43
I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Embed Size (px)

Citation preview

Page 1: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

I.3. The Tianshan Radio Experiment for Neutrino Detection

Olivier Martineau-HuynhTREND workshop,

April 19, 2013

Page 2: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Why TREND?Why Ulastai?

Page 3: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND-21CMA site

Beijing

Urumqi

Ulastai

• Ulastai, Tianshan mountains, XinJiang autonomous province• Site of the 21CMA radio interferometer (Epoch of Reionization)

AM emitters : forbidden zone

Electronics noiseAntenna measurmentGalactic emissionmodel

Background electromagnetic level ≡

Galactic emission

Page 4: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

21CMA • Interferometer of 10000

antennas • Built in XinJiang by Wu

XiangPing (NAOC) in 2007• Obj: study of the Epoch of

ReIonization (1st stars)

N

4 km

E

S

W

3 km

Page 5: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

The 21CMA setup

• Signals from 127 antennas added after phasing

N

E

S

W

1 pod of 127 antennas

DAQ room

• Transfer to acquisition room through optical fiber (2 fibers/ pod)

• Sampling at 200MSamples/s & online FFT & correlation

Setup, infrastructure & support fully available for TREND!

Page 6: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND setup & DAQ

Page 7: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

The TREND-50 setup• 50 antennas deployed in summer-automn 2010, total surface

~1.5km² (+ 3 scintillators).• Stable operation since March 2011.

TREND-50~1.5 km²

East arm: antennas 101-120West arm: antennas 121-138, 140South arm: antennas 148-158Scintillators: 139, 175(@pod S15), 176 (@podS16)

Page 8: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND acquisition chain

Filter 50-200MHz

LNA 24dB

40dBFilter 50-100MHz

Optical transmitter

buffer 200MB

disk

antenna

~100m coax cable

<4km fiber Optical recevier

ADC 8b 200MS/s

Electronic boardPod

DAQ room

Page 9: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND acquisition chain

fiber to the DAQ room

(<4km)

Page 10: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

64dB ampli+ 50-100MHz

filter

Optical receiver

Antenna 101

U183300G disk

Triggered events Data file

u101

Time fileu101

scans ADC

8bits200

MS/s

Circular buffer

200MB

Circular buffer

200MBcomputeru101

CPU(trigger)

64dB ampli+ 50-100MHz

filter

Optical receiver

Antenna 158

Triggered events Data fileu158

Time fileu158

scans ADC

8bits200

MS/s

Circular buffer

200MB

Circular buffer

200MBcomputeru158

CPU(trigger)

50 parallel & identical chains

Optical fiber100m<d<4km

1 triggered event = 4 words in time file &

1024 samples in data file

DAQ room

computeru203

(ADCs init)

start signal

50 parallel & identical chains

Page 11: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Buffer structure

• 2 buffers on each machine u101 – u158.

• 1 buffer is 200MB (ie 228 bytes).

• ADC flow synchronous on all machines thanks to start

signal sent simultaneously to all ADCs by machine u001.

• ADC running at 200MSamples/s (5 ns per sample)

Buffer = 1.34 s of data

• If buffer full, ADC flow to second buffer.

• When buffer fully analysed (see next slide), buffer cleared.

• If buffer full before 2nd one cleared, both are dumped.

Buffer 200MB(268 435 456 samples)

1.34 s of data withADC @ 200MSamples/s

subbuffer n°1 (1024 samples)

subbuffer n°262 144

subbuffer n°262 143

subbuffer n° 2 (1024 samples)

Buffer structure

Page 12: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Trigger principle / Buffer analysisT0:On each machine uNANT (NANT in 101-158):

– For every new buffer, compute snoise over 1024 samples of 1st sub-buffer.

– If sample i with amplitude Ai > N x snoise , trigger of level T0 on this antenna. 6<N<10.

T1:If at least 4 antennas have T0 triggers within a causal time window (Dt<DL/c), then data is sent to disk on machine u183 for all antennas with T0s

– to data file R[NRUN]_A[NANT]_data.bin: 1024 samples centered on sample i

– to time file R[NRUN]_A[NANT]_time.bin : • UNIX second of sample i• Buffer index of sample i• Subbuffer index of sample i• Position of sample i in subbuffer.

5

snoise

N x snoise

Code in C with MPI for Master/Slaves dialogs. Master program in python. Securities to check computer & ADC card status, buffer status, machines dropping out of DAQ. Monitoring tools to check status.

Page 13: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND monitoring

Page 14: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Log files• Process log files to compute live DAQ time,

stalled DAQ & dumped buffers (BuildStat.m).

Page 15: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Power Spectrum Density• PSD |FFT|²

OK

Bad environment

No gain

Monitoring of the DAQ chain & environment…Also used for calibration.

Page 16: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Calibration 1: relative calibration

• Baseline calibration

– Hyp: senv >> selec

then sbline ~K senv => K a sbline at time t

𝐴𝐶𝑎𝑙=𝐴𝐴𝐷𝐶

𝜎𝑏𝑙𝑖𝑛𝑒

DA/A = 15%

Page 17: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Absolute calibration(under development)

Use load measurement• PSDload: power spectum

density with input = 75Ω load.

