IAEA-SR-208/7 Illlllllllllllllllllllllllllll XA9952477 Y2K Experiences in the Nuclear Material Control Area T. Yagi, T. Suzuki Nuclear Material Control Center, Japan 1. Introduction Though Y2K problem was treated by each organization, it became systematic in Japan when Advanced Information and Tele-communication Society Promotion Headquarter, c haired by Prime Minister, was established and issued an action plan last September, recognizing the importance and urgency of the issue. Here is presented the summary of action plan and some experiences of Y2K issues in the nuclear material control area. 2. Action plan issued by the Japanese government Recognizing the importance and urgency of the Y2K issues, an action pla n for Y2K issue was decided and released. Following is the summary of the action plan. (1) Wide and complete offer of the information to the general public -provides widely the information on on-going Y2K measures and state of the issue in the official gazette and asks mass-media as newspaper, magazines et. for cooperation of publication of the information. It goes further than simple calling attention to the issue but gives the necessary information as structure of the responsibility for this issue, simulation tests to ensure Y2K readiness, preparation of the contingency plans, inclusion of not only computers and software but embedded systems in the Y2K action plan , inclusion of communication networks in the plan to ensure the readiness from outside influence, asking the vendor or supplier of the systems to ensure if they are Y2K ready, and information on the current state of the remedy actions -each government ministry establishes contact person and open the Home page by September 1998 for Y2K actions being implemented so that general public can access to it and get the information on current state of the issue. (2) Remedy actions by governments as well as private sectors -requests central government and local governments for their computer -1 - 30-43

IAEA-SR-208/7 Illlllllllllllllllllllllllllll

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

IAEA-SR-208/7

IlllllllllllllllllllllllllllllXA9952477

Y2K Experiences in the Nuclear Material Control Area

T. Yagi, T. SuzukiNuclear Material Control Center, Japan

1. IntroductionThough Y2K problem was treated by each organization, it becamesystematic in Japan when Advanced Information and Tele-communicationSociety Promotion Headquarter, c haired by Prime Minister, wasestablished and issued an action plan last September, recognizing theimportance and urgency of the issue.Here is presented the summary of action plan and some experiences of

Y2K issues in the nuclear material control area.

2. Action plan issued by the Japanese governmentRecognizing the importance and urgency of the Y2K issues, an action pla nfor Y2K issue was decided and released.Following is the summary of the action plan.

(1) Wide and complete offer of the information to the general public-provides widely the information on on-going Y2K measures and state of

the issue in the official gazette and asks mass-media as newspaper,magazines et. for cooperation of publication of the information. It goesfurther than simple calling attention to the issue but gives the necessaryinformation as structure of the responsibility for this issue, simulation teststo ensure Y2K readiness, preparation of the contingency plans, inclusion ofnot only computers and software but embedded systems in the Y2K actionplan , inclusion of communication networks in the plan to ensure thereadiness from outside influence, asking the vendor or supplier of thesystems to ensure if they are Y2K ready, and information on the currentstate of the remedy actions

-each government ministry establishes contact person and open the Homepage by September 1998 for Y2K actions being implemented so thatgeneral public can access to it and get the information on current state ofthe issue.

(2) Remedy actions by governments as well as private sectors-requests central government and local governments for their computer

-1 - 3 0 - 4 3

Page 2: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

systems to complete the remedy actions in accordance with the "remedyaction guidance" for higher prioritized systems in the programme by theend of June, 1999.

-encourages important private industries as banking, energy,Tele-communication, traffic and medical to establish the over-all inspectionplans to make thorough self-inspections and report the results tosupervising Ministries and also encourages vendors and suppliers toactively provide necessary information on status of Y2K remedy actions toinside and outside of the country.

-follows up the action plans at Senior Advisory Committee on Y2Kproblems, Y2K Problem Measure Promotion Committee composed of allAdministrative Vise-Ministers and Advanced Information and Tele-communication Society Promotion Headquarter

3. Examples in the Nuclear Material Control AreaBased on the self-initiative as well as Science and technology Agency'srequest related to the above Initiative to remedy the Y2K problems, nuclearresearch and development organizations under the supervise of STA aretaking necessary actions for Y2K problems.Here is examples for Y2K remedy actions in the area of Safeguards andPhysical Protection.

