IBM SYSTEM 370

Abdulmumin IbrahimIbrahim Musa Adam

Saeed Malhooz

Page 2: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 2

Outline

• Introduction• Evolution of the Project• Project life cycle• Project drivers• Objectives of System 370• Project Selection Model• Risk and Uncertainty • The Project Manager• Project Organization• Integration

Page 3: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 3

Introduction

• Project Management– Project management is the methodological approach.

• Project Management and technology– Project Management implementation.

• Benefits of Project Management– Efficiency– Customer satisfaction – Improved growth– Competitive edge

Page 4: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 4

Evolution of System 370

• Reusability of software– Mainframe hardware

• Virtual Memory

Page 5: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 5

Project life cycle

• Conception– Idea: system with extendable memory

• Selection– Backward compatibility– Software reusability – Memory address storage

• Planning– Peter Druke (plans)– Time factor– Project outcome meets parent organization outcome

• Termination– Will be discussed latter

Page 6: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 6

Project drivers• Speed to market– Fore front in technology market

• Cost effective– Features

• Complexity an uniqueness of innovation– Reusability of software

• Distribution of enterprise– Geographic location

Page 7: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 7

Objectives of System 370

• Price• Compatibility• Performance

Page 8: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 8

Project Selection Model

• Sacred cow• Competitive necessity– Market domination in US and Europe– Fore front of technology

• Product line extension– Chain of family line architecture

Page 9: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 9

Risk and Uncertainty

• The most highly risk decision in computer industry.

• “Classic case of all eggs in one basket”• Uncertainty

Page 10: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 10

The Project Manager

• Mythical on-Month– “Adding man power to a late project make it later”

• Brooks invented computer architecture– Aid in reusing software packages in new hardware

Page 11: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 11

Project Organization

• Organizational structure– Manner in which an organization arrange itself

• Functional– System 370

• Matrix– System 360

Page 12: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 12

Integration

• Program Managers• Hierarchy

Page 13: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 13

Project Control

• Result regulation• Administration• Asset conservation– Physical asset– Financial asset– Human resource

Page 14: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 14

Termination

• Termination by extinction– Name Replacement

Page 15: IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz

MGMT 341 IBM System 370 15

Thank you