Protective Response I-1 STP 3 & 4 Emergency Plan I Protective Response This section of the Plan describes the protective response actions for the protection of site and offsite personnel in the plume exposure pathway. This Emergency Plan is applicable to the South Texas Project Electric Generating Station and the Emergency Planning Zone within the 10-mile and 50-mile radius of the Station. Maps depicting the 10 and 50 mile Emergency Planning Zones are included as Figures I-1 and I-2. I.1 Onsite Personnel Notification Onsite personnel are notified of an emergency via the Station Public Address Paging System. The Emergency Director, or his designee, will announce the emergency classification and other pertinent data relating to the emergency classification to Station personnel using the Station Public Address Paging System on site. This system is described in Section E of this Plan. Persons within the Protected Area are notified of the emergency classification via the Public Address Paging System. Notification of personnel located onsite but outside the Protected Area is accomplished through emergency sirens, Public Address announcements, pocket pager activation, and by Security Force personnel. To comply with emergency classification and severity, evacuation within the Protected Area will be initiated for non-essential personnel at a Site Area Emergency classification or if not already performed at a General Emergency classification (optional at an Unusual Event or Alert). The sounding of the alarms over the Public Address Paging System occurs for both classifications. Inside plant buildings, where hearing is difficult due to high ambient noise levels, flashing lights are used to supplement the Public Address Paging System. I.2 Assembly and Accountability Protected Area assembly and accountability is initiated at the Emergency Director's discretion or when either a Site Area Emergency or a General Emergency has been declared. Protected Area assembly and accountability must be initiated when a Site Area Emergency or General Emergency is involved. Appropriate actions are implemented by 0ERP01-ZV-IN04, Assembly and Accountability and in Section F.3 of this Plan. I.3 Site Evacuation Site evacuation will be performed in accordance with 0ERP01-ZV-IN05, Site Evacuation and Section F.5 of this Plan, after assembly and accountability is completed. I.4 Onsite Shelter The Emergency Response Organization (ERO) monitors hazards and appropriate protective actions are taken for emergency workers. Station nonessential personnel shelter instructions are contained in Emergency Response Procedure 0ERP01-ZV-IN05, Site Evacuation and Section F.6 of this Plan. I.5 Protective Action Recommendations The Station is designed and equipped with a series of safety systems engineered to meet Title 10 Code of Federal Regulations Part 100 criteria for reactor safety. The Station recognizes Rev. 0 15 Sept 2007

I Protective Response - NRC

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

STP 3 & 4 Emergency Plan

Rev. 015 Sept 2007

I Protective Response

This section of the Plan describes the protective response actions for the protection of site and offsite personnel in the plume exposure pathway. This Emergency Plan is applicable to the South Texas Project Electric Generating Station and the Emergency Planning Zone within the 10-mile and 50-mile radius of the Station. Maps depicting the 10 and 50 mile Emergency Planning Zones are included as Figures I-1 and I-2.

I.1 Onsite Personnel Notification

Onsite personnel are notified of an emergency via the Station Public Address Paging System. The Emergency Director, or his designee, will announce the emergency classification and other pertinent data relating to the emergency classification to Station personnel using the Station Public Address Paging System on site. This system is described in Section E of this Plan. Persons within the Protected Area are notified of the emergency classification via the Public Address Paging System. Notification of personnel located onsite but outside the Protected Area is accomplished through emergency sirens, Public Address announcements, pocket pager activation, and by Security Force personnel. To comply with emergency classification and severity, evacuation within the Protected Area will be initiated for non-essential personnel at a Site Area Emergency classification or if not already performed at a General Emergency classification (optional at an Unusual Event or Alert). The sounding of the alarms over the Public Address Paging System occurs for both classifications. Inside plant buildings, where hearing is difficult due to high ambient noise levels, flashing lights are used to supplement the Public Address Paging System.

I.2 Assembly and Accountability

Protected Area assembly and accountability is initiated at the Emergency Director's discretion or when either a Site Area Emergency or a General Emergency has been declared. Protected Area assembly and accountability must be initiated when a Site Area Emergency or General Emergency is involved. Appropriate actions are implemented by 0ERP01-ZV-IN04, Assembly and Accountability and in Section F.3 of this Plan.