(1) Examples for Nuclear Material Accounting in the SafeguardsNuclear Material Control Center (NMCC) is, based on Japanese Law, togather nuclear material accounting reports as Inventory Change Report(ICR), Material Balance Report (MBR) and others from all nuclearfacilities in Japan, and treat and report them through state authority,Science and Technology Agency (STA), to IAEA based on safeguardsagreement, and foreign countries as Australia, Canada, France, UK, USA,based on bilateral agreements.

NMCC has a central information treatment and analysis system andnuclear material accounting data received from various facilities areprocessed to verify and correct the accounting data, and national inspectiondata as Destructive Assay (DA) and Non-Destructive Assay (NDA) areanalyzed. Measurement error and Inventory Difference are also eva luated.

- 2 -

Page 3: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

Then accountancy reports and floppy diskette are sent to relevantorganizations as IAEA.

This mainframe computer system to treat the information has beenupgraded successively to cope with the increase of information andtreatment programs in conformity with the expansion of the Japanesenuclear programs

Format used for nuclear material accounting is common between facilityoperator and NMCC, and between NMCC and IAEA, and it has 6 digitscalendar. Existing computer program in the mainframe has 6 digits calendarwhere year 2000 would be recognized as year 1900 and leads to error.Before the replacement of the program and hardware were started, basicmeans of modification was decided. In the computer program, date of allcontrol data and computer panel display and output were changed to 8digits instead of 6. But we decided to minimize the corrections andcontinue to use the same common format with 6 digits calendar instead of8.

NMCC recognized Y2K issue, requested the necessary budget for it andmade a 3 year-plan for making Y2K ready system of the mainframecomputer starting 1997, and has implemented the actions with targetcompletion date of March this year. In the program, we studied the upgradeof data base, picture display, computer languages as NATURAL andPL/1,and output list. We also studied and defined the validation orintegration test environment to ensure Y2K readiness before installing themodified system and re-designed display picture and output list. Now it isalmost complete and the integration test is under way which is expected tofinish by middle of this y e ar. After successful completion of theintegration test, the whole system will be transferred to operationalcondition and checked to ensure Y2K readiness.

Right now each facility operator has it's own program with validation teststo get rid of the Y2K error, and the interface or boundary between operatorand NMCC is common format which makes the whole system easyto modify and check. NMCC is to provide Y2K error proof materialaccounting program to those organizations which utilize small quantity ofnuclear material, and normally has very limited resources for this kind ofmodification.

- 3 -

Page 4: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

(2) hysical rotection of u clear a terial and ac ilityJapan Nuclear Cycle Development Institute (JNC) has reactors, and fuelcycle facilities which are safeguarded by relevant physical protectionsystems.With regards to the Y2K problem it has been recognized since around1995 . When The Institute made and started systematic plans for upgradingimportant facilities around that time, this issue was also taken intoconsideration in them and advanced operation systems have been adoptedwith Y2K proof. They are now almost complete including simulation tests.Those facilities, which were not modified or replaced, are under review toevaluate the influence of the Y2K problem as well as effective measures bythe vendor.

During the course of consideration, following sort of issues wererecognized.

1. Entry and exit control systemMachine does not recognize the validation date of card, which people usefor entry and exit, and make errors after year 2000. Entry and exit data ofthe people become invalid.2. Monitor systemTV camera has a embedded timer and recorded date becomes wrong one.This makes it difficult to review the data. Alarm signal treatment processmay stop or make abnormal performances.3. It cannot respond to leap year in 2000, discards 2000 and after data asold one, makes an error in data review and data accumulation.