• PSDref with input = antenna right after load.

• PSDcurrent with input = antenna at time t.

GdB (t) = PSDload + PSDcurrent (t) - PSDref

Page 18: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Calib comparison

OK but sometimes really off & not as good as relative callibration on plane tracks (~20%).We need to improve our calibration if we want to study shower later profiles.

Page 19: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Absolute callibration with calibrator

A solution for TREND? (balloon or helicopter)

Pierre CHAUVEAU’s internship (?)

Page 20: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND RADIO ENVIRONNEMENT

Local sidereal time

Sign

al n

oise

leve

l

Galactic plane @ 408 MHzMajor radio source: thermal emission from the Galactic plane.

Visible in Ulastai sky between 15h & 23h LST.

TREND antennas clearly exhibit an increased noise level when the Galactic plane is in the sky

Page 21: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND offline data treatment

Page 22: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Radio background

TREND antenna

TREND-50 antennas radio array:2011-2012 data220 real days analysed

1.2 1010 triggers recorded1.4 109 coincidences ~100Hz background event rate over whole array (physical origin)

Expected EAS trigger rate:~2 events/day for E>1018 eV

Background rejection is a key issue for EAS radio-detection

(& major goal for TREND phase 1)

Page 23: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

EAS signal Background

Ex: signal pattern:

Elm background point sources

• Distinct features compared to EAS radio signals.→ Localized background can be rejected through data processing.

Shower axis

Page 24: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Background discriminationEAS radio signals features:- Focused signal spot on ground (decreasing

when moving away from shower axis)- ~ Flat wavefront- Short (<500ns) pulses- Isolated pulses- Random in time- Random in direction- Come from the sky- Polarized ( shower direction & Bgeo)- Frequency signature (?)

Background radio signals features- If distant: ~constant amplitude

- If close: curved wavefront - Usualy long pulses- Usually repetition- Possible pattern for consecutive triggers (50Hz)- Point sources or trajectories- Mostly from ground- Non polarized- Frequency signature possible…

EAS and background have distinct features → data processing written to efficiently select candidates & reject background

Page 25: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

DATA PRE PROCESSING : STAGE 1

• Informations on run set-up (antennas, positions, delays….)

• Rejection of « empty » events (bug DAQ, corrected 02/2012)

• Identification of coincidences between antennas

Time (s)

Coin

cide

nce

rate

(Hz)Example of run: 3577

- 49 antennas- Total duration: ~38h30- Number of triggers: 4.452.938- Number of coincs: 633.918

Page 26: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

DATA PRE PROCESSING : STAGE 2• Main source of pollution: power line

• Typical signature: Δt between 2 events = n.10 ms

• On run 3577: 67.406 coincidences remaining (89% efficiency)

• Influence on acceptance? (mainly cross-point events, estimated dead-time ~10%)

10 ms

Time (s)

Coin

cide

nce

rate

(Hz)

Could be implemented as an on-site pre-treatment (C program)

reduce data volume & ease up offline treatment

Page 27: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

DATA PRE PROCESSING : STAGE 2• Signal waveform analysis:

Create « boxes » around over-threshold parts of the signal

- Total ToT- Number of boxes- Boxes ToT- Pre-trigger ToT- Central box (at expected trigger time)- …

Informations available for signal rejection in stage 3

• Rejection of « bad » signals (if mult<4, coincidences are rejected)

• For run 3577, 22.244 remaining coincidences (66% efficiency)

Page 28: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Event reconstruction• Reconstruct wave associated with coincidences of 4+ antennas.• Plane (direction ,q j) & spherical (source x0, y0, z0) wave front

hypotheses.• Antenna trigger times corrected through signal inter-correlation

treatment.• “Delay plot” to check reconstruction quality.

• For all reconstructions, parameters saved into DST (Matlab file)

Page 29: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

RADIO PERFORMANCES

• Plane track reconstruction : - 3037 events in 4 minutes- Θ > 60°- Max multiplicity: 40

Total angular resolution <1.5° on the track.(and improves with smaller zenithal angle)

mult ≥ 22 antennasσ = 0.7°

Reconstruction quality should be checked more systematically (in particular single antenna effect wrong delay correction)

Page 30: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

DATA PRE PROCESSING : STAGE 3

• Track identification (Δθ/Δφ < 10°, Δt < 1m) and rejection• For run 3577, 432 remaining coincidences (98% efficiency)

Page 31: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Data pre-processing: stage 4

• For surviving events: – shower profile reconstruction– Data saved to DST (‘Candidates’ field)

• Final cuts (local treatment):– More selective cuts on signal shape– More selective cuts on neighbours– Cut on amplitude difference Amax/Amin>1.5– Cut on pattern (visual)

Final list of EAS candidates

Page 32: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Conclusion on data treatment

• Whole process consists in rejecting background.

