IENG 217 Cost Estimating for Engineers. Operation Estimating. Tooling. Estimated Operation Cost. Direct Labor. Prime Cost. Direct Material. Operation Cost Elements. Turning Operation. Operation Time. t pr = total process time = machine time + handling time + tool change time - PowerPoint PPT Presentation

Citation preview

Page 1: IENG 217 Cost Estimating for Engineers

IENG 217Cost Estimating for

Engineers

Operation Estimating

Page 2: IENG 217 Cost Estimating for Engineers

Operation Cost Elements

Direct Material

Direct Labor

Tooling

Prime Cost

EstimatedOperation

Cost

Page 3: IENG 217 Cost Estimating for Engineers
Page 4: IENG 217 Cost Estimating for Engineers

Turning Operation

Page 5: IENG 217 Cost Estimating for Engineers

Operation Time tpr = total process time = machine time + handling time + tool change time

= tm + th + tc(tm/T)where

tm = machine time

th = time to load/unload machine

tc = time to change a tool

(tm/t) = no. parts that can be produced before a tool change is required

T = life of a tool

Page 6: IENG 217 Cost Estimating for Engineers

Operation Time

cpr = production cost

= batch cost + machine cost + tool cost

cc

Nc t t

t

Tt c

t

T

where

c

total machine operator rate

c of tool

N batch size

prb

bo m h

mc pt

m

b

pt

b

( ) ( )

&

cost of batch setup

c

costo

Page 7: IENG 217 Cost Estimating for Engineers

Machining Time Function of rate of processing

t tool path length feed speed

L

f N

where

f feed inches tooth revolution

N rpm

m

/

( / / )

Page 8: IENG 217 Cost Estimating for Engineers

Machining Time Function of rate of processing

t tool path length feed speed

L

f N

L

fVD

L D

f V

m

/

12 12

Page 9: IENG 217 Cost Estimating for Engineers

Example 3” diameter piece to be turned to 2.8” diameter,

length of stock to be turned is 10”, f = 0.01”/rev., V = cut speed = 200 fpm, d = depth of cut = .2”.

Find machine processing time

Page 10: IENG 217 Cost Estimating for Engineers

Tool Life V

V

t

T

where

n

V cutting speed

T tool life

V ref cutting speed

t ref tool life

r

rn

r

r

FHIK

constant

.

.

n

r

r T

t

V

V

Page 11: IENG 217 Cost Estimating for Engineers

Tool Life

V

V

t

T

TV

Vt

Tt V

V

C

V

r

rn

n rrn

r rn

n

FHIK

1

1

/

/

n

r

r T

t

V

V

Page 12: IENG 217 Cost Estimating for Engineers

Example

HSS cutter; at 250 sfpm tool lasts 30 min; at 100 sfpm tool lasts 60 min. Find tool life eq.

Page 13: IENG 217 Cost Estimating for Engineers

Operation Time

tpr = total process time

= machine time + handling time + tool change time

= tm + th + tc(tm/T)

cc

Nc t t

t

Tt c

t

Tprb

bo m h

mc pt

m ( ) ( )

Page 14: IENG 217 Cost Estimating for Engineers

Operation Time

tpr = total process time

= machine time + handling time + tool change time

= tm + th + tc(tm/T)

cc

Nc t t

t

Tt c

t

Tprb

bo m h

mc pt

m ( ) ( )

Q: Do we want to minimize processing time or do we want to minimize part cost?

Page 15: IENG 217 Cost Estimating for Engineers

Example Turning operation; L=10 inches, D = 3inches to

2.9 inches, feed = 0.1 inch/rev, load and unload = 2 min, cutter change = 3 min, tool life given by

T = 1.7x105 V-1.7, Co = $35/hr, Cpt = $3 / cutter

Page 16: IENG 217 Cost Estimating for Engineers

Example Turning operation; L=10 inches, D = 3inches to 2.9 inches, feed = 0.1

inch/rev, load and unload = 2 min, cutter change = 3 min, tool life given by T = 1.7x105 V-1.7, Co = $35/hr, Cpt = $3 / cutter

nV

D

VV

V fn V V

tL

V VV

f

mf

12 123 2 9

2

1 273

0 1 1 273 1273

10

127378 5 1

. .