- 4 -

Page 5: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

11 Remedy Action Guidance for Gov. Ministry "

• Establish Organization to Cope with the Issue• Check Following Items

/Computer Hardware /Net-work Related Equipment/Application Program /Embedded system

• Identify , Prioritize ActionsA: Close Relationship with Public Life &Economic Activity

& Reliability with Foreign Country or International Org.B: influence on Other Ministries

• Implement Over-All Inspection/Action Plan /Measure to Not-Yet Implemented Item/Listing of Inspection Items /Simulation Test

• Establish Contingency Plan/ Identify Influence & Extent of Y2K Trouble/ Establish Recovery Actions Priority , Alternative Measure/ Establish Recovery System, Communica. Network & Method/ Establish Chain of Command, Site Authority/ Conduct Training Etc.

Report Over-Ail Inspection Results

Safeguards Information Treatment in NMCC

Inspection Data

Safeguards Information Treatment Division

Data Processing Section

-Verification &Correction ofAccounting Data, etc.

- Reporting to IAEA-Reporting to BilateralCountries

-Reporting to STA

Information Treatmenl& Analysis System

ADABAS

Data Analysis Section

-DA&NDA DataAnalys is

- PerformanceAnalysis ofMeasurement Error

-Evaluation ofMUF

bcnedule oI ABdilmcation tor i

Output to the Government

-Accountancy reports & floppy Diskette to IAEA-Accountancy reports for bilateral agreement-Data processing for STA-Results of Data Analysis

Page 6: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

gcaTYearWorking Process 1997 1998 1999Analysis of System

Definition of EnvironmentFor DevelopmentDesign of Display Pictureand Output ListModification of Program

Integration Test

Re-Building of Database

Operational Test

Some Y2K Problems in Physical Protection System

- Entry & Exit Control/ Do Not Recognize Entry & Exit Cardor

/ Entry & Exit Data becomes Invalid- Monitor System

/ DifFicult to Review TV Recorded Data/ Alarm Signal Perform Abnormally

- Others/ Do Not Respond Correctly to Leap Year/ Make Errors in Data Accumulation

- 6 -

Page 7: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

(00)

c(0Q.

o

•••••-,

0!

0Q.X

LU

C9

o(0

(5o

3N3

CO

en

ocCDO_o

oo.£5'II

late

(5CD

O)O>G>

oLL

a

Page 8: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

Action Plan - Wide Information Offer tothe Public

-Provide wide and complete information on on-going Y2KMeasures and state of the issue in the official gazette

/ Structure of Responsibility/ Preparation of Contfr^ncy Plan/ Inclusion of computer/sollvvare and embedded items/ Inclusion of Related Communication Network System/ Vendor and Supplier's information

- Each Government Ministries establish contact personand open Home Page by September 1998 for Y2K actions

- Ask Mass Media for cooperation of publication of theinformation

Page 9: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

Action Plan - Remedy Action• • - . . , .

- Request Central and Local Governments to Complete RemedyActions for Higher Prioritized Systeqis by June, 1999

- Encourage Important Private Industries to Establish Over-AllInspection Plans and Make Thorough Self-Inspections

- Encourage Vendor & Supplier to actively Provide informationto Inside & outside of the Country

- Follow-Up the Actions at/ Senior Advisory Committee on Y2K Problems/ Y2K problem Measure Promotion Committee/Advanced Information & Tele-Communication Society

Promotion Headquarter

Page 10: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

"Remedy Action Guidance for Gov. Ministry"

- Establish Organization to Cope with the Issue- Check Following Items/ Computer Hardware / Net-work Related Equipment/ Application Program / Embedded system

- Identify, Prioritize ActionsA: Close Relationship with Public Life & Economic

Activity & Reliability with Foreign Country orInternational Organization

B: Influence on Other Ministries- Implement Over-All Inspection/ Action Plan / Measure to Not-Yet Implemented Item/ Listing of Inspection Items / Simulation Test

Page 11: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

"Remedy Action Guidance for Gov. Ministry"(continued)

' • • • • • • . . . ,

- Establish Contingency Plan \/ Identify Influence & Extent of Y2K Trouble/ Establish Recovery Actions Priority, Alternative

Measure/ Establish Recovery System, Communication Network

& Method/ Establish Chain of command, Site Authority/ Conduct Training Etc.

