GOVERNMENT OF ANDHRA PRADESH PANCHAYATRAJ ENGINEERING DEPARTMENT REPAIRS TO THE DAMAGED CULVERT AT IDDUVANIPALEM ESTIMATED COST:-Rs.0.50 lakhs DISTRICT : SRIKAKULAM CIRCLE : SRIKAKULAM DIVISION : TEKKALI SUB-DIVISION : ICHAPURAM MANDAL : KAVITY

Idduvanipalem Slab Culvert ESTIMATE

Embed Size (px)

DESCRIPTION

SLAB CULVERT ESTIMATE

Citation preview

CoverGOVERNMENT OF ANDHRA PRADESHPANCHAYATRAJ ENGINEERING DEPARTMENTREPAIRS TO THE DAMAGED CULVERT AT IDDUVANIPALEMESTIMATED COST:-Rs.0.50 lakhsDISTRICT:SRIKAKULAMCIRCLE:SRIKAKULAMDIVISION:TEKKALISUB-DIVISION:ICHAPURAMMANDAL:KAVITY

Specification reportSPECIFICATION REPORTName of the work:-Repairs to the Damaged Culvert at IdduvanipalemEst.Cost.Rs.0.50 lakhsAs per the instructions of the instructions of the Dy.Exe.Engineer,PR,Ichapuram and as per theneed,it is proposed to repair the damaged culvert at Edduvanipalem village of Kavity(M).The village Idduvanipalem is situated at sea-shore edge.The villagers are always being suffered dueto erosion of houses and road portion,due to sea back water tides and waves.The above village road is graduallyeroding.Further,the existing culvert at the entrance of the village is badly damaged and the deck slab of the culvert ispartially collapsed.Due to the rains from 3-10-2004 to 6-10-2004,the culvert is further damaged and road portion was alsopartially eroded.At present only two wheelers can go on the culvert.Hence,it is proposed to repair the culvert and to strengthen the eroded road portion by gravelpacking.The following provisions are made in the estimate.1.Provision for cost and supply of steel2.Provision for Rabbit Mesh3.Provision for C.C(1:2:4) for parapet walls4.Provision for VRCC(1:2:4) for DECK SLAB4.Provision for gravel packingThe estimate is prepared as per the current SSR,i.e.2004-2005 rates and the work will be carriedout as per APDSS.Asst.Executive EngineerPR(spl),Ichapuram

Slab culvert rEPAIRSABSTRACT-CUM-DETAILED ESTIMATEName of the Sub work:-Repairs to the Damaged Slab Culvert at Idduvanipalem villageEst.Cost:Rs.0.50 lakhsS.NoDescription of itemNosMeasurementsQuantityRatePerAmountLengthBredthDepth1Cement Concrete(1:2:4) mix using 20mm HBG chips includingcost and conveyance of all materials and all labour chargesincluding machine mixing chargesParapet walls1X24.000.450.401.44Cum7.50.242.64.681.44Cum2313.801.00Cum333280374.42VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materialsand all labour charges including machine mixing and vibrating charges but excluding cost andfabrication charges of steel for deck slabDeck slab1X23.502.000.243.36Cum3213.651.00Cum107983Cost,supply and fabrication charges of steel including cost of binding wire and all labourcharges etc.complete400.00Kgs33.281.00Kg133124Cost,supply of Rabbit mesh for repairs to deck slab1X23.502.00----14.00Sqm79.041.00Sqm11075Filling with gravel in the eroded road portion including watering and rolling with hand road rollerincluding all labour charges etc.completeEroded road portion1X125.00(1.5+2.5)/21.00100.00Cum207.771.00Cum207775Provision for unforeseen items,if any--------LS------------674TOTAL50000Asst.Executive EngineerPR(spl),Ichapuram

Lead statementLEAD STATEMENTName of the work:-Repairs to the damaged culvert at Idduvanipalem,Est.Cost.Rs.0.50 lakhsS.NoDescription of itemName of the quarryLead in KmsInitialConveyanceSeinorageBlastingMachineDeductTotalMRCTTotalCostchargescrushingstackingcharges1GravelRajapuram17.400.0017.4038.50132.4020.000.000.00(-)3.70187.202Sand for MortarBahuda river21.900.0021.9071.00145.9036.000.000.00(-)3.70249.20340mm HBG metal-SS5Rattakanna27.400.0027.40269.00183.9045.0053.000.00(-)6.10544.80420mm HBG metal-SS5Rattakanna27.400.0027.40470.00183.9045.0053.000.00(-)6.10745.80Certified that the above leads are correct to the best of my knowledgeAsst.Executive EngineerPR(spl),Ichapuram

DataDATA SHEETName of the work:-Repairs to the Damaged culvert at IdduvanipalemEst.Cost.Rs.0.50 lakhsS.NoQuantityDescription of itemRatePerAmount1Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materialsand all labour charges including machine mixing charges for parapet walls0.92CumCost of 20mm HBG metal745.801.00Cum686.140.46CumCost of sand249.201.00Cum114.63330.00KgCost of cement2700.001000.00Kg891.001.00CumLabour charges350.541.00Cum350.541.00CumMachine mixing charges31.001.00Cum31.001.50NosWoman Mazdoor101.001.00Cum151.50Add TOT@4%88.99TOTAL2313.802VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materialsand all labour charges including machine mixing and vibrating charges but excluding cost andfabrication charges of steel for deck slab0.92CumCost of 20mm HBG metal745.801.00Cum686.140.46CumCost of sand249.201.00Cum114.63330.00KgCost of cement2700.001000.00Kg891.001.00CumLabour charges620.281.00Cum620.281.00CumMachine mixing charges31.001.00Cum31.001.00CumCentring charges564.001.00Cum564.001.00CumVibrating charges31.501.00Cum31.501.50NosWoman Mazdoor101.001.00Cum151.50Add TOT@4%123.60TOTAL3213.653Cost,supply and fabrication charges of steel including cost of binding wire and all labourcharges etc.complete1.00KgCost and supply of steel28.001.00Kg28.001.00KgFabrication charges of steel4.001.00Kg4.00Add TOT@4%1.28TOTAL33.284Filling with gravel and rolling the formation with hand road roller irrespective of thickness including costand conveyance of all materials and all labour charges etc.complete.1.00CumCost of gravel187.201.00Cum187.201.00CumLabour charges165.0010.00Cum16.50Add TOT@2%4.07TOTAL207.77Asst.Executive EngineerPR(spl),Ichapuram