I.3 Site Evacuation

Site evacuation will be performed in accordance with 0ERP01-ZV-IN05, Site Evacuation and Section F.5 of this Plan, after assembly and accountability is completed.

I.4 Onsite Shelter

The Emergency Response Organization (ERO) monitors hazards and appropriate protective actions are taken for emergency workers. Station nonessential personnel shelter instructions are contained in Emergency Response Procedure 0ERP01-ZV-IN05, Site Evacuation and Section F.6 of this Plan.

I.5 Protective Action Recommendations

The Station is designed and equipped with a series of safety systems engineered to meet Title 10 Code of Federal Regulations Part 100 criteria for reactor safety. The Station recognizes

Protective Response I-1

STP 3 & 4 Emergency Plan

Rev. 015 Sept 2007

that in any accident situation, it is prudent and logical to make every effort to reduce and minimize exposure of the public to radioactive materials and radiation. This is accomplished by issuing offsite protective action recommendations when plant conditions indicate a potential for release of radioactive material or if a release is occurring or has occurred. The Protective Action Guidelines for the general public for thyroid dose due to inhalation from a passing plume and exposure to airborne radioactive material, as recommended by the Environmental Protection Agency, are five (5) rem Thyroid Committed Dose Equivalent and one (1) rem Total Effective Dose Equivalent respectively. Additional information is provided in Addendum I-1.

Recommendations for protective actions for the general public will originate from the Control Room, the Technical Support Center, or the Emergency Operations Facility (depending on facility activation and Emergency Director location) based on plant conditions and/or based on data derived from offsite dose assessment or actual field monitoring measurements. Emergency Response Procedures establishing these methodologies are 0ERP01-ZV-TP01, Offsite Dose Calculations and 0ERP01-ZV-IN07 Offsite Protective Action Recommendations. These procedures establish methods for determining projected dose to the public at risk. Recommendations will be made in accordance with agreements made with the Department of State Health Services. Whenever possible, message formats provided in the Emergency Response Procedure 0ERP01-ZV-IN02, Notifications to Offsite Agencies, in accordance with Section E of this Plan will be utilized. The implementing procedures relating to Protective Action Guidelines assure that the recommendations are determined through an approved process. The Emergency Director shall approve Offsite protective action recommendations.

I.6 Public Notification

In the event public notification is required, both transient and resident population within the ten mile Emergency Planning Zone will be initially notified through the Prompt Notification System as referenced and described in Section E of this Plan and by the Matagorda County officials. Additional notification and information will be provided to the transient and resident population as well as the general public outside the ten mile Emergency Planning Zone through the Emergency Alert System. Radio station KMKS FM, Bay City, is the primary Emergency Alert System station for the Station nuclear emergency response and KZRC FM is secondary.Information brochures and other public information documents describing notification, protective actions and general radiological education are provided by mailing and by general distribution to residents and transients within the ten mile Emergency Planning Zone. Matagorda County will issue messages similar to those provided in the Matagorda County Emergency Management Plan describing the incident and recommended public protective actions.

I.6.1 Public Shelter and Evacuation

Shelter and Evacuation recommendations from the Station and/or the Department of State Health Services are considered, and appropriate actions are determined and conducted by Matagorda County officials. Pertinent information from the evacuation time estimate1 has been incorporated into Matagorda County emergency procedures.

1 Evacuation Time Estimates for the South Texas Project Electric Generating Station Plume Exposure Pathway Emergency Planning Zone, Earth Tech 1994 KLD Associates,2007

I-2 Protective Response

STP 3 & 4 Emergency Plan

Rev. 015 Sept 2007

The evacuation time estimate study is maintained by and on file in the Station Emergency Response Division.

I.6.2 Special Needs Groups

Individuals with special needs will be accommodated as per Matagorda County plans and procedures.

I.7 Environmental Monitoring Points

In the event of an emergency, the permanent air sampling stations may be utilized for long term evaluation concerning airborne releases. Environmental Thermoluminescent Dosimeters located at the background radiation stations provide exposure data. At least one dosimeter shall remain at each station until the end of the event to provide integrated dose data over the duration of the release. Sampling efforts may be combined with Offsite Field Team activities.