- Reporting Over-All Inspection Results

Page 12: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

Responsible Organizations for SafeguardsImplementation in Japan

I A E A

Reports1. Accountancy Reports2. Inspection Results3. Operation-Inspection

Program4. Advance Notification

of Transfer

Reports1. Conclusion of

Verification2. Import

Communication3. Semi-annual

Statement, etc.

Bilateral Agreement( Australia, Canada, China, France, U.K., U.S.A )

1. Reports on Inventory & Transfer List2. Notification-Confirmation of Transfer

& Authorized Person3. Consultation on Safeguards, etc

...f?...i?...y...®..r...n....rn...©...n..i .?? J a p a n ( S T A )

I n t e r n a t i o n a lI n s p e c t i o n

\ Inspection

i 1. Book Audit\ 2. Item Count; 3. Measurement;4. Sample Taking: 5. Application of: C/S Devices

R e p o r t s

1. ICR2. MBR&PIL3. OCR4. Semi-annual

material balancereport

5. Other Reports

N u c l e a r F a c i l i t i e s

Nuclear Material Control Center(NMCC)

| 1 . Information Treatment(2. Analysis of Sample Taken3. Calibration & Adjustment4. R&D on Theories & Techniques of SG

Page 13: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

Safeguards Information Treatment in NMCC

Accounting Reports Dl &FA Inspection Data

Safeguards Information Treatment Division

Data Processing Section

- Verification &Correction ofAccounting Data, etc.

Information Treatment& Analysis System

ADABAS

r D/B

Data Analysis Section

- DA & NDA DataAnalysis

- PerformanceAnalysis ofMeasurement Error

- Evaluation of MUF

Output to the Government

- Accountancy reports & floppy diskette to IAEA- Accountancy reports for bilateral agreement- Data processing for STA- Results of Data Analysis

Page 14: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

Basic Means of Modification for Y2K' • • " • • - . . . .

Date of all control data be changed to 8 digitsfrom 6 digits ^

Date displayed on computer panel and output bealso changed to 8 digits instead of 6

Do not change program logic

Continue to accept 6 digits date in the report fromrelated organizations

Continue to report to IAEA with 6 digits date,but plan to change to 8 digits

Page 15: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

Schedule of Modification for Y2KStart of Year 2000

——_____ Fiscal YearWorking Process ~~~—-—___^^

Analysis of System

Definition of Environment forDevelopment

Design of Display Picture andOutput List

Modification of Program

Integration Test

Re-Building of Database

Operational Test

1 9 9 7

_•• •

- •

*-•

1 9 9 8 1 9 9 9

MM —4•

r

Page 16: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

En

Facilities in Tokai Works(A) Exhibition Building(B) Health and Safety AdministrationBuilding(C) Tokai Reprocessing Plant(D) Tokai Vitrification Facility(E) Recycle Equioment Test Facility

(under construction)(F) Chemical Processing Facility(G) Engineering Demonstration Facility(H) Plutonium Fuel Production Facility(I) Geological Isolation Basic ResearchFacility(J) Uranium Enrichment Facility

TOKAI WORKS

jnc-ico mnc

Page 17: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

PERIPHERAL PROTECTION AREA

CAMERA LIGHT

PROTECTED AREA

CAMERA

ENTRY & EXIT CONTOL EQUIPMENT

C t N I K A L A L A R M S I A I 1 U NRESPONCE FORCE

C O N C E P T OF PHYSICAL P R O T E C T I O N

Page 18: IAEA-SR-208/7 Illlllllllllllllllllllllllllll

Some Y2K?>robl$ms in Physical Protectionem

- Entry & Exit Control X/ Do Not Recognize Entry & Exit Card

or/ Entry & Exit Data becomes Invalid

- Monitor System/ Difficult to Review TV Recorded Data/Alarm Signal Perform Abnormally

- Others/ Do Not Respond Correctly to Leap Year/ Make Errors in Data Accumulation