon Hydrotec Renewables, Inc. San Juan 1 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.55

Quezon City Hydrotec Renewables, Inc. San Juan 2, river

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 0.68

Sta. Mesa Hydrotec Renewables, Inc. San Juan 3 River

Submitted documents are under

evaluation. For Payment of

processing Fee with letter dated

February 2, 2011. No payment yet

made. 1.04

V Camarines Sur GoaClean and Green Energy

Solutions, Inc.Ranggas on-going legal evaluation

1.80

Sorsogon SorsogonSunwest Water & Electric Co.,

Inc.

Lower Cawayan

(Cawayan 2)

For submission of lacking

documentary requirmenst with 30-

day period 0.99

Catanduanes Caramoran Sunwest Water & Electric Co.,

Inc.

Gigmoto

For submission of lacking

documentary requirmenst with 30-

day period 0.55

Hitoma 2

For submission of lacking

documentary requirmenst with 30-

day period 1.35

Pangaldawan Sunwest Water & Electric Co.,

Inc.

Upper Hinipaan River

(Hinipaan River 2)

For submission of lacking

documentary requirmenst with 30-

day period 1.20

LUZON Sum 2,942.03

VISAYAS VI Aklan IbajaySunwest Water & Electric Co.,

Inc.Ibajay 1

For submission of lacking

documentary requirmenst with 30-

day period 1.00

Page 11: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

VISAYAS VI Aklan IbajaySunwest Water & Electric Co.,

Inc.Ibajay 2

For submission of lacking

documentary requirmenst with 30-

day period 2.00

VIII Northern Samar Victoria PNOC- Renewables Corporation MaouFor submission of list and names of

technical consultants 3.00

VII Bohol AntequeraSolutions UsingRenewable

Energy (SURE), Inc,.Inambacan

For submission of lacking

documentary requirements within

the 30-day period. With letter dated

February 18, 2011. 0.00

VISAYAS Sum 6.00

MINDANAO ARMM Lanao del Norte BacolodProvincial Government of Lanao

delNorteLiangan

For submission of lacking

documentary requirements12.00

Iligan CityEuro Hydro Power (Asia)

Holdings, Inc.Bayug River For Contract negotiation 1.00

KolamboganEuro Hydro Power (Asia)

Holdings, Inc.Titunod River For Contract negotiation 1.00

Lanao del Norte &

Lanao del Sur(blank) Agus 3 Hydropower Corporation Agus 3

Prepared letter informing Agus 3

Corp that the applied site is under

OCSP.

240.00

Lanao del Sur KapaiEuro Hydro Power (Asia)

Holdings, Inc.Kapai River For Contract negotiation 0.30

IXZamboanga del

NorteLeon Postigo

Euro Hydro Power (Asia)

Holdings, Inc.Polandoc River For legal and financial evaluation 2.00

MutiaEuro Hydro Power (Asia)

Holdings, Inc.Dapitan River (Middle) For legal and financial evaluation 4.40

SindanganZamboanga delNorte Electric

CooperativeIngin

With letter for submission of lacking

documentary requirements within 30-

days dated Janaury 27, 2011. No

reply yet.

3.00

(blank) Epower Technologies Corp. Sindangan River

For submission of docuemntary

requirements. Withletter dated April

28, 2011.

7.00

Page 12: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

MINDANAO IXZamboanga del

NortePiñan

Epower Technologies Corp.

Polako River

For submission of docuemntary

requirements. Withletter dated April

28, 2011.

2.00

Zamboanga del

SurJosefina PG of Zamboanga del Sur Salug Daku River 2

For submission of

lackingdocuemnetary requirements

within the 30-day period. With letter

of march 28, 2011.

6.00

Salug Daku River 1

For submission of

lackingdocuemnetary requirements

within the 30-day period. With letter

of march 28, 2011.

6.00

Salug Daku River 3

For submission of

lackingdocuemnetary requirements

within the 30-day period. With letter

of march 28, 2011.

4.00

Salug Daku River 4

For submission of

lackingdocuemnetary requirements

within the 30-day period. With letter

of march 28, 2011.

2.50

Lakewwod Hedcor, Inc. Lakewood

For submission of

lackingdocuemnetary requirements

within the 30-day period.

7.50

Zambonga del

NorteMutia

Euro Hydro Power (Asia)

Holdings, Inc.Dapitan River (Upper) For legal and financial evaluation 3.60

Manukan Epower Technologies Corp. Dohinong

For submission of docuemntary

requirements. Withletter dated April

28, 2011.

3.00

Page 13: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

MINDANAO IXZambonga del

NorteManukan Epower Technologies Corp. Pian River

For submission of docuemntary

requirements. Withletter dated April

28, 2011.

1.40

Katipunan

Epower Technologies Corp.

Tookan River

For submission of docuemntary

requirements. Withletter dated April

28, 2011.