Protective Response I-3

STP 3 & 4 Emergency Plan

Rev. 015 Sept 2007

Fig

ure

I-1

10 M

ile E

merg

en

cy P

lan

nin

g Z

on

es

SWIT

CHY

ARD

4TH

STRE

ET

AU

X.W

ATE

RT

ANKIV

CF

EED

TAN

KW

ATE

RF

EED

AU

X.CC

LCC

L

STR

UCTU

RE

1

CAUS

TIC

E.C

.W.

INTA

KE

TGB

RCB

FHB

ME

AB

DGB

TGB

ME

ABFH

B

IVC

RCBDG

BX

xxxx

xxxx

xxxxxx

xx

x xxxxxxxx

xxxxxxx xxx

xx

xxx

xx

xxxx

x

x xx xx xx xxx xx x

xx

xxx

xxxx

xxx

xxx

xxx

xxx x xxx xx xxx

xxxx

xxxx

x

xxxxx

x xxxx x xx xx x

xxx xxx xxxxxx

xxxxx

xxxxxxxxxx x xxxxxxx

xx xxxxxx xxxxxx xxxxx xxxxxx xxxxxx xxxxxx xxx

xxx xxxxxx xxxxxx xxxxx xxxxxx xxxxxx xxxxxx xxx

xx

xxxxxxxxxxxxxxx

xxxxx xxxxxxxxxxxx

xx xxxxxx xxxxxx xxxxx

xxxxxxxx xxxxxx xxxxxx xxxx

xxxxxxx

xxxxx

xxxx

xx

xxxxxxxx

xx

xxxxxxxxxx

xx

xxxx

x

xxxxxxx

x

xxx

xx

xxxxxxx

xxx

x

xxx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xxx

xx

xxxxxxxxxxxx

xxxxxxxxxx

xxxx

xxxxxxxx

xx

xx

xxxxx xxx xx xx

x

xxx

xxxxxxxx

xx xxxx x

xxxxxxxxx x

xx

x

xxx

xxx

xxx

xxxxxxxxx

xxx

xxx

xxx

xx

xxx

xxx

xxx x

xxx

xx

xxx xxxxx

xxxxxxx

x xxxx

xxx

xxx

xx

xx x xxx

xxxx

xx

xxx

xxx

xxxxx

Baxt

er

Bles

sing

Ble

ssin

gS

cho

ol

Briar

Buck

eye

Cas

hs

Cre

ek

Citr

us

Gro

ve

Col

lege

port

Cra

b

Dic

k

Dog

Don

ald

son

East

East

Res

ervo

ir

Egre

tIsl

and

ElM

aton

Fres

hw

ater

Gill

ettL

ake

Got

tsch

alk

Johnsons

Kelly

Lak

e

Little

Live

Ma

dIs

lan

d

Mar

kham

Mat

agor

da

McN

ab

McN

abb

Min

e

Pala

cios

Pelic

an

CR32

5

Rat

tles

nak

e

Rob

bin

s

Rob

bin

sS

loug

h

Selk

irk

Shel

lLa

kes

Tid

ehav

en

Tin

Top

Palacios

Wad

swor

th

West

Wild

Cow

Willow

Will

ow

Wilson

1

SCALEINMILES

Bay

City

Lak

e

Lak

e

Lak

e

Lak

eLak

e

Isla

nd

Isla

nd

Isla

nd

Isla

nd

Isla

nd

Lak

e

Lak

e

Isla

nd

Robbins Slough

Tres

Rive

r

Timber

Slough

Dam

SloughC

ree

k

BranchMadIslandSlough

West

Branc

h MadIsland

Slough

Slo

ugh

Lak

e

Lak

e

Isla

nd

BranchColora

doRiver

Oak

Cree

k

Cottonwood

Creek

RI V E R

OC

OD

AR

OL

LeTulle

Lake

P

P

Hig

hS

choo

l

Tid

ehav

en

Creek

CulverCut

Com

mun

ity

Riv

ersi

dePa

rk

Jun

ior

Hig

h

Oaks

Pala

cios

Tres

Oaks

Tide

wate

r

60

60

60

60

35

35

35

35 35 3

5

2668

3057

2668

2078

521

521

521

521

521

1468

1468

1095

1095

1095

2031

2853

2853

2853

459

2431

438

CR37

1

CR36

4

CR35

8

TRESPALACIOS BAY

CR365

CR37

3

CR378

CR37

4

CR37

2