. ( . ) .

.

Page 17: IENG 217 Cost Estimating for Engineers

Example

tL

V VV

t t t t t T

VV

x V

V V

mf

pr m h c m

FHG

IKJ

10

127378 5

78 5 2 378 5

1 7 10

78 5 2 001386

1

11

5 1 7

1 1

.

( / )

..

.

. .

. 715

1

1071

578..

.

Vx

V

Page 18: IENG 217 Cost Estimating for Engineers
Page 19: IENG 217 Cost Estimating for Engineers

Operations Analysis Factual time and cost estimating catalogues Product design Process knowledge Operations sheet preparation Time and cost finding

Page 20: IENG 217 Cost Estimating for Engineers

Time Elements Setup time Cycle time

Page 21: IENG 217 Cost Estimating for Engineers

Setup TimeElement Time (hrs)Punch in, study drawing 0.2Turning Equipment First machining tool 0.8 Additional tool 0.3 Collet 0.2 Fixture 0.2Milling Equipment Vise 0.6 Fixture 1.2 Collet 0.5Drilling Equipment Fixture 0.3 Vise 0.1 First Spindle 0.7 Additional spindles 0.4Total Setup Time 5.5

Page 22: IENG 217 Cost Estimating for Engineers

Cycle Time Elements Element Time (min) Time (min)General Start/stop machine 0.10 Air clean part 0.09 Brush chips 0.12 Inspect w/micrometer 0.30 Total General 0.61Turning Equipment Advance/Index turret 0.08 Cross slide adv/index 0.09 Advance stock 0.23 Place guard / start 0.16 Total Turn Specific 0.56Milling Equipment 1.8Drilling 1.2Total Setup Time 4.17

Page 23: IENG 217 Cost Estimating for Engineers

Product Design

Page 24: IENG 217 Cost Estimating for Engineers

Process knowledge

Workstation Ops. No. DescriptionTurret Lathe 10 Turn and cutoffVertical Mill 20 End Mill SlotHorizontal Mill 30 Slab Mill FlatNC Drill Press 40 Drill and Tap Holes

Page 25: IENG 217 Cost Estimating for Engineers

Operations Sheet

Page 26: IENG 217 Cost Estimating for Engineers

Cost Estimates Design Length 18.750Facing Length 0.015Cutoff Length 0.187Total Length 18.952Units / 12 ft bar stock 7.598Units / 12 ft bar stock 7Bars per Lot (200) 28.571Bars per Lot (200) 29Cost per bar (8.178 lb/ft x 12 ft x $1.5/lb) $147.20Lot Cost (bars/lot x cost per bar) $4,268.92Cost per unit (Lot Cost/Lot Size $21.34Material Yield (200 x fl / total length) 89.8%

Page 27: IENG 217 Cost Estimating for Engineers

Setup & Cycle for Operation 10Setup Elements Punch in, study drawing 0.2 First machining tool 0.8 Additional tool 0.3 Collet 0.2 Fixture 0.2Total Setup, Oper 10 1.7

Handling Start/stop machine 0.10 Advance stock 0.23 Brush chips 0.12 Place guard / start 0.16 Advance/Index turret 0.08 Cross slide adv/index 0.09 Inspect w/micrometer 0.30Total Handling 1.08

Machining Times Dimension Depth Length Safety Stc Length Diameter Velocity feed Min Face 1.45 0.015 0.875 1/32 0.906 1.75 350 0.007 0.17 Rough turn 1.15 0.15 16.5 1/32 16.531 1.75 350 0.015 1.44 Rough turn 1.10 0.15 16.5 1/32 16.531 1.45 350 0.015 1.19 Finish turn 1.735 0.025 16.5 1/32 16.531 1.15 350 0.007 2.03 Turn 1.75 0.0075 0.5 1/32 0.531 1.75 350 0.007 0.1 Cutoff 0.187 0.875 1/32 0.906 1.75 350 0.015 0.08Total Mach. Time 5.01Total Cycle Time 6.09

Entry for Opr 10 to Ops Sht. Setup hr 1.7 Hrs/100 units 10.15