0.90

X BukidnonBaungon and

LibonanBubunawan Power Company Bubunawan For Contract negotiation 8.00

ImpasugongEuro Hydro Power (Asia)

Holdings, Inc.Atugan

For submission of lacking

documentary requirements0.80

MalaybalayEuro Hydro Power (Asia)

Holdings, Inc.Sawaga For legal and financial evaluation 1.20

MalitbogEuro Hydro Power (Asia)

Holdings, Inc.2.5 MWSiloo For legal and financial evaluation 2.50

Sta. Clara Power Corporation Malitbog For Contract negotiation 5.00

Silo-o For Contract negotiation 4.50

Manolo Fortich Sta. Clara Power Corporation Mangima For Contract negotiation 10.00

MaramagEuro Hydro Power (Asia)

Holdings, Inc.Nabatantungan

For submission of lacking

documentray requirements.1.60

First Bukidnon Electric

Cooperative, Inc.Maramag For payment of processing fee 2.00

Moleta For payment of processing fee 2.00

Santiago Hedcor, Inc. Amusig For financial evaluation 15.40

Malagaong For financial evaluation 11.20

TalakagFirst Gen Mindanao Hydro Power

Corp.Cagayan River 1 For Contract negotiation 8.00

Cagayan River 2 For Contract negotiation 10.00

Guihian Hedcor, Inc. Guihian For financial evaluation 6.10

ValenciaBukidnon II Electric Cooperative,

Inc.Upper Manupali For legal and financial evaluation 2.00

Misamis

OccidentalCalamba

Misamis Occidental 1 Electric

Cooperative Inc.Langaran River For Contract negotiation 3.64

Misamis OrientalCagayan de Oro

citySta. Clara Power Corporation Mat-i 2 For Contract negotiation 4.00

Page 14: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

MINDANAO X Misamis Oriental Cagayan de Oro Sta. Clara Power Corporation Mat-i 3 For Contract negotiation 4.00

Turbines Resources &

Development Corp.Limbatangon For Contract negotiation 10.00

Jasaan Minergy Energy Systems, Inc. Lower Cabulig

Fo submission of lacking

documentary requirements within 30-

day period

10.00

XICompostela

ValleyNew Bataan

Euro Hydro Power (Asia)

Holdings, Inc.New Bataan River For Contract negotiation 1.00

(blank)Euro Hydro Power (Asia)

Holdings, Inc.Lapaz (Cawayan River) For Contract negotiation 1.20

Hedcor, Inc. Camanlangan For Contract negotiation 7.20

Tandik For Contract negotiation 7.00

Davao del Sur Davao City Hedcor Bukidnon, Inc. Simod For Contract negotiation 11.80

Sita For Contract negotiation 16.40

Hedcor, Inc. Tamugan For Contract negotiation 12.00

Malita LGU of Malita Malita River For legal and financial evaluation 2.50

Sta. Cruz HEDCOR Sibulan, Inc. Sibulan Plant A For Contract negotiation 16.50

Sibulan Plant B For Contract negotiation 26.00

Hedcor Tudaya, Inc. Tudaya 1 For Contract negotiation 6.60

Tudaya 2 For Contract negotiation 7.00

Davao Oriental Caraga Hedcor, Inc. Caraga (lower) For financial evaluation 22.90

Caraga (middle) For financial evaluation 19.50

Caraga (Upper) For financial evaluation 7.10

Cateel Hedcor, Inc. Aliwagwag For financial evaluation 9.70

Manurigao Hedcor, Inc. Manurigao For financial evaluation 12.20

Tauantauan Hedcor, Inc. Tauantauan For payment of processing fee 10.00

Davao del Norte TalaingodHedcor, Inc.

Talaingod For payment of processing fee 8.50

XII North Cotabato AlamadaEuro Hydro Power (Asia)

Holdings, Inc.Alamada River For Contract negotiation 1.00

Malitubog River For Contract negotiation 3.00

Sarangani MaasimAlsons energy Development

CorporationSiguil 1 For financial evaluation 8.70

Siguil 2 For financial evaluation 3.20

Page 15: Hydro Power Projects 2011

PENDING HYDROPOWER PROJECTS

ISLAND /

GRIDREGION PROVINCE

CITY /

MUNICIPALITYCOMPANY NAME PROJECT NAME STATUS

POTENTIAL

CAPACITY

(MW)

MINDANAO XII Sarangani Maasim Alsons energy Development Siguil 3 For financial evaluation 4.80

Saranggani MaitumAlsons energy Development

CorporationKalaong 1 For payment of processing fee 12.00

Kalaong 2 For payment of processing fee 6.00

Kalaong 3 For payment of processing fee 4.00

Euro Hydro Power (Asia)

Holdings, Inc.

Pangi

For submission of lacking

docuemnetary requirements within

the 30-day period.

1.20

South Cotabato Lake Sebu Euro Hydro Power (Asia)

Holdings, Inc.

Pitol Kalabaw 1

For submission of lacking

docuemnetary requirements within

the 30-day period.

0.50

Pitol Kalabaw 2

For submission of lacking

docuemnetary requirements within

the 30-day period.

0.40

Sultan Kudarat Isulan Sta. Clara Power Corporation Kabulnan 2 For Contract negotiation 110.00

XIII Agusan del Norte Butuan Equi-Parco Cosntruction Co. Taguibo 1 For Contract negotiation 2.00

Taguibo 2 For Contract negotiation 2.40

Jabonga Agusan Power Corporation Lake Mainit On-going technical evaluation 25.00

(blank) Equi-Parco Cosntruction Co. Asiga For Contract negotiation 5.00

MINDANAO Sum 823.84

Grand Total 3,771.87