39
Hydrograph Summary Charts 2007-2017 Eel River below Cape Horn Dam (E-11) PVP Diversion Tunnel (E-16) Lake Mendocino Storage Lake Mendocino Releases Russian River at Cloverdale Lake Pillsbury not included in Scenarios 1-3 because Scott Dam is removed Results for Scenarios 1-4 May 22, 2019

Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Hydrograph Summary Charts

2007-2017Eel River below Cape Horn Dam (E-11)

PVP Diversion Tunnel (E-16)

Lake Mendocino Storage

Lake Mendocino Releases

Russian River at Cloverdale

Lake Pillsbury not included in Scenarios 1-3 because Scott Dam is removed

Results for Scenarios 1-4

May 22, 2019

Page 2: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Scenarios illustrated in the following slides

See Individual Scenario reports for more detail on assumptions in each Scenario

Modeling Scenarios

Updated 4/16/19

Russian River & Lake Mendocino Alternatives

Current Operations

Lake Mendocino

FIRO (Hybrid) with

Fish Flow EIR

Operations

Raise Coyote Valley

Dam

Po

tte

r V

alle

y P

roje

ct A

lte

rnat

ive

s

Current

Operations

Baseline: Existing

Climate (n=1)

Baseline FC: Future

Climate (n=4)

PVP Revised

Operations

Scenario 4: Existing

Climate (n=1)

Run-of-the-

River

Scenario 2: Existing

Climate

(n=1)

Scenario 2FC: Future

Climate (n=4)

PVP

Decommissio

n

Scenario 1: Existing

Climate (n=1)

Scenario 3: Existing

Climate (n=1)

Scenario 5:

Preliminary analysis

with Existing Climate

(includes two sub-

scenarios)

Page 3: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Scenario & Legend Symbol Corresponding Model Run

Current (modeled) Operations

Full PVP Decommission, No Diversions, Current Russian River ops

Full PVP Decommission, No Diversions, FIRO and Fish Flow Russian River ops

Scott Dam removal, Run of River with 240 cfs Max PVP diversion

Revised PVP operations with FIRO and Fish Flow Russian River ops

Same

Same

PVP Decommission (unimpaired Eel River)

Proposed Legend For All Charts

Baseline Operations

Scenario 2

Scenario 4

Scenario 1

Scenario 3

Lake Mendocino Existing Rule Curve

Lake Mendocino FIRO Rule Curve

Scenarios 1 and 3

Page 4: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Pillsbury, 2007

Baseline Operations Scenario 4

Lake Pillsbury, 2008

Baseline Operations Scenario 4

Page 5: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Pillsbury, 2009

Lake Pillsbury, 2010

Baseline Operations Scenario 4

Baseline Operations Scenario 4

Page 6: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Pillsbury, 2011

Lake Pillsbury, 2012

Baseline Operations Scenario 4

Baseline Operations Scenario 4

Page 7: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Pillsbury, 2013

Lake Pillsbury, 2014Baseline Operations Scenario 4

Baseline Operations Scenario 4

Page 8: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Pillsbury, 2015

Lake Pillsbury, 2016

Baseline Operations Scenario 4

Baseline Operations Scenario 4

Page 9: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Pillsbury, 2017

Baseline Operations Scenario 4

Page 10: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Eel River blw Cape Horn Dam, 2007

Eel River blw Cape Horn Dam, 2008

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 11: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Eel River blw Cape Horn Dam, 2009

Eel River blw Cape Horn Dam, 2010

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 12: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Eel River blw Cape Horn Dam, 2011

Eel River blw Cape Horn Dam, 2012

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 13: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Eel River blw Cape Horn Dam, 2013

Eel River blw Cape Horn Dam, 2014

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 14: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Eel River blw Cape Horn Dam, 2015

Eel River blw Cape Horn Dam, 2016

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 15: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Eel River blw Cape Horn Dam, 2017

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 16: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Diversion Tunnel, 2007

Diversion Tunnel, 2008

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 17: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Diversion Tunnel, 2009

Diversion Tunnel, 2010

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 18: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Diversion Tunnel, 2011

Diversion Tunnel, 2012

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 19: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Diversion Tunnel, 2013

Diversion Tunnel, 2014

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 20: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Diversion Tunnel, 2015

Diversion Tunnel, 2016

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 21: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Diversion Tunnel, 2017

Baseline Operations Scenarios 1 and 3 (Unimpaired) Scenario 2 Scenario 4

Page 22: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Storage, 2007

Lake Mendocino Storage, 2008

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Page 23: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Storage, 2009

Lake Mendocino Storage, 2010

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Page 24: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Storage, 2011

Lake Mendocino Storage, 2012

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Page 25: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Storage, 2013

Lake Mendocino Storage, 2014

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Page 26: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Storage, 2015

Lake Mendocino Storage, 2016

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Page 27: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Storage, 2017

Baseline Operations Scenario 1 Scenario 3Scenario 2

Lake Mendocino Existing Rule Curve Lake Mendocino FIRO Rule Curve

Scenario 4

Page 28: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Outflow, 2007

Lake Mendocino Outflow, 2008

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 29: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Outflow, 2009

Lake Mendocino Outflow, 2010

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 30: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Outflow, 2011

Lake Mendocino Outflow, 2012

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 31: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Outflow, 2013

Lake Mendocino Outflow, 2014

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 32: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Outflow, 2015

Lake Mendocino Outflow, 2016

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 33: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Lake Mendocino Outflow, 2017

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 34: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Russian River at Cloverdale, 2007

Russian River at Cloverdale, 2008

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 35: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Russian River at Cloverdale, 2009

Russian River at Cloverdale, 2010

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 36: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Russian River at Cloverdale, 2011

Russian River at Cloverdale, 2012

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 37: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Russian River at Cloverdale, 2013

Russian River at Cloverdale, 2014

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 38: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Russian River at Cloverdale, 2015

Russian River at Cloverdale, 2016Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4

Page 39: Hydrograph Summary Charts 2007-2017 - Potter Valley Projectpottervalleyproject.org/wp-content/uploads/2019/05/2007-2017-Time... · Eel River blw Cape Horn Dam, 2007 Eel River blw

Russian River at Cloverdale, 2017

Baseline Operations Scenario 1 Scenario 3Scenario 2 Scenario 4