CR37

9

CR388

CR384

CR39

0

CR34

2

CR38

5

CR377

CR387

CR23

7

CR 262

EASTMATA

GORDABAY

WE

ST

MAT

AG

OR

DA

BAY

CR392

CR39

1

CR436

ROAD

Equi

star

CR24

8

CR24

4

CR25

9

CR17

1

NewCut

POR

T

Cel

anes

e

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

CR32

3

CR34

3

CR 347

CR34

6

CR 349

CR38

1

CR22

4

CR38

6

CR383

CR38

0

CR 345

CR 344

CR35

7

CR 358

CR35

4

VACEKRD.

CR35

2

CR41

1

71

HA

LE'S

ACR

ES

CELANESERD.

BUCKEYERD.

Peyt

on

Creek

WilsonCreek

Ma

tag

orda

Har

bor

CR24

2

CR23

9

CR37

6

CR34

8

CR32

4CR 463

CR43

2

CR42

7

CR437

CR229

CR263

CR241

adsw

orth

Sl

o

ug

h

CR 444

Rattlesnake

IslandSlough

35

ASH

BY

CE

ME

TER

YR

D.

CR428

EST

AT

ES

PRA

IRIE

W

RESP

ON

SEEM

ERG

ENC

Y

NN

NW

NW

WNWW

WSW

SW

SSWS

S SE

SENE

NNE

0

315

270

225

180

13 5

90

4 5

ESEE

ENE

F.LAW

Scho

ol

FM52

1R

iver

Pa

rk

CR35

5

CR22

2

CR243

CR415

CR35

6

CR389

CR305

CR262

CR 245

CR247

CR 394

CR36

6

CR23

7

Tres

Pala

cios

Ri v

e r

Me

adow

bro

okEs

tate

s

3

9

4

8

10

11

52

1

6

and

the

Intra

coas

talW

ater

way

east

ofth

eC

olor

ado

Riv

er.

St.M

ary'

sB

ayou

whi

chin

clud

esth

eto

wn

ofM

atag

orda

,

and

whi

chin

clud

esEl

Mat

onan

dBu

ckey

e.no

rther

npo

rtion

ofth

eC

olor

ado

Riv

er,n

orth

ofW

ilson

Cre

ek,

north

ern

porti

onof

FM10

95,s

outh

ofSH

35w

esto

fthe

Gen

erat

ing

Sta

tion

with

inth

ese

boun

darie

s:E

asto

fthe

Anar

eage

nera

llyno

rthof

the

Sout

hTe

xas

Pro

ject

Ele

ctric

incl

udes

Tide

wat

erO

aks,

Tres

Pal

acio

sO

aks.

1095

and

the

Tres

Pal

acio

sR

iver

,nor

thof

FM52

1,an

dw

hich

and

sout

hof

SH

35,w

esto

fthe

north

ern

port

ion

ofFM

Elec

tric

Gen

erat

ing

Sta

tion

with

inth

ese

boun

darie

s:E

ast

Anar

eage

nera

llyno

rthw

esto

fthe

Sout

hTe

xas

Pro

ject

north

ern

porti

onof

Tres

Pal

acio

sB

ay.

Isla

ndS

loug

h,an

dw

hich

incl

udes

Col

lege

port

and

the

SH35

,sou

thof

FM52

1,w

esto

fFM

1095

,and

Mad

Elec

tric

Gen

erat

ing

Sta

tion

with

inth

ese

boun

darie

s:E

asto

fAn

area

gene

rally

sout

hwes

toft

heS

outh

Texa

sPr

ojec

t

and

north

ofW

estM

atag

roda

Bay

Stat

ion

sout

hpr

oper

tybo

unda

ry,w

esto

fthe

Col

orad

oR

iver

,Is

land

Slo

ugh,

sout

hof

the

Sout

hTe

xas

Proj

ectG

ener

atin

gG

ener

atin

gS

tatio

nwi

thin

thes

ebo

unda

ries:

