    Hull Survey for New ConstructionZ23 (July 2006)

    John Finch

    Chairman

    IACS expert group on the Hull survey forNew Construction

    September 2006

  • 8/12/2019 iacs presentation

    2/11

    Scope of the presentation:

    To present the IACS UR which has beenapproved by Council.

    To explain the background to it, how the

    draft UR was developed and show howindustry comments were discussed andincorporated into it.

    The next stages of the groups activities

  • 8/12/2019 iacs presentation

    3/11

    Items to address:

    Classification survey during newbuilding

    Goal-based standards

    Industry comments so far

    Comments on the scope for the next stage ofthe groups task

  • 8/12/2019 iacs presentation

    4/11

    Introduction:

    At MSC 77 (2003) the Bahamas and Greece proposed

    IMOs involvement in developing Goal-basedstandards (GBS) for shipbuilding. OCIMF made a

    submission which called for the consistentimplementation of classification requirements.

    IACS Council have agreed to include thedevelopment of GBS for shipbuilding into its

    strategic plan

    a joint submission IACS/Bahamas/Greece was made to MSC.

    MSC agreed that a new work programme item to beplaced on the agenda of MSC 78 in May 2004

    IACS Council agreed to establish an Expert Group for

    developing Unified Requirements for the survey ofNew Buildings in December 2003. This groupsubmitted a final draft which incorporated industrycomments.

    Council approved UR Z23 in July 2006 and issued itin August for implementation from 1 Jan 2008.

  • 8/12/2019 iacs presentation

    5/11

    Objectives of the expert group

    Develop comprehensive unifiedrequirements for survey concentrating onthe hull structure

    Establish a link between classification and

    statutory surveys and the draft Goal-basedstandards being developed at IMO

    Ensure that the Unified Requirement isrobust and meets the expectations ofindustry (taken from the form A)

  • 8/12/2019 iacs presentation

    6/11

    Background to the Goal-based regulatoryframework and the links with UR Z23

    The tiered pyramid

    Basic principles

    The tiers

    Tier I safety objectives

    Tier II functional requirements

    Tier III - verification of compliance criteria

    Summary

  • 8/12/2019 iacs presentation

    7/11

    Goal-based new construction standardsapplication to hull new construction survey

    Basic Principles 5

    And requirements developed & applied by Administrations orClassification Societies .. should be capable ofdemonstrating compliance with the goal-based standards

    Tier I Safety Objectives: I-5 Quality of Construction

    Ships should be built in accordance with controlled qualityproduction standards, due care to health & safety of personnel& by using original materials, capable of maintaining theirphysical & mechanical properties during the expected designlife

    Tier II Functional Requirements: II 7 Construction quality

    procedures

    The ship construction quality procedures should includespecifications for material manufacturing, assembling, joiningand welding procedures, steel surface preparation and coating

  • 8/12/2019 iacs presentation

    8/11

    Goal-based new construction standards

    application to hull new construction survey

    Tier III Verification of Compliance Criteria

    III - 1 Design

    5. Development of Ship Construction File

    III 2 Verification1. The ship compliance with the goal basedstandards should be verified by means of surveysduring construction and at periodic surveys byAdministrations or Classification Societies

    3. The main construction testing & inspectionactivities should be witnessed by Surveyors of the Classification Society to verify compliance withthe goal-based standards & relevant applicable rules

  • 8/12/2019 iacs presentation

    9/11

    Industry Comments received from:

    Shipbuilders Association of Japan

    Intertanko

    Chinese Shipbuilding Industry

    Intercargo

    EMSA

  • 8/12/2019 iacs presentation

    10/11

    The make up of UR Z23

    Defines the scope of survey sub-contractors andshipbuilders to be treated alike.

    Assessment of the construction facilities required.

    Provides a list of surveyable items for the hull

    structure. Requires newbuilding survey planning.

    Requires on the examination and test plan fornewbuilding activities.

    Requires demonstrable proof of consistency ofsurveys and describes auditable information.

    Defines the requirements for the Ship ConstructionFile.

  • 8/12/2019 iacs presentation

    11/11

    Next steps:

    IACS Council has requested the expertgroup to continue with specific taskswhich include:

    develop a UI for initial statutory surveysat new construction

    discuss the issue of coating in its reviewof statutory issues, consulting with theIACS expert group on coatings