• Trading between cut efficiency / candidate survival probability / data treatment power.

• This layout does not allow for efficient cut on pattern need for strict cuts on neighbours (very unefficient!)

EAS selection could certainly be optimized…

Effect on EAS radio signals to be studied with MC simulations (see

below)

Page 33: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND results & present activities

Page 34: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

The TREND status

• 2009: 6 antennas protype– Test setup for principle validation.– 25 CR candidates detected.

Page 35: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND-15 setup (2010)• 15 log-periodic antennas + 3 particle detectors (same DAQ

algorithm).

400 m

800

m

Ardouin et al., Astropart. Phys 34, 2011 <arXiv:1007.4359>

First EAS identification with autonomous radio

arrayNants θradio θscints ϕradio

ϕscints

4 61±3 67±5 359±2 3±4

4 52±1 49±3 195±2 191±4

5 42±1 36±3 55±4 56±5

4 45±1 49±3 12±1 10±5

7 56±2 53±4 323±2 331±5

Some radio EAS candidates are coincident with scintillator coincidences + direction recons match!

Selection of radio EAS candidates with dedicated algorithm

Radio data(subset)

Reconstruction of 3-fold scintillator coincidences EAS

Scintillator data

• Independant trigger & analysis of scint data (EAS) & radio data (EAS radio candidates).

Page 36: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

The TREND-50 setup• 50 antennas deployed in summer-automn 2010, total surface ~1.5km².

TREND-50~1.5 km²

TREND-15(2010)

TREND-6(2009)

All according to previously presented, except: Antennas 148, 150-152, 157: log periodic (21CMA type)Antennas 149, 153, 155: proto butterflyAntennas 148-155, 158: elec board @ pod

Stable operation between Jan 14, 2011 and Dec 6, 2012: 691 days8 data taking campaigns: 574 days (83%)DAQ running time: 320 days (56%) Data analyzed so far: 220 days (69%) [100% off-line treatment]Acceptance = 103 km².days 69 days with full array @100% efficiency (31%)

TREND-50 is a BAD & UNRELIABLE setup.Significant effort in the last 5 years on maintenance, with mitigated success…That is certainly the price to pay for a (nearly) cost-free detector!

Page 37: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND-50 EAS candidates search• 2011-2012 dataset:

– 140 EAS candidates found (2/ live day)

Valid candidate?

Statistical response

Page 38: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

EAS candidate search• Observed distribution very different from background one.

All events EAS candidates

Deficit for j = 90 & 270°All events

Page 39: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

West90°

Expected distribution

• Antennas sensitive to East-West polarization only (x axis):

EEAS . x skymap West90°

North0°

Experimental distribution

30°

60°

90°

30°

60°

90°

Looks promising, but requires better modeling: Full simulation of radio signal & system responseto produce expected EAS distribution.[on-going work]

South180°

East270°

A a EEAS .x a vBgeo .x

Page 40: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

EAS detection simulation• Shower simulation (CONEX): FORTRAN

– All sky: 5°<q<85° (step:10°) & 0<j<360° (step=20°)– At least 2 energies: E=5 1017 & 1018eV.– At least 100 core positions per direction

2x8x18x100 = 28’800 shower simulations2 modes:– 1D pure longitudinal MC+ODE => fast (2-3 s/shower).– Full 3D MC => very slow @ ultra high energies (~2+ h / shower @ CCIN2P3 with intel compiler)…

Probably still room for tuning though).

• Radio signal simulation ~10 antenna signals per core position -> 288000 signal simulations

2 modes again:– 1D: EVA/FORTRAN or custom Python code. Fast : ~2-3 s/antenna– 3D: EVA/FORTRAN. Very slow (~3-4 h/antenna) BUT 3D is the only accurate method close to shower axis (~100 m) due to strong Tcherenkov effect.

• Antenna response (NEC2): FORTRAN+Python interface. Fast (2-3 s/antenna).

Page 41: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

TREND simulation: toolsCode in FORTRAN/C++ + Python 2.6

1D option fast: ~10s / antenna 3D option very slow: ~3-4h/ antenna

CPU needs: • 28800 showers & 288000 antenna signals

Massive computing needs!

Go for distributed computing. France-Asia Virtual Organisation (IN2P3, IHEP, KEK,KISTI). DIRAC as middleware.

Major effort undergoing.

Page 42: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

EAS candidate search

• Ultimate test for EAS detection: rotate antennas to N-S

Same background distribution (random polar) but EAS expected distribution radicaly different.

Antennas rotated December 2012.Background distribution unchanged.

EAS candidates search just began.

Validation will open the way for a detailed study of EAS radio characteristics. Valuable because first self-triggered sample ever!

Page 43: I.3. The Tianshan Radio Experiment for Neutrino Detection Olivier Martineau-Huynh TREND workshop, April 19, 2013

Conclusion

• TREND-50 on the way to confirm EAS radio-detection with limited background contamination: 1st objective validation.

• Poor reliability, stability & callibration may be a major handicap for detailed & reliable study of EAS radio characteristics.