Eas

tofM

adAn

area

gene

rally

sout

hof

the

Sou

thTe

xas

Proj

ectE

lect

ric

and

sout

hof

the

prot

ectio

nle

vyat

Mat

agor

da,n

orth

ofSH

60,w

esto

f,C

R26

2,an

dC

R24

8,so

uth

ofC

R23

7,El

ectri

cG

ener

atin

gS

tatio

nwi

thin

thes

ebo

unda

ries:

Eas

tof

Anar

eage

nera

llyea

stan

dso

uthe

asto

fthe

Sou

thTe

xas

Proj

ect

Riv

ersi

deP

ark,

Hal

esA

cres

,and

Mea

dowb

rook

Esta

tes.

west

ofC

R26

2,no

rthof

FM52

1,FM

3057

and

incl

udes

ofth

eC

olor

ado

Riv

er,s

outh

and

wes

tofL

ive

Oak

Cre

ek,

Elec

tric

Gen

erat

ing

Sta

tion

with

inth

ese

boun

darie

s:E

ast

Anar

eage

nera

llyno

rthea

stof

the

Sou

thTe

xas

Proj

ect

650

POPU

LAT

ION

6ZO

NE

POPU

LAT

ION

POPU

LAT

ION

POPU

LAT

ION

POPU

LAT

ION

POPU

LAT

ION

BOUN

DAR

YN

OT

DEF

INED

BYN

ATUR

ALLA

NDM

ARKS

POPU

LATI

ONSO

URCE

:200

2U

.S.C

ENS

US

BUR

EAU

/TE

XAS

STAT

ED

ATA

CEN

TER,

TEXA

SA&

MUN

IVER

SIT

Y

ZON

EZO

NE

ZON

EZO

NE

ZON

E

10 118 97

Zone

11Su

b-to

tal

2295

TOT

AL28

75

692

1980

237

518

POPU

LAT

ION

POPU

LAT

ION

POPU

LAT

ION

POPU

LAT

ION

POPU

LAT

ION

Sub-

tota

l

ZON

EZO

NE

ZON

EZO

NE

ZON

E4 52 31

7

Zone

8

Zone

9

Zone

10

56 8240 4020

580

Zone

6

Zone

7

ZON

ESAN

DP

OP

ULA

TIO

NS

FM14

68,a

ndno

rthof

FM52

1.th

eTr

esP

alac

ios

Riv

er,s

outh

ofW

ilson

Cre

ek,w

esto

fEl

ectri

cG

ener

atin

gS

tatio

nwi

thin

thes

ebo

unda

ries:

Eas

tof

Anar

eage

nera

llyno

rthw

esto

fthe

Sout

hTe

xas

Pro

ject

incl

udes

Tin

Top

and

Citr

usG

rove

Com

mun

ity.

sout

hof

FM52

1,we

stof

CR

392,

north

ofC

R39

1,an

dw

hich

Gen

erat

ing

Sta

tion

with

inth

ese

boun

darie

s:E

asto

fFM

1095

,An

area

gene

rally

wes

toft

heSo

uth

Texa

sP

roje

ctE

lect

ric

incl

udes

Sel

kirk

Isla

nd,E

xotic

Isle

,and

Equ

ista

r.SH

60,n

orth

ofth

epr

otec

tion

leve

eat

Mat

agor

da,a

ndth

eC

olor

ado

Riv

eran

dKe

llyLa

ke,s

outh

ofFM

521,

wes

tof

Elec

tric

Gen

erat

ing

Sta

tion

with

inth

ese

boun

darie

s:E

asto

fAn

area

gene

rally

sout

heas

toft

heSo

uth

Texa

sP

roje

ct

ofFM

521

Eas

t,an

dw

hich

incl

udes

Cel

anes

e.of

FM14

68,s

outh

ofFM

3057

,wes

tofF

M26

68,a

ndno

rthEl

ectri

cG

ener

atin

gS

tatio

nwi

thin

thes

ebo

unda

ries:

Eas

tAn

area

gene

rally

north

east

ofth

eS

outh

Texa

sPr

ojec

t

(Not

e:N

opo

pula

tion

lives

inth

isar

ea.)

the

north

ern

porti

onof

the

Stat

ion.

