Hyper Concrete

Embed Size (px)

Citation preview

  • 8/20/2019 Hyper Concrete

    1/15

     

    L7

    High Volume Fly Ash Concrete

    Dr. R.V. Ranganath 

    Professor & Head  

    Dept. Of Civil Engineering  

    BMS College of Engineering  

    Bangalore-560 019  

  • 8/20/2019 Hyper Concrete

    2/15

     

    L7

    456: 2000 .

    •  C: 300450K /3 

     

    ./C : 0.550.4

    • 

    G C: 20 40

    • 

    :

    o  A (F A, F, GGB, H A, )

    o  C A

    ()

    •  E G

     

    C ,

    .

    ()

      E G

      C ,

    .

    •  A, 90 F A I.

    •  65,000

    •  B 2015, 1000 K .

    • 

    C C 70

    H E G

    1. 

    2.  D

    3. 

    C

    4. 

    A

    5. 

  • 8/20/2019 Hyper Concrete

    3/15

     

    L7

    6.  B

    7. 

    ()• 

    A

    •  I

    • 

    •  C

    •  I

    • 

    G

    •  C

    • 

    I

     

    1.  F 30 60%

    2.  /B < 0.40

    3. 

    , C &

    4.  A

    5.  B

    6. 

    B A

    7. 

    D

    8. 

    E

    9. 

     

    1.  A

    2. 

    3.

     

    4.  I ,

    5. 

    6. 

    7. 

    7

  • 8/20/2019 Hyper Concrete

    4/15

     

    L7

    .. , 1984.

    (

    )  

    F A

    ?

    •  F ,

    .

    • 

    L (C < 10% )o  E

    ( ).

    •  H (C > 10% )

    o  E C .

    • 

    2, A23, F23 ,C L I (LI).

    • 

    , 2, K2, 3, , 2. 

    ,  

  • 8/20/2019 Hyper Concrete

    5/15

     

    L7

     

    FA , % 40 50 60

    B, 435

    C, 260 215 175

    /B 0.42 0.42 0.42

    , 75 85 95

    A , % 3.5 3.8 4.0

    B, /2 0.020 0.024 0.025

    D, /3 2500 2495 2490

    0

    10

    20

    30

    40

    50

    60

    70

    80

    0 50 100 150 200

    Age, days

      C o  m  p r e s s  i v e s  t r e  n g  t  h ,  M  P a

    40 50 60

    0

    1

    2

    3

    4

    5

    6

    7

    8

    0 50 100 150 200

    Age, days

      M  O  R ,  M  P  a

    40 50 60

  • 8/20/2019 Hyper Concrete

    6/15

     

    L7

    0

    10

    20

    30

    40

    50

    28 60 90 180

    Age, days

      W  a  t  e  r  p  e  n  e  t  r  a  t  i  o  n ,  m  m

    40 50 60

    0

    200

    400

    600

    800

    1000

    0 50 100 150 200Age, days

      C  h  a  n  g  e  p  a  s  s  e  d ,  C  o  u  l  o  m  b

    40 50 60

  • 8/20/2019 Hyper Concrete

    7/15

     

    L7

    F %

    C , 0 25 40 56

    1 27.8 26.2 18.1 10.0

    3 41.4 33.5 30.1 26.9

    7 46.1 43.5 42.6 41.6

    28 61.6 59.2 60.4 57.7

    182 62.6 60.9 62.1 64.5

    •  F + E E B A A .

    •  , HFA

    CAE

  • 8/20/2019 Hyper Concrete

    8/15

     

    L7

  • 8/20/2019 Hyper Concrete

    9/15

     

    L7

    ,

    1. 

    F 20 , ,

    2. 

    30% 35

    3.  40%

    4.  50% F

    ,

     

    C = 300

    FA = 130

    = 165

    /B = 0.40

    A = 1975

    G = 35

    • 

    A , 15 35 %

    .

    • 

    B D

    • 

    60%

    D 100 ,

  • 8/20/2019 Hyper Concrete

    10/15

     

    L7

    30% & 70%

    700 , 7 CIDA

       

    G 40

    C 280

    F 200

    180

  • 8/20/2019 Hyper Concrete

    11/15

     

    L7

    2.8

    A 1830

    C , 7

    28

    90

    27.0

    40.2

    ?

    F , 28 6.4

    , DI , 17

    C, A 1202, C 551

      I HFAC

      I

      C /C/A

      B B

      I C:

    • 

    • 

    •  /

     

    • 

    •  3

    •  A 40 100

  • 8/20/2019 Hyper Concrete

    12/15

     

    L7

    • 

    H

    •  C

    • 

    450 , 40

    •  60

    • 

    C

    • 

    ( 100 )

    •  660 H.

  • 8/20/2019 Hyper Concrete

    13/15

     

    L7

    • 

    ,

    .

    •  90 , 30

     

    20

    •  C

    • 

    • 

    •  I

    /

    • 

    •  C

    •  B

    o  ,

    o  I ,

    ,

    •  .

    •  I

    ( ) .

    •  B

    .

    •  .

    • 

    •    .

    • 

    .

  • 8/20/2019 Hyper Concrete

    14/15

     

    L7

    • 

    L

    • 

    I

    , ,

    .

    .

  • 8/20/2019 Hyper Concrete

    15/15

     

    L7