Energy in Japan
Present Status of Hydropower Development
Policy for Hydropower Introduction Licensing Procedures for Hydropower
Development
8/7/2019 HYDROPOWER STATUS IN JAPAN
3/22
EnergyEnergyDemand in JapanDemand in Japan
8/7/2019 HYDROPOWER STATUS IN JAPAN
4/22
8/7/2019 HYDROPOWER STATUS IN JAPAN
5/22
EnergyEnergySupply in Japan (2)Supply in Japan (2)
8/7/2019 HYDROPOWER STATUS IN JAPAN
6/22
Background of Hydropower DevelopmentBackground of Hydropower Development
Hydropower potential survey1) First Survey (1910-1913)
To correct understand potential
2) Second and Third Survey (1918-1923, 1937-1941)
To make efficient use of hydropower resource
3) Fourth Survey (1956-1959)
To cope with peak load
4) Fifth Survey (1980-1985)
To strengthen the hydropower development
5) Review of Fifth Survey (1993-1995)
To review the promising sites
8/7/2019 HYDROPOWER STATUS IN JAPAN
7/22
Hydropower ResourcesHydropower Resources
and Development Status (1)and Development Status (1)
140,606,5477,63635,118,3834,599Total
45,888,636
(33%)
4,47012,130,6902,714Untapped
2,253,756
(1%)32,832853,63926
Under
Construction
92,464,155(66%)
11,90622,134,0541,859Developed
Possible Annual
Generation Power
(MWh)
Average Output
(kW)
Total Output
(kW)Number of Sites
(31 March, 2006)
8/7/2019 HYDROPOWER STATUS IN JAPAN
8/22
Hydropower ResourcesHydropower Resources
and Development Status (2)and Development Status (2)
2 0 9
2 7
6 4
3 6 3
2 8 5
1 6 5
4 2 1
4 4 5
8 9
1
7
1
9
4
4
1 4
2 1
3
3 7 1
1 , 2 3 3
5 2 3
3 4 0
- 6 0 0 - 4 0 0 - 2 0 0 0 2 0 0 4 0 0 6 0 0 8 0 0 1 0 0 0 1 2 0 0 1 4 0 0
O ve r 1 0 0 ,0 0 0
U n de r 1 ,0 0 0
Outputclassification(kW)
D e v e lo p p e d U n d e r c o n s t r u c t i o n U n t a p pe d6 0 0 4 0 0 2 0 0
SitesOutput
(kW)
Power
Generation
(MWh)
SitesOutput
(kW)
Power
Generation
(Mwh)
SitesOutput
(kW)
Power
Generation
(Mwh)
Under 1,000 445 195,209 1,249,280 9 3,439 12,200 371 242,190 1,218,611
1,000 3,000 421 751,990 4,221,711 4 13,000 67,093 1,233 2,266,800 9,204,386
3,000 5,000 165 622,415 3,321,659 4 22,600 96,960 523 1,961,900 7,887,463
5,000 10,000 285 1,928,750 9,963,840 1 27,300 133,343 340 2,287,800 9 ,174,150
10,000 30,000 363 6,058,100 28,140,354 7 126,500 499,861 209 3,313,000 12,331,126
30,000 50,000 89 3 ,370,600 14,946,209 0 38,000 144,738 21 801,900 2 ,610,500
50,000 100,000 64 4,183,690 16,398,316 0 84,800 449,484 14 879,100 2,353,400
Over 100,000 27 5 ,023,300 14,222,786 1 538,000 850,077 3 378,000 1 ,109,000
Total 1,859 22,134,054 92,464,155 26 853,639 2,253,756 2,714 12,130,690 45,888,636
Average 11,906 49,739 32,832 86,683 4,470 16,908
Unexploited
Output classification
Developed Under construction
8/7/2019 HYDROPOWER STATUS IN JAPAN
9/22
8/7/2019 HYDROPOWER STATUS IN JAPAN
10/22
Target of Hydropower DevelopmentTarget of Hydropower Development
Present State
Hydropower accounts for10% of the total electric
power supply and for20% of the total installed capacity
in Japan.
Hydropower plays an important role
Future
Target of the total hydropower development is
20,700MW by FY2010.
8/7/2019 HYDROPOWER STATUS IN JAPAN
11/22
Development Targets ofDevelopment Targets of
Conventional HydropowerConventional Hydropower
Considerable effort is necessary to achieve this targetConsiderable effort is necessary to achieve this target
Decrease of the economical undeveloped hydropowerDecrease of the economical undeveloped hydropowerpotential sitespotential sites
Increase public concern of the environmentalIncrease public concern of the environmentalconservationconservation
8.58.520,70020,7008.88.820,08020,08011.211.219,31019,310
Ratio (%)Ratio (%)OutputOutput
(MW)(MW)Ratio (%)Ratio (%)
OutputOutput
(MW)(MW)Ratio (%)Ratio (%)
OutputOutput
(MW)(MW)
FY2010 (Target)FY2010 (Target)FY2000 (Developed)FY2000 (Developed)FY1990 (Developed)FY1990 (Developed)
Development target of addition: 60MW/year
8/7/2019 HYDROPOWER STATUS IN JAPAN
12/22
Policy to Promote HydropowerPolicy to Promote Hydropower
Reduction of construction costApplication of new techniques
Developing technology about simplified electricgeneration system etc.
Reinforcement of hydropower development promotionand environment conservation
Condition ordering to hydropower developmentpromotion
Simplification and review of criteriaEnhancement of Subsidy System
Introduction of RPS system etc.
8/7/2019 HYDROPOWER STATUS IN JAPAN
13/22
Outline of the RPS SystemOutline of the RPS System
Type of Energy CoveredSolar, Wind, Biomass, Hydro (up to 1MW), Geothermal
Utilization Target
The target for 2010 is 12.2 TWh, which would comprise1.35% of national electricity supply.
Fulfillment of Obligations. By generation of electricity oneself. By purchasing the new energy electricity from
another party
. By purchasing an "New Energy Certificates" fromanother party
8/7/2019 HYDROPOWER STATUS IN JAPAN
14/22
8/7/2019 HYDROPOWER STATUS IN JAPAN
15/22
Hydro Valley DevelopmentHydro Valley DevelopmentProgrammesProgrammes
8/7/2019 HYDROPOWER STATUS IN JAPAN
16/22
8/7/2019 HYDROPOWER STATUS IN JAPAN
17/22
Subsidy System (2)Subsidy System (2)
Interest Subsidy for hydropower plant constructioncost
Interest Subsidy
Unit; % (rate of interest subsidy to construction cost)
-1.01.02.05 30MW
1.01.52.53.0 5 MW
10 12 year7 9 year4 6 year1 3 year
Number of years after the beginning of operationScale of Hydro-plant
8/7/2019 HYDROPOWER STATUS IN JAPAN
18/22
1. F/S1. F/S--Project CommencementProject Commencement
F/S for Specific Sites
Site Determination
Concept Design
EIA (if required)
Presentation to Authorities
and Local Communities
Project Commencement
Relevant Public Authorities
and Any Interested Parties
8/7/2019 HYDROPOWER STATUS IN JAPAN
19/22
2. Project Commencement2. Project Commencement
License AcquisitionLicense Acquisition
Application for Permit etc.
Registration of Work Plan
Application forWater Right Utilization
Acceptance by METI
Application for
Relevant Permits
Power Purchase Contract
Acceptance and Permitby MLIT or Local
Acceptance and Permit
by Relevant Authorities
, , , , , ,
, ,
and Other Relevant Law
8/7/2019 HYDROPOWER STATUS IN JAPAN
20/22
3. License Acquisition3. License Acquisition
Construction CompletionConstruction CompletionStart of Construction Works
Completion of Construction Works
Application for
Safety Inspection
Application for
Work Completion Test
Approval by METI
Approval by MLIT
or Local Municipality
8/7/2019 HYDROPOWER STATUS IN JAPAN
21/22
4. Construction Completion4. Construction Completion
Start of Commercial OperationStart of Commercial Operation
Start of Commercial Operation
Registration of Safety Rules
Registration of Chief Engineer
Registration of Chief Engineer
Acceptance by METI
Approval by MLIT
or Local Municipality
EIA: Environmental Impact Assessment
METI: Ministry of Economy, Trade and Industry
MLIT: Ministry of Land Infrastructure and Transport
8/7/2019 HYDROPOWER STATUS IN JAPAN
22/22
Thank you for your kind attentionThank you for your kind attention
EijiEijiYamamotoYamamoto
New Energy FoundationNew Energy Foundation
EE--mail :mail : [email protected]@nef.or.jp