Elec

tric

Gen

erat

ing

Sta

tion

and

FM52

1,ru

nnin

gin

anar

car

ound

Anar

eage

nera

llyno

rthan

dno

rthea

stof

the

Sou

thTe

xas

Proj

ect

PRO

TEC

TIVE

RE

SPO

NS

E

ZON

EBO

UN

DA

RY

DE

SCR

IPTI

ON

S

Zone

4

Zone

5

Zone

2

Zone

3

Zone

1

SOU

THTE

XAS

PR

OJE

CT

ELE

CTR

ICG

EN

ERAT

ING

STAT

ION

10-M

ILE

EPZ

320

310

300

290

280

270 260 25

0

240

230

210

220

200

190

180

170

160

150

140

130

120

11010

09080

70

60

50

40

30

20

360

10

0

330

340

N

P

Q

RA

B

C

D F

HJ

K

LL

M

350

E

Lege

nd Maj

orR

oad

Elev

ated

Surfa

ce

Pav

edR

oad

Low

Surfa

ce

Gra

velS

urfa

ce

Dirt

orG

rass

Sur

face

Gat

e

Mat

agor

daEl

emen

tary

109

5

G

2

10Mi

5

11/2

0/03

I-4 Protective Response

STP 3 & 4 Emergency Plan

Rev. 015 Sept 2007

Figure I-2 50 Mile Emergency Planning Zones

Protective Response I-5

STP 3 & 4 Emergency Plan

Rev. 015 Sept 2007

Addendum I-1 Recommended Protective Actions for the PublicPage 1 of 1

1.0 Recognizing, in an accident situation, that it is prudent and logical to make every effort to reduce and minimize public exposure, the Station will make protective action recommendations to the State and County authorities. These recommendations are to assist the public officials in protecting the public in the Plume Exposure Pathway. It should be noted that the responsibility of final decision to implement offsite protective action recommendations made by the Station rests solely with Matagorda County authorities and respective authorities in other affected counties. Detailed instructions to implement protective actions will also be disseminated by County authorities.

2.0 The protective actions for offsite areas are discussed or presented in the State and County Emergency Management Plans. The State and County Plans have adopted the United States Environmental Protection Agency's Protective Action Guides for initiating actions to protect the health and safety of the public in the event of a nuclear power plant accident. These are the same guides used by the Station in developing their protective action recommendation to the State and County authorities. In addition, the Station has developed protective action recommendations based on plant conditions exclusive of actual or projected radiological exposures.

3.0 There are various types of actions that can be taken to protect the public. These include shelter, evacuation, access control, controlling distribution of food, water, milk, and livestock, and individual protective actions.

4.0 United States Environmental Protection Agency Protective Action Guidelines serve as the basis for offsite protective actions recommendations. The type, amount, and duration of the release source term, and the potential for radiological release based on plant conditions must also be considered when recommending protective actions.

5.0 Projected or measured doses that the public may be or is subject to receiving are correlated to protective action guides. Dose projections and measured dose are not prerequisites for issuance of a protective action recommendation.

6.0 The Emergency Director has the authority to make protective action recommendations and approve their release to governmental authorities. Protective action recommendations originate from the Control Room, Technical Support Center, Emergency Operations Facility or the Alternate Emergency Operations Facility based upon data derived from or received from assessment of plant conditions, radiological monitoring computer systems, field measurements, or process instrument readings. The Emergency Plan procedures relating to Protective Action Guides assure that recommendations are determined through an approved process. Emergency Plan Procedures, like the Plan, are based on the United States Environmental Protection Agency's Manual of Protective Action Guides and Protective Actions for Nuclear Incidents Environmental Protection Agency 400-R-92-001, revised May, 1992.

7.0 The Station agrees with the position of the State of Texas not to use radioiodine blocking drugs such as potassium iodide for the general public. It is the State's responsibility to stockpile and acquire the agent and disseminate it if it is to be distributed to the general public during an accident. The Station is responsible for maintaining and providing to the Department of State Health Services upon request, a quantity of potassium iodide sufficient for State and local emergency workers including any mobility impaired or institutionalized members of the general public whose evacuation could not be readily effected.

I-6